[00:00:03]
[*A portion of this meeting is missing content during Item 14*]
RIGHT.THIS IS SUSIE CLIFTON FROM ERCOT.
BEFORE WE GET STARTED WITH TODAY'S TAC MEETING, I'M VERY QUICKLY GOING TO RUN THROUGH THE MEETING ROOM REMINDERS.
UM, IF YOU'RE SITTING HERE IN THE ROOM, YOU HAVE TWO OPTIONS TO GET INTO THE CA UH, CHAT TO QUEUE FOR MOTIONS OR DISCUSSIONS.
YOU CAN EITHER HOLD YOUR CARD UP AND JORDAN'S IN THE RIGHT HAND CORNER OF THE ROOM AND HE'LL ENTER YOU INTO THE CHAT, OR YOU CAN ENTER YOURSELF DIRECTLY IF YOU ARE LOGGED IN TODAY.
OF COURSE, THOSE OF YOU ON THE WEBEX WILL BE, UH, ENTERING YOURSELF IN THE CHAT AS WE APPROACH THE VOTING PROCESS AND BALLOTING.
IF YOU ARE A SEATED REPRESENTATIVE, PLEASE MAKE SURE IF TO UNMUTE YOURSELF AND THEN RETURN TO THE MUTE FUNCTION AFTER YOU CAST YOUR VOTE.
THAT'LL HELP US BE A LITTLE BIT MORE EFFICIENT WITH THAT BALLOTING PROCESS.
IF YOU'RE HERE IN PERSON TODAY, PLEASE MAKE SURE TO SIGN IN IN THE SIGN IN SHEET OUTSIDE THE MEETING ROOM, AND IF THE WEBEX ENDS FOR ANY REASON, WE WILL GO AHEAD AND RESTART THE MEETING WITH THE SAME WEBEX DETAILS.
UH, IF ANYTHING CHANGES, WE'LL SEND THAT TO THE T LIST SERVE.
AND CAITLIN, WE DO HAVE A QUORUM THIS MORNING AND ARE READY TO BEGIN WHEN YOU ARE.
SORRY, I'M DOING MY VALIDATION, WHICH CAN WAIT, BUT I HAD COPIED AND SO I HAD TO HIT PASTE.
[1. Antitrust Admonition]
SCREEN IS THE ANTITRUST ADMONITION.TO AVOID RAISING CONCERNS ABOUT ANTITRUST LIABILITY, PARTICIPANTS IN NARCOTIC ACTIVITIES SHOULD REFRAIN FROM PROPOSING ANY ACTION OR MEASURE THAT WOULD EXCEED OR CAUSES AUTHORITY UNDER FEDERAL OR STATE LAW.
AND THERE IS MORE INFORMATION ON THE WEBSITE.
UM, FIRST FOR ALT REPS AND PROXIES IN THE COOPERATIVE SEGMENT.
BLAKE HOLT HAS ALT REP TREVOR SAFCO, UM, IN THE INVESTOR U OWNED UTILITY SEGMENT, KEITH NICKS WITH, UH, TNMP HAS ALT REP ROB BEVEL AND DAVID MERCADO WITH CENTERPOINT HAS ALT REP, EBY, JOHN, AND THE MUNICIPAL SEGMENT, UH, JOSE WITH DENTON HAS ALT REP ANDREW KIEFER.
DID I MISS ANY? THAT'S CORRECT.
UM, WE HAVE A FEW ANNOUNCEMENTS.
UH, WE, WE HAVE SEVERAL AGENDA ORDER CHANGES, UM, DUE TO SCHEDULING.
SO WE WILL TAKE UP THE LLWG REPORT AND THE, THE LOAD INTERCONNECTION STATUS UPDATE AFTER PRS.
UM, WE WILL HAVE LUNCH PROBABLY AROUND 1230.
WE ARE TRYING SOMETHING NEW, UM, DELIVERIES FROM LUNG LUNCH DROP E ERIC HAS QR CODES.
I GUESS I HAVE ONE ON MY DESK BUT DON'T, LIKE, DON'T COME TAKE IT FROM ME.
UM, BUT HE PASSED THEM OUT AND YOU NEED TO ORDER LUNCH BY 10.
WE WILL, I THINK IT WILL BE DELIVERED BETWEEN 12 AND 1230.
SO WE WILL LOOK TO TAKE LUNCH AROUND 1230 WHEN WE RETURN FROM LUNCH.
WE WILL FIRST DO, UM, THE PC UPDATE ON ANCILLARY SERVICE COST ALLOCATION STUDY AND THEN THE SEPTEMBER BOARD STAKEHOLDER ENGAGEMENT UPDATE.
AND THEN WE WILL START SORT OF OUR MAIN EVENT AFTER LUNCH.
THE ANCILLARY SERVICE METHODOLOGY, UM, PROBABLY AROUND ONE 15.
AND THE THEME OF THE MONTH IS EFFICIENCY AND THAT'S WHY WE'RE HAVING A MEETING UNTIL 4:00 PM
DON'T LOOK AT ME LIKE THAT, BRIAN.
UM, IT DEPENDS ON HOW LONG THE ANCILLARY SERVICE, UH, METHODOLOGY CONVERSATION TAKES, I THINK.
BUT WE ARE PREPARED TO GO FOR A FEW HOURS AFTER LUNCH AND KEITH HAS HEALTHY SNACKS.
[2. Approval of TAC Meeting Minutes (Vote)]
SO WE WILL START WITH THE MEETING MINUTES.UM, WE, I DON'T BELIEVE WE HAD ANY SUGGESTED EDITS OR CORRECTIONS.
SO WE ARE LOOKING TO APPROVE THE JULY 30TH MEETING MINUTES AS SUBMITTED.
IS THAT CORRECT? DOES ANYONE HAVE COMMENTS? UM, OR CAN WE PUT THIS ON THE COMBO BALLOT? OKAY.
[3. Meeting Updates]
OPEN MEETINGS, UM, OR THE MEETING UPDATES.THIS IS WHERE WE JUST GO OVER THE, THE MEETINGS WE'VE HAD SINCE TAC THE BOARD MEETINGS ARE OPEN MEETINGS.
THEY DID HAVE, UH, A COUPLE OPEN MEETINGS, BUT AT THE JULY 31ST OPEN MEETING, THEY APPROVED EVERY, ALL THE REVISION REQUESTS FROM THE JUNE BOARD.
[4. Biennial TAC/TAC Subcommittee Structural and Procedural Review Update]
WE ARE TO[00:05:01]
THE BIENNIAL TECH AND TECH SUBCOMMITTEE, STRUCTURAL AND REVIEW, STRUCTURAL AND PROCEDURAL REVIEW UPDATE.SO ABOUT TWO WEEKS AGO, WE HELD OUR BIENNIAL, UM, REVIEW.
WE USED TO DO THIS EVERY YEAR.
WE ARE NOW DOING IT EVERY OTHER YEAR, WHICH I THINK, YOU KNOW, HAD THE INTENDED EFFECT OF, OF BEING A LITTLE BIT MORE PRODUCTIVE.
UM, THANK YOU TO ALL THE SUBCOMMITTEES AND WORKING GROUPS FOR PARTICIPATING.
UM, AND, AND I KNOW IT WAS A LOT OF WORK AND THEY PROVIDED A LOT OF INFORMATION.
ALL OF THOSE MATERIALS ARE POSTED TO THIS MEETING SITE.
UM, AND I, I THINK I WOULD CALL YOUR ATTENTION, THERE IS ONE VERY GOOD CHART THAT SU AND ANN OR SOMEBODY PUT TOGETHER WITH, WITH ALL THE DIFFERENT KIND, HOW, HOW OFTEN MEETINGS MET, HOW, HOW LONG THEY TOOK, HOW MANY PEOPLE WERE THERE.
UM, AND I, I THINK THAT'S HELPFUL IF PEOPLE WANNA TAKE A LOOK AT IT.
WE HAD, UH, SEVERAL SUBSTANTIVE RECOMMENDATIONS COMING OUT OF THAT REVIEW.
UM, UNDER RMS, THERE WAS A RECOMMENDATION TO, I THINK ESSENTIALLY CONSOLIDATE PWG WITH TEXAS SET.
UM, ANOTHER SUGGESTION FROM WMS WAS TO ME, MOVE THE METERING WORKING GROUP FROM WMS TO ROSS.
AND THEN ALSO UNDER WMS, THERE WAS A SUGGESTION TO SUNSET BOTH, UH, RCWG AND THE MARKET SETTLEMENTS WORKING GROUP AND HAVE THOSE KIND OF SUBSTANTIVE TOPIC MATERIALS GO TO WHOLESALE MARKET WORKING GROUP INSTEAD.
AND DID YOU WANT TO TALK ABOUT THE NEXT STEPS FOR THOSE? YEAH, WE DO HAVE SOME GUIDANCE ON HOW TO DO THAT.
UM, WE DID LOOK THROUGH PROTOCOLS, GUIDES, PROCEDURES, AND THERE ARE SOME REFERENCES TO, UM, SPECIFICALLY PWG AND TEXAS SET AND THOSE DOCUMENTS.
SO THOSE WILL HAVE TO BE CHANGED AS WELL.
BUT WE CAN WORK WITH EACH OF THE SUBCOMMITTEE CHAIRS AND LET YOU KNOW, UM, WHAT ORDER WE NEED TO DO ALL OF THAT IN.
SO THOSE WILL NEXT BE TAKEN UP JUST AT THOSE SUBCOMMITTEES THEN.
SO AT, UM, RMS NETWORK, AT WMS, I THINK THOSE DISCUSSIONS WILL START, UM, KAYTON, SORRY.
UM,
I DON'T, WE DON'T HAVE TO DIRECT THEM TO WE, WE CAN IF WE WANT TO.
WE'RE SITTING IN A GROUP OF VERY HIGHLY QUALIFIED AND INTELLIGENT AND ENGAGED INDIVIDUALS.
AND I JUST WANTED TO MAKE SURE EVERYBODY HAD AN OPINION, YOU KNOW, THAT HAD AN OPINION COULD EXPRESS IT.
AND THIS MIC IS REALLY, REALLY LOUD.
I THINK, YOU KNOW, I FEEL LIKE THE SUBCOMMITTEES KNOW BETTER THAN I DO.
LIKE I RAISED, I THINK WHAT BECAME A SORT OF SILLY QUESTION ABOUT IS WHOLESALE MARKET WORKING GROUP THE RIGHT PLACE FOR MARKET SETTLEMENT WORKING GROUP? AND I, I DIDN'T GET A LOT OF RESPONSE, BUT I, I THINK I WOULD DEFER TO WMS ON WHAT THEY, WHAT THEY THINK.
SO I'M HAPPY TO TAKE DISCUSSION AND, AND IF WE HAVE DIRECTION TO THOSE, THOSE GROUPS.
BUT I THINK SOME OF THAT CAME OUT OF THE WORKSHOP TOO THAT, YOU KNOW, THAT IT, THEY HAD CONSENSUS TO, TO MOVE FORWARD WITH THOSE CHANGES.
BILL, IN TERMS OF LEVERAGING OUR EXTENSIVE KNOWLEDGE, UM, AND I DEFER TO THE, OBVIOUSLY THE WORKING GROUPS, BUT JUST THINKING OF THE COMBINATION OF THE PROFILING WORKING GROUP IN TEXAS SET, WE HAVE THE OPPORTUNITY HERE TO CREATE THE PET WORKING GROUP
AND SO I WOULD JUST OFFER THAT TO THOSE THAT ARE CONSIDERING WHAT THE COMBINED GROUP MAY BE CALLED.
THAT IS MY CONTRIBUTION AND MY EXTENSIVE EXPERIENCE.
IS THAT WHAT YOU WERE THINKING, BETH
UM, I WILL, I WILL SAY CAITLIN, THAT RMS HAS, UM, WE'LL GO THROUGH THIS DURING MY PRESENTATION, BUT THE RETAIL MARKET SUBCOMMITTEE LEADERSHIP, WE'VE DEVELOPED A TEAM AND, UM, REALLY THEY'RE VERY INVOLVED IN WORKING REALLY HARD.
HOWEVER, BOTH GROUPS ALREADY HAVE A LOT ON THEIR PLATE.
AND SO I'VE TOLD THEM, WE'LL WORK WITH YOU, JOHN AND I WORK WITH YOU IN YOUR DIRECTION, BUT YOU ABSOLUTELY HAVE TO FINISH THE THINGS THAT YOU'VE GOT IN PROGRESS RIGHT NOW.
SO THEY'VE HAD SOME JOINT MEETINGS, BUT, BUT NOT A GREAT DEAL.
BUT WE DID HAVE A LOT THAT CAME OUT OF THE MEETING ON AUGUST 12TH THAT REALLY HELPED US.
I THINK MAYBE IT WOULD BE MOST IMPORTANT TO ME FOLLOWING UP ON BEST QUESTION IF, IF SOMEBODY OBJECTED TO MOVING FORWARD WITH THAT, BUT I THINK OTHERWISE WE CAN LEAVE IT WITH THE
[00:10:01]
SUBCOMMITTEES.BUT I, I THINK IT WOULD BE BETTER TO KNOW OBJECTIONS NOW THAN TO HAVE THOSE GUIDE REVISIONS COME TO US AND US ALL OF A SUDDEN SAY, NO, WE DON'T LIKE THAT.
ANY OTHER DISCUSSION? ALL RIGHT.
UM, THE OTHER CONVERSATION WE HAD THERE WAS ON, UH, LATE FILED MATERIALS.
I THINK I AM JUST GOING TO TURN IT OVER TO ANNE AND THEN TO, UH, KATIE RICH FOR THIS.
SO AT THE BIENNIAL REVIEW, THERE WERE CONCERNS RAISED REGARDING CONSIDERATION OF LATE COMMENTS AND MATERIALS AT MARKET MEETINGS.
UM, SOME CONCERNS WERE THAT PEOPLE DON'T HAVE ENOUGH TIME OR ADEQUATE TIME TO START PREPARING FOR THOSE MEETINGS WHEN THOSE MATERIALS COME IN LATE.
UM, SO KATIE RICH HAD A SUGGESTION TO GIVE SUBCOMMITTEE LEADERSHIP A LITTLE BIT MORE DISCRETION TO DECIDE WHETHER OR NOT LATE ME LATE MATERIALS COULD BE CONSIDERED.
SO AT THE REVIEW, IT WAS DISCUSSED TO CHANGE THE SUBCOMMITTEE PROCEDURES.
HOWEVER, AFTER WE STARTED LOOKING INTO IT, UM, IT WILL REQUIRE PROTOCOL AND GUIDE CHANGES.
THE PROTOCOLS AND GUIDES DO CURRENTLY ALLOW COMMENTS ON A PRS REPORT TO BE CONSIDERED REGARDLESS OF WHEN THEY'RE FILED.
SO IT WILL TAKE PROTOCOL AND GUIDE CHANGES.
UM, AND I KNOW KATIE'S BEEN WORKING ON FILING NPR TO MAKE THESE CHANGES, TO GIVE SUBCOMMITTEE CHAIRS THAT DISCRETION TO CONSIDER THE LATE FILE COMMENTS.
UM, AND WE'VE BEEN WORKING WITH KA UH, KATIE ERCOT HAS ON SOME OF THE LANGUAGE AND THE NPR TO MAKE SURE IT DOES ACHIEVE WHAT SHE'S TRYING TO DO.
UM, HOWEVER, ERCOT IS CONTINUING TO ASSESS IF THERE ARE ANY UNINTENDED CONSEQUENCES OF THAT, ANY GOVERNANCE IMPLICATIONS AND PROCESS ISSUES.
SO WE'LL FILE COMMENTS IN THAT NORMAL STAKEHOLDER PROCESS WHEN THAT COMES THROUGH IF WE DO FIND ANYTHING.
AND SO I'LL LET KATIE KIND OF SPEAK TO HER NPR AS WELL.
SORRY, I WAS WAITING FOR THE MOTORCYCLE TO COME TO A NATURAL STOP.
UM, SO FIRST I JUST, I REALLY WANTED TO THANK ANNE, BRITTANY, COREY AND KEITH ON THE ERCOT SIDE FOR HELPING ME THINK THROUGH THIS CONCEPT AND, AND HELPING ME PUT IT INTO PRACTICE IN THE NPRR.
AND THANK YOU FOR FINDING A, UM, A MORE EFFICIENT PROCESS FOR, UM, APPROVAL OF THE GUIDE.
SO IT LOOKS LIKE IT WILL JUST BE THE NPR THAT HAS TO GO THROUGH THE PROCESS, AND THEN THERE'S AN ADMINISTRATIVE PIECE TO IT WHERE ALL OF THE GUIDES THAT HAVE THE ASSOCIATED CHANGES WILL, WILL COME THROUGH.
SO I'M NOT FILING NINE REVISION REQUESTS FOR YOU TODAY.
I'M FILING ONE NPRR FOR YOU TODAY.
UM, AND THEN I REALLY WANTED TO THANK THE, THE SUBCOMMITTEE LEADERSHIP FOR, FOR THEIR INPUT AND SUPPORT ON THIS.
UM, NOT SURE I COULD HAVE MADE IT HAPPEN WITHOUT YOU GUYS, SO THANK YOU VERY MUCH.
AND, UH, THE NPR WILL COME OUT BY THE END OF THE DAY.
BRITTANY AND I ARE WORKING ON IT RIGHT NOW, SO THAT WILL BE WELL IN ADVANCE OF THE PRS MEETING.
I WOULD PROBABLY SAY LET'S HOLD OFF ON ANYTHING TODAY.
I AM NOT ASKING FOR TAC APPROVAL.
T TAC APPROVAL WILL COME ONCE IT'S GONE THROUGH ALL OF THE SUBCOMMITTEES.
SO IF YOU HAVE QUESTIONS FOR ME AFTER IT GETS FILED TODAY, PLEASE, UH, FEEL FREE TO REACH OUT.
UM, CLAYTON GREER IN THE CHAT.
IT, WELL, I, I DIDN'T NEED TO TALK, BUT I MEAN, I THINK WE ALL KNOW THAT PRS IS DIFFERENT THAN, THAN THE REST OF THE GROUPS.
IF YOU BRING SOMETHING LATE TO THE REST OF THE GROUPS, I THINK THERE'S PLENTY OF LATITUDE YOU CAN GIVE THEM TO REJECT, YOU KNOW, LATE FILE COMMENTS.
BUT AT, AT THE PRS, WE KIND OF LEAVE THAT OPEN MORE BECAUSE THAT IS THE APPEALS ROUTE, UM, THROUGH THE COMMISSION.
SO WE WANTED TO TRY TO BE AS FAIR AS POSSIBLE.
ANY OTHER DISCUSSION? UM, AND, AND THANKS KATIE.
I, I THINK THAT'S BEST TO KIND OF, SINCE YOU HAVE A PROPOSAL READY TO GO, LET'S JUST LET THAT GO THROUGH THE PROCESS IN CASE.
BUT IF, IF ANYBODY HAS, YOU KNOW, OTHER COMMENTS ON THIS TOPIC BROADLY FROM THE, THE WORKSHOP, I'M HAPPY TO HEAR THOSE NOW.
UM, I GUESS THE, THE QUESTION I HAD THAT IT SOUNDS LIKE YOU ARE ALREADY LOOKING AT IS, I, I THINK THIS SECTION OF THE PROTOCOLS IS SORT OF THE REQUIRED PUBLIC COMMENT SECTION.
AND SO, SO THAT'S HOW I VIEW IT IN MY MIND.
SO ARE WE, YOU KNOW, DOES THAT IMPACT ON, ON OUR ABILITY TO, TO MAKE SURE EVERYBODY GETS HEARD? THAT KIND OF THING? I DON'T NEED AN ANSWER NOW THAT, THAT WAS JUST SORT OF THE, THE LENS IN WHICH I'M VIEWING IT.
CAN I, CAN I RESPOND TO THAT QUICKLY THOUGH? YEAH, BECAUSE I, I SEE TWO WAYS OF PEOPLE GETTING HEARD.
ONE, WE WANNA RECOGNIZE WHEN FOLKS DO TAKE
[00:15:01]
THE TIME INITIATIVE AND THOUGHT TO PUT TOGETHER COMMENTS.AND THEN THERE'S ALSO THE PUBLIC COMMENT PIECE, RIGHT? COMING TO THE MEETINGS BEING IN THE QUEUE.
SO I WANT TO MAKE SURE THAT EVERYBODY KNOWS THAT THEY WILL BE HEARD.
UM, AND SO REGARDLESS OF WHAT WE DO IN HERE, THERE IS NOTHING THAT WOULD EVER SHUT DOWN PEOPLE'S PUBLIC COMMENTS ON THAT.
SO JUST WANTED TO SAY THAT ON THE RECORD.
UM, WE ARE NOW HAVE A PRIORITIZATION WORKSHOP UPDATE.
AMANDA FRASIER WITH TREATY OAK CLEAN ENERGY.
AND SPEAKING OF LATE FILED MATERIALS, I JUST REALIZED MY SLIDES WERE STUCK IN MY OUTBOX.
I'VE JUST GOTTEN THEM TO STAKEHOLDER SERVICES.
THE WORKSHOP WAS MONDAY THOUGH, SO IT'S FINE.
I'VE HAD 48 HOURS MONDAY AFTERNOON.
UM, SO IF IT'S OKAY, I'LL GIVE YOU A SECOND TO PULL 'EM UP.
LET ME SEND THEM DIRECTLY TO YOU.
C WHAT DO YOU THINK IS BEST FOR YOU TO, UM, CAN YOU ACCESS CRAFT? IT'LL TAKE ME A FEW MINUTES TO LOAD IT AND CRAFTER, I JUST GOT THEM FASTER.
DO YOU WANNA, SHOULD WE DO SOMETHING ELSE WHILE YOU'RE LOADING IT? YEAH, YOU NEED TO MOVE TO SOMETHING ELSE.
[6. Review of Revision Request Summary/ERCOT Market Impact Statement/Opinions]
LET'S MOVE, UM, TO THE REVISION REQUEST SUMMARY OR CUT MARKET IMPACT STATEMENTS AND OPINIONS.UM, SO WE HAVE 11 REVISION REQUESTS FOR TAC CONSIDERATION MINUS THE TABLED ONE, UM, THAT WILL REMAIN TABLED.
UM, WE HAVE SEVEN THAT ARE FALLING IN THAT GENERAL, UM, SYSTEM PROCESS IMPROVEMENTS, CATEGORY TWO THAT ARE REGULATORY AND TWO THAT HIT THAT, UM, STRATEGIC PLAN.
UM, BUCKET ERCOT DOES SUPPORT ALL OF THE REVISION REQUESTS THAT ARE HERE FOR CONSIDERATION.
UM, IMM SUPPORTS 1279 AND THEN NO OPINION ON THE REST.
AND THEN CFSG DID REVIEW ALL OF THESE.
NONE OF THEM HAVE CREDIT IMPLICATIONS.
THEY DO ACKNOWLEDGE THAT 1290, UM, UPDATES USAGE OF THE SYSTEM-WIDE OFFER CAP.
ANY IMM WANT TO ADD ANYTHING? I DON'T THINK SO.
SHOULD WE, SUSIE, ARE WE READY? NO, WE'RE NOT READY YET.
[7. PRS Report (Vote) (Part 1 of 2)]
MOVE TO PRS.UM, I THINK THESE ARE ALL UNOPPOSED.
SO DIANA, WHY DON'T YOU GO THROUGH YOUR REPORT AND THEN WE WILL TAKE IT FROM THERE.
DIANA COLEMAN WITH CPS ENERGY WITH THE AUGUST PRS REPORT.
THE FIRST ITEM WE HAVE FOR TAX CONSIDERATION IS 1266 ON JULY 16TH, PRS VOTED UNANIMOUSLY TO RECOMMEND APPROVAL AS AMENDED BY THE MAY 5TH.
ERCOT COMMENTS ON AUGUST 13TH, WE VOTED TO UNANIMOUSLY ENDORSE AND FORWARD TO ATTACK THE JULY 16TH, 2025 PRS REPORT AND THE DECEMBER 31ST, 2024 IA WITH A RECOMMENDED EFFECTIVE DATE OF MARCH 1ST, 2026 NPRR 1279.
ON JULY 16TH, WE VOTED UNANIMOUSLY TO RECOMMEND APPROVAL AS SUBMITTED.
ON AUGUST 13TH, WE VOTED UNANIMOUSLY TO ENDORSE AND FORWARD TO TAG THE JULY 16TH PRS REPORT AND THE AUGUST 6TH IA WITH A RECOMMENDED SUNSET DATE OF APRIL 1ST, 2020 7, 12 83.
ON JULY 16TH, WE VOTED UNANIMOUSLY TO RECOMMEND APPROVAL AS SUBMITTED.
AND THEN ON AUGUST 13TH, WE VOTED UNANIMOUSLY TO ENDORSE AND FORWARD TO ATTACK THE JULY 16TH PRS REPORT AND THE APRIL 29TH, 2025 IA WITH THE RECOMMENDED EFFECTIVE DATE OF JANUARY 1ST, 2026.
AND THEN WE ALSO HAVE A SYSTEM CHANGE REQUEST 8 32.
THIS, UH, ON JULY 16TH, WE VOTED UNANIMOUSLY TO RECOMMEND APPROVAL AS SUBMITTED.
AND THEN ON AUGUST 13TH, WE VOTED UNANIMOUSLY TO ENDORSE AND FORWARD TO TAG THE JULY 16TH PRS REPORT IN THE JUNE 24TH IA.
AND I'LL PAUSE THERE, CAITLYN.
UM, ON WHERE IS THIS ON NPR 1291? DID WE NEED TO LOOK AT THAT? YES.
I THINK THERE WAS SOME GRAY BOX LANGUAGE OR SOMETHING WITH A RECOMMENDED EFFECTIVE DATE UPON SYSTEM IMPLEMENTATION FOR THE GRAY BOX LANGUAGE AND
[00:20:01]
THE FIRST MONTH FOLLOWING PUCT APPROVAL FOR ALL REMAINING LANGUAGE.SHOULD WE LOOK AT THAT, CORY OR ANN, OR DO YOU THINK IT'S FINE? YEAH, WE'RE JUST CLARIFYING THERE THAT THE GRAY BOX LANGUAGE WILL GO IN UPON SYSTEM IMPLEMENTATION AND THEN THE REST OF IT WILL GO, UM, UPON PUC APPROVAL.
1291 HAS THE DISTINCTION OF HAVING A MIXTURE OF RED LINES AND, YOU KNOW, SO RED LINES, YOU'RE ALL USED TO SEEING THOSE, BUT THEN ALSO CARL AND COMPANY PRE BOX SOME STUFF TOO.
SO IT'S ONLY THE GRAY BOXES THAT NEED THE SYSTEM IMPLEMENTATION.
EVERYTHING THAT'S RED LINED IS WHAT CAN TAKE EFFECT UPON FIRST OF THE MONTH FOLLOWING PUC APPROVAL.
SO THAT CLARIFIED MOTION THAT KAITLYN READ OFF IS TO MAKE SURE THAT WE'RE NOT TRYING TO THROW EVERYTHING IN THE GRAY BOX.
IT'S ONLY WHAT'S ALREADY GRAY BOX THAT NEEDS THE SYSTEM WORK.
AND ALL OF THESE OTHER THINGS ARE THE CLARIFICATIONS THAT CAN GO IN AFTER PSE APPROVAL.
SO A LITTLE WORDIER MOTION, BUT GETS TO THE RIGHT ANSWER, LAURIE.
UM, COMMENT ON 1265 FROM BOB MEYER.
YEAH, JUST REAL QUICKLY ON 1265, THIS IS PRIMARILY REPORTING RESIDENTIAL, UM, RESIDENTIAL DISTRIBUTED GENERATION.
I THINK IT'S REALLY IMPORTANT THAT WE CAPTURE THE DATE THAT THE DATA WAS ENTERED INTO THE SYSTEM, YOU KNOW, 30 YEARS FROM NOW OR 20 YEARS FROM NOW, THAT'S NOT GONNA BE THE SAME EQUIPMENT.
AND I THINK WE NEED TO JUST MAKE SURE THAT THAT'S REFLECTED IN THE DATABASE SO THAT WE KNOW THAT.
DO YOU NEED A RESPONSE FROM ERCOT ON THAT JUST TO COMMENT? NO.
ANY OTHER QUESTIONS OR COMMENTS ON ANY OF THESE REVISION REQUESTS? I, OKAY.
SO WE ARE LOOKING TO RECOMMEND APPROVAL OF NPR 1265 AS RECOMMENDED BY PRS IN THE EIGHT 13 PRS REPORT.
RECOMMENDED APPROVAL OF 1266 AS RECOMMENDED BY PRS IN THE EIGHT 13 PRS REPORT.
RECOMMEND APPROVAL OF NPR 1279 AS RECOMMENDED BY PRS IN THE EIGHT 13 PRS REPORT.
RECOMMENDED, RECOMMENDED APPROVAL OF 1283 AS RECOMMENDED BY PRS IN THE EIGHT 13 PRS REPORT.
RECOMMEND APPROVAL OF 1290 AS RECOMMENDED BY PRS IN THE EIGHT 13 PRS REPORT.
UM, THE LONG MOTION RECOMMENDED APPROVAL OF 1291 AS RECOMMENDED BY PRS IN THE EIGHT 13 PRS REPORT WITH A RECOMMENDED EFFECTIVE DATE OF UPON SYSTEM IMPLEMENTATION FOR THE GRAY BOX LANGUAGE AND THE FIRST OF THE MONTH FOLLOWING PUC APPROVAL FOR ALL REMAINING LANGUAGE.
AND THEN RECOMMEND APPROVAL OF SCR 8 32 AS RECOMMENDED BY PRS IN THE EIGHT 13 PRS REPORT.
CAN WE PUT THOSE ON THE COMBO? ALL RIGHT, IKA.
YEAH, I JUST, UH, ANNOUNCE REGARDING 1266.
IF YOU DID NOT NOTICE ON READY, WE OPEN DOCKET 5 8 5 3 1 REGARDING THE IZATION, UH, D UH, EXEMPT CUSTOMER LIST AND HOW WE ARE GONNA PROCESS IF THERE IS ANY CHANGES, I JUST WANNA BRING TO YOUR ATTENTION, THAT'S ALL.
ANYBODY OBJECT TO PUTTING ALL OF THOSE ON THE COMBO BALLOT? BRIAN? NO, NO OBJECTION.
BUT MAYBE WE CAN JUST THROW THAT DOCKET NUMBER IN THE, UM, IN THE CHAT.
WHAT WAS THE 5 8 5 3 1 5 8 5 3 1.
CORY, DID WE GET THOSE ALL COMBOED? YES.
[5. Prioritization Workshop Update]
SO WE'RE BACK TO THE PRIORITIZATION WORKSHOP UPDATE.AND THANK YOU FOR, UH, FIXING MY MISTAKE IN GETTING THESE POSTED.
UM, SO WE HAD A WORKSHOP ON MONDAY AFTERNOON TO TALK THROUGH ERCOT RECOMMENDED PRIORITIZATION OF KIND OF ONGOING INITIATIVES.
UH, A LOT OF THESE ARE REPRESENTED AS NPRS OR OTHER REVISION REQUESTS, BUT SOME OF THEM ARE NOT.
SOME OF THEM ARE, ARE IDEAS OR THINGS THAT ARE STILL IN THE WORKS, UM, OR GOT PREPARED A SPREADSHEET THAT HAD KIND OF THEIR LIST OF THE INITIATIVES THAT THEY HAD OUTLINED AND THEIR RECOMMENDED KIND BASELINE FOR HOW THEY WOULD STRUCTURE, UM, THEIR PRIORITIZATION RECOMMENDATIONS.
[00:25:02]
UM, THERE WAS A, A, A LOT OF CONSENSUS AROUND THE ITEMS THAT ERCOT HAD DESIGNATED AS CRITICAL AND AS HIGH PRIORITY.UM, AND IN FACT, NOBODY RECOMMENDED TAKING ANY ITEMS OFF OF THE CRITICAL OR HIGH PRIORITY LIST.
UM, SIMILARLY, THERE WAS A LOT OF CONSENSUS AROUND ITEMS THAT ERCOT HAD DESIGNATED AS NEEDING NO ACTION.
THE CURRENT TIME, UM, THERE WERE A COUP, THERE WAS ANOTHER BOX OF THINGS THAT WERE LABELED AS POTENTIAL FOR REMOVAL.
AND THERE WAS SOME, WERE SOME COMMENTS AROUND SOME OF THOSE THAT MAYBE THEY SHOULD BE MOVED TO NO ACTION.
UM, BECAUSE IT WASN'T TIME YET TO, TO GET RID OF THEM AND OR ERCOT SHOULDN'T UNDERTAKE THE WORK THAT IT WOULD TAKE TO GET RID OF THEM.
THEY SHOULD JUST REMAIN PENDING, UM, BUT WITHOUT BEING PRIORITIZED FOR WORK.
AND THEN OF COURSE, THERE WAS A GOOD AMOUNT OF, UH, DISCUSSION AND DEBATE AROUND A NUMBER OF THE NBRS AND OTHER REVISION REQUESTS THAT HAD BEEN LABELED FOR MEDIUM PRIORITY.
AND, UH, MARKET PARTICIPANTS KIND OF WEIGHED IN ON SOME OF THOSE THAT THEY VIEWED SHOULD BE MOVED HIGHER IN PRIORITY OR CERTAINLY HIGHER IN RELATIVE PRIORITY TO OTHERS THAT WERE ON THE LIST.
SOME OF THE GENERAL FEEDBACK THAT, UM, ERCOT RECEIVED WAS THAT ERCOT SHOULD INCREASE STAFFING TO HELP DELIVER MORE THROUGHPUT OF THESE NPR R THAT IT WAS NOT LIKELY TO BE THE CASE THAT ONCE THE CURRENT BACK LOG IS COMPLETED, THAT UM, THERE WOULDN'T BE ADDITIONAL, UH, THINGS IN THE WORK.
AND SO THE, THE LEVEL OF WORK WAS LIKELY TO CONTINUE.
UM, ERCOT DID, YOU KNOW, RESPOND THAT JUST ADDING STAFF IS NOT GOING TO FIX OUR NEAR TERM PROBLEM WITH TRYING TO GET THROUGH THE, THE MATERIALS THAT WE KNOW NEED TO BE DELIVERED IN THE NEAR TERM.
UM, AND THAT IT WOULD REQUIRE TIME AND EFFORT TO TRAIN NEW STAFF TO, TO MAKE THAT HAPPEN.
THERE IS ALSO GENERAL FEEDBACK THAT, UM, THERE MAY BE A NEED TO DEVELOP PRINCIPLES FOR WHICH INITIATIVES DESERVE PRIORITY.
SO SOME EXAMPLES WERE GIVEN, INCLUDING NRS, THAT IMPACT PRICE FORMATION SHOULD DESERVE PRIORITY NRS THAT IMPACT A LARGE NUMBER OF MEGAWATTS COMPARED WITH OTHERS DESERVE PRIORITY.
AND SO THERE MAY BE A NEED IN THE FUTURE TO, TO, UM, WORK THROUGH SOME OF THOSE GUIDING PRINCIPLES.
ADDITIONAL FEEDBACK WAS THAT THERE ARE MANY INITIATIVES THAT WOULD, UH, BENEFIT FROM ADDITIONAL DISCUSSION BEFORE A FORMAL FILING OF AN NPRR.
SOME EXAMPLES WERE GIVEN WHERE AN NPR HAD BEEN FILED AND THEN NEEDED TO BE WITHDRAWN OR COMPLETELY REWORKED BECAUSE IT DIDN'T HAVE ENOUGH FEEDBACK ON THE FRONT END.
UM, OTHER COMMENTS THAT, YOU KNOW, ERCOT SHOULD USE MORE WHITE PAPERS OR THAT SORT OF APPROACH TO EDUCATE ON ISSUES AHEAD OF DRAFTING LANGUAGE.
UH, AND, AND THEN ALSO THAT NASCENT IDEAS SHOULD BE DISCUSSED IN THE STAKEHOLDER PROCESS AS COMPARED WITH SORT OF ONE-OFF CONVERSATIONS BETWEEN A MARKET PARTICIPANT AND ERCOT TO DEVELOP SOME OF THAT FEEDBACK EARLY IN THE PROCESS.
AND THEN FOURTH, KIND OF THE GENERAL FEEDBACK WAS THAT THERE MAY NEED TO BE SOME MORE FORMALIZED PROCESS FOR HOW ERCOT SOCIALIZES WHEN THEY'VE RUN INTO AN IMPLEMENTATION HURDLE.
UH, THE EXAMPLE WAS WITH RESPECT TO MBR RR 10 0 6, WHERE AS THEY WENT TO IMPLEMENT ERCOT, UM, DISCOVERED THAT THEY DIDN'T HAVE A CLEAN DATA SOURCE FOR WHICH TO BASE THEIR, UM, HOW THEY WOULD RUN THE RDPA NUMBERS.
AND SO THAT CAUSED A DELAY IN, UM, BEING IMPLEMENTED.
AND SO THERE MAY BE MORE WORK NEEDED ON.
HOW WOULD ERCOT, UH, RESOLVE SOME OF THOSE ISSUES THAT CAN'T BE RESOLVED INTERNALLY? I'LL NED I'LL TAKE YOUR QUESTION.
UM, IT WAS A GOOD, GOOD SYNOPSIS.
UM, YOU, YOU HAD MENTIONED THAT NO ONE HAD BROUGHT FORWARD, UM, PULLING ANYTHING OFF OF THE CRITICAL LIST.
AND I, I THINK SOME CONTEXT ON THAT MIGHT BE HELPFUL BECAUSE THERE WAS SOME DISCUSSION ABOUT THE ERCOT, UM, PRIORITIZATION OF THE RESIDENTIAL DEMAND RESPONSE NPRR.
AND I THINK, CORRECT ME IF I'M WRONG, BUT I THINK THE WAY THAT WAS CHARACTERIZED IS ERCOT IS PLANNING TO PRIORITIZE THEIR RESOURCES TOWARDS THAT.
BUT THE BEING ON THE CRITICAL LIST IS NOT, DOES NOT SIGNIFY STAKEHOLDER ALIGNMENT WITH
[00:30:01]
THAT VIEW, ESPECIALLY ON THAT PARTICULAR ONE.THERE'S, THERE SHOULD BE NO SURPRISE, I, I'VE VOICED CONCERNS BEFORE ABOUT HOW THAT, UM, WILL UNDERCUT PRICE FORMATION IN AN ENERGY ONLY MARKET AND HAVE, UH, SOME, SOME ISSUES TO WORK THROUGH.
WE'LL COME BACK TO THAT IN, IN DUE TIME.
SO WE DON'T NEED TO HAVE THAT DEBATE RIGHT NOW, BUT I DO WANNA FLAG THAT ONE PARTICULAR YEAH, THAT'S A GOOD CORRECTION.
SO, UM, THE FACT THAT THAT FOLKS SORT OF AGREED WITH WHAT, WHAT ISSUES WERE, UM, BEING PRIORITIZED DID NOT INDICATE THAT THEY WERE SUPPORTIVE OF, UM, THE CURRENT VERSIONS.
AND, BUT THAT I THINK THEY GENERALLY AGREED THAT THE TOPICS THAT WERE IDENTIFIED FOR DISCUSSION WERE THE RIGHT SET OF TOPICS GIVEN THE PRIORITIES OF THE COMMISSION, OF THE BOARD AND OTHER DECISION MAKERS.
UM, SO THAT'S A, THAT'S A GOOD CLARIFICATION.
SO ON THIS FINAL PAGE, I THINK THERE ARE A COUPLE OF TAKEAWAYS FROM MY PERSPECTIVE OF THAT WE, UH, COULD USE SOME ADDITIONAL FEEDBACK.
THE FIRST IS, SHOULD PRS AND DIANE, I'M GLAD YOU WALKED BACK IN THE ROOM, SHOULD PRS TAKE UP A FORMAL REPRIORITIZATION UM, EFFORT BASED ON THESE TYPES OF CONVERSATIONS? SO, YOU KNOW, PRS HAS A RANK AND PRIORITY THAT HAS BEEN ASSIGNED TO ALL OF THE EXISTING NPR, UM, IT, YOU KNOW, WORTH DISCUSSION AT PRS ON WHETHER IT'S TIME TO REVISIT THOSE AND KIND OF TAKE SOME OF THE INPUT THAT WE'VE RECEIVED THROUGH THE PRIORITIZATION WORKSHOP IN ORDER TO REWORK THAT LIST.
AND THEN, UM, SECOND, ARE FUTURE PRIORITIZATION WORKSHOPS USEFUL? AND, AND ESPECIALLY I WAS THINKING TO MAINTAIN AND DEVELOP THE LIST OF, UM, INITIATIVES THAT DON'T CURRENTLY HAVE AN NPRR ASSOCIATED WITH THEM SO THAT STAKEHOLDERS HAVE MORE TRANSPARENCY AROUND WHAT ARE THE GENERAL POLICY TOPICS THAT ARE, UM, DESERVING OF ERCOT RESOURCE ATTENTION.
CAN I, I HAVE A QUESTION ON, ON EACH OF THESE.
UM, SO ON THE FIRST ONE, THE FORMAL REPRIORITIZATION OF APPROVED NPR, CAN WE TALK THROUGH LOGISTICALLY WHAT THAT WOULD LOOK LIKE OR WHAT THAT MEANS? BECAUSE I THINK THE NPR ALL HAVE BOARD APPROVED IAS, AND SO WOULD THOSE ALL NEED TO BE RE BOARD APPROVED OR ARE WE TALKING ABOUT SOME OTHER PROCESS THAT COULD BE A AND QUESTION OR A AMANDA QUESTION OR KEITH QUESTION? I THINK TROY CAN PROBABLY OKAY.
SPEAK TO IT AS WELL, BUT, UM, KAITLYN'S RIGHT, THAT THE PRIORITY AND RANKS HAVE ALL BEEN APPROVED BY EITHER THE BOARD OR PUC ALREADY.
SO IF WE DID A FORMAL REPRIORITIZATION, I'M THINKING YOU WOULD HAVE TO GO BACK THROUGH THAT PROCESS.
HOWEVER, IF YOU DIDN'T CALL IT A FORMAL REPRIORITIZATION
BUT, YOU KNOW, IT'S ALREADY IN THE BOARD REPORTS, IT'S ALREADY IN THE PDC REPORTS, WHAT WAS APPROVED THROUGH THE STAKEHOLDER PROCESS.
CAITLIN'S IGNORING ME, SO I'LL FILL, I'M NOT IGNORING YOU BE GO AHEAD,
BUT, BUT TO THAT END, I, I THINK THE, THE, THE PRIORITIZATION ISSUE THAT WE SHOULD FOCUS ON FIRST IS WHAT'S THE NEXT SLUG OF STUFF THAT'S GOING TO BE IMPLEMENTED POST RTC AND, AND IT SEEMS LIKE TROY AND, AND ET AL MAY BE WORKING ON THAT.
AND THAT MAY BE THE DEFACTO NEXT SORT OF REPRIORITIZATION OF NPRS.
UM, BUT, UM, UM, WE DON'T NEED TO GO, I WOULD SUGGEST THAT GOING BACK TO THE BOARD TO REPRIORITIZE THE LIST IS NOT A WORTHY AND UH, NECESSARY PROCESS.
UM, BUT WE DO NEED TO UNDERSTAND WHAT, WHAT CO YOU KNOW, WE'VE, WE'VE BUILT UP A BACKLOG FOR THE LAST YEAR, SEVERAL MONTHS, AND SOMETHING'S GOTTA COME NEXT AND WE GOTTA HAVE SOME AS STAKEHOLDERS, I WOULD SUGGEST WE, IT'S IN OUR INTEREST TO UNDERSTAND WHAT'S COMING NEXT AND IN WHAT ORDER.
KEITH, DO YOU WANNA RESPOND TO THAT? YEAH, IN A WAY.
I THINK THAT'S KIND OF WHAT WE DID THE OTHER DAY.
UM, AND I THINK GIVEN THE INFORMATION WE GOT IN TERMS OF PARTICULARLY WHAT'S ON THE HIGH LIST, IN MY VIEW, THAT'S WHAT'S NEXT.
AND I THINK TROY'S HOMEWORK IS TO SAY, OKAY, I GOT THE HIGH STUFF.
DEVELOP KIND OF THAT PLAN BASED ON THAT INFORMATION SO THAT WE CAN, 'CAUSE WE KNOW RTC IS IT'S, IT'S GONNA COME TO AN END AND
[00:35:01]
WHAT DO WE IMMEDIATELY GOT READY TO GO? AND I THINK HE'S, HE'S GONNA START WORKING ON THAT AND, AND BRING THAT BACK IN TERMS OF WHAT THAT PLAN WILL BE.AND THEN THERE'LL BE MORE BITES OF THE APPLE, UH, EVENTUALLY.
BUT I THINK THE INITIAL PLAN, I THINK WE GOT, AND TROY'S GONNA WORK ON THAT.
OKAY, CLAYTON? YEAH, I JUST, YOU MIGHT WANT TO CHANGE THE, THE WAY THAT THE DOCUMENTS READ WHENEVER THEY GET APPROVED BY THE BOARD AND THE PUC IF IT'S NOT OFFICIAL WHENEVER THEY, PARDON ME.
'CAUSE IF THEY'RE APPROVING THE PRIORITIZATION, THAT SEEMS LIKE YOU HAVE TO GO THROUGH THE SAME FORMAL PROCESS TO UNP PRIORITIZE THOSE.
JUST SAYING YOU SORT OF TRAILED OUT AND I'M, I'M NOT SURE I UNDERSTOOD THE, THE POINT JUST WELL, YOU'RE NOT THE BOSS OF THEM, SO IF THEY'VE APPROVED IT, YOU CAN'T UNAPPROVE IT.
SO IF YOU PRIOR, SO I MEAN, I WOULD JUST LIST THOSE AS, OKAY, SO WHEN WE, IF WE DO IT INFORMALLY, JUST PUT FOR INFORMATION ONLY OR SOMETHING ON IT.
WELL, I WOULD SAY WHENEVER YOU'RE ORIGINALLY GOING FOR APPROVAL OF, OF THE NPR R YOU NEED TO MAKE SURE THAT THAT PRIORITIZATION IS LISTED AS IN FOR INFORMATION ONLY OR CURRENT PRIORITIZATION.
SO I THINK THAT WOULD TAKE PROTOCOL CHANGE THAT THEY WOULD HAVE TO APPROVE FIRST
I JUST DON'T KNOW HOW, YOU KNOW, PRS AND TCC APPROVE A DIFFERENT LIST THAN WHAT HAS ALREADY BEEN APPROVED BY THE, THE BOARD ON THE COMMISSION.
RICHARD, ARE WE, IF IF WE'RE DONE WITH THIS, THEN I WON'T SAY ANYTHING ELSE, BUT IF WE'RE GONNA KEEP TALKING ABOUT IT, I WILL.
IT'S UP TO YOU IF YOU SHOULD TALK ABOUT IT.
WE'RE NOT DONE UNTIL, OKAY, WE'RE DONE.
AMANDA, WHAT DO YOU WANT? I MEAN, I MEAN, I MEAN WE'VE, WE'VE ESTABLISHED THAT WE CAN'T CHANGE WHAT THE COMMISSION HAS ALREADY DONE WITHOUT GOING TO THE COMMISSION TO CHANGE WHAT THEY'VE ALREADY DONE.
UM, MY THOUGHT WITH WHAT YOU'VE ASKED IS IF YOU LOOK AT THE LIST AND YOU SEE A BIG UGLY SPOT WHERE SOMETHING'S JUST BASICALLY WRONG, DON'T CALL IT, HEY, I'M DOING A FORMAL REVIEW.
BUT IF THERE'S A BLATANT PROBLEM THAT WE NEED TO RELABEL SOMETHING, HEY, I'M ALL FOR ENTERTAINING.
BUT IF THERE'S NOT A BIG UGLY SPOT THAT NEEDS TO BE REPRIORITIZED, THEN MOVE ON AND WORK ON BETTER THINGS.
I AGREE WITH WHAT BETH SAID ABOUT, HEY, WHAT'S NEXT? AND WE NEED TO UNDERSTAND WHAT IT IS.
BUT I DON'T, I I DON'T THINK, I DON'T IF IF YOU WANT ANYTHING BEYOND THAT, I, I NEED TO UNDERSTAND WHAT WE NEED TO DO HERE.
CAN TROY WALK US THROUGH SOME OF THOSE OR? YEAH, LET'S SURE.
GO TO TROY CAN, I'M OVER HERE IN COREY'S SPOT BY THE WAY.
UM, ONE IDEA CHATTING HERE WITH MATT, PERHAPS WHAT WE'RE REALLY TALKING ABOUT IS NOT REPRIORITIZATION.
IT'S A, IS DEVELOPING A RELEASE PLAN FOR ALL THESE ITEMS, YOU KNOW, THAT ARE, THAT ARE, UH, ON THIS, UH, BACKLOG.
AND AS THE PORTFOLIO MANAGER, I BELIEVE IT'S MY DUTY TO TAKE THE INPUT FOR MONDAY, TRY TO LAY OUT WHAT A RELEASE PLAN COULD LOOK LIKE SO THAT WE CAN ALL THEN COME TO GRIPS WITH WHAT'S LIKELY TO BE WORKED ON NEXT YEAR AND THE FOLLOWING YEAR, AND WHAT ITEMS ARE PROBABLY SLIPPING INTO YEARS AFTER THAT.
IN TERMS OF PRIORITIES THAT YOU'RE CONSIDERING HERE TODAY, WE'VE KINDA TAKEN INTO ACCOUNT THE FACT THAT THIS PROCESS WAS GOING ON IN PARALLEL.
SO THE THINGS THAT WERE RECOMMENDED, UM, FOR 2026, FOR EXAMPLE, ARE LEGITIMATE 2026 ITEMS TYPICALLY 'CAUSE THEY'RE IN A DIFFERENT PATH THAN THE MMS AREA WHERE WE HAVE THE MOST, YOU KNOW, CONSTRAINTS AMONGST THE ITEMS THAT ARE IN THE QUEUE.
SO I DON'T KNOW IF THAT HELPS ANSWER SOME OF THE QUESTIONS.
AND I, I THINK THAT FIRST BULLET MIGHT HAVE BEEN PLANTED BY ME WITH AMANDA.
MAYBE I SHOULDN'T HAVE DONE THAT.
UM, I'M, I'M JUST CONCERNED THAT, YOU KNOW, WE HAVE SOME THINGS THAT HAVE OLD PRIORITIES ON THEM THAT CLEARLY WILL BE DONE PROBABLY BEYOND 2026.
AND I JUST THOUGHT WE NEEDED TO THINK ABOUT WHETHER THAT WAS AN IMPORTANT FACTOR OR NOT.
BUT, BUT PERHAPS THAT THIS RELEASE PLAN IDEA IS THE WAY WE CAN KIND OF AVOID GETTING INTO THAT PROBLEM.
YEAH, JUST REAL QUICK TALKING ABOUT THE, UH, THE PRIORITIES THAT WE PUT ON A PRS.
THEY DON'T ALWAYS WORK ANYWAY.
SO SAYING THAT YOU HAVE TO DO IT EXACTLY WHENEVER IT'S PRIORITIZED TODAY, THAT DOESN'T WORK.
SO I'M LESS WORRIED ABOUT THAT PIECE.
[00:40:01]
A BETTER WAY OF GETTING AROUND THAT.I THINK TROY HAD A PRETTY GOOD IDEA THERE OR SOMETHING, BUT I'M NOT WORRIED ABOUT THAT DATA ON THERE.
'CAUSE THAT IS IN MY MIND, ALWAYS BEEN, THIS IS WHAT WE WISH FOR.
UM, THIS IS AN IMPORTANT TOPIC AND AT SOME POINT I DO THINK IT'S WORTHWHILE FOR TAC TO COME BACK TO THE QUESTION OF THE APPROPRIATE RESOURCES FOR ERCOT IN ORDER TO ACCOMPLISH THESE OBJECTIVES.
LONG TERM UNDERSTANDING THIS IS SHORT TERM, YOU KNOW, SET OF CONSTRAINTS THAT'S JUST AS IMPORTANT, UM, AS LOAD GROWS AND AS THE, THE NUMBER OF FRANKLY COMPETING OBLIGATIONS THAT ERCOT HAS TO DO AT THE SAME TIME GROW.
UM, JUST THE ABILITY TO HAVE THE RIGHT RESOURCES TO NOT HAVE, YOU KNOW, YEARS OF DELAY, UM, WILL BE MORE AND MORE IMPORTANT.
I DON'T THINK IT'S ERCOT STAFF'S FAULT THAT WE'RE IN THIS SITUATION.
THEY'RE BEING GIVEN MORE WORK THAN THEY CAN HANDLE.
AND, UM, BUT AT THE SAME TIME, I THINK JUST FROM A STRATEGIC PERSPECTIVE, THE ERCOT BOARD CAN RECOMMEND, UM, THE RIGHT LEVEL OF RESOURCES TO ACCOMPLISH THESE GOALS AND COLLABORATION WITH TAX, YOU KNOW, SETTING THE, THE IMPORTANCE OF THEM.
I DO THINK THAT IN ORDER TO ACCOMPLISH THESE THINGS, IT WILL BE NECESSARY FOR ERCOT TO BE ABLE TO PAY THE RIGHT AMOUNT TO HIRE TALENT SO THAT THEY CAN HIRE FROM THE MARKET AND NOT JUST THE MARKET HIRING FROM ERCOT.
AND IF THAT'S THE CASE, THEN THEY CAN HAVE THE RIGHT LEVEL OF EXPERIENCE AND RESOURCES NECESSARY TO ACCOMPLISH ALL OF THIS AND, AND WE CAN DO IT COLLABORATIVELY.
YEAH, SO IN, IN RESPONSE TO ERIC'S POINT, I THINK WE, YOU KNOW, WE, WE DO NOTE THAT THERE'S SORT OF A SHORT TERM AND LONG, LONG-TERM DISTINCTION BETWEEN WHAT WE'RE TALKING ABOUT.
UM, HOWEVER, I'D ALSO POINT OUT THAT THE BUDGET IS, IT'S IN FLIGHT ALREADY, SO IT IS BEYOND KEITH'S ABILITY TO DO ANYTHING TO IT.
UM, AND, YOU KNOW, TO THE EXTENT THAT SOMETHING IS RISING TO THE BOARD OR THE COMMISSION, IF, IF TAC WANTS TO SAY SOMETHING, YOU KNOW, I'M NOT GONNA JUMP IN THE WAY SURE.
BUT, BUT I THINK THE, THE IDEA OF, YOU KNOW, WE, WE HAVE TO SORT OF THINK ABOUT THIS IN A SENSE OF THE CONSTRAINTS IN TERMS OF, YOU KNOW, THEIR KEY STAFF HAS CONSTRAINTS, IT HAVE HAS CONSTRAINTS, OTHER STAFF HAS CONSTRAINTS.
AND SO YOU, YOU NEED TO THINK ABOUT HOW THAT'S GOING TO HOLISTICALLY DEAL WITH THINGS.
AND I KNOW ONE OF THE THINGS THAT WHEN I FIRST CAME ON BOARD, WOODY SAID, KEITH, I NEED YOU TO ASSESS THE EFFICIENCY OF THE GROUP BEFORE WE GO ANY OTHER STEP.
AND SO I GUESS THE, THE, THE, THE RECOMMENDATION I WOULD HAVE IS LIKE, ARE WE DOING EVERYTHING WE CAN FROM AN EFFICIENCY STANDPOINT BEFORE WE ASK FOR RESOURCES TO MOVE IT FORWARD? I, I APPRECIATE THAT.
AND, UM, AND BEING CAREFUL WITH, RIGHT, PAYER DOLLARS IS ALWAYS, YOU KNOW, JOB NUMBER ONE.
UM, THAT SAID, I THINK THAT MOST TAC MEMBERS WOULD AGREE THAT, YOU KNOW, ERCOT NEEDS THE RESOURCES TO GET ALL THESE THINGS DONE.
AND, UM, EXCELLENT POINT ON THE TIMING OF THE BUDGET.
YOU KNOW, IT'LL NEVER BE THE RIGHT TIME TO HAVE THE CONVERSATION, BUT AT SOME POINT THEY CAN ALIGN IN SOME FUTURE BUDGET, YOU KNOW, OR AT THE RIGHT OPPORTUNITY.
UM, I THINK, DIANA, ARE YOU STILL IN THE QUEUE? YES.
WE WANTED TO MAKE THE GOAL, ONE OF THE GOALS OF THE WORKSHOP ON MONDAY AFTERNOON WAS NOT TO START FROM SCRATCH, BUT RATHER TAKE A LOOK AT THE PROPOSED CHANGES THAT HAVE BOTH BEEN PREVIOUSLY APPROVED AND ASSIGNED A RANK AND A BUDGET THAT'S ASSOCIATED WITH EACH OF THOSE PROPOSED CHANGES, BUT ALSO PROACTIVELY TAKE A LOOK AT WHAT'S COMING POST DECEMBER 5TH AND TROY'S OPTIONALITY OF, UM, LOOKING OUT WHAT MAY HAVE BEEN PREVIOUSLY APPROVED GIVEN A 2024 OR A 2025 PRIORITIZATION.
OBVIOUSLY THAT HASN'T COME TO FRUITION.
YES, WE, WE HAVE BEEN WORKING WITH ERCOT, UH, AND LEADERSHIP TO TRY TO FIGURE OUT HOW TO BEST MANAGE THIS.
AND SO JUST ONE POINT IS, IS THAT WE'RE DOING THIS WITH
[00:45:01]
AN ABUNDANCE OF TRANSPARENCY, SO FOLKS ARE NOT SURPRISED, BUT OUR GOAL IS NOT TO START FROM SCRATCH.OUR GOAL IS TO LOOK AT WHAT WE HAVE AND PUT THEM INTO DIFFERENT TIERS.
AND THAT LEADS ME TO ANOTHER POINT THAT I WANNA ADD, AND IT WAS RAISED ON MONDAY, BUT I WANNA SAY IT AGAIN, THAT THE DIFFERENT TIER LEVELS THAT WERE ASSIGNED ON IN MONDAY'S WORKSHOP, THE ONE OF THEM WAS DEEMED CRITICAL.
AND I WOULD ENCOURAGE FOLKS TO LOOK AT THAT, NOT AS A MATTER OF URGENCY, GIVING THAT PRIORITY OVER SOMETHING ELSE, BUT RATHER LOOKING AT WHAT WAS LABELED CRITICAL AS A NON-NEGOTIABLE.
THESE ARE ITEMS THAT WERE EITHER PROVIDED OR GIVEN TO OR CAUGHT BY THE LEGISLATURE OR THE COMMISSION AS SOMETHING THAT NEEDS TO BE DONE.
LIKE THERE'S NO WIGGLE ROOM ON THOSE.
SO I JUST WANTED TO MAKE SURE THAT FOLKS UNDERSTOOD THAT WE HAD THAT CONVERSATION ON MONDAY AFTERNOON.
BUT CRITICAL, THOSE TIER ONE, THOSE ARE LEGISLATIVE DIRECTIVES, PUC DIRECTIVES, THOSE ARE THINGS THAT HAVE TO BE DONE.
THOSE DON'T NECESSARILY MEAN THAT THEY'RE GONNA JUMP AHEAD OF SOMETHING ELSE, BUT IT'S GONNA BE IN THE, THE GREATER LANDSCAPE OF PRIORITIES AND PROJECTS.
AND WE WILL KEEP WORKING AT PRS WITH ERCO AND WITH THE STAKEHOLDERS TO MAKE SURE THAT AS MUCH AS WE CAN, FOLKS AREN'T SURPRISED AND THAT WE KNOW WHAT'S COMING AND IF THERE IS SOMETHING, UM, THAT IS IMPORTANT.
AND, YOU KNOW, WE PROVIDED A WORKSHOP ON MONDAY THAT WAS A GOOD OPPORTUNITY FOR FOLKS TO LET US KNOW THAT WE HAD SOME, UH, PRIORITY RANKING, UH, OFFERS THAT WERE SUGGESTED.
AND SO I THINK WE'RE TAKING ALL OF THE FEEDBACK AND THEN WE'RE GONNA START WORKING AT PRS AND HERE AT TAC TO MAKE SURE THAT WE CONTINUE THOSE CONVERSATIONS.
THIS ISN'T A COMPLETED CONVERSATION, BUT IT'S AN ONGOING CONVERSATION.
I JUST WANTED TO GO BACK TO SOMETHING THAT KEITH SAID ABOUT THE BUDGET.
I WAS WONDERING, IS THERE A SPECIFIC LINE ITEM FOR STAKEHOLDER PROJECTS IN THE BUDGET? TROY? UH, THERE IS NOT.
UH, WE HAVE A PROJECT ALLOCATION IN THE BUDGET AND A PORTION OF THAT IS EARMARKED FOR STAKEHOLDER WORK.
UM, THE NUMBER THAT ADDS UP TO CURRENTLY FOR THE NEXT TWO YEARS IS $10 MILLION.
DOES THAT INCLUDES THINGS LIKE D-R-D-R-R-S AND OTHER SMALLER ITEMS? OKAY.
HAS THAT BEEN TRENDING UP OR DOWN THROUGH THE YEARS THAT ALLOCATION FOR STAKEHOLDER PROJECT? UH, IF YOU RECALL, I USED TO REPORT ON THIS IN VERY, IN A VERY DETAILED WAY AT PRS.
IT WAS THREE, TWO TO $3 MILLION MANY YEARS AGO, THEN IT WAS 4 MILLION.
AND AS WE'VE GOTTEN INTO LARGER AND LARGER REQUIRED REVISION REQUESTS, IT'S PROBABLY PEAKING AT ABOUT RIGHT NOW.
AND, UH, I GUESS IS ALL THAT PUBLISHED SOMEWHERE THAT I CAN, YOU KNOW, GO ONLINE AND REVIEW? I BELIEVE AS PART OF THE, UH, THE BUDGET MATERIALS POSTED FOR THE BOARD, THERE'S A LIST OF THE CANDIDATE PROJECTS THAT ARE EXPECTED.
NOW ADMITTEDLY, THINGS CHANGE AS NEW THINGS GET APPROVED AND AS PRIORITIES GET ADJUSTED, BUT WE DO HAVE A, A TARGET LIST GOING IN OF WHAT WE WOULD EXPECT TO WORK ON.
OTHER QUESTIONS OR COMMENTS? I THINK WE HAVE MOSTLY TALKED ABOUT THE REPORT PRIORITIZATION.
UM, SO I DID WANNA ASK A QUESTION ON THE FUTURE WORKSHOPS.
AMANDA, DO YOU HAVE TO, TO QUOTE RICHARD ROSS? WHAT DO YOU WANT HERE? DO YOU, DO YOU HAVE A RECOMMENDATION THAT THIS CONTINUE? I, I GUESS I SEE THERE WILL PROBABLY BE MORE WORK.
SO I WOULD SEE TWO OPTIONS BEING STICKING WITH WORKSHOPS LIKE WE HAD OR MOVING THAT WORK OVER TO PRS.
UM, AND SO I, I THINK I'D WANT TO KNOW WHAT, WHAT YOU THINK ABOUT THAT AND WHAT PRS THINKS ABOUT THAT.
THOSE ARE THE OPTIONS AND HAPPY TO FACILITATE A FUTURE WORKSHOP IF THAT'S THE WILL OF, OF TAC.
UM, OTHERWISE I THINK THAT, YOU KNOW, THESE ISSUES CAN BE HANDLED LARGELY THROUGH PRS, ESPECIALLY FOR THE NPR THAT ARE ALREADY FILED AND THEN POTENTIALLY THROUGH THE SUBCOMMITTEES FOR THE ISSUES THAT ARE MORE TOPICAL THAT HAVEN'T, DON'T NECESSARILY HAVE NPRS ASSOCIATED WITH THEM YET.
UM, SO, BUT I'M OPEN TO THE WILL OF TAC.
WE'LL KEEP WORKING ON THIS, UM, AT PRS AND IF WE ARE HEARING OR FEELING THAT WE NEED ADDITIONAL WORKSHOPS OR MORE CONVERSATIONS, WE CAN WORK, UH, WITH AMANDA
[00:50:01]
ERCOT AND OTHERS, MAKE SURE THAT THAT HAPPENS.I, I, TROY, I I LIKED YOUR, UM, THE, THE PLAN, THE PROCESS THAT YOU'RE THINKING ABOUT IN TERMS OF KIND OF THIS NEXT GA NEXT SET OF RELEASE, YOU KNOW, KIND OF A RELEASE.
MY EXPECTATION IS THAT THAT WOULD SHOW UP AT PRS FOR DISCUSSION AT THE NEXT PRS.
IS THAT A REASONABLE EXPECTATION? I WOULD LIKE TO HAVE IT AT THE NEXT PRS, YES.
DO WE, TROY, DO WE THINK THAT CAN BE ACCOMPLISHED IN A NORMAL PRS MEETING OR IS THAT, I THINK THAT'S THE GOAL.
A LOT OF EXTRA TIME FOR A PRS MEETING.
DIANE IS A WHI AT BRINGING THOSE MEETINGS IN, YOU KNOW, VERY EFFICIENTLY IN OUR WORD FOR THE DAY.
SO WE CAN, TROY, WE CAN WORK WITH YOU AND JUST, AND TRY TO INCORPORATE THAT INTO THE TYPICAL AGENDA THAT'S INCLUDED IN PRS FOR OKAY.
SO WE'LL HAVE SOME DEDICATED TIME WHERE WE CAN SPEND ON THAT, BUT NOT GROSSLY MAKE THE PRS INTO A, IT MIGHT TAKE A COUPLE ITERATIONS ALSO, SO IT'S A WORK IN PROCESS.
WE, WE HAD SAID WE WERE GOING TO TAKE LARGE LOAD WORKING GROUP AND INTERCONNECTION QUEUE UP NOW-ISH, BUT JULIE HAS A HARD STOP AT 10 30, SO I THINK WE WILL NOW MOVE THAT TO THE END OF THE DAY, IF THAT'S OKAY WITH BOB WHO DIDN'T ANSWER MY TEXT, BUT GAVE ME A THUMBS UP.
[8. Revision Requests Tabled at TAC (Possible Vote)]
WE CAN MOVE TO REVISION REQUESTS, UH, TABLED AT T AND SO WE HAVE NO GER 2 64 AND THAT CAN CONTINUE TO REMAIN TABLED.[9. RMS Report]
WE ARE TO THE RMS REPORT.UM, REALLY QUICKLY WE'RE GONNA GO THROUGH A FEW OF THE ITEMS THAT WE HAD TALKED ABOUT ALREADY TODAY.
THE, UH, CHANGES THAT ARE COMING FORWARD TO RMS WOULD BE THE MERGER OF PROFILING WORKING GROUP AND TEXAS SET.
THOSE TWO GROUPS HAVE A, A GREAT DEAL OF THE SAME ATTENDEES.
UH, THE CORRECTIONS FOR ANNUAL VALIDATION DO COME THROUGH THE TEXAS SET TRANSACTION, THE 8, 14, 20.
THERE'S A GOOD DEPENDENCY THERE THAT'S REALLY UNDERSTOOD AND APPRECIATED.
UM, AS I'VE, UH, SHARED WITH A COUPLE OF PEOPLE TODAY THAT HAVE ASKED ME ABOUT THIS, WORKING GROUPS ARE REALLY NEEDED WHEN YOU ARE SEEKING COLLABORATION AND CONSENSUS AND MOVING FORWARD.
LOTS OF BRAINSTORMING IS DONE AT, UH, WORKING GROUP MEETINGS AND A LOT OF THE AUTOMATION FOR ANNUAL VALIDATION AND STUDYING, UH, LOAD PROFILES.
UM, THAT'S REALLY, UH, SOME REALLY GOOD EFFORTS THAT'S SUCCESSFUL AT BOTH THE TDSP LEVEL AND AT ERCOT LEVEL.
SO REALLY WE WANNA TRY THIS AND MAKE SURE THAT WE CAN DO THIS SUCCESSFULLY.
UM, IN ADDITION, WE HAVE, UM, TALKED TO A GREAT DEAL OF PEOPLE, JOHN AND I HAVE, AND WE REALLY BELIEVE THAT THIS IS THE BEST WAY, UM, TO MOVE FORWARD.
SO THIS WOULD TAKE RMS FROM THREE WORKING GROUPS AND ONE TASK FORCE TO TWO WORKING GROUPS IN A TASK FORCE.
AND AT THE END OF LAST YEAR, WE SUNSETTED TWO TASK FORCES.
SO WE ARE BEING, UH, VERY CAREFUL AND LOOKING AT EFFICIENCIES.
AND, UH, WE'LL CONTINUE TO DO SO.
AND THIS IS HOW WE'RE DOING IT.
SO WE HAVE A TEAM LEADING THIS EFFORT AND UM, IT STARTS WITH KYLE PATRICK, WHO'S TEXAS SET CHAIR.
HE'S REALLY DOING THE HEAVY LIFTING AND KEEPING EVERYTHING ON TRACK AND, UH, COORDINATED.
KYLE HAS BEEN INVOLVED IN SET FOR OVER 20 YEARS.
HE HAS CHAIRED FOR, FOR MANY YEARS.
HE HAS BEEN A PAST CHAIR OF RMS. UM, HE'S REALLY DEDICATED TO THE CAUSE.
UH, THERE WAS A LITTLE BIT OF, UM, I GUESS DUST KICKED UP AT SOME OF THE MEETINGS, BUT, UH, WE'RE MOVING FORWARD.
WE'VE GOT A GOOD TEAM INVOLVED.
JOHN AND I ARE PROVIDING OVERSIGHT.
UM, THE CORE TEAM DOES INCLUDE ALL OF THE LEADERSHIP CROSS RMS AND UM, THEN WE ALSO HAVE VETERANS SUCH AS LIKE KATHY SCOTT, WHO IS, UM, PROVIDING SUPPORT AND, UH, DEFINITELY A LOT OF, UH, DETAIL WHEN IT COMES TO THE DOCUMENTATION THAT NEEDS TO BE REVISED.
AS YOU CAN SEE, THE ACTIVITIES THAT WE'RE WORKING ON IS, UM, THE NEW SCOPE, THE ACRONYM, UM, THE WEBPAGE.
[00:55:01]
IT LOOKS LIKE WE'LL BE GETTING A NEW WEBPAGE.UM, THE RELEVANT DOCUMENTATION SUCH AS ANNE MENTIONED THIS MORNING, THE CHANGES THAT WILL NEED TO BE DONE TO THE RETAIL MARKET GUIDE AND TO THE ERCOT PROTOCOLS, THE LEADERSHIP, WHAT WE'RE LOOKING AT, WHAT WOULD BE A GOOD MODEL FOR 2026, MAYBE TWO, UH, CO-CHAIRS AND MAYBE THREE VICE CO-CHAIRS WHEN ONE WOULD WORK ON TESTING, ONE WOULD WORK ON TRANSACTIONS AND THE OTHER WOULD WORK ON PROFILING JUST TO MAKE SURE THAT WE CAN KEEP THE WORK GOING.
AND, UM, WE REALLY THINK THAT EVERYTHING CAN BE IN PLACE BY THE END OF THE YEAR AND THEY WOULD KICK OFF THEIR FIRST MEETING, ELECTING THE NEW LEADERSHIP FOR THE JOINT EFFORT, UH, IN JANUARY.
AND THAT IS THE STANDARD TIMELINE FOR WORKING GROUPS AND TASK FORCES TO ELECT THEIR LEADERSHIP.
NEXT, THESE ARE SOME OF OUR ACTIVITIES GOING ON IN PROGRESS.
THEY ARE GOING TO FINISH UP THE, UH, PROFILE, ANNUAL PROFILE VALIDATION.
THERE'S JUST SOME OUTSTANDING, UH, ITEMS TO BE COMPLETED THAT WILL FINISH THE END OF SEPTEMBER.
AS ON SCHEDULE, THEY ARE LOOKING AT THE PROFILE DECISION TREE AND GOING THROUGH THAT.
THERE ARE ALSO SOME CONVERSION OF, OF WORK FROM EXCEL TO WORD DOCUMENTS, WHICH REALLY IS GOING TO BE, UH, VERY HELPFUL.
THE RETAIL MARKET TRAINING TASK FORCE, OUR CLASSES ARE REALLY WELL ATTENDED.
MOST ARE COMPLETELY FULL BEFORE EVEN THE SECOND NOTIFICATION HAS GONE OUT.
A HUNDRED PERCENT OF RETAIL TRAINING CLASSES ARE NOW HELD VIA WEBEX.
AND ALL OF THESE HAVE INDIVIDUAL ONLINE MODULES THAT CAN USUALLY BE COMPLETED IN LESS THAN AN HOUR.
UM, BUT THE CLASSES ARE EITHER HALF A DAY OR FULL DAY.
THE TEXAS DATA TRANSPORT MARKET TRACK SYSTEM WORKING GROUP, THEY'RE LOOKING AT THE SUBTYPE ANALYSIS AND THAT'S A GOOD INDICATION OF WHAT KIND OF MARKET PARTICIPANTS OR WHICH INDIVIDUAL MARKET PARTICIPANTS HAVE AN ISSUE.
AND THERE'S REALLY, WE'VE ADDED TWO SINCE, UH, THE LAST QUARTER OF LAST YEAR.
AND THOSE HAVE BEEN, UH, HAVE AUTOMATED SOME OF THAT SUCH THAT THERE'S NOT SO MUCH MANUAL ANALYSIS NEEDED AND TEXAS SET.
AND WE ARE LOOKING AT THE TEXAS MARKET TEST PLAN.
WE'VE MADE SOME REALLY GOOD CHANGES.
ONE THING THAT CAME UP AT THE LAST RMS MEETING WAS THE 2026, THE TEST FLIGHT.
WE HAVE THREE TEST FLIGHTS A YEAR.
THE JUNE TEST FLIGHT LOOKED LIKE IT WAS GONNA BE ENDING ON A HOLIDAY, WHICH WAS A BANKING HOLIDAY.
SO THERE WASN'T A WAY FOR THE REPS TO BE ABLE TO FINISH THAT IN ANY EVENT, ACCORDING TO THE SCRIPT.
SO WE'VE DONE A LOT OF WORK AND, UM, WE'RE JUST GONNA KEEP MOVING FORWARD AND MAKING PROGRESS UNTIL WE FINISH.
I WANTED TO MENTION THIS BECAUSE THE SMART METER, TEXAS FTPS AND API SECURITY UPGRADE DID GO LIVE THIS PAST WEEKEND.
THERE WILL BE ONE MORE UPDATE TO RMS AT OUR NEXT MEETING.
AND, UH, THE DECOMMISSIONING DATE SET FOR THE FTP IS IN SEPTEMBER.
SO ANYONE WHO IS RELYING ON THAT PAST TECHNOLOGY OR DID NOT MAKE CHANGES TO THEIR APIS, THEY'RE GOING TO BE FAILING WITH THOSE, THOSE, UH, TRANSMISSIONS.
AND DEFINITELY IF YOU ARE, IF YOU WERE USING AN API TRANSMISSION, THOSE CHANGES ARE NOT JUST OVERNIGHT.
YOU'RE REALLY GONNA HAVE TO GET YOUR TECH FOLKS INVOLVED.
SO IF YOU HAVEN'T, UM, BEEN KEEPING UP WITH THE PROJECT, PLEASE MAKE YOUR FOLKS AWARE.
AND THEN, AS YOU CAN SEE, THIS IS THE TIMELINE AND WE'RE LOOKING AT SEPTEMBER 13TH AS THE DECOMMISSIONING DATE OF THAT IS FTP.
MANY REPS ARE COMPLETELY, EXTREMELY DEPENDENT ON THE DATA THAT THAT IS AVAILABLE IN THE SMART METER, TEXAS.
AND WE INVITE YOU TO JOIN US ON SEPTEMBER 9TH.
UM, I DID WANNA MAKE ONE MORE COMMENT IS THAT RMS HAS USUALLY BEEN MEETING ON THE FIRST TUESDAY OF THE MONTH, AND WE ARE MOVING TO THE SECOND TUESDAY OF THE MONTH, UH, STARTING IN 2026.
AND, UH, ERCOT HAS, HAS BEEN, WE'VE CHECKED WITH THEM AND THEY REALLY THINK THAT'S A GOOD IDEA.
IT WOULD STILL ALLOW US TO PROVIDE, UM, I GUESS A COMMENTS TO PRS LIKE ENDORSEMENTS, UM, SINCE IT IS THE DAY BEFORE PRS.
SO WE REALLY THINK THAT'S GONNA BE, UM, A GOOD CHANGE.
MANY MARKET PARTICIPANTS THAT HANDLE SETTLEMENT, THIS WILL MAKE IT A LITTLE BIT EASIER FOR THEM, SUCH THAT WE WON'T BE MEETING AT THE VERY FIRST OF THE MONTH.
[01:00:01]
OKAY.THAT DOESN'T POSE ANY ISSUES FOR GETTING THINGS FROM RMS TO PRS.
DON'T WE TYPICALLY LIKE A, A WEEK, IT'S THE DAY BEFORE.
YEAH, WE MIGHT HAVE, THERE MIGHT BE INSTANCES, DEBBIE, RIGHT? WHERE WE MIGHT HAVE TO, UM, DO AN URGENT VOTE ON AN ITEM OR, RIGHT.
WE HAD, WE DID TAKE THAT IN CONSIDERATION.
UM, SOME OF THE COMMENTS THAT WE, UH, HAVE PROVIDED DURING RMS, YOU DO GET THOSE FULL WEEK IN ADVANCE, BUT THERE'S OTHER COMMENTS THAT HAVE COME OUT SUCH THAT IT WOULD BE CLOSER TO THE PRS STATE.
SO BACK TO THE CIRCLE OF HOW MANY DAYS IN ADVANCE SHOULD COMMENTS BE CONSIDERED? MM-HMM
THAT CHANGE THAT CAME UP, I BELIEVE THAT KATIE SUGGESTED AND RECOMMENDED IT AND PRESENTED IT AT THE AUGUST 12TH MEETING, THAT IS SOMETHING THAT COULD COME INTO PLAY FOR YEARS.
THE MARKET PARTICIPANTS ON THE RETAIL SIDE THAT MANAGE SETTLEMENT, THEY HAVE REALLY WANTED TO MOVE AWAY FROM THE FIRST OF THE MONTH.
WE DID LOOK AT MOVING TO THE SECOND THURSDAY OF THE MONTH, WHICH CAN CONFLICT WITH THE PUC MEETING.
UM, BUT WE REALLY FELT LIKE THIS.
WE STILL THINK THIS IS REALLY A GOOD CHANGE AND IT'S GONNA MAKE THINGS EASIER FOR OUR FOLKS ON THE RETAIL SIDE.
BUT IF WE, YOU'RE VOTING ON A VOTING ITEM, THE RMS, CAN IT, CAN WE GET IT TO PRS NEXT DAY OR IT JUST STARTS GOING TO THE NEXT MONTH? PRS IT SEEMS LIKE YOU ALL WOULD HAVE TO GO TO THE NEXT MONTH UNLESS THERE'S SOMETHING THAT'S AN ANOMALY.
WE DID, UH, LOOK AT THE NUMBER OF NPR R THAT RMS HAS PROVIDED THE INPUT TO, AND IT DOES SEEM LIKE THAT EVERY OTHER MONTH THERE IS SOMETHING EVERY OTHER MONTH, OKAY? MM-HMM
THERE IT'S NOT A GREAT NUMBER JUST BECAUSE OF THE NATURE OF THE RETAIL WORK.
MOST OF IT GOES THROUGH, MOST OF OUR CHANGES ARE RETAIL MARKET GUIDE CHANGES, THE BLOCK CALENDARS.
SO, COREY, JUST FOR CLARIFICATION, IF IT'S THE DAY BEFORE PRS AND IT HAPPENS TO BE ONE OF THOSE MONTHS FOR THEY HAVE THINGS THAT THEY NEED TO SEND TO US, CAN YOU JUST WALK US THROUGH WHAT THAT PROCESS WOULD LOOK LIKE? SURE.
IT'S, IT'S NOT UNLIKE WMS AND ROSS TODAY WHERE WMS AND ROSS MIGHT BE MEETING, YOU KNOW, EXACTLY SEVEN DAYS AHEAD OF PRS AND THEY'RE DISCUSSING NPRS THAT PRS SENT OVER TO THEM.
THEY HOPEFULLY TAKE A VOTE TO UNANIMOUSLY ENDORSE SOME VERSION OF THAT.
THOSE COMMENTS THAT COME OUT FROM THAT MEETING AREN'T NECESSARILY POSTED SAME DAY MARKET RULES PUT TOGETHER THOSE COMMENTS TO REFLECT THE VOTES OF WMS AND ROSS HAS TO BE CIRCULATED FOR WM WMS AND ROSS LEADERSHIP.
AND OFTEN THEY LEAVE THE WMS AND ROSS MEETING TO JET OFF TO BERMUDA, AND IT TAKES A WHILE TO GET THEIR APPROVAL.
THOSE NOT, I'M NOT SAYING THEY DON'T DESERVE THE TRIP, I'M HAPPY THAT THEY'RE GETTING THAT RELAXATION, BUT THEN THOSE COMMENTS COME OUT A DAY OR TWO AFTER ROSS OR WMS, WHICH MEANS THEY ARE FIVE DAYS AHEAD OF P-R-S-P-R-S ALWAYS HAS THE DISCRETION TO TAKE UP OR NOT TAKE UP THOSE REFERRALS BACK.
IT DOESN'T MATTER WHETHER OR NOT THE REFERRAL CAME BACK FROM W-M-S-R-O-S, UM, WMS, R-O-S-R-M-S, SORRY,
THE, IT'S, IT'S ALWAYS WITHIN P S'S DISCRETION, AT LEAST CURRENTLY, UM, UNTIL AN NPR CHANGES THAT TO SAY, HEY, WMS OR RMS IS JUST RUBBER STAMPING.
SOMEBODY'S COMMENTS THAT, YOU KNOW, WERE FILED SIX WEEKS AGO, WE REFERRED IT TO RMS TO GET THEIR FEEDBACK.
RMS MET WHENEVER THEY MET, FILED COMMENTS SAYING, HEY, PRS, THOSE COMMENTS FROM SIX WEEKS AGO, WE LIKE THEM.
THAT'S ALL THE SUBSTANCE THAT THEIR COMMENTS WERE.
THERE'S NO, OKAY, THERE'S NO NEEDING TO DIG INTO THE NITTY GRITTY LINES OF A FOUR SENTENCE OR FOUR LINE RMS COMMENT THAT SAYS, WE'RE HAPPY WITH THE LANGUAGE FROM MANY, MANY MOONS AGO.
SO I DON'T THINK PRS HAS EVER NEEDED THAT TIME TO DIGEST THAT.
THE FLIP SIDE OF THAT WOULD BE WMS RECOMMENDS APPROVAL OF SOMETHING WHERE THEY PROVIDED 50 PAGES OF DESKTOP EDITS SO THAT THEY'VE TRULY MORPHED IT INTO SOMETHING THAT PRS HADN'T SEEN.
AND IF THOSE COMMENTS COME OUT 10 DAYS, FIVE DAYS, ONE DAY BEFORE THE MEETING, PRS HAS THAT DISCRETION TO SAY, I HAVEN'T REALLY HAD TIME TO DIG INTO THIS.
LET'S, LET'S PUNCH IT TO THE NEXT MEETING.
SO ALL THE EXISTING RULES WE HAVE IN PLACE TODAY ACHIEVE WHAT DEBBIE'S TALKING ABOUT.
SO I THINK THEM SLIDING THEIR MEETING AROUND IS NOT GOING TO DISRUPT.
BUT YOU KNOW, THE GROUPS OF DISTINGUISHED SMART PEOPLE OR WHATEVER BETH SAID, ARE NOT JUST RUBBER STAMPING THINGS.
SO, UM, AND ANN TELLS ME IT'S GONNA BE OKAY, AND SHE TELLS ME THAT WE'VE ALREADY SEEN THE BLOCK CALENDAR WITH THIS CHANGE, WHICH IS POSTED TO THE TAC PAGE.
SO WE CAN, WE CAN ALL LOOK AT IT.
ANYTHING ELSE, DEBBIE? NO, I DO WANNA THANK MARKET RULES FOR WORKING WITH US SO INTENSELY ON BOTH THE CALENDAR AND THEN ALSO MERGING SET WITH PWG.
[01:05:01]
REALLY APPRECIATE THAT.THE PAT OR THE PAST, I HOPE IT'S NOT PASSED, BUT I'LL SEE.
[10. ROS Report (Vote)]
TO THE ROSS REPORT.KATIE, I WAS THINKING THAT WE WOULD DO YOUR REPORT AND THEN TRY TO GET THE TWO UNOPPOSED OR UNANIMOUS ONES, UM, ON THE COMBO BALLOT, IF THAT'S THE WILL OF THE GROUP, AND THEN GO BACK TO 2 72 AND 1 21.
SO, UH, CORY, FOR THE RECORD, I HAVE NEVER JETTED OFF TO BERMUDA AFTER A ROSS MEETING.
THERE'S TOO MUCH WORK TO DO, BUT WHEN I VOTE MYSELF OFF THE ISLAND IN RICHARD'S VERNACULAR, I HOPE THAT YOU WILL LET ME CHOOSE WHAT ISLAND I WOULD LIKE TO GO TO.
ALRIGHT, SO, SO WE HAVE TWO VOTING ITEMS THAT ARE BEFORE YOU, THAT ARE RELATED, THAT ARE NON UNANIMOUS.
I WANTED TO SEE IF I COULD BRING FRED UP.
AND THEN MATT ATH, CAN YOU CONFIRM YOU'RE ON THE LINE? IT'S MATT ON.
SO I KNOW WE'RE GOING TO GET INTO A SUBSTANTIVE DISCUSSION ON THESE TWO ONCE I GET THROUGH MY REPORT.
BUT, UM, AND, AND I WILL GET TO THIS ERCOT FILED SET OF COMMENTS THAT CAME OUT AFTER ROSS, BUT I DON'T KNOW IF YOU GUYS KNOW THIS.
I HOPE YOU HAVE FIGURED THIS OUT, BUT FRED IS A VERY MUCH A SHINING STAR AT ERCOT.
AND HE HAS BEEN ON THE FIRING LINE SEVERAL TIMES AT ROSS MEETINGS, AND HE SETS AN EXAMPLE FOR US ALL.
HE IS KIND, HE IS PROFESSIONAL, AND HE IS FLEXIBLE AND WILLING TO WORK WITH FOLKS TO TRY TO EITHER GET TO SOME CONSENSUS OR IN AGREEMENT TO DISAGREE.
BUT IT'S FOUNDED ON PRINCIPLES.
SO WHEN YOU SEE FRED AT THE MEETINGS, TAKE SOME NOTES.
'CAUSE WE CAN ALL LEARN FROM THE WAY FRED DOES THINGS.
UM, AND THEN WITH THE COMMENTS THAT WERE POSTED, THIS IS JUST ANOTHER EXAMPLE.
SO THE LAST, UH, SENTENCE IN THE SECTION THAT IS BEING REVISED UNDER NOER 2 72 DID, DID CAUSE SOME CONSTERNATION AT, AT ROSS.
UM, THERE WERE WHAT FIVE SETS OF COMMENTS FILED ON THIS TOPIC.
UM, BUT FRED HAS WORKED OFFLINE WITH EACH ESR OWNER TO TRY TO CLARIFY THE INTENT OF THOSE COMMENTS AND COME TO SOMETHING THAT, UH, HOPEFULLY I'M NOT PREJUDGING AND I'M NOT SHOWING BIAS HERE, BUT HOPEFULLY RESOLVE SOME OF THOSE COMMENTS THAT WERE DISCUSSED AT ROSS.
SO, UM, I, I JUST WANTED TO TAKE A MOMENT TO THANK FRED.
I'VE SAID IT PRIVATELY, BUT I THINK IT'S IMPORTANT TO SAY IT PUBLICLY.
AND I HAD HOPED MATT WAS ON THE LINE, BUT FOR, FOR MATT, I, I APPRECIATE YOUR THOROUGH UNDERSTANDING OF THE PROTOCOLS AND BRINGING THAT RESEARCH TO US.
AND I ALSO APPRECIATE YOU TAKING THE TIME TO MEET WITH US OFFLINE TO TRY TO RESOLVE SOME OF THESE ISSUES.
UM, SO, SO WITH THAT, I'LL, I'LL MOVE ON FROM THIS SLIDE, BUT, UH, YOU KNOW, AND LET YOU GET TO THE SUBSTANTIVE DISCUSSION, BUT, UH, I WOULD BE REMISS IF I DIDN'T SAY SOMETHING AS THIS IS COMING TO AN END.
SO WITH THAT, WE CAN GO ON TO THE NEXT SLIDE.
SO, NOER 2 78 IS RELATED TO 1291 OR 1290, I'M SORRY, 1290 WAS APPROVED.
UM, THIS NOER WERE SOME CHANGES THAT WERE NEEDED, BUT I THINK ERCOT STAFF WANTED TO MAKE SURE 1290 GOT THROUGH AND THEN THERE WERE SOME CHANGES UNDER, UH, 2 78 THAT WERE NECESSARY.
AND THEN, UM, WE WERE FINE WITH PICKER 1 29.
SO BOTH OF THOSE WERE APPROVED UNANIMOUSLY.
AND THEN, UH, NEXT SLIDE, THE TOPIC DE AZURE TODAY, THE AS METHODOLOGY.
UM, I DID WORK THROUGH THAT AT ROSS.
WE WERE ABLE TO TAKE A LIVE VOTE ON IT.
UM, THERE WERE FOUR NO VOTES AND EIGHT ABSTENTIONS.
I, I NOTE THAT BECAUSE, UM, YOU KNOW, I THINK THAT'S PRETTY SIGNIFICANT GOING INTO THIS DISCUSSION TODAY.
UM, SO SOME OF THAT WAS AROUND THE, UM, THE RISK CREDITS AND THE PERCENTAGE THAT WAS USED THERE.
UM, I THINK THERE WERE SOME OTHER, UH, CONCERNS FROM CONSUMERS.
I'LL LET THOSE REP, YOU KNOW, THOSE FOLKS REPRESENT THEMSELVES THAT AT THE APPROPRIATE TIME.
I JUST WANTED TO GIVE YOU A FLAVOR OF THAT.
AND THEN, UH, AS USUAL, I USUALLY HAVE A COUPLE SLIDES THAT SHOW YOU KIND OF WHAT'S STILL AT ROSS AND, UH, WHERE IT IS SO THAT YOU CAN PLUG IN.
[01:10:01]
WE, WE HEARD T'S CONCERN LOUD AND CLEAR ABOUT THE PLWG MEETINGS.IF YOU CAUGHT THAT AT THE TAIL END OF PLWG YESTERDAY, WE ARE TRYING TO WORK OUT HAVING A SPECIFIC START TIME FOR PLWG FOR FOLKS THAT ARE TRYING TO PLUG IN THAT EITHER, UM, DON'T REGULARLY ATTEND OR WOULD NOT LIKE TO BE AT RPG AND PLWG.
AND THEN, UH, NEXT SLIDE'S JUST A CONTINUATION HERE.
AND THEN OUR NEXT MEETING IS, UH, SEPTEMBER 11TH.
UM, OUT OF RECOGNITION OF THIS DAY, IT IS WEBEX ONLY.
I THINK MANY OF US COULD PROBABLY REMEMBER WHERE WE WERE ON SEPTEMBER 11TH.
UM, SO THAT'S THE NEXT MEETING.
AND, UH, I'LL TAKE ANY QUESTIONS YOU MIGHT HAVE, AND THEN I WILL YIELD THE FLOOR TO THE DISCUSSION ON NUMBER 2 72 ON PICK 1 21.
QUESTIONS FOR KATIE? ALL RIGHT.
AND THANK YOU FOR THE, THE PLWG START TIME.
THAT IS, UH, AN ASK THAT CAME OUT OF THE SUBCOMMITTEE WORKSHOP AND I, I REALLY APPRECIATE THAT ONE.
ALRIGHT, SO WE, LET'S TRY TO TAKE UP THE UNANIMOUS ONE, SEE IF WE CAN GET THEM ON THE COMBO BALLOT.
WE WOULD BE LOOKING TO RECOMMEND APPROVAL OF NO G 2 78 AS RECOMMENDED BY ROSS IN THE EIGHT SEVEN ROSS REPORT AND TO RECOMMEND APPROVAL OF FIGURE 1 29 AS RECOMMENDED BY ROSS IN THE EIGHT SEVEN ROSS REPORT.
BETH, DID YOU HAVE A QUESTION ON THOSE? NO, NO.
I WAS JUST GONNA SUGGEST THAT, UH, IF WE NEED A MOTION OR WHATEVER THE PROCESS IS TO MOVE THOSE TWO TO THE COMBO BALLOT, USUALLY I JUST, YOU KNOW, ASK, LOOK, LOOK AROUND AND NOBODY LOOKS AT ME AND WE PUT IT ON THE COMBO BALLOT
SO LET'S PUT THOSE ON THE COMBO BALLOT AND THEN WE CAN, UH, TAKE IT OVER TO 2 72 AND 1 21.
SO WE'LL TAKE UP NUMBER 2 72 AND PICK OUR 1 21 TOGETHER SINCE THEY'RE COMPANION ITEMS. UM, AT THE AUGUST ROSS MEETING, THEY DID VOTE TO RECOMMEND APPROVAL OF BOTH ITEMS. UH, FOR THE NOER, IT WAS APPROVED WITH THE ERCOT AUGUST ONE COMMENTS.
AND ON THAT VOTE, THERE WAS ONE OPPOSING FROM THE GENERATOR SEGMENT AND THERE WERE FOUR ABSTENTIONS, UH, FOR THE NOER.
THERE HAVE BEEN COMMENTS FILED BY ERCOT SINCE ROS.
UH, THOSE WERE FILED ON THE 20TH.
AND THEN PIGGER 1 21 HAD A SIMILAR VOTE AT ROSS THAT, FOR THAT ITEM, THEY VOTED TO APPROVE THE ERCOT JUNE 4TH COMMENTS WITH ONE OPPOSING FROM THE INDEPENDENT GENERATOR SEGMENT AND FOUR ABSTENTIONS.
SO I THINK, UH, WELL ACTUALLY, SORRY, LET ME SAY, UH, ON THE PIGGER, ERCOT HAS ALSO FILED COMMENTS TO THE PIGGER, AND THEN WE HAVE ADDITIONAL COMMENTS FROM TESLA THAT HAVE BEEN SUBMITTED SINCE ROSS.
SO I THINK WHAT WE'LL DO HERE IS, UH, JUST HAVE FRED GO THROUGH THE ERCOT COMMENTS ON BOTH OF THESE, AND THEN WE'LL LET TESLA PRESENT THEIR COMMENTS AND WE CAN TAKE ANY DISCUSSION ALONG THE WAY.
UH, THIS IS FRED FROM, I THINK THE, UH, LATEST COMMENT WE FILE AS KIND OF WE DESCRIBED IN OUR COMMENTS, UH, DESCRIPTION, UM, AT OUR MEETING, UH, WHERE WE GET A LOT OF GOOD SUPPORT.
AND, UH, WE ALSO RECOGNIZE, UH, ADDITIONAL CONCERNS AND THE KIND OF RAISE, UH, AT THE MEETINGS AND THE FILE COMMENTS.
SO WE HAD A CHANCE TO WORK WITH, UM, MOST OF THE COMMENTERS AND TRY TO UNDERSTAND THEIR CONCERNS AND, UH, ALSO LAY OUT WHAT WE NEED.
SO THE, THE CHANGES HERE IS REALLY TRY TO REFLECT THE DISCUSSIONS AND, UH, THE INTENT, UH, IN THE END IS FOR THE A GS REQUIREMENT FOR THE EXISTING PROJECTS IS GOING TO FOCUS ON ANY ADDITIONAL NEW EIGHT CAPACITIES FOR YOUR EXISTING CAPACITIES.
IF YOU, UH, FOR THE REASON FOR THE REPAIR OR FOR THE SOME ADJUSTMENT, AS LONG AS YOU MAINTAIN THE SAME CAPACITY, UH, YOU ARE NOT REQUIRED TO PROVIDE THE A GS.
SO LET'S KIND OF TRY TO, UH, ADDRESS THE COMMENTS AND STILL TO MAINTAIN THE SYSTEM NEED AS WELL.
UM, ANY, DID YOU ANY, ANY CHANCE WE COULD LOOK AT THAT WITHOUT THE, THE MARKUP? THANK YOU.
DO YOU WANNA GO AHEAD AND SPEAK TO YOUR PICKER 1 21 COMMENTS, FRED? OKAY.
SO, UH, WE MAY NOT FILE A COMMENTS, WE RECOGNIZE THE, THE TESLA'S COMMENTS.
YEAH, I THINK THERE WAS JUST A CHANGE TO THE BUSINESS CASE, A SMALL DATE CHANGE, UH, THAT YOU GUYS FILED.
BUT WE CAN GO AHEAD AND GO OVER TO TESLA AND LET THEM TALK ABOUT THEIR COMMENTS TO PICK 1 1 21.
ANITA, DO YOU WANNA GO AHEAD? CAN YOU HEAR ME? ALL RIGHT? THIS IS ANITA.
YEAH, MY NAME IS ANITA SHARMA AND I COVER ERCOT POLICY
[01:15:01]
FOR TESLA.UH, THANKS TO T AND ERCOT STAFF FOR CONSIDERING OUR COMMENTS ON BOTH BIG EARTH 1 21 AND, UH, NOGA 2 72.
UH, NOW TESLA'S INTENT WITH THESE COMMENTS WAS JUST TO CLARIFY THE LANGUAGE IN THESE GUIDES.
UH, WE READ THE LANGUAGE AS MEANING THAT ESRS WOULD NEED TO DEMONSTRATE THE CAPABILITY TO PROVIDE ADVANCED GRID SERVICES OR A GS, BUT WOULD NOT BE REQUIRED TO HAVE A GS ACTIVATED DURING NORMAL OPERATIONS.
UH, SO TO ADDRESS THIS, WE PROPOSED SUBMISSION OF TWO MODELS, UM, ONE WITH A GS CAPABILITIES ENABLED TO DEMONSTRATE CAPABILITIES AND ONE WITHOUT A GS, UH, WHICH WOULD BE USED DURING OPERATIONS.
UM, NOW FRED
UM, SO WITH THAT CLARIFICATION, REALLY THAT CHANGES THE CONTEXT FOR SOME OF OUR COMMENTS.
UM, HOWEVER, UH, I DO WANT TO NOTE THAT WE CONTINUE TO BELIEVE THAT IT IS APPROPRIATE TO COMPENSATE ESRS FOR THE PROVISION OF A GS, UH, SINCE OPERATION AND GRID FORMING MODE, UH, DOES IMPOSE OPPORTUNITY COSTS.
UM, WE APPRECIATE STAFF EXPRESSING A WILLINGNESS TO WORK WITH STAKEHOLDERS ON DEVELOPING A MARKET-BASED FRAMEWORK FOR EGS, AND WE REALLY LOOK FORWARD TO ENGAGING FURTHER ON THIS, UH, IMPORTANT TOPIC.
UM, THANKS FOR, UM, UH, YOU KNOW, UH, ALLOWING US TO PROVIDE SOME COMMENTS HERE.
UH, NEXT IN THE QUEUE IS PATRICK HART.
THIS IS PATRICK HART FROM, UM, FROM MORTENSON.
I'M, I'M A, A TECHNICAL RESOURCE.
UM, SO NOT AN EXPERT ON POLICY OR ANYTHING.
UM, BUT I APPRECIATE THE, THE CHANCE TO SPEAK HERE.
UM, I, I, I DO WANT TO MENTION THAT HAVING MULTIPLE TYPES OF RESOURCES WITHIN, UM, A A A SINGLE FACILITY IS GOING TO PROVIDE SOME CHALLENGES IN TERMS OF HOW, UM, THE, THE FACILITY WIDE CONTROLS.
SO KIND OF THE, THOSE, THOSE PPCS THAT REGULATE THE, THE MULTIPLE TYPES OF RESOURCES THAT WOULD BE WITHIN ONE FACILITY, UM, TO THE POI, UM, THOSE, THOSE RESOURCES ARE, ARE NOT TYPICALLY DESIGNED TO CONTROL BOTH SAY THE GRID FORMING AND GRID FOLLOWING RESOURCES.
SO, SO THERE'S GOING TO BE SOME TECHNICAL CHALLENGES ON, ON THAT FRONT THAT IF, IF YOU HAVE BOTH TYPES WITHIN ONE FACILITY, I, I, I WANT TO, UM, KINDA BRING THAT UP 'CAUSE IT, IT, WE, WE, WE TEND TO, TO FOCUS ON THE, THE HIGH SPEED MODELS OF THIS, WHERE, WHERE THE INVERTERS THEMSELVES PERFORM THAT, THAT KIND OF RESPONSE.
UM, WITH RESPECT TO A AC GRID DISTURBANCE, IT, WE KIND OF TEND TO GLOSS OVER THE, THE MODE SWITCHES THAT HAPPEN AT THE, THE FACILITY WIDE CONTROLS LAYER.
UM, AND, AND, AND OFTEN THE MODELS DON'T, UM, THAT, THAT ARE PROVIDED DON'T COVER ALL OF THOSE, THOSE DIFFERENT MODE SWITCHES AND, AND DIFFERENT, UH, CONTINGENCY CASES.
UM, SO I, I'M, I'M JUST A LITTLE CONCERNED, UM, ABOUT THAT LANGUAGE.
UM, AND, AND I'D, I'D LIKE TO WORK WITH THE TEAM TO KIND OF SORT THROUGH HOW TO KIND OF ADDRESS THAT.
ARE THERE OTHER COMMENTS OR QUESTIONS EITHER FOR ERCOT OR FOR TESLA ON THESE ITEMS? SO GOING BACK TO THE COMMENTS, WE ONLY HAD ONE NEW SET OF COMMENTS FILED TO THE NOER SINCE ROS SO WE COULD CONSIDER, OH, SORRY MATT, YOU WANNA GO AHEAD? HEY, THIS IS MATT ARTHUR FOR ERCOT.
APOLOGIES THAT I'M LATE TO THE CONVERSATION HERE, BUT I DID, UM, JUST WANNA ADD ON THE NOER 2 72 COMMENTS THAT ERCOT FILED.
UM, WE INTRODUCED THE, THE MODIFIER ORIGINAL BEFORE THE SGIA UP THERE AND THOUGHT IT MIGHT JUST BE HELPFUL TO QUICKLY LAY OUT OUR THINKING ON THAT.
UM, WITHOUT THAT ORIGINAL THERE, IF A AN SGA WAS TO BE AMENDED AND RESTATED AT A LATER DATE, UH, PROBABLY THAT AMENDED AND RESTATED SGIA WOULD SAY THAT IT COMPLETELY REPLACES THE FIRST SGIA AND THAT WOULD, UH, MOVE THE, THE DATE OF THE SGIA UP.
SO BY PUTTING THAT ORIGINAL SGIA THERE, OUR INTENT IS TO SORT OF SOLIDIFY THAT GRANDFATHERING SUCH THAT IF, EVEN IF THAT SGIA IS LATER AMENDED AND RESTATED, THE, UH, GRANDFATHERING WILL CONTINUE TO APPLY.
UM, SO THAT'S SORT OF A MOVEMENT THAT WE'RE TRYING TO USE THAT TERM IN OTHER PLACES AS WELL.
I KNOW ANDY GALLO HAS BEEN WORKING ON THAT, I THINK, IN SOME OTHER REVISION REQUESTS, BUT, UH, JUST WANTED TO CLARIFY THAT HERE.
[01:20:03]
ARE YOU READY TO START MOVING THIS? IS THAT WHAT YOU'RE, I WAS GONNA HINT AROUND OR DANCE AROUND SOME OPTIONS.UH, DO YOU HAVE A SUGGESTION? NO, I WANNA MAKE A STATEMENT FIRST.
WELL, FIRST OF ALL, AS WAS STATED LONG AGO, FRED'S BEEN GREAT WORKING ON THIS AND ANSWERED A LOT OF THE QUESTIONS TO TAKE CARE OF A LOT OF THINGS.
UM, WHAT I, WE'RE GONNA BE DISCUSSING THIS FOR SOME TIME IN MY MIND, UH, ALL THE WAY THROUGH IMPLEMENTATION AND EVERYTHING ELSE.
'CAUSE WE DON'T REALLY KNOW HOW THIS IS ALL GONNA REACT IN EFFECT, UH, AS WE MOVE FORWARD.
THE OTHER POINT IS, FIRST I WANNA SAY I'M NOT GONNA OPPOSE THIS NOER, UH, FRED'S DONE A REAL GOOD JOB OF TAKING CARE OF THINGS, BUT I DO HAVE TO SAY THAT I STILL DON'T BELIEVE THAT THIS IS THE MOST EFFICIENT WAY OF DOING WHAT WE'RE TRYING TO DO HERE AND GET THE GRID FORMING OR ADVANCED GRID SUPPORT SERVICES IN THE AREAS THAT ARE MOST NEEDED BY THE GRID.
I THINK THAT WOULD BE DONE THROUGH A MARKET BASED AREA MUCH BETTER THAN THIS IS.
BUT I UNDERSTAND WHAT THEY'RE TRYING TO DO HERE.
I UNDERSTAND THEY'RE WANTING THE CAPABILITY, SO I'M NOT GONNA STAND IN THAT WAY.
THANK YOU FOR YOUR COMMENTS, RICHARD.
I'M TO MAKE A MOTION WHENEVER YOU'RE READY.
UH, I DON'T SEE ANYONE ELSE IN THE QUEUE AT THIS POINT.
SO, UH, ONE OPTION, RICHARD, FOR YOU TO CONSIDER, UH, IS THAT WE WOULD POTENTIALLY BE LOOKING TO RECOMMEND THE NOER AS ROSS RECOMMENDED IN ITS REPORT, AND ALSO AS AMENDED BY THE ERCOT AUGUST 20TH COMMENTS.
AGAIN, THERE AREN'T ANY OTHER NEW COMMENTS FILED TO THE NOER, UM, ALONG WITH THE IA I'LL ASK, BUT HAVE LOW HOPES THAT WE CAN PUT THAT ON THE COMBO BALLOT.
SO IS THERE ANYONE THAT NEEDS TO ABSTAIN OR VOTE NO ON A MOTION LIKE THAT? OKAY.
UM, SO THAT WOULD, LET'S SEE IF WE CAN MAYBE COMBINE IT WITH THE PIGGER AND BUILD FROM THERE.
UM, SO WITH, WITH THE PIGGER, WE HAVE THE CHOICE, RICHARD, A SIMILAR MOTION.
WE HAVE THE CHOICE OF THE ERCOT, UM, EIGHT, I'M SORRY, EITHER THE TESLA COMMENTS OR THE ERCOT 8 22 COMMENTS TO THE PIGGER.
SO THOSE HAD BOTH BEEN SUBMITTED SINCE, UH, WHAT'S YOUR PREFERENCE? AND I'M HAPPY TO AMEN.
SO I'M GONNA SUGGEST WE PUT THESE TWO TOGETHER ON A MINI COMBO BALLOT.
UM, SO WHAT, WHAT IS YOUR MOTION GONNA MAKE ME RESTATE? YOU WANT ME TO GIVE IT A SHOT,
LET ME, LET ME GIVE IT A SHOT HERE.
SO I THINK WE TOOK CARE OF THE NOER.
IT WOULD BE TO RECOMMEND APPROVAL AS, AS RECOMMENDED BY ROSS, ALONG WITH THE NEW ERCO EIGHT 20 COMMENTS AND THE IA.
AND THEN FOR THE PIGGER 1 21, WE COULD LOOK AT RECOMMENDING APPROVAL ALSO AS RECOMMENDED BY ROSS WITH THE ERCOT 8 22 COMMENTS AND THE IMPACT ANALYSIS.
YES, I THINK THAT'S WHAT I, OKAY.
DO WE HAVE A SECOND TO RICHARD'S? YES, WE DO COMBO BALLOT MOTION? YES, WE DO.
IS THERE ANY DISCUSSION ON THE MOTION, CAITLIN? YEAH.
UM, SO I'M GOING TO ABSTAIN FROM THIS ONE.
I, I PRETTY MUCH AGREE WITH BOB HILTON, BUT I, I JUST WANTED TO SAY, YOU KNOW, UM, FRED AND, AND ERCOT DID A GREAT JOB WORKING WITH US.
UM, ALL THESE SORT OF TECHNICAL LANGUAGE, THE, THE DATE, UM, THE, THE ISSUE THAT GOT SOLVED IN THE LATEST COMMENTS, ERCOT WAS VERY ACCOMMODATING.
THE, THE LACK OF A YES IS JUST, YOU KNOW, ON, ON PRINCIPLE.
I, I BELIEVE THAT THE, THE MARKET BASED, UM, PRODUCT WOULD'VE BEEN A, A BETTER AND FAIRER WAY TO DO THIS.
BILL THAT WAS KAITLYN'S PARTIALLY ANSWERED MY QUESTION.
I WAS JUST KIND OF CURIOUS WHAT THE REMAINING CONCERNS WERE WITH THIS.
AND I'M KIND OF COMPARING IT TO NORE 2 45 WHERE, UH, THERE WERE NEW WRITE THROUGH REQUIREMENTS APPLIED TO BOTH EXISTING AND NEW RESOURCES, WHICH IS WHERE THOSE OF US THAT WERE MORE NEUTRAL ON THE ISSUE GOT CONCERNED WHEN YOU'RE TRYING TO APPLY COMPLIANCE REQUIREMENTS ON INVESTED DOLLARS THAT HAPPENED YEARS AGO.
AND THERE CERTAINLY IS PRECEDENT WHERE ERCOT HAS ESTABLISHED NEW COMPLIANCE REQUIREMENTS FOR NEW GENERATION THROUGHOUT THE YEARS.
THE WHOLE D CURVE VOLTAGE ISSUE BATTLE BACK IN THE 2008, 2010 TIMEFRAME, POWER SYSTEM STABILIZERS, PMU RECORDING DEVICES, LIKE THIS IS NOT NEW.
THIS IS PRETTY TYPICAL ACTUALLY.
AND SO I WAS JUST KIND OF CURIOUS NOW THAT, UH, ERCOT HAS DONE A GOOD JOB OF OBVIOUSLY TALKING TO THOSE THAT WERE CONCERNED AND MAKING THIS, UH, THE DATE FAR ENOUGH OUT WHERE THE CON THE CONCERNS
[01:25:01]
HAVE BEEN ADDRESSED.WHAT ARE THE REMAINING PROBLEMS WITH THIS? AND IT SOUNDS LIKE BOB EXPRESSED, AND CAITLYN TO SOME EXTENT IS THEY THINK THEY SHOULD GET PAID TO DO THIS, UM, WHICH I THINK IS PROBABLY DEBATABLE.
BUT IS THERE ANYTHING ELSE THAT, THAT THET NEEDS TO UNDERSTAND ABOUT LINGERING CONCERNS FROM THE, UH, BATTERY PROVIDERS ON THIS? I, I THINK THERE IS SOME LINGERING CONCERN.
UM, AND, AND YES, IT'S, IT'S A DIFFERENT ISSUE THAN 2 45.
AND THE, THE RETROACTIVITY IS, IS NOT HERE, BUT SOME OF THE SAME ISSUES AROUND, UM, THE, THE CAPABILITY REQUIREMENT VERSUS THE PERFORMANCE OBLIGATION I THINK EXISTS.
AND SO I THINK WHEN, WHEN BOB AND I TALK ABOUT CONTINUING TO HAVE THE CONVERSATION OR MAYBE NOT BEING ABLE TO ME FULLY SUPPORT YET, I THINK THERE ARE PROBABLY CONVERSATIONS WE NEED TO CONTINUE TO HAVE TO MAYBE EVEN HAVE MORE DETAILED LANGUAGE TO MAKE SURE, UM, YOU KNOW, WHAT PEOPLE ARE DOING IN CAPABILITY IS MEETING ANY COMPLIANCE OBLIGATION.
BECAUSE I THINK WE'VE SEEN SOME TROUBLES IN IMPLEMENTING 2 45 AND, AND GETTING COMPLIANCE WITH THAT.
AND I THINK WE COULD SEE THAT THE SAME THING HERE.
THIS IS REALLY NEW TECHNOLOGY.
AND SO I, I UNDERSTAND IT WAS REALLY DIFFICULT AT ROSS AND IT WAS DIFFICULT FOR ME EVEN AS A ESR OWNER.
YOU KNOW, ERCOT WOULD SAY ONE THING ABOUT TECHNICAL CAPABILITIES, MY ENGINEERS WOULD SAY ONE THING, EVERY OTHER ESR COMPANY WOULD EACH SAY A DIFFERENT THING.
AND I, I THINK EVERYBODY WAS BEING SINCERE.
I THINK IT'S JUST SUCH NEW TECHNOLOGY THAT WE DON'T KNOW, LIKE IF IT'S ON ON MODE OR OFF MODE, YOU KNOW, THE, THE DIFFERENT MODELS, HOW IT WILL REACT IN CERTAIN SITUATIONS.
SO I THINK THERE'S JUST SOME HESITANCY ABOUT WHAT THE ACTUAL PERFORMANCE COMPLIANCE LOOKS LIKE AND, AND HOW THIS WILL BEHAVE IN REAL TIME.
AND, AND DOES THAT RAISE ANY CONCERNS FOR OR CO OR ESR OWNERS? THANKS NED.
I WAS, I WAS, I'M PLANNING TO ABSTAIN ON THE VOTE.
UM, WANTED TO GIVE A LITTLE EX UH, EXPLANATION OF WHY.
AND BILL, THIS PROBABLY GETS TO YOUR POINT, YOU KNOW, UH, EXISTING GENERATORS HAVE A LOT OF REQUIREMENTS THAT WE ARE KIND OF TABLE STAKES, BUT AS YOU KNOW, THIS NPR OR THIS, I'M SORRY, THIS, UH, THIS NO GRAND BIGGER HAVE HIGHLIGHTED, SOME OF THOSE CAPABILITIES ARE BECOMING MORE SCARCE AND THERE'S A NEED IN THE MARKET.
SO FROM A PRINCIPLED STANDPOINT, WE THINK A MARKET-BASED APPROACH WOULD BE A WAY TO ADDRESS THAT AND PROVIDE VALUE TO ALL GENERATORS, NOT JUST, UH, IBR, BUT HAVE THAT BE A, UM, YOU KNOW, PROCURED SYSTEM WIDE FROM ANY RESOURCE THAT CAN PROVIDE IT.
SO THAT'S, THAT'S THE PRINCIPLE.
THAT'S NOT THE WAY THIS ONE'S GOING.
WE ACTUALLY, BUT WE, YOU KNOW, FROM WHAT WE SEE HERE, UH, WE DO THINK ERCO T'S COMMENTS HAVE, UH, HAVE ADDRESSED THIS IN A WAY THAT IS PROBABLY THE, THE BEST WAY TO MOVE FORWARD.
SO NOT GETTING IN THE WAY OF IT BY ANY MEANS, BUT THAT'S THE, THE BASIS FOR THE, THE ABSTENTION.
YEAH, FIRST JUST TO GO ON AND TALK ABOUT ON THE COMPLIANCE PIECE IN THAT, I HAVE LESS OF A CONCERN ABOUT THAT ANYMORE, BUT I WILL REMIND EVERY ONE OF US, LIKE RICHARD AND BILL AND SOME OF US THAT HAVE BEEN AROUND HERE FOR A WHILE, WHENEVER THE CCG TS CAME IN AND WE STARTED MODELING CCG TS AND LOOKING AT, UH, PFR AND EVERYTHING ELSE, 'CAUSE THOSE ARE OPERATED DIFFERENT.
THEY DON'T HAVE A GOVERNOR, THEY HAVE A FUEL VALVE THAT DOES ALL THAT.
IT TOOK US, I THINK IT WAS A YEAR AND A HALF BEFORE WE EVER GOT THAT ALL COMPLETELY IRONED OUT TO WHERE WE WENT THROUGH WITH COMPLIANCE ISSUES.
SO THAT'S JUST, THAT'S JUST TO LAY THAT BASE OUT THERE.
BUT I'M NOT AS WORRIED ABOUT THAT BECAUSE OF SOME OF THE WORDING AND THE WAY THIS WILL BE IMPLEMENTED.
WHILE I STILL DO HAVE A LITTLE, BUT MY, MY, UH, CONCERN IS THAT NOT NECESSARILY THE PAY, ALSO IT'S THAT THE WAY THAT 2 72 WILL WORK IS ALL OF THE ESRS THAT HAVE AN SGIA AFTER APRIL 1ST, 2026, WILL HAVE TO HAVE THIS CAPABILITY.
YOU DON'T KNOW WHERE IT'S GONNA BE.
YOU DON'T KNOW IF IT'S GONNA BE CLUSTERED, YOU JUST DON'T KNOW WHAT'S GONNA HAPPEN AS IT MOVES FORWARD ON INSTALLATION.
AND I BELIEVE THAT THE GRID FORMING PIECES OF THIS NEED TO BE FOCUSED AND THEY'RE TARGETED FOR WHERE THEY WOULD BRING THE BEST POSITIVE IMPACTS TO THE GRID.
AND I'M SPECIFICALLY TALKING ABOUT SOME OF THE GTCS AND SOME OF THE OTHER PLACES WHERE THEY HAVE CONGESTION THAT THIS TYPE OF ACTIVITY WOULD, WOULD HELP.
AND BY DOING IT IN A MARKET BASED EFFORT, YOU COULD TARGET THAT AND YOU COULD SAY, I NEED THEM IN THESE AREAS.
AND THAT'S WHY 1278 WAS WRITTEN THE WAY IT WAS, JUST TO USE THE EXAMPLE.
IT DOESN'T HAVE TO BE THE ONE THAT WE USE, BUT THAT'S WHY IT WAS WRITTEN THAT WAY SO THAT
[01:30:01]
ERCOT COULD SAY, I NEED SO MUCH GRID FORMING IN THIS AREA.I NEED SO MUCH IN THIS AREA, I NEED IT OVER HERE, RATHER THAN JUST HAVING IT BEING PUT OUT THERE LIKE A SHOTGUN.
AND SOME OF IT'S GONNA DO, DO SOME REALLY GOOD THINGS FOR IT, AND SOME OF IT AREN'T GONNA DO AS MUCH GOOD FOR IT.
AND THERE'S DEBATE, I DON'T KNOW THE ANSWER TO IT.
I'M NOT SAYING IT'S RIGHT OR WRONG, BUT THERE HAVE BEEN QUESTIONS ON WHETHER A CONSOLIDATION OF GRID FORMING IN ONE AREA, WHICH YOU'D HAVE THE SAME PROBLEM WITH, UH, WITH THERMAL GENERATION ALSO, IF YOU HAD AN ALL TOO MUCH IN ONE SPOT, YOU GET OVERREACTIONS AND THINGS LIKE THAT.
SO THERE, THERE, THAT'S MY ONLY CONCERN ABOUT THAT.
BUT THAT'S WHY I'M NOT GOING TO OPPOSE IT, IS 'CAUSE IT'S GONNA GIVE, GIVE OR COP WHAT THEY THINK THEY NEED.
SO WHAT I'M HEARING RIGHT NOW, AND I WANNA RECONCILE THIS FOR EVERYONE, IS THERE'S A LINE IN THE SAND AND WE'VE GOT THE OPERATIONAL SIDE THAT'S A REQUIREMENT FROM ERCOT, AND WE'VE GOT THE MARKET SIDE.
WELL, I'M HERE TO TELL YOU, LIKE, WE CAN JUST MARK THAT OUT, TAKE YOUR SHOE AND JUST ERASE THAT LINE.
BECAUSE WHAT I'VE HEARD FROM FRED IS THAT THIS DOES NOT CLOSE THE DOOR FOR LOOKING AT THE MARKET ASPECT OF THINGS.
HE'S ALREADY COMMITTED TO DOING THAT.
HE'S ALSO SAID THAT, YOU KNOW, WHETHER YOU LIKE THIS IDEA FOR AN NPR OR NOT, HE, IT SOUNDS LIKE HE STILL IS DEVELOPING, FOLLOWING THROUGH WITH HIS WORD ON A ONE TIME PAYMENT.
SO I DON'T KNOW WHAT INCENTIVE THAT PROVIDES.
I DON'T KNOW IF IT'S ENOUGH, BUT HE HAS COMMITTED TO STILL WORK WITH THE FOLKS THAT WOULD RATHER SEE, UM, A MARKET BASED APPROACH TO THAT.
AND AS NED STATED, IF WE WANTED TO LOOK AT THAT MORE BROADLY, UM, THAT WOULD BE GREAT.
BUT I, I JUST WANT FOLKS TO KNOW THIS IS NOT THE THE END ALL BE ALL.
YOU'RE, YOU'RE TAKING A VOTE ON WHAT'S BEFORE YOU TODAY, BUT THERE IS STILL MORE WORK TO BE DONE ON THIS SHUI.
UM, FIRST I WANT TO APOLOGIZE FOR MY SHAKY VOICE BECAUSE I'M NOT USED TO TALKING TO, UM, A GROUP OF PEOPLE WHO ARE
AND SO, UM, MY THOUGHTS OF ALL THESE, UH, DEBATE IS THAT, UM, THEY ARE APPARENTLY, UH, ALL KINDS OF, UH, COMPETING PRIORITIES, RIGHT? SO I THINK, UM, SO WE NEED TO SORT THROUGH ALL THE DEBATES AND FIGURE OUT, YOU KNOW, WHICH ONES SHOULD TAKE, YOU KNOW, HIGHEST PRIORITY, JUST LIKE HOW WE PRIORITIZE THE, THOSE NPR.
SO I THINK THAT AT A VERY HIGH LEVEL, THE FIRST LEVEL WE WANT TO LOOK AT THE RELIABILITY AND THE ECONOMICS.
THESE TWO, WHICH ONE TAKES HIGHER PRIORITY IN THIS CASE.
SO ACCORDING TO ORCAS DEBATES, I THINK, YOU KNOW, UM, THEY REALLY THINK IT'S URGENT FOR UHRS TO HAVE THIS KIND OF CAPABILITY.
UM, SO, UM, SO I'M NOT SURE IF THAT GIVES A LOT OF WEIGHT TO THESE, UH, YOU KNOW, TO, TO THE FINAL DECISION OF THIS.
AND I THINK ONCE WE GOT THAT TAKEOFF, YOU KNOW, WHICHEVER WAY TAKES PRIORITY, RIGHT? RELIABILITY OR ECONOMICS, THE NEXT LET'S LOOK AT, YOU KNOW, THE ECONOMICS, WHICH IS COST OVER, UH, VERSUS COMPENSATION.
SO I, I HEARD PEOPLE TALK ABOUT ONE SIDE AND ANOTHER THE OTHER.
SO I THINK, YOU KNOW, JUST LIKE HOW WE TRY TO FIGURE OUT HOW TO RE YOU KNOW, LOOK AT THE TRANSMISSION COST ALLOCATION, I THINK THIS IS SIMILAR.
SO IF WE WANT TO COMPENSATE EVERYBODY FOR THIS SERVICE, AND THEN WE SHOULD LOOK AT ALLOCATE THE COST TO THOSE WHO COST THIS, RIGHT? UM, SO, UM, YEAH, I JUST PUT IT OUT THERE.
YEAH, I DON'T WANT TO EXTEND THINGS TOO MUCH, BUT I, I DO WANNA, BOB, AND YOU IN PARTICULAR, I WANNA MAKE SURE I UNDERSTOOD WHAT YOU AND THEN SOME OF THE OTHERS ARE SAYING HERE.
'CAUSE I MEAN, NUMBER ONE, I THINK, UM, UH, THE COMMENTS ABOUT, HEY, THIS IS NOT OVER, YOU KNOW, WE'RE GONNA CONTINUE DISCUSSING THE COMPENSATION ISSUE AND, AND ALL OF THAT IS THAT I, I DO AGREE WITH THAT.
THIS DOESN'T CLOSE THE DOOR ON DISCUSSING THAT.
UM, THIS IS MOST IMPORTANT TO ME THAT WE GET IN PLACE SOME GROUND RULES SO THAT THE CAPABILITIES ARE THERE AND WITH WHAT YOU WERE SAYING ABOUT, YOU KNOW, GETTING IT WHERE IN THE RIGHT LOCATIONS AND, AND ALL OF THAT.
[01:35:01]
IT, IT, IT JUST, IF, IF YOUR INTENT IS TO NOT HAVE TO DO IT AT ALL, UM, IN SOME LOCATIONS VERSUS HAVING TO DO IT IN, IN IMPORTANT LOCATIONS, THAT MAY, THAT ALONE MAY BE DIFFICULT.YOU KNOW, THE CAPABILITY STANDPOINT, I FEEL LIKE THAT MAY BE DIFFICULT BECAUSE THE SYSTEM'S CHANGING.
AND SO ONE DAY THERE MAY BE A NEED, A LACK OF A NEED HERE TODAY AND A DESPERATE NEED TOMORROW.
UM, BUT IF YOU'RE, AND SO THAT I, I MIGHT BE WORRIED A LITTLE BIT ABOUT, BUT WHAT I THINK YOU WERE REALLY GETTING AT WAS THAT HAVING THE STUFF ON ALL THE TIME TO BE CAPABLE OF, OF PROVIDING THIS SERVICE BOOM RIGHT NOW IS A COST.
AND WHAT YOU WOULD LIKE IS THE ABILITY TO RETREAT FROM THAT IF THERE'S INSTANCES WHERE IT'S REALLY NOT NEEDED IN A PARTICULAR AREA SO THAT YOUR ENERGY PRODUCTION OR WHATEVER IS CAPABLE OF MORE.
AND SO ALL I'M REALLY LOOKING FOR FOR IS, DID I, DID I UNDERSTAND YOUR POINT AND, AND THE COLLECTIVE POINTS WELL ENOUGH, OR SHOULD WE JUST HAVE A SIDEBAR DISCUSSION? 'CAUSE I DO WANT TO UNDERSTAND IT.
WE CAN AND MAKE SURE I HEAR YOU.
YEAH, WE CAN, BUT IT'S NOT SAYING THAT I DON'T WANT TO SUPPLY IT IN AN AREA, IT'S NOT DOING VERY MUCH GOOD.
WHAT I'M SAYING IS, IS THAT UNDER 2 72, PART OF MY CONCERN IS IT COULD ALL END UP IN AREAS THAT WE DON'T REALLY NEED IT.
AND THEN THE AREAS WHERE WE REALLY DO NEED IT, THERE'S NO ESRS NEW ASRS BEING BUILT IN THOSE AREAS, AND THEREFORE WE DON'T GET THE BENEFITS THAT WE COULD.
SO YOU'D LIKE THE, THE, THE, YOU MIGHT WANT TO PUT SOMETHING SOMEWHERE.
THAT'S WHAT I WAS AFTER THAT I LOOK FORWARD TO THE DISCUSSIONS.
YEAH, THAT'S ALL I WAS TRYING TO SAY.
PATRICK, ANOTHER TWO QUICK COMMENTS ON, ON BOTH THE COST AND, AND THE, LIKE, THE DENSITY OF, OF GRID FORMING RESOURCES.
UM, ONE, THE, THERE IS ADDED COST TO THE CAPEX SIDE OF THIS EQUATION.
SO AS YOU'RE BUILDING THE FACILITY, YOU HAVE TO BUILD IT IN A WAY THAT, THAT HAS ADDITIONAL COST TO MAKE SURE THAT THE FACILITY KIND OF WITHSTANDS SOME OF THE, THE GRID FORMING BEHAVIOR OF THAT RESOURCE.
SO I, I, I THINK THERE, THERE IS ADDITIONAL COST THAT'S GOING TO BE INCURRED BY THE PEOPLE WHO ARE DEVELOPING THESE.
UM, AND, AND I THINK ONCE IT'S THERE, THE, THE, THE ADDED COST, I MEAN, THERE'S PROBABLY AN OPERATIONAL BENEFIT TO TURNING IT OFF, UM, WHEN WE GET TO THE POINT WHERE WE'RE REQUIRING ESRS TO PROVIDE A BUFFER, UM, IN ORDER TO KIND OF PROVIDE PERFORMING RESOURCES AT ALL TIMES.
UM, BUT I, I DON'T BELIEVE THAT THAT'S REQUIRED WITH THIS, THIS, UM, THIS NOER.
SO, UH, JUST THE, THE COST SIDE OF THINGS, UM, ON, ON THE DENSITY, RIGHT? SO IF, IF THERE'S A, A REGION WHERE THERE'S A WHOLE BUNCH OF THESE RESOURCES THAT ARE, ARE, ARE, UM, ARE GRID FORMING, UM, I DON'T THINK WE YET UNDERSTAND THE, THE, THE POTENTIAL INTERACTIONS BETWEEN NEIGHBORING FACILITIES, FOR EXAMPLE, OR, UM, THE, LIKE THE IBS THEMSELVES WITHIN THE FACILITIES HAVING INTERACTIONS WITH COMPETING STRATEGIES OF, OF CONTROL DESIGN FROM, FROM POTENTIALLY NEIGHBORING RESOURCES THAT ARE NOT OF THE SAME MAKE AND MODEL.
UM, SO I THINK, I THINK THERE'S, THERE'S CONSIDERATIONS THAT, THAT NEED TO BE THOUGHT THROUGH ON, ON, ON THAT SIDE OF THINGS.
SO I, IF, IF A WHOLE BUNCH OF RESOURCES ARE GOING INTO AN AREA THAT IT MAY MAKE SENSE TO BE ABLE TO TURN THAT OFF, UM, IN CERTAIN AREAS IN CERTAIN FACILITIES.
JUST A FINAL WORD, UH, TO BE CLEAR, I'M NOT TRYING TO CONVINCE ANYONE TO VOTE NO HERE.
I'M NOT TRYING TO DO THAT AT ALL.
I JUST WANTED TO PUT, I FELT THAT I NEEDED TO GET MY CONVICTIONS OUT THERE ON WHAT I FELT ABOUT IT, AND I WILL BE SUPPORTING IT JUST TO LET YOU KNOW.
SO, UH, BUT I HAVE THOSE OTHER CONVICTIONS AND I THINK THERE'S BETTER WAYS OF DOING IT.
AND SO WE HAVE THE MOTION ON THE SCREEN THAT RICHARD MADE, WHICH BETH SECONDED.
IS THERE ANY FINAL DISCUSSION ON THE MOTION BEFORE WE VOTE? OKAY, CORY, WE'LL TURN IT OVER TO YOU.
SO ON YOUR MINI YET POWERFUL COMBO BALLOT, WE WILL START UP WITH THE CONSUMERS.
[01:40:01]
YOU, KYLE.ONTO OUR INDEPENDENT GENERATORS.
IT'S A, IT'S A MINI COMBO, BRIAN.
IT'S A MINI, IT'S SMALL BUT MIGHTY COMBO BALLOT.
IT'S A MINI COMBO, BUT YOU ABSTAINED ON THE COMBO.
BRIAN, BRIAN, DON'T TELL ME YOU'RE GONNA HAVE TO BREAK.
DON'T TELL ME YOU'RE GONNA NEED TO BREAK THESE APART INTO TWO SEPARATE BALLOTS.
BRIAN, I DID ABSTAIN ON THE COMBO BALLOT.
DO YOU WANNA MAKE A MOTION TO SPLIT THE MOTION? NO, I'M JUST TEASING.
INSIDE JOKE, I GUESS SOME OF US GOT IT.
UM, YES, WITH SYMPATHIES TO, UH, THE REST OF MY SEGMENT, THAT WAS A SYMPATHETIC YES.
WAS THAT A SYMPATHETIC ABSTENTION? IT WAS A SYMPATHETIC ABSTENTION, YES.
AND AN EFFICIENT ONE,
YOU WITH US? OH, GOT YOUR YES IN CHAT, JENNIFER.
THANK YOU ABBY FOR DAVID? YES.
AND THEN ANDREW FOR JOSE? YES.
SO WE ARE FINISHED WITH ROSS NOW.
DOES ANYONE WANNA TAKE A SHORT BREAK OR DO YOU WANNA KEEP ROLLING UNTIL LUNCH? KEEP ROLLING.
[11. WMS Report]
THE WMS REPORT WITH, UH, JIM LEE TODAY.UM, YEAH, JIM LEE, UH, VICE CHAIR OF WMS HERE TO GIVE THE UPDATE.
UM, SO AT OUR AUGUST 6TH MEETING, UM, WE HAD A VERY HEALTHY DISCUSSION ON THE 2026, AN ANCILLARY SERVICE METHODOLOGY.
UM, AS WE WERE GOING THROUGH THAT DISCUSSION, UM, IT WAS RAISED THAT, YOU KNOW, UH, MEMBERS DIDN'T FEEL LIKE THEY HAD, UH, ENOUGH TIME TO, UH, UH, GIVE A, GIVE A GOOD VOTE ON THIS ONE.
SO THE WS LEADERSHIP DECIDED TO, TO MOVE THIS TO AN EMAIL VOTE.
UM, AND, UH, WE USED THE, THE IDENTICAL MOTION THAT, THAT ROSS HAD USED FOR THEIR, THEIR, UH, VOTE THE THE FOLLOWING DAY.
AND SO, UH, THANKS TO KATIE FOR WORKING WITH WMS LEADERSHIP TO KIND OF COORDINATE, UM, THAT, UH, THE RESULTS OF, UH, THE EMAIL VOTE.
UM, IT PASSED, UM, IT HAD SIX, SIX OBJECTIONS WITH TWO ABSTENTIONS.
UM, I THINK I'LL, I'LL LEAVE THE, THE DETAIL DISCUSSION FOR AGENDA ITEM 15 ON, ON THE AS METHODOLOGY.
BUT, UH, THAT DID WRAP UP THE WMS PORTION OF THAT, UM, DISCUSSION.
AND THEN THE OTHER PIECE THAT WE, UH, TALKED ABOUT, UH, WAS NPR 1285, UH, WHICH IMPROVES THE, UH, SELF COMMITMENT, UH, WINDOW WITHIN THE R OPT OUT WINDOW.
UM, AND WHAT THAT DOES IS IT, IT, UM, SEEKS TO EXPAND THE, THE R OPT-OUT WINDOW BY REMOVING THE, THE TWO HOUR REQUIREMENT CURRENTLY IN PROTOCOLS.
AND SO, UH, THIS ONE, UH, WMS VOTED TO ENDORSE AS SUBMITTED.
UM, AND THE NPR IS CURRENTLY AT PRS RIGHT NOW FOR IA CONSIDERATION.
SO THAT IS A UPDATE FOR THE MEETING ON THE SIXTH.
AND THEN THIS, THIS SLIDE JUST, UH, OUTLINES THE REMAINING TOPICS THAT WMS HAS ON OUR PLATE, UH, TO WORK THROUGH.
SO IT'S SHORT AND SWEET UPDATE.
ANY QUESTIONS OR COMMENTS FOR JIM? THANK YOU.
[12. Credit Finance Sub Group (CFSG) Report (Vote)]
TO, UM, THE CFSG REPORT.[01:45:01]
YEP.UM, WE DIDN'T HAVE A MEETING THIS MONTH BECAUSE OF A LIGHT AGENDA.
UM, WE WILL BE MEETING LATER IN SEPTEMBER.
UM, THE ONLY THING WE NEED TO ADD TO THET AGENDA IS, OR THET BALLOT IS VOTING ON BRIAN PEN PENDERGRAST.
AND I HOPE I DIDN'T SLAUGHTER HIS NAME TOO BAD.
HE IS A BACKUP REPRESENTATIVE FOR CITY OF AUSTIN, AND OUR CHARTER ALLOWS, UH, MEMBERS TO HAVE BACKUP MEMBERS.
THEY ONLY HAVE ONE VOTE, BUT THEY HAVE AL, YOU KNOW, ALTERNATIVES THAT CAN SERVE.
SO WE ARE LOOKING TO APPROVE THE CFSG MEMBERSHIP EDITION AS PRESENTED.
BRIAN, UH, ER OF CITY OF AUSTIN.
CAN WE PUT THIS ON THE COMBO BALLOT? OKAY.
ANYTHING ELSE FOR US, LORETTO? NO, THANK YOU.
WE ARE SKIPPING, UM, LARGE LOAD UNTIL JULIA IS OUT OF FURTHER COMMITMENT, SO WE CAN
[14. RTC+B Task Force Report]
MOVE TO RTC PLUS B TASK FORCE REPORT, UH, IF MATT MARINAS IS READY.AND I THINK I WENT FROM 40 SLIDES AT LAST HACK MEETING TO 14, SO I JUST GOT LUCKY ON THE EFFICIENCY.
UM, WE'RE GONNA GO THROUGH THE ISSUES LIST THAT, UH, THAT TASK FORCE HAS BEEN WRAPPING UP.
IT'S REALLY ABOUT MARKET READINESS IN THE MARCH TO THE FINISH LINE.
WE'RE AT A HUNDRED DAYS, 100 DAYS FROM GO LIVE.
UM, AND WE HAVE THE LFC TEST IN LESS THAN THREE WEEKS.
SO I WANT TO KIND OF TOUCH ON HOW THINGS FIT TOGETHER, ESPECIALLY OVER THE NEXT 21 DAY.
UH, HERE'S THE, YOU KNOW, CHECKING 'EM OFF THE LIST.
THANK YOU FOR KEEPING THINGS MOVING.
UH, NOTE WE DID FILE A GOOD CAUSE EXCEPTION.
UH, IF I DIDN'T TOUCH ON THIS, WELL LAST TIME IT WAS THE IDEA FOR THE LFC TEST THAT IS A PRODUCTION LIVE TEST ON SEPTEMBER 11TH FROM 10 30 TO 1230 WHERE THE CONTROL ROOM WILL DO A HOTLINE CALL AND SAY, FOLLOW THE RTC SIGNAL.
THAT IS ESSENTIALLY OUR VDI TO SAY FOLLOW SOMETHING ELSE.
THIS GOOD CAUSE EXCEPTION SAYS ERCOT WILL NOT CHARGE FOR THOSE DEVIATIONS BETWEEN THE INSTRUCTIONS OR THE DISCREPANCIES DURING THAT PERIOD.
SO THAT'S WHAT WAS FILED WITH THE COMMISSION TO ALLOW US TO ESSENTIALLY BREAK PROTOCOLS AND NOT USE THAT CHARGE.
SO POLICY WISE, WE THINK WE'RE IN A POSITION.
I HAVE HAD AT LEAST A COUPLE PHONE CALLS FROM PEOPLE SAYING COMPLIANCE, WHAT ARE, UH, WHAT DOES IT MEAN FOR NODAL PROTOCOLS TO BE LIVE FOR TWO HOURS? THAT'S NOT THE CASE.
THIS IS A CONTROLLED TEST FROM THE CONTROL ROOM AND BACK OUT AGAIN.
UH, AND THAT'S HOW WE'RE MANAGING THROUGH THAT.
UH, THE SCOPE HAS NOT CHANGED.
THANK YOU STAKEHOLDERS FOR THAT.
UH, AGAIN, THE PROGRESSION THAT WE'RE IN, WE'RE INTO THIS, UH, END OF AUGUST, SO WE'RE IN THE TIPPING POINT OF MOVING INTO THE LOAD FREQUENCY CONTROL TEST AND DAY AHEAD MARKET.
IT'S ALSO KIND OF A WIN THAT WE'VE BEEN RUNNING SCED NOW FOR TWO MONTHS ALMOST WITH THE MARKET PARTICIPANT.
SO THE PRICES LOOK A LITTLE WEIRD, UH, BUT WHAT WE ARE SEEING IS WE ARE CLEARING ANCILLARY SERVICES FOR THESE HOURS.
WE ARE GETTING THE WORK DONE AND PEOPLE ARE EXERCISING THE SYSTEMS. SAW A QUESTION PIPE IN.
AND I APOLOGIZE IF I MISSED THIS AT THE LAST, UH, TASK FORCE MEETING, BUT WHEN, UH, WHEN YOU HAVE THAT HOTLINE CALL AND YOU GIVE THE, THE EFFECTIVELY THE VDI FOR, UH, FOLKS TO SWITCH OVER, IS THERE GONNA BE SOME PHASING OF WHEN PARTICIPANTS GOING OR IS IT EVERYONE JUMPING THE POOL AT THE SAME TIME? GREAT QUESTION.
WE'VE GONE BACK AND FORTH ON THIS, THE CON WE'VE TALKED TO THE CONTROL ROOM.
WE BELIEVE THE SYSTEMS ARE CLOSE ENOUGH IN HOW THEY RELATE TO WHERE IT'S SAFER TO GO WITH A SINGLE SWITCH.
SO IT'LL BE EVERYONE SWITCHES AT ONCE ON OR AROUND 10:34 AM WE'LL TALK ABOUT THAT AT THE WORKSHOP NEXT WEEK TO CONFIRM THAT.
THAT'S ALSO THE BEAUTY OF THAT ONE IS IF THINGS, UM, GET INTO AN UNRELIABLE POSTURE, WE CAN THEN SNAP OUT IN LESS THAN FIVE MINUTES.
ALRIGHT, SO CONNECTIVITY WISE, WE'VE CHECKED THAT OFF THE LIST.
WE'RE WRAPPING UP THE JULY AND AUGUST AND HERE WE ARE WALKING INTO SEPTEMBER 2ND, NEXT TUESDAY.
UM, AGAIN, THIS ON THE RIGHT SIDE REFLECTS THIS LIVE PRODUCTION TEST.
ON THE LEFT IS THE DAY AHEAD MARKET.
THAT'S AN OPTIONAL, UH, PARTICIPATION DAY AHEAD MARKET IS ALMOST IDENTICAL.
UH, THERE'S VERY LITTLE LEFT, BUT THAT WILL BE THE CHANCE FOR MARKETERS AND OTHER PARTICIPANTS TO BE IN THERE IN AND SUBMITTING OFFERS IF THEY CHOOSE.
AND I'LL SHOW A CALENDAR OF THAT IN JUST A MINUTE.
UH, AND HERE'S WHAT I REDACTED FROM THE PREVIOUS ONE, BUT I DON'T WANT TO CLOSE THE DOOR ON.
IF ANYONE WANTS TO OPEN THIS PAST WEEK'S MEETINGS AND LOOK AT SCORECARDS
[01:50:01]
AND GO THROUGH THIS, WE CAN.MY SUMMARY OF THIS IS THAT THE SCORECARDS ARE ON TRACK WITH THE ONGOING, UM, OUTREACH.
WE'VE HIT AS HIGH AS 95%, BUT ON AVERAGE WE'RE 92% AND SKI OFFERS ARE AT THE 95% LEVEL.
SO THOSE ARE BOTH KIND OF EXIT CRITERIA TO MOVE TO THE NEXT PHASE.
AND WE'RE HITTING THOSE AND WE STILL ARE, UM, YOU KNOW, IMPROVING IT EVEN THIS WEEK.
UM, ALSO IN THOSE SLIDES THERE ARE THE SUMMARY OF THE PRICES AND AWARDS.
AGAIN, THE AWARDS ARE MORE IMPORTANT, UM, IN TERMS OF MEGAWATT AMOUNT THAN THE PRICES RIGHT NOW.
THE BIG ONE IS THESE ATTESTATION.
SO I SENT OUT A MARKET NOTICE LAST WEEK, AND THIS WAS THE REALIZATION OF IF WE DO A HOTLINE CALL ON SEPTEMBER 11TH, IS THERE GONNA BE A CONTROL ROOM THAT ANSWERS THE PHONE AND SAYS, I DON'T KNOW WHAT REAL TIME IZATION IS.
AND SO I SENT OUT A MARKET NOTICE AND I SAID, ALL QUEASY WITH RESOURCES MUST RESPOND AND ACKNOWLEDGE THAT THEY HAVE PERSONNEL AND SYSTEMS THAT WILL BE READY ON SEPTEMBER 11TH FOR THIS ACTIVITY.
SO IT'S REALLY KIND OF A GENTLE PING TO MAKE SURE THERE'S SOMEONE ON THE OTHER END OF THE LINE THAT THEY ARE READY FOR THAT DAY TO OCCUR.
UH, SO THAT'S THE PURPOSE OF THE READINESS.
SOME PEOPLE HAVE SAID, WELL, WHAT IF EVERYTHING'S NOT PERFECT? WE'RE NOT LOOKING FOR PERFECTION, WE'RE LOOKING FOR READINESS.
UH, AND THEN RAMPING UP FOR SEPTEMBER 11TH.
UM, AGAIN, I KEEP USING THE WORD LIVE PRODUCTION TEST BECAUSE CLOSED LOOP LFC TEST SOUNDS LIKE MUMBO JUMBO.
NOW THAT'S ON TAPE MUMBO JUMBO.
OKAY, SO WHERE ARE WE AT? UM, WE'RE ACTUALLY ON THE 27TH TODAY.
SO WHAT ERCOT HAS, THIS IS THE DUE DATE FOR THOSE AT STATIONS TO COME IN.
OUR TEAM IS MAKING A GO NO GO DECISION ON THE 29TH FOR THE SEPTEMBER 11TH LIVE TEST TO OCCUR.
THAT'S WITH CONTROL, THAT'S WITH DAN WOODFIN, THAT'S WITH CHAD SEALEY, THAT'S WITH KEITH, THAT'S WITH OUR IT STAFF.
THAT'S THE IDEA OF ARE WE ALL IN ON THIS? SO WE'LL SEND A MARKET NOTICE ON THE 29TH THIS FRIDAY CONFIRMING THIS TEST.
AND THEN I'VE PUT IN A, UM, UH, LFC WORKSHOP NUMBER THREE ON THE AFTERNOON OF THE FOURTH, A WEEK BEFORE THE TEST JUST TO DO ONE MORE WALK DOWN ON THIS TO MAKE SURE WE ALL KNOW WHAT WE'RE DOING.
UH, THESE YELLOW BOXES ARE WHERE WE'RE ASKING MARKET PARTICIPANTS TO BEHAVE AS IF IT IS THE LFC TEST.
IN TERMS OF OFFERS, UH, I WILL PAUSE.
THIS IS REALLY IMPORTANT CONCEPT IS WE ARE ASKING IF YOU ARE CARRYING REGULATION RIGHT NOW, YOU'RE A QUEASY, YOU'VE BEEN AWARDED IN DAM, YOU HAVE TRADES, YOU HAVE 10 MEGAWATTS OF REGULATION THAT YOU'RE CARRYING.
WHEN WE GET INTO THIS TEST, WE'D LIKE THAT SAME QUEASY TO CARRY THAT SAME 10 MEGAWATTS.
SO WE'RE SAYING OFFER IN THOSE 10 MEGAWATTS IS $0 AND IF YOU'RE NOT AWARDED FOR THE OTHER STUFF, OFFER IT IN AT $2,000.
SO WE'RE COULD TRY TO PARK AND HOLD THINGS WHERE WE CAN, BUT THERE WILL INVARIABLY BE SOME DRIFT DURING THE TEST.
BUT THIS IS HOW WE'RE TRYING TO, ED'S GONNA WANNA REOPTIMIZE EVERYTHING TO THE LEAST COST SOLUTION.
WE DON'T WANT TO GO IN THAT TEST.
THIS IS ABOUT REGULATION AND CAN EVERYONE HOLD WHAT THEY'RE DOING AND WITH THE NEW SIGNALING STILL FOLLOW THE SIGNAL.
UM, SO ANYWAYS, THAT'S OUR PROGRESSION TO GET THERE.
THE BACKUP TEST, YOU KNOW, THE 18TH, THAT'S IF SOME BIG SYSTEM ISSUE IS OCCURRING THAT WE NEED TO RESCHEDULE, THAT'S IF A HURRICANE'S ROLLING IN.
BUT OTHERWISE, YES, IT MAY BE HOT, BUT WE'RE DOING THE 10 IN THE MORNING WHEN THE SUN'S UP AND THE, YOU KNOW, THE HEADROOM ON THE SYSTEM IS AROUND 10,000 MEGAWATTS.
UH, AND THEN WE'LL START RUNNING OUR FIRST DAY AHEAD MARKET MID MONTH.
UH, AND THEN WE'LL RUN THAT, UH, AT LEAST TWO OR THREE MORE TIMES.
SO REALLY YOUR STAFF, OUR STAFF IS LIKE NEXT WEEK'S A BEAR.
IT IS WHERE WE ARE ALL HANDS ON DECK REACHING OUT TO ANY QUEASY THAT'S NOT ABLE TO GET THESE OFFERS.
IN THE SAME WAY WE WANT TO START LOOKING AT PRODUCTION NEXT TO SC RTC AND SEE VERY SIMILAR, UH, DISPATCH.
SO THANK YOU FOR YOUR SUPPORT OF THAT.
OKAY, SO THIS WEEK WE'RE CONTINUING TO OUTREACH ON TELEMETRY.
WE'VE BEEN REACHING OUT ON MARKET SUBMISSION, SO IF THERE'S STUFF MISSING OR THAT LOOKS OFF, WE'RE LETTING YOU KNOW.
UM, AND I TOUCHED ON THIS, ALTHOUGH WE'RE 90 PLUS PERCENT ON BOTH ITEMS, THE SCED PRICES ARE STRANGE BECAUSE WE'LL AWARD WANT TO AWARD REGULATION TO AN ECONOMIC OFFER, BUT THEIR TELEMETRY RAMP RATE IS ZERO.
SO YOU'RE LOCKED OUT AND YOU CAN'T MOVE THAT ONE.
SO YOU GO THE NEXT RESOURCE OR THE NEXT RESOURCE.
SO THAT'S WHERE PRICES ARE TENDING TO SPIKE, UM, ABNORMALLY WHILE PEOPLE FIGURE OUT HOW TO GET THEIR SKID AND AS OFFERS ALL SYNCHRONIZED, UH, SO OUR OBSERVATIONS IS QUEASY NEED TO OFFER AS LEAST AS MUCH ANCILLARY SERVICES AS THEY'RE CARRYING IN PRODUCTION.
UH, IN THE LONGER TERM, QUEASY SHOULD BE OFFERING THEIR FULL CAPABILITY INTO THE SYSTEM.
UH, AND THEN N CLRS CANNOT USE THE SELF-PROVISION RIGHT NOW BECAUSE WE'RE NOT RUNNING THE DAY AHEAD MARKET.
SO NEXT WEEK, HERE'S MY VOICEOVER ALREADY HIT.
IT'S A SUPPORT INCREASE FOR THE QUEASY AND ERCOT.
WE'RE ASKING FOR SUBMISSIONS FOR ALL HOURS OF THOSE HIGHLIGHTED YELLOW DAYS.
THESE ARE THE DAYS TO PUT IN IT'S BUSINESS HOUR SUPPORT, BUT WE WANT YOU TO LOAD IN THE FULL 24 HOUR STRIP.
[01:55:01]
WE'LL BE WATCHING SKID OVER AND OVER AGAIN.UH, S ARE REQUIRED TO ADHERE TO THE LLC HANDBOOK DURING THAT TIME.
SO ENERGY OFFERS THE PRICE MATCHES PRODUCTION AS OFFERS SHOULD BE AT THIS ZERO OR 2000.
AND WE HAVE A DEEPER DIVE MARKET TRIALS CALL.
AND AFTER THE SEPTEMBER 11TH TEST, THAT'S WHEN WE PIVOT TO THE INITIAL DAY AHEAD MARKET TESTING.
UM, JUST A A VOICEOVER IF YOUR CONTROL ROOM'S INTERESTED IN THIS, WE DID POST AT THE LAST TASK FORCE BEING ALL OF THE RED LINES FOR OUR CONTROL ROOM, UH, PROCEDURES.
SO YOU COULD OPEN UP THE REAL TIME DESK THAT THE ERCOT CONTROL ROOM HAS AND YOU'RE SEEING WHAT IS DIFFERENT FOR HOW SCS BEING DISPATCHED, TRANSMISSION CONSTRAINTS, R DESK, ALL THOSE PROCEDURES HAVE BEEN UPDATED AND POSTED AS DRAFT JUST FOR TRANSPARENCY.
SO HERE IT IS, UH, UPCOMING THREE WEEKS ARE CRITICAL.
UH, WE NEED THOSE ATTESTATIONS.
WE HAVE ABOUT HALF IN, SO THERE'S A LONG WAY TO GO.
UM, AGAIN, THE, THOSE HELP FEED IN WITH ASSURANCE OF A GO NO GO FOR FRIDAY AND SENDING OUT THE MARKET.
NOTICE THE RAMP UP FOR EARLY SEPTEMBER AFTER THE HOLIDAYS.
THE PLANNED WORKSHOP ON SEPTEMBER 4TH, IT JUST POSTED YESTERDAY.
AND I'LL GET A MARKET NOTICE OUT TODAY THAT SEPTEMBER 4TH FROM ONE TO THREE IS A WEBEX, THE PROD LFC TEST, THE ACTUAL SWITCHING OVER WILL BE ON OR AROUND 10:30 AM TO 12:30 PM WITH CONTROL ROOM HOTLINE CALLS.
AND THEN THE FIRST DAY AHEAD MARKET RUN IS SEPTEMBER 16TH.
SO THAT'S THE UPDATE WHEN YOU GET BACK IN OCTOBER.
HOPEFULLY WE HAVE FINISHED ALL THOSE LFC TESTS.
WE'RE DEEP INTO MARKET TRIALS AT THAT POINT AND WE'LL REALLY BE TALKING ABOUT THE TRANSITION TO GO LIVE AT THAT POINT.
SO IF THERE ARE ANY QUESTIONS, WE CAN TAKE 'EM NOW.
GO AHEAD BILL, MATT, ON YOUR CALENDAR SLIDE, I KNOW WHERE IT IS.
I KNOW LIKE ALL EYES ARE ON UH, SEPTEMBER 11TH LLC TEST RIGHT NOW, BUT THE 17TH OF SEPTEMBER, WHAT IS, WHAT, WHAT ARE YOU PLAN THERE FOR NON-CONTROLLABLE LOAD, UH, SELF PROVIDE FUNCTIONALITY? YEAH, SO IT'S ACKNOWLEDGING A GAP THAT WE HAVE RIGHT NOW WITHOUT A DAY AHEAD MARKET.
THE NON-CONTROLLABLE LOAD RESOURCES ARE NOT BEING AWARDED, I'M SORRY, ARE NOT BEING AWARDED AN OBLIGATION THAT THEN THEY HAVE THAT CARVE OUT IN RTC THAT SAYS YOU CAN CARRY THAT OBLIGATION TO AND AUTOMATICALLY BE AWARDED IN REAL TIME.
IT'S NOT THERE RIGHT NOW BECAUSE THERE'S NO DAY AHEAD.
SO THIS IS JUST HIGHLIGHTING THAT DAMN RUN.
WE'LL GIVE YOU THAT CAPABILITY FOR NCLR TO SELF PROVIDE AND WE WANNA MONITOR TO MAKE SURE THAT THEY PICK UP ON THAT AND CAN CONTEST IT.
ANY OTHER QUESTIONS? ANY OTHER QUESTIONS OR COMMENTS FROM IT? I DON'T SEE ANY.
THANK YOU FOR THE TIME AND SUPPORT.
WE ARE SAVING ANCILLARY SERVICE METHODOLOGY FOR AFTER LUNCH
[16. ERCOT Reports (Part 1 of 2)]
SO WE CAN MOVE TOIS THAT RIGHT ANNE? SO FIRST IS THE RPG PROJECT.
UM, OR I GUESS WE'LL, WE'LL DO BOTH WITH BU IS HE READY? IS PRABU ON? OKAY, YOU WANNA SKIP? GO TO THE NEXT ONE.
GRID RESEARCH INNOVATION AND TRANSFORMATION GRID UP UPDATE, GET FROM MOVE ON TO DO THIS AFTERWARDS.
HI EVERYONE, I'M PRASHANT ELL.
I'M THE DIRECTOR FOR A GRID TRANSFORMATION TEAM, UM, WHICH IS A NEW TEAM AT ERCOT.
AND, UH, WE ARE WORKING ON, UM, SOME GRID TRANSFORMATION INITIATIVES.
UM, AND I WILL SHARE THE DETAIL OF, YOU KNOW, WHAT THOSE INITIATIVES ARE ABOUT, UM, AND HOW IT IS TIED TO OUR COURT MISSION, UH, AND THE PROCESS GOING FORWARD.
UH, GRID TRANSFORMATION INITIATIVES ARE, UH, LIKE AS PART OF THIS EFFORT, WE ARE TRYING TO BE PROACTIVE IN, UM, UH, BASICALLY LOOKING AT THE FUTURE LOOKING PROBLEM, UH, TRYING TO RESEARCH WHAT THOSE PROBLEMS ARE AND PROTOTYPE THE SOLUTION.
UM, EFFECTIVELY THIS IS ALL PART OF THE ERCOT MISSION, UH, IN, IN TERMS OF HELPING US DEVELOP THE EXPERTISE AND, UH, EVENTUALLY FEED INTO THE RELI, UH, RELIABILITY AND THE MARKET EFFICIENCY OF THE GRID.
SO WHY WE ARE TALKING ABOUT IT RIGHT NOW, AS WE KNOW, THE GRID IS CHANGING A LOT AND, UH, IT'S BOTH ON THE GRID SIDE, MEANING, UH, WE HAVE, UH, IBS, WHICH ARE ALL, WHICH WHICH WE ALREADY HAVE A LOT AND IS CONSTANTLY INCREASING.
[02:00:01]
UH, WE HAVE WEATHER CONDITIONS, UH, DER GROWTH AND NOW GRID ENHANCING TECHNOLOGIES TOO.UM, SO THAT IS THE PART OF, UH, WHERE THE GRID IS CHANGING A LOT, BUT ALSO ALSO ON THE OPERATIONS SIDE, UH, THERE ARE NEW TOOLS THAT ARE COMING BOTH SIMULATION, AI, A LOT MORE DATA AND, UH, THE COMPUTATION CAPABILITIES.
SO COMBINE THOSE TWO THINGS TOGETHER.
UM, THERE IS DEFINITELY A NEED FOR
UM, AND, UH, AND WHICH IS, WHICH IS THE CORE MISSION FOR THE GRID TRANSFORMATION INITIATIVES THAT WE ARE PLANNING ON RIGHT NOW.
UM, SO I, I WILL, UH, AND EVENTUALLY LIKE WE, WE WANT TO LIKE, MAKE THIS PROCESS FLOW AND I'LL GO, I'LL GO THROUGH THE PROCESS.
THIS IS SORT OF LIKE BEING, UM, THIS IS KINDA THE PRE-PROCESS TO, UH, HOW THINGS WILL COME TO DIFFERENT STAKEHOLDER WORKING GROUP.
UH, THIS WILL HELP US PREPARE, UH, WHAT WE ARE PROPOSING AS A SOLUTION OR, OR WHAT OUR, OUR NESTING OF THE PROBLEM IS.
SO HOW IS IT TIED TO THE CO MISSION? IT'S REALLY, UH, IF YOU START FROM THE THIRD BULLET AT THE BOTTOM, UH, THIS IS ALL ABOUT BEING EXPERT IN, IN THE PROBLEMS THAT, THAT ARE COMING IN THE SYSTEM AND EVENTUALLY FEED IT BACK TO THE RELIABILITY AND THE MARKET EFFICIENCY, UH, THROUGH THE STAKEHOLDER PROCESS THAT WE HAVE ALREADY.
SO HOW ARE WE COMING UP WITH THESE INITIATIVES? UM, SO WE, WE OBVIOUSLY ARE WORKING WITH ALL THE MAR MARKET PARTICIPANTS AND POCS AND WE HEAR ALL, UH, THAT WE ARE SEEING IN THE GRID THAT IS COMING.
WE WORK WITH THE VENDORS, NATIONAL LAB UNIVERSITIES, ISOS, AND THE IDEA IS TO TAKE ALL THAT INFORMATION AND FIRST FUNNEL IT THROUGH THE INTERNAL PROCESSES.
UH, WE HAVE NOW, UH, BY BIWEEKLY DIRECTORS MEETING WHERE WE ARE SYNCING WITH DIFFERENT BUSINESS DIRECTORS TO ALIGN ON DIFFERENT PROBLEMS AND SOLUTIONS THAT THEY ARE SEEING IN THEIR BUSINESS UNIT.
UM, BECAUSE THERE'S, AS YOU CAN IMAGINE, THERE ARE A LOT OF NEW TECHNOLOGIES BEING PROPOSED RIGHT NOW.
SO WE AS ERCOT HEAR THEM A LOT IN DIFFERENT BUSINESS TEAMS. SO WE ARE TRYING TO CONSOLIDATE THAT IN A BIWEEKLY MEETING DISCUSSION.
WE ALSO HAVE A BIMONTHLY DISCUSSION NOW WHERE WE PULL IN A LOT OF PRINCIPLES AND SMES AND UH, AND LEADERSHIP, UH, TO KIND OF CONSOLIDATE THAT AGAIN, YOU KNOW, IN, IN A BIMONTHLY MEETING.
AND THEN WE ARE DOING A SEMI E SEMI-ANNUAL LEADERSHIP MEETING NOW, UM, WHERE WE ARE TRYING TO FUNNEL ALL THESE IDEAS AND SEE, UM, WHAT INITIATIVES, UM, NEED SOME PROACTIVE WORK NOW.
AND, UM, AND THERE IS A PROCESS FOR THAT THAT I'LL SHARE.
UH, SO ONCE WE HAVE THOSE IN GRID INITIATIVES, UM, LIKE THE, AND THE SELECTION PROCESS I WAS SAYING, YOU KNOW, IS WHEN WE LOOK AT THE PROBLEM STATEMENT, WE ARE CATEGORIZING THEM INTO TWO THINGS.
ONE IS DO WE UNDERSTAND THE PROBLEM OR NOT? AND IF WE HAVE A PROBLEM, DO WE UNDERSTAND THE SOLUTION OR NOT? RIGHT? IF WE UNDERSTAND BOTH THE PROBLEM AND THE SOLUTION THAT FITS WITHIN THE BUSINESS TEAM AS, UH, THE WORK THAT IS ALREADY HAPPENING WITH, UH, IN THE BUSINESS TEAMS, AND IF WE DON'T HAVE EITHER OF THEM, UH, THEN THAT BELONGS IN THE TRANSFORMATIONAL REALM WHERE, UH, OUR TEAM CAN WORK WITH DIFFERENT, UH, PARTNERS WITHIN OUR COT AND, YOU KNOW, DIFFERENT PARTNERS OUTSIDE OUR COT, UH, TO HELP UNDERSTAND THE PROBLEM OR THE SOLUTION.
AND THIS IS BOTH THE SELECTION PROCESS IN TERMS OF HOW YOU, UH, HOW YOU ONBOARD THE INITIATIVE.
AND ALSO, ONCE WE ARE DONE WITH THAT WORK, WE'LL, WE'LL BASICALLY OFFLOAD THAT INITIATIVE AND BRING THAT BACK INTO THE OPERATIONAL REALM, UH, WHICH IS WHERE, UM, IT CAN GO THROUGH THE STAKEHOLDER PROCESS.
SO JUST TO EXPLAIN THAT PROCESS A BIT.
SO ONCE YOU HAVE INITIATIVE, UH, UH, ALIGNED, LIKE WITHIN OUR COURT, UH, WE'LL DO A WHITE PAPER OR RESEARCH PAPER OR SOME KIND OF A SURVEY PAPER.
UH, BY THE WAY, WE, WE WILL ALSO PUT THIS OUT, UH, PUBLICLY SO THAT, YOU KNOW, TECH MEMBERS OR, YOU KNOW, DIFFERENT STAKEHOLDER MEMBERS OR EVEN OUR MEMBERS OUTSIDE OUR COURT, FOLKS OUTSIDE, UH, OUR COURT CAN COMMENT ON THOSE WHITE PAPERS.
SO WE'LL BE LAUNCHING OUR WEBPAGE, WHICH WILL GO ON OUR COURT.COM, UH, WEBSITE, UH, STARTING NEXT WEEK OR THIS WEEK.
SO WE'LL, WE'LL EITHER LAUNCH IT TOMORROW OR MAYBE NEXT WEDNESDAY.
UM, BUT ALL THESE WHITE PAPERS, ALL THESE PROBLEM STATEMENTS WILL GO LIVE ON THE WEBPAGE WHERE ANYONE CAN COMMENT, UM, ON THOSE, UH, WHITE PAPERS.
UM, AND BASED ON THE FEEDBACK THAT WE GET, UM, WE WILL GO THROUGH THE, UH, NEXT STAGE WHERE WE WILL SELECT WHAT WHITE PAPERS SHOULD WE DO A PROOF OF CONCEPT ON.
SO, UH, SO THAT WILL BE THE NEXT STAGE, UH, OF THIS WORK.
AND THEN IF THERE IS, UH, IDENTIFIED PROBLEM AND A SOLUTION TO PROOF OF CONCEPT, UH, WE CAN BRING THOSE, UH, THROUGH THAT, AT THAT PART.
AT, AT THAT POINT WE'LL TRANSITION IT THROUGH THE
[02:05:01]
LER PROCESS, MEANING THROUGH THE LER STAKE STAKEHOLDER PROCESS, WE, WE WILL BRING THOSE SOLUTION AND, UM, FORWARD THROUGH THE WORKING GROUPS.UM, SO YEAH, SO THAT'S THE IDEA HERE.
AND SO FOR ALL OF THIS WORK, WHAT WE ARE FORECASTING IS, UM, UH, A $2 MILLION BUDGET, UH, FOR 2026 AND, UH, TWO FTES.
UM, SO, AND THIS IS, UH, NOT A NET NEW BUDGET IN THE SENSE OF $2 MILLION.
BUT THE IDEA IS WITH THIS NEW TEAM FORMED, UH, WE ARE TRYING TO BRING IT UNDER ONE UMBRELLA.
UM, AND THEN THE NET NEW HERE IS REALLY THE PROOF OF CONCEPT WORK, UH, THAT WE'LL BE DOING, TAKING THOSE CONCEPTS, UH, WRITING THE WHITE PAPERS, AND, YOU KNOW, WORKING ON THE SOLUTIONS.
UH, SO, SO THAT'S REALLY THE NET NEW HERE, UH, IN A SENSE.
SO LIKE JUST ONE CASE STUDY OF, YOU KNOW, HOW, HOW TO THINK ABOUT WHAT INITIATIVES, UH, RISES UP TO BE A GRID INITIATIVE, RIGHT? SO THE, THE PROCESS THAT WE TALKED ABOUT, UM, THE PROBLEM AND THE SOLUTION, UH, DEFINING THE NU SCORING ON THE PROBLEM AND SOLUTION ACCESS.
UH, SO FOR EXAMPLE, UH, MEASURING, UH, REGIONAL INERTIA AND SYSTEM STRENGTH.
UH, SO FOR INERTIA TODAY, FOR EXAMPLE, OR CAUGHT, UM, I WOULD SAY CALCULATES THAT ESTIMATES THIS, UH, BASED ON, YOU KNOW, HOW MANY SYNCHRONOUS MACHINE ARE ONLINE TODAY.
UM, BUT WE DON'T HAVE A WAY TO MEASURE IT BASED ON THE ACTUAL MEASUREMENTS COMING FROM THE GRID, UH, USING PNU DATA.
AND THE REASON IT KIND OF ROSE TO BE A, A GRID TRANSFORMATION INITIATIVE PROBLEM IS BECAUSE THERE ARE VENDORS WHO WOULD CLAIM THAT THEY CAN DO SOME KIND OF A MEASUREMENT BASED ANALYSIS ON, YOU KNOW, WHAT IS THE SYSTEM INERTIA AND SYSTEM STRENGTH.
UH, BUT, UH, WE, WE DON'T KNOW IF THOSE SOLUTIONS ARE AC ACCURATE.
WE DON'T KNOW IF, UM, THEY CAN WORK WITH OUR CURRENT OPERATIONAL TECHNOLOGY THAT WE HAVE IN, UH, IN A CONTROL ROOM.
SO THE IDEA WAS, UM, THE, THE PROBLEM WAS KIND OF DEFINED WHAT WE WANTED TO DO HERE.
WE DIDN'T KNOW WHAT THE SOLUTIONS ARE.
SO, UH, TO, TO GO THROUGH THAT, THAT PROCESS IN 2024,
AND, UH, ONCE THOSE RESULTS ARE READY, WE'LL BRING IT BACK TO, YOU KNOW, WE'LL, WE'LL BASICALLY BRING IT BACK TO DIFFERENT WORKING GROUPS, AND IT GOES THROUGH A REGULAR PROCESS IF YOU HAVE TO GO THROUGH THE IMPLEMENTATION.
BUT FOR NOW, WE ARE JUST TRYING TO UNDERSTAND IS THERE A VIABLE SOLUTION TO THIS PROBLEM, AND IF THERE IS A SOLUTION, HOW ACCURATE IT IS.
SO WE'LL DO ALL, ALL OF THAT COMPARISON.
SO IT'S REALLY A PREP WORK, UH, SO AS TO SAY TO BRING, TO KIND OF TRANSITION THAT WORK INTO THE ACTUAL WORKING GROUPS.
AND THIS IS THE GENERAL IDEA OF HOW WE ARE SELECTING THE INITIATIVES, UH, FOR, UH, GREAT WORK, UM, UM, LIKE BOTH ONBOARDING AND, YOU KNOW, OFFLOADING.
SO ONCE WE, THE WORK IS, YOU KNOW, DONE, WE WILL TRANSITION IT OUT.
SO, SO THAT IS JUST ONE, UM, EXAMPLE OF THE CASE STUDY THAT I SHARED.
UM, BUT THEN THERE ARE OTHER INITIATIVES.
THERE ARE TOTAL OF 14 INITIATIVES THAT WE IDENTIFIED, UM, THROUGH VARIOUS ENGAGEMENT, INTERNAL DISCUSSION, EXTERNAL DISCUSSION LIKE THROUGH, THROUGH, YOU KNOW, UNIVERSITIES AND ET CETERA TO UNDERSTAND, YOU KNOW, UH, UH, LIKE, UH, WHAT INITIATIVES SHOULD WE WORK ON.
AND, UH, SO THE FIRST ONE HERE IS, UH, BATTERY ENERGY SUFFICIENCY.
THE IDEA IS, UH, LIKE AS OF TODAY, WE RELY ON BATTERIES TO MEET OUR EVENING RAMP.
UM, BUT GOING FORWARD, AS THE BATTERY STORAGE IS INCREASING IN THE SYSTEM, IF WE CONTINUE TO RELY ON THAT, UM, ENERGY, UH, TO MEET THE EVENING RAMP, LIKE, CAN WE BE BLINDSIDED WITH THAT, RIGHT? DO WE NEED TO SCHEDULE, UM, UH, BATTERIES OR AT LEAST HAVE AN IDEA OF, YOU KNOW, WHAT THAT ENERGY WILL LOOK LIKE WHEN WE ARE IN, WHEN WE ARE IN THE EVENING PERIOD? SO THAT'S THE FIRST INITIATIVE.
UH, THE SECOND ONE IS MORE ABOUT RECEIVING THE OPERATIONAL INFORMATION FROM DER, UH, WHICH IS MORE ABOUT AS DERS ARE INCREASING, THIS DATA IS ONLY GOING TO INCREASE.
I MEAN, SO FAR WE DO THE NET LOAD APPROACH THAT IS WORKING SO FAR AT SIX GIGAWATT, UH, WITH THAT SCALE TO AS DER INCREASES, UH, PROBABLY NOT.
SO WE HAVE TO START LOOKING AT PLATFORMS, TECHNOLOGIES THAT CAN INGEST THAT MUCH DATA BECAUSE OUR CURRENT ICCP BASED APPROACH FOR LARGE TRANSMISSION, YOU KNOW, BASE CONNECTED RESOURCES MIGHT NOT BE SUFFICIENT AT THAT POINT.
SO, SO THAT'S THE IDEA TO START LOOKING INTO THAT.
NOW, METADATA DESEGREGATION IS, METADATA DESEGREGATION IS MORE ABOUT USING AI TECHNOLOGIES TO UNDERSTAND WHAT IS BEHIND THE METER THAT CAN FEED
[02:10:01]
INTO DIFFERENT INITIATIVES LIKE DEMAND RESPONSE, UH, AND, YOU KNOW, EVEN UNDERSTANDING WHAT PROFILES OF, YOU KNOW, DER ARE COMING BEHIND THE METER, THAT CAN FEED INTO A PLANNING PROCESS AT SOME POINT.UM, UH, WE TALKED ABOUT SYSTEMS STRENGTH AND INERTIA.
UM, THERE ARE OTHER INITIATIVES, MAYBE I'LL NOT GO IN DEPTH WHEN EACH OF THEM, BUT THERE ARE THINGS AROUND WHERE WE ARE LOOKING AT CAN WE, UH, OPTIMIZE REACTIVE POWER AS MORE IBS AND LOADS ARE COMING INTO THE SYSTEM.
CAN WE, WE BE BLINDSIDED IN TERMS OF, YOU KNOW, VOLTAGE NOT BEING HEALTHY IN FUTURE LOOKING STATES.
UH, THERE ARE THINGS AROUND, UM, ROBUST OPTIMIZATION, UH, ENGINES.
UM, SO WE ARE LOOKING INTO THAT.
UM, THINGS AROUND IMPEDANCE SCAN TOOL, WHICH IS JUST NEW TOOLS THAT WE NEED AS PSSE PSCA, UH, OUR TRADITIONAL PLANNING BASED TOOLS CAN, CAN HIT THE LIMITATIONS AS MORE IB ARE INCREASING, UM, IMPROVEMENT OF LARGE LOAD MODELS.
AGAIN, THIS IS ONE OF THOSE THINGS WHERE LARGE LOAD WORK IS HAPPENING RIGHT NOW BASED ON THE MODELS THAT WE HAVE AT HAND.
SO THAT WORK IS ALL OPERATIONAL.
THE, THE PART THAT KIND OF RISEN UP TO BE A GRID TRANSFORMATION INITIATIVE IS MORE ABOUT THE DATA CENTER ARCHITECTURE IS CONSTANTLY CHANGING.
UH, WE BASICALLY, AS PART OF THIS WORK, WE ARE PARTNERING WITH TEXAS A AND M TO GO IN DEPTH INTO THE ARCHITECTURE OF THE DATA CENTER AND CRYPTO AND POWER SUPPLIES TO THAT LEVEL TO UNDERSTAND HOW TO MODEL THEM IN PSCA.
WE'LL ALSO MAKE ALL THOSE MODELS, YOU KNOW, PUBLIC, UH, AS, AS WE DEVELOP THOSE MODELS.
BUT THE IDEA IS TO REALLY DEEP DIVE, AND THIS IS GOING TO BE A CHANGING WORLD IN NEXT FEW YEARS BECAUSE, YOU KNOW, THIS ARCHITECTURE IS EVOLVING.
THE DATA CENTER ARCHITE, UH, ARCHITECTURE IS STILL EVOLVING.
SO THAT'S WHY IT RISE UP TO BE A GREAT TRANSFORMATION WORK, THAT PIECE OF IT.
BUT WE ARE CONTINUOUSLY WORKING ON THE, THE OTHER PIECE OF IT, WHICH IS ALL OPERATIONAL DISCUSSION THAT YOU'RE HEARING DIFFERENT WORKING GROUPS.
UM, THEN THERE ARE OTHER INITIATIVES AROUND, YOU KNOW, USING AI TO RUN, YOU KNOW, OPTIMAL POWER FLOWS AND THINGS AROUND SHORT CIRCUIT AND POWER QUALITY THAT COULD BECOME A ISSUE IN FUTURE, UM, AND SMART EDGE CONTROL OF, UH, DERS AND LOADS.
UM, AND THEN SINGLE TOOL FOR, YOU KNOW, UH, COMBINED ANALYSIS OF, UH, UM, CAPACITY EXPANSION AND PCM AND RELIABILITY.
UM, AND THE LAST SLIDE I HAVE IS, UM, SO WE ARE TAKING ALL OF THIS WORK PUBLIC, UM, UH, THROUGH OUR WEBPAGE LAUNCH.
UH, BY NEXT WEEK WE'LL HAVE THAT WEBPAGE UP AND THERE WILL BE MARKET NOTICE OUT, UH, ON THAT WEBPAGE.
THERE WILL BE A RIPE PROGRAM THAT WE ARE LAUNCHING, MEANING, UM, THERE WILL BE A FORM THAT YOU CAN SUBMIT, UH, AND YOU CAN, YOU KNOW, IF ANYBODY WANTS TO PARTNER WITH OUR COURTS, WE, ONE, WE WILL HAVE THIS ROADMAP PUBLIC THAT WILL SHOW THE INITIATIVES THAT WE ARE WORKING ON.
IF ANYBODY WANTS TO PARTNER WITH OUR COURT, THEY CAN PARTNER WITH OUR COURT THROUGH, YOU KNOW, FILLING OUT A FORM.
AND, YOU KNOW, THROUGH THIS, YOU KNOW, INTERNAL DIRECTOR SYNC THAT WE HAVE, WE WILL, WE ARE LOOKING AT ALL THESE INFORMATION TO MAKE SURE, YOU KNOW, WE, WE AS A, OUR CODE DECIDE TO PARTNER WITH RIGHT TEAMS. UH, SO RIGHT PROCESS WILL BE THERE, WILL, THE WEBPAGE WILL ALSO INCLUDE THE ROADMAP AND THE WHITE PAPERS, UH, THAT WILL PUT IT OUT THERE.
AND THEN, UH, YOU KNOW, WE'LL USE THIS WEBPAGE TO ALSO ANNOUNCE OUR CODE INNOVATION SUMMIT.
UM, AND THE LAST THING IS GOING FORWARD, WE'LL GIVE UP, UH, YOU KNOW, UH, EVERY SIX MONTHS WE'LL BRING THIS UPDATE TO TECH WHERE WE ARE WITH THESE INITIATIVES SO THAT TECH IS AWARE AND WE, EVEN THOUGH IT'S NOT SIX MONTHS, BUT WHEN TO CLOSE THE YEAR OUT, WE'LL GIVE AN UPDATE IN DECEMBER.
YEAH, I'LL PAUSE THERE AND SEE IF YOU HAVE QUESTIONS.
HEY, PRASHANT, UH, THANKS FOR FOR WALKING US THROUGH THIS.
IT'S, YOU'VE GOT QUITE A LOT ON THE, ON THE AGENDA THERE, AND, UM, I'M GLAD TO HEAR THAT Y'ALL ARE, ARE, YOU KNOW, TAKING A, A SCOPE, A FORWARD-LOOKING SCOPE AND TRYING TO SEE WHAT, YOU KNOW, HOW TO LOOK AHEAD AND SEE ROUND CURVES.
THAT'S, THAT'S, UH, AN IMPORTANT, UH, AN IMPORTANT FUNCTION.
UM, BUT WHAT I WANTED TO ASK IS, UM, AND WE'VE TALKED A LITTLE BIT ABOUT ERCOT PRIORITIZATION AND, AND PROCESS, UH, TODAY.
SO I WANTED TO UNDERSTAND HOW THIS FITS WITHIN THAT CONTEXT.
IT SEEMS LIKE THIS WOULD BE A SEPARATE STAKEHOLDER TRACK THROUGH THE RIPE GROUP, AND THEN IT COME, IS THERE GOING TO BE IMPLEMENTATION THROUGH THE REVISION REQUEST PROCESS, OR IS IT SOMETHING SEPARATE WHERE ERCOT WILL TAKE FEEDBACK THROUGH RIPE, BUT THEN IMPLEMENT ON ITS OWN JUST WITH UPDATES TO TACK AND, AND TRYING TO UNDERSTAND WHAT OUR ROLE IS IN THIS PROCESS? YEAH, I THINK, UH, I THINK THE MAIN THING HERE IS, I MEAN, CONSIDER, CONSIDER THEM AS TWO SEPARATE PROCESSES, ENTIRELY SEPARATE PROCESSES.
SO THE PRIORITIZATION WORK THAT KEITH, UH, IS DRIVING IS MORE ABOUT THE THINGS THAT ARE ALREADY LIKE DECIDED THROUGH WORKING GROUP, RIGHT? SO THAT IS A PRIORITIZATION.
THIS ONE IS MORE, UH, ABOUT, UH, AGAIN,
[02:15:01]
BEING PROACTIVE ABOUT THE PROBLEM STATEMENTS THAT WE ARE HEARING OR, YOU KNOW, THE GROUP HAS.SO I THINK THE BEST WAY TO, FOR THE TECH TO ENGAGE IS, YOU KNOW, THROUGH THIS, YOU KNOW, DISCUSSIONS THAT WE WILL BRING FORWARD.
SO IF YOU WANT THINGS ON THE INITIATIVE, YOU KNOW, THE IDEAS THAT YOU HAVE, I MEAN, THIS IS, AGAIN, THIS IS NOT THE PRE-PROCESS OF IT, MEANING WE ARE, WE ARE DOING SOME INITIAL PROBLEM STATEMENT RESEARCH AND THE PROTOTYPE.
I WOULD NOT SAY THAT FLAVOR IS TRADITIONAL STAKEHOLDER FLAVOR OF IT.
NO, BECAUSE THIS IS, THIS IS ARE CALLED BEING PROACTIVE, RIGHT? BUT IF YOU BASICALLY HAVE, YOU KNOW, IDEAS OR PROBLEMS, THEN YOU CAN TAKE THE FEEDBACK THROUGH THE RIGHT FORM, YOU KNOW? UM, BUT BEYOND THAT, I THINK THE IDEA HERE IS ONCE THIS IS ALL SORTED OUT, THEN WE WILL HAND IT OVER TO OUR BUSINESS TEAMS. AND, AND ALSO, LIKE, UH, ONE THING I WANT TO MENTION IS GRID TRANSFORMATION TEAM IS NOT WORKING IN ISOLATION, UH, LIKE MOST OF THE WORK, UH, BECAUSE THE TEAM ITSELF WILL BE SMALL, BUT MOST OF THE WORK WILL PARTNER THROUGH DIFFERENT, YOU KNOW, BUSINESS TEAMS TO MAKE SURE WHATEVER PROBLEM AND SOLUTION THAT WE ARE PROPOSING IS VERY PRACTICAL, YOU KNOW? SO.
I, AND I SUSPECT WE'LL PROBABLY SINCE IT'S A NEW PROCESS, THERE'LL BE SOME, SOME ITERATION AND KIND OF LEARNING BY DOING AS WE, WE GO ALONG.
AS I'M THINKING THROUGH SOME OF THESE, SOME SEEM LIKE THEY'RE, YOU KNOW, FAIRLY, YOU KNOW, FAIRLY, YOU KNOW, STRAIGHTFORWARD AND MIGHT BE MM-HMM
YOU KNOW, EASIER TO IMPLEMENT JUST FROM AN AR SIDE.
THERE MAY BE OTHERS THAT IMPACT OTHER MARKET PARTICIPANTS.
AND SO THE SOCIALIZATION AND, AND KIND OF GETTING HEADS, HEADS ALL NODDING IN THE SAME DIRECTION WILL BE, WILL BE IMPORTANT FOR, UH, FOR SOME, PROBABLY MORE THAN OTHERS.
BUT, UM, WE'LL LOOKING FORWARD TO THE DISCUSSION.
HI, UH, KEVIN HANSON AND ENERGY, UM, I'VE BEEN CURIOUS, YOU GOT A NICE, WONDERFUL LIST THERE.
I'M CURIOUS WOULD BE POSSIBLE TO ADD IN ADDITIONAL ITEMS. ONE SPECIFIC ONE I WOULD THINK BE VALUABLE TO LOOK AT IS BENCHMARKING YOUR, THE, UH, PLANNING MODELS WITH REAL WORLD HISTORY.
THE BIGGEST COMPONENT THAT'S CLEARLY MISSING IN THE PLANNING PROCESS RIGHT NOW IS THE ASSUMPTION THAT ALL RENEWABLES ARE BIDDING IN AT ZERO, WHICH CLEARLY IS NOT REALITY.
CLEARLY WE SEE FROM, YOU KNOW, THERE'S THE PRODUCTION TAX CREDITS IN PLACE.
CLEARLY FROM THE SIX DAYS SC REPORTS, YOU CAN SEE THAT PROJECTS ARE BIDDING MUCH DIFFERENT NUMBERS THAN IN REALITY MM-HMM
VERSUS WHAT WE'RE USING IN PLANNING PROCESS.
SO I'D BE CURIOUS IF THAT'S ANOTHER OPTION TO ADD IN.
YEAH, I THINK THAT WILL BE GREAT FEEDBACK.
I MEAN, THROUGH THE RIGHT PROCESS, IF YOU FEEL THAT IS MORE OF A PROBLEM STATE, I MEAN, THAT MIGHT BE OPERATIONAL WORK THAT MIGHT BE ALREADY HAPPENING IN
BUT IF NOT, LIKE IF YOU THINK THIS IS SOMETHING THAT, YOU KNOW, IS STILL A PROBLEM STATEMENT THAT IS NOT REALLY UNDERSTOOD, OR THE SOLUTION IS NOT UNDERSTOOD, YOU KNOW, WE'D LOVE TO HEAR THE FEEDBACK THROUGH RIPE AND WE CAN DEFINITELY PUT IN A PRIORITY LIST.
CL CLEARLY IT'S NOT CURRENTLY IN THE PLANNING PROCESS THAT I KNOW FOR SURE.
AND SO THAT'S WHY I BRING IT UP.
YEAH, YOU'RE, YOU'RE ONLY ASKING FOR TWO OVER HERE.
YOU'RE ONLY ASKING FOR $2 MILLION.
IS, IS THAT ENOUGH? UM, I'LL POINT OUT THAT IN GER 1202, THE MARKET SAID, PARTICULARLY ON THE LARGE LOADS, CHARGE US MORE, MOVE FASTER.
IF $5,000 ADDITIONAL FEE ON THOSE GUYS, THE $10 MILLION BUDGET TO ERCOT, THEY WILL GLADLY PAY THAT DAYS ARE HUNDREDS OF THOUSANDS, IF NOT MILLIONS OF DOLLARS TO THEM.
SO IF YOU NEED MORE MONEY, RAISE YOUR HAND AND TELL US AND WE CAN FIND A WAY TO GET IT.
YEAH, NO, THANK YOU FOR THE SUPPORT
I, IF ANYTHING, I, I WILL MAYBE, I MEAN, I THINK BASICALLY, I THINK THIS IS THE, AGAIN, WE'LL, WE'LL GO AT A PACE AT WHICH WE'LL START FIRST AND, YOU KNOW, IF WE CAN MAKE THE PROCESS WORK AND YEAH.
MARTHA, THANK YOU MARTHA HENSON WITH ENCORE.
COULD YOU GO BACK THROUGH THE WHITE PAPER COMMENTING PROCESS AGAIN? IS IT JUST LIKE ONCE THEY GET POSTED TO THIS WEBPAGE, ANY MARKET PARTICIPANT CAN GO READ THEM AND JUST SEND COMMENTS IN INFORMALLY? OR IS THERE SOMETHING MORE TO IT THAN THAT? NO, JUST INFORMAL COMMENTS.
SO WE'LL HAVE A EMAIL, UH, ALIAS.
SO YOU'LL JUST SEND IT TO GRID TRANSFORMATION@OURCO.COM AND ANYBODY CAN SEND THAT COMMENT TO THE WHITE PAPER.
AND, UM, WOULD YOU MIND GOING BACK THROUGH THE VOICEOVER ON THE FIRST INITIATIVE ONE MORE TIME, PLEASE? THE ENERGY SUFFICIENCY? YEAH.
SO THIS ONE IS MORE AROUND, I MEAN, RIGHT NOW WE ARE DEPENDENT, UM, OR WE ARE USING ESR QUITE A BIT TO MEET OUR EVENING RAMP.
UM, SO GOING, AND WE ARE AT 15 GIGAWATT RIGHT NOW, AND THE QUEUE IS ONE 50 GIGAWATT.
[02:20:01]
THE IDEA IS IF YOU HAVE MORE ESR IN FUTURE, WE'LL HAVE TO HAVE SOME KIND OF A MECHANISM TO UNDERSTAND DO WE HAVE ENOUGH, UH, ENERGY TO MEET THE EVENING RAMP, RIGHT? SO, SO THAT WE ARE NOT BLINDSIDED BY SOMEBODY DISCHARGING THE BATTERY AT TWO OR 3:00 PM YEAH.I, I'LL JUST, I, I'M GLAD TO SEE ERCOT LOOKING FORWARD.
I, UM, I REMAIN CONCERNED THAT, 'CAUSE YOU SAID WE'RE GONNA REACH OUT TO THE BUSINESS GROUPS AND GET THEIR INPUT.
I REMAIN CONCERNED WITH KEITH KEITH'S, UH, STATED LIMITATIONS IN PEOPLE AND PROCESSES AND HOW, HOW TO MANAGE BOTH OF THOSE THINGS.
UM, NOT MY JOB TO MANAGE, THAT'S ERCOT JOB TO MANAGE, BUT I REMAIN CONCERNED THAT WE HAVE THESE TWO THINGS GOING ON, BOTH OF WHICH ARE PUTTING DEMANDS ON, ON THE SAME PEOPLE.
AND JUST TAKING THE FIRST EXAMPLE, UM, SIZE A GOOD EXAMPLE OF BEING A PART OF THAT EFFORT AND BEING A PART OF OTHER EFFORTS.
SO YES, AND WE, WE WORK, WE WORK HARD TO MANAGE THAT, BUT WE APPRECIATE THE DIALOGUE WE'VE HAD OVER THE LAST FEW DAYS.
ANY OTHER QUESTIONS OR COMMENTS? I DON'T SEE ANY.
I AM HEARING BU IS WITH US NOW, SO WE CAN TAKE UP THE RPG PROJECTS.
SORRY I WAS IN THE ROOM, BUT I WAS, I WAS IN ANOTHER CALL, SO APOLOGIZE FOR THE DELAY.
BUT ANYWAY, UM, I DO HAVE LIKE TWO PROJECTS, RPG PROJECTS FOR YOUR CONSIDERATION, COMMENTS AND APPROVAL.
SO THE FIRST ONE IS THE BTU TEXAS A AND M, UH, SYSTEM, REALLY CAMPUS RELIABILITY PROJECT.
SO THIS IS A PROJECT SUBMITTED BY, UH, BRYAN TEXAS UTILITIES, UM, TO SUPPORT A LOAD EDITION AS A TEXAS A AND UNIVERSITY CAMPUS.
IT'S REALLY, UM, THIS IS PROPOSED AS A TIER ONE PROJECT, UH, WITH AN ESTIMATED COST OF $271 MILLION.
AND IT WILL REQUIRE CCN AS I SAID.
THIS IS AGAIN, UH, TO ADDRESS A RELIABILITY ISSUE DUE TO ADDITION OF A LARGE LOAD IN THE BRASS COUNTY AND IN THE EAST WEATHER ZONE.
UM, AGAIN, THIS FALLS INTO THE TIER ONE PROJECT, UH, BY THE COST THRESHOLD, A HUNDRED MILLION DOLLARS PLUS, AND IT REQUIRES A CCN.
SO, UH, THE REQUIREMENT IS THAT SHALL BE PRESENTED AS A TIER ONE PROJECT TO TAC FOR REVIEW ON COMMENTS AND ANY COMMENTS FROM T SHALL BE INCLUDED IN THE PRESENTATION TO THE ER CARD BOARD.
SO THE NEED OF THE PROJECT, UH, WE, WE PERFORMED AN INDEPENDENT REVIEW, LOOKED AT THE, THE RELIABILITY CRITERIA UNDER PLANNING GUIDE AND NERC, AND WE IDENTIFIED SEVERAL, UH, THERMAL AND VOLTAGE ISSUES, UH, WITH THE ADDITION OF THE LARGE LOAD.
SOME OF THEM ARE DRIVEN BY SEC, UM, YOU KNOW, G MINUS ONE X MINUS ONE PRIOR OUTAGE CONDITIONS.
UH, SO THERE WERE SEVERAL, UH, THERMAL AND, UH, VOLTAGE ISSUES IDENTIFIED AS, UH, THE BASE LABATE ISSUE.
SO ERCOT ANALYZED, UH, FOUR OPTIONS AND, UH, SHORTLISTED TO THREE OPTIONS.
SO AMONG THE THREE OPTIONS, OPTION ONE AND TWO WERE SELECTED FOR FURTHER EVALUATION.
AND BASED ON ALL THE ADDITIONAL ANALYSIS WE PERFORMED, UH, WE IDENTIFIED LIKE OPTION ONE PERFORMED SLIGHTLY BETTER FOR SERVING A LOT OF ADDITIONAL TO 1200 MEGAWATTS, WHICH HAS A FORMAL REQUEST IN THE STUDY ERA.
SO THE PRELIMINARY RESULTS SHOWED LIKE BOTH OPTION TWO AND OPTION ONE WILL MEET THE RELIABILITY NEED, BUT IN THE LONG RUN, IT SHOWED LIKE OPTION TWO WOULD COST AT LEAST A HUNDRED MILLION DOLLARS MORE COMPARED TO OPTION ONE TO MEET THIS, UH, PROJECTOR OR ADDITIONAL LOAD IN THIS AREA.
SO THE TABLE HERE SHOWS SOME OF THE, YOU KNOW, OVERVIEW OF LIKE, WHEN WE LOOK AT THIS ADDITIONAL LOAD, UH, BEYOND WHAT WAS REQUESTED, YOU COULD SEE, YOU KNOW, OPTION TWO WOULD REQUIRE, YOU KNOW, OPTION SHOOT, OPTION TWO SHOWS MORE RELIABILITY AND THERMAL ISSUES, AND IT WOULD REQUIRE MORE PROJECTS TO ADDRESS THOSE OVERLOADS IF YOU WANT, IF YOU WERE TO BUILD ON, UH, FUTURE PROJECTS,
[02:25:03]
UM, THERE'S, HERE'S THE COMPARISON OF THIS OPTIONS OPTION ONE AND TWO.AS I SAID, OPTION ONE OVERALL PERFORMS BETTER COMPARED TO OPTION TWO.
UH, AGAIN, OPTION ONE IS MORE EXPENSIVE THAN OPTION TWO, BUT IN THE LONG RUN WE THINK, UH, OPTION ONE HAS THIS FLEXIBILITY TO ADAPT ADDITIONAL LOAD AND EXPAND.
UH, FOR THE PROPOSED OPTION, AGAIN, AS PART OF THE TIER ONE PROJECT, THIS ADDS NEW TRANSMISSION LINE.
SO WE ARE PERFORMING, WE ARE REQUIRED TO PERFORM THE SSR SCREENING OPTION ONE, WE FOUND THERE WAS NO ADVERSE SSR IMPACT WITH THE ADDITION OF THE PROPOSED NEW LINES.
UM, ADDITIONAL SENSITIVITIES CONGESTION ANALYSIS.
UH, WE LOOKED AT, UH, BOTH THE CONGESTION ANALYSIS AND THE GENERATION SENSITIVITY ANALYSIS AND WE CONCLUDED THAT OPTION ONE DID NOT CAUSE ADDITIONAL CONGESTION OR, UH, NO POTENTIAL FUTURE GENERATIONS.
UH, THERE WERE THAT WERE INCLUDED AS SINCE WE DID NOT HAVE A MATERIAL IMPACT ON THE PROJECT.
SO HERE'S THE RECOMMENDATION FOR THE, UH, TO ADDRESS THIS, UH, RELIABLE ISSUE AND LOAD GROWTH.
AGAIN, THIS IS, UH, PROJECT THAT'S EXPECTED, UH, TO BE IN SERVICE OF OCTOBER, 2029 WITH AN ESTIMATED COST OF $281.2 MILLION.
THIS WILL REQUIRE A CCN PRIMARILY.
THE BIG PORTION OF THE PROJECT IS TO CONSTRUCT A 40 MILE, UH, 3 45 KB LINE BETWEEN TNP ONE AND THE RELEASE SUBSTATION RAISE IS A 1 38 KB SUBSTATION.
NOW THAT WILL BE EXPANDED AND CONVERTED TO A 3 45 KV STATION WITH, UH, TWO AUTO TRANSFORMERS.
IN ADDITION TO THAT, THERE ARE SOME, UH, SOME 1 38 KV, UH, REBUILDS AND NEW LINES NEEDED.
I'LL JUST GO IN HERE, SHOW YOU THE MAP.
SO THERE ARE A PORTION OF THE PROJECT IS A STEEL STORE TO COOK PROJECT.
THERE IS A NEW 1 38 KB LINE WITH SINGLE CIRCUIT, AND THEN THERE IS ANOTHER, UH, NEW LINE BETWEEN RES AND RIVERSIDE.
THIS IS A NEW SUBSTATION THAT'LL BE TAPPED BETWEEN DAN P AND UH, UH, THOMPSON COOK, EXISTING 1 38 KB.
SO THERE'LL BE ANOTHER NEW LINE CONNECTING TO THE 2 1 30 KB LINES CONNECTING TO THIS RELEASE STATION TO SUB, TO SUPPORT THE LOAD.
I BELIEVE THAT'S THE LAST, UH, SLIDE.
SO I'LL PAUSE HERE TO SEE IF THERE ARE ANY QUESTIONS HERE ON THIS PROJECT.
ARE THERE ANY QUESTIONS OR COMMENTS? I SEE A COUPLE OF SLIDES.
YEAH, JUST, JUST A COUPLE ON THIS ONE.
UM, BACK TO THE SORT OF THE SUMMARY SLIDE OF THE, UH, OF THE OPTION SLIDE SIX.
I, I I WOULD JUST, I, I WOULD JUST SUGGEST THAT A SUMMARY THAT SAYS BETTER, UM, WHEN JUSTIF IS PROBABLY NOT ENOUGH INFORMATION TO JUSTIFY SPENDING AN ADDITIONAL $90 MILLION.
AND, AND, AND MY COMMENT WOULD BE FOR TAX CONSIDERATION THAT POTENTIALLY ASKING ERCOT TO BE A LITTLE BIT MORE, UM, QUANTITATIVE IN THAT ASSESSMENT BEFORE THIS WOULD GO TO THE BOARD.
UM, OKAY, THAT'S, YEAH, WE'LL TAKE THAT INTO CONSIDERATION.
SO I THINK THIS IS THE SLIDE WHICH KIND OF EXPLAINS SOME OF THE THING, BUT YEAH, POINT, BECAUSE I THINK I, I, I KNOW AND, AND YOU WERE NOT SURPRISED BY MY COMMENT FROM YOU.
AND I APPRECIATE THE, THE BACK AND FORTH THAT WE'VE HAD PRIOR TO THIS.
UM, I THINK THE, UM, YOU DID SOME WORK THAT SAYS THESE TWO OPTIONS SUPPORT AN ADDITIONAL X AND Y AMOUNT OF LOAD JUST BY THEIR OWN.
PLUS WE HAD THIS OTHER 1200 MEGAWATT INCREASE.
AND BEING ABLE TO EXPLAIN THAT MORE CLEARLY, I THINK IS A HELPFUL, UH, INPUT TO THIS, TO THIS PROJECT DESCRIPTION.
THANKS FOR THE COMMENT AND WE WILL TRY TO CAPTURE THAT IN THE BOARD.
UM, ONE THING TO NOTE IS, I THINK IN THE, YOU KNOW, YEAH, I THINK THAT INFORMATION IS ALREADY AVAILABLE, WILL BE AVAILABLE IN THE REPORT, BUT YEAH.
I, AND ONE, ONE LAST QUESTION QUESTION HAS TO DO WITH THE, UM, JUST TO HELP ME UNDERSTAND THE, IT WAS A, WHAT, IT WAS A $270 MILLION PROJECT AS PROPOSED AND A $280 MILLION PROJECT AS RECOMMENDED.
IS, IS THAT JUST COST INCREASES OR, OR WHAT CAN HELP ME UNDERSTAND THAT SMALL CHANGE? YEAH, I DON'T HAVE THAT INFORMATION.
IT'S PROBABLY, YOU KNOW, UPDATED COST INFORMATION.
WHEN WE, WHEN WE DO THE RPG REVIEW, WE DO GO BACK TO THE TSPS ASK FOR UPDATED CONFIRMATION, AND THAT I, I KIND OF ASSUMED THAT ON THIS PROJECT.
GIVEN THE TIMEFRAME AND THE INFLATION THAT WE'VE SEEN IN LOTS OF EQUIPMENT, THAT, AND SO THAT, YEAH, THAT'S ALSO A HELPFUL PIECE, I THINK.
AND, AND WE'LL GET TO MORE ON THAT ON THE, ON THE NEXT PROJECT, SO.
[02:30:01]
OKAY.YEAH, I'M GOING TO HAVE A BIG PROBLEM VOTING FOR THIS.
AS A GRADUATE FROM THE UNIVERSITY OF TEXAS, MAYBE ONE, ONE POSSIBLE SOLUTION WOULD MAKE KYLE FIELD AN INTERRUPTIBLE LOAD.
UM, THAT MIGHT BE TO GET ME TO YES.
ON THIS, UH, NO, I DO HAVE A REAL QUESTION THOUGH.
DID THIS PRO, DID YOU USE THE 2025 RTP FOR EVALUATING THIS PROJECT? OR IS IT 2024 RTP? THIS WAS THE PREVIOUS YEAR'S RTP BECAUSE THIS PROJECT WAS SUBMITTED END OF LAST YEAR.
SO IT WOULD'VE BEEN LIKE, PICKED UP THE CASE.
I THOUGHT IT, I DON'T HAVE THE EXACT INFORMATION, BUT THAT SHOULD BE IN THE REPORT.
I THOUGHT I SAW IT WAS SUBMITTED IN JANUARY 25.
SO YOU, THAT WOULD PICK UP THE 24 RTP 24 RTP AND THAT LOOKED FORECAST.
AND JUST, AND I THINK THIS IS THE CASE IN THE 25 RTP AS WELL, YOU DID NOT HAVE TO ADD ANY ADDITIONAL, I'M GONNA CALL IT FICTITIOUS GENERATION TO GET THE MODELS TO SOLVE.
YOU HAD ENOUGH IN THE CDR AND THE GIS THAT HAVE NOT MET THE 6.9 CRITERIA THAT YOU WERE ABLE TO USE FOR BOTH OF THOSE PLANNING MODELS.
I, I THINK WE START, LIKE WHEN WE LOOK AT THE R-T-P-R-R-P-G ANALYSIS, WE REMOVE THOSE FIX GENERATION IN THIS AREA OF STUDY.
I, I, I HAVE TO GO LOOK BACK AT THE MODEL 2024, WHAT WAS INCLUDED, BUT GENERALLY OUR PRINCIPLE IS ONE, WE LOOK AT RPG, WE DON'T ADD THOSE FIX GENERATORS.
AND I DID SEE, YEAH, I THINK THERE'S A, A NEW FIGURE THAT WAS FILED THAT THERE'LL BE INCREASED TRANSPARENCY WHENEVER ERCOT HAS TO TAKE THAT STEP TO ADD GENERATION, GENERATION THAT BEYOND 6.9.
BECAUSE THAT CAN OBVIOUSLY HAVE BIG IMPACT ON THE POWER FLOWS AND THE NEED FOR THERMAL OVERLOAD.
BU, AND I, I, SOME OF THE, UH, BACK AND FORTH, YOU AND BETH HAD, UH, MAYBE GO BACK AND LOOK AT THE, THE ORIGINAL FILING AND IT HELP, JUST HELP ME UNDERSTAND THIS.
IT LOOKS LIKE THE ORIGINAL RPG FILING WAS IT REFERENCED A ABOUT A 300, UH, CALL IT A 400 ISH MEGAWATT LOAD, BUT THE RECOMMENDATION HERE CAN SUPPORT UP TO 1200.
IS THAT, THAT THE, THE RECOMMENDED PATH IS ABLE TO, TO IN, TO SERVE MORE LOAD THAN JUST WHAT THE INITIAL OUT, UH, YES, THE INITIATING REQUEST WAS.
APOLOGIZE, I DON'T HAVE ALL THOSE DETAILS, BUT THAT'LL BE IN INCLUDED IN THE REPORT.
SO YOU'RE RIGHT, THE INITIAL LOAD WAS ROUGHLY AROUND 300 MEGAWATTS.
THAT'S PLANNING TO CONNECT AND THAT'S, THAT TRIGGERED THIS RPG REVIEW.
BUT WHEN WE DO DID LOOK AT THIS OPTION, SUB COMPARISONS, WE DO SEE THAT OPTION TWO COULD PROVIDE, I DON'T HAVE THE UP TO 400 MEGAWATTS COMPARED TO OPTION OR OPTION ONE CAN SUPPORT MORE LOAD, ADDITIONAL, MORE LOAD COMPARED IN ADDITION TO THE 300 MEGAWATTS.
I THINK THAT NUMBER WAS LIKE 400 MEGAWATTS.
AND THEN OPTION TWO WAS LIKE AROUND 250 MEGAWATTS.
AND IN ADDITION TO THAT, WHAT WE ARE SEEING IS THERE ARE OTHER PENDING REQUESTS LIKE OFFICER LETTERS, THAT'S THE 1200 MEGAWATTS WE ARE SEEING.
SO, YOU KNOW, WHEN YOU LOOK AT THE ADDITIONAL 1200 MEGAWATTS OF LOAD, WE DO SEE THAT IT'S, IT'S CHEAPER TO EXPAND OPTION ONE.
NOW IF THOSE LOADS MATERIALIZE, AND THEN, YOU KNOW, THE RELATIVE COST FROM THE INITIAL ESTIMATE TO WHAT YOU SEE HERE IS ACTUALLY NOT 90 MILLION, IT'S MORE LIKE 10.
THAT'S, THAT'S REALLY HELPFUL.
THE 90 MILLION CAME FROM, SORRY, MARK.
THE 90 MILLION CAME BETWEEN THE OPTION ONE, OPTION TWO.
AND, AND THAT THE, THE ABILITY TO SPEND THAT EXTRA MONEY IS, IN MY MIND, JUSTIFIED BY THE ABILITY TO SERVE GREATER AMOUNTS OF LOAD IN THE VERIFIED BY THE SYNDICATION OF AN OFFICER ATTESTED LETTER.
SO THAT, THAT'S, THAT'S THE, THAT'S MY THINKING ON, ON ALL OF THAT.
UM, FIRST I, I JUST NEED TO NOTE THAT ON THIS PROJECT I HAVE SUPPORTED RYAN TEXAS UTILITIES THROUGH THE RPG PROCESS.
SO I WILL BE ABSTAINING IN MY POSITION AS THE SMALL COMMERCIAL CONSUMER REPRESENTATIVE.
UM, BUT FOR BTU IN RESPONSE TO THE, THE DIALOGUE WE'VE BEEN HAVING, I, I THINK THAT THE, THE DETAILED MATERIAL IS IN THE STUDIES THAT HAVE BEEN PRESENTED TO THE RPG, THE QUESTIONS ARE REALLY ABSTAINING.
UH, CAN YOU GUYS HEAR ME? I HEARD SOME BACKGROUND NOISE.
UM, SO I THINK THAT THE, THE DIALOGUE THAT WE'VE BEEN HAVING IS, IS ANSWERED IN THE, THE MORE DETAILED STUDIES
[02:35:01]
THAT HAVE BEEN PRESENTED THROUGH THE RPG PROCESS.AND THE QUESTIONS ARE REALLY JUST ABOUT THE PRESENT PRESENTATION OF THE MATERIAL.
SO, UM, ON BEHALF OF BTU, THIS IS THE CRITICAL PROJECT FOR THE ENTIRE COMMUNITY.
UH, THE BRYAN TEXAS UTILITIES REGION IS EXPERIENCING THE SAME, UH, CHARACTERISTICS OF, OF EXTREME LOAD GROWTH AND PROSPECTIVE DATA CENTERS THAT, THAT WE'RE SEEING ALL AROUND THE STATE.
AND I, AND I WOULD JUST NOTE THAT THE BRYAN TEXAS UTILITY SYSTEM IS NOT ON THE 3 45 NETWORK.
AND, AND SO THIS IS JUST A, A REALLY IMPORTANT CONNECTION TO, UH, ALLOW FOR THE, THE ACCOMMODATION OF LOW GROWTH IN THE FUTURE OF THE COMMUNITY.
AND, AND I APOLOGIZE FOR HAVING TO ABSTAIN ON THE VOTE.
THAT'S WHAT I WAS TALKING ABOUT.
I WAS WONDERING IF YOU COULD GIVE YOUR PROXY TO SOMEBODY, BUT I THINK IT'S TOO LATE FOR THAT.
SO WE WILL, WE'LL DO THE ABSTENTION, UH, KATIE RICH.
SO, UM, THE DELAY IN ME BEING IN THE QUEUE, UM, IS DELAYED MY RETORT TO BILL AS A FORMER AGGIE.
I JUST WANT PBU TO CONFIRM THAT OUR BELOVED MASCOT WILL NOT BE NEGATIVELY AFFECTED BY THIS PROJECT.
THAT'S NOT ONE OF THE OPTIONS WE CONSIDERED, BUT ANYWAY,
UM, YOU'RE NOT A FORMER AGGIE.
YOU'RE A, YOU'RE A FORMER STUDENT.
ANYMORE AGGIE STUDENT OR OTHERWISE COMMENTARY
UM, ANY OTHER QUESTIONS OR COMMENTS FOR BU? SO WE NEED A SEPARATE BALLOT ON THIS ONE.
UM, SO THE MOTION IS ENDORSED THE BTU TEXAS A AND M UNIVERSITY SYSTEM,
AND RICHARD WILL MAKE THE MOTION.
CAN I GET A SECOND? WHO WAS THE SECOND? WE, I'LL, I'LL SECOND IT IF NOBODY ELSE.
ON THE MOTION TO ENDORSE THIS PARTICULAR RPG PROJECT FOR THE FIGHT IN TEXAS, AGGIES, WE WILL START UP WITH THE CONSUMERS, WITH MARK DREYFUS.
ONTO THE INDEPENDENT GENERATORS.
ALRIGHT, HOW ABOUT KAITLIN? YES, THANK YOU, BRIAN.
YOU WITH US? ALL RIGHT, NOW CHRIS, I SEE BOB HILTON'S BACK IN THE ROOM.
THAT'S FOR MY GRANDDAUGHTER WHO GOES TO A AND M.
ALL RIGHT, NOW CHRIS, RIGHT ONTO OUR IOUS, RICHARD GIG.
LOOK AT THAT COOPERATION BETWEEN BOTH CAMPS.
[02:40:01]
MOTION CARRIES ONE ABSTENTION.I THINK WE SHOULD DO COLLEGE SHIRT DAY IN OCTOBER.
CAN THAT FIT IN WITH YOUR THEME, RICHARD? OKAY.
I THINK WE NEED TO GO BACK TO THE RED NOSE DAY SHIRTS AND SLIPPERS.
DO ANY OF YOU REMEMBER THE RED NOSE DAYS? WHICH WAS THE, THE FOOD FOR CHILDREN? WE STILL, WE STILL DO THE RED NOSE DAY, RIGHT? NO, WE HAVEN'T.
'CAUSE WE CHANGED THE DAY OF TACK AND IT DIDN'T FALL ON RED NOSE DAY.
SO I THINK WE'RE BACK TO IT THOUGH, SO INTERESTING.
UM, LET'S GO TO OUR NEXT, UH, RPG PROJECT.
UM, I, I'M NOT SURE IF YOU WANT TO TAKE THE WAIVER NOW OR LATER ON.
UM, I GOT DISTRACTED BY THE COLLEGE.
SO WE DO NEED TO WAIVE NOTICE.
I THINK I WILL DO WHAT COREY AND ANN TELL ME, EVEN IF THEY'RE CONFLICTING THINGS.
BUT I, I BELIEVE THAT WE CAN TAKE THE PRESENTATION UP AND THEN THROW A WAIVE NOTICE ON THE COMBO BALLOT IF THAT'S OKAY WITH EVERYONE.
OR DO WE NEED TO WAIVE NOTICE NOW? BETH, BETH IS MORALLY OPPOSED TO THAT
I, I THINK, UM, I, I'M, I'M NOT OPPOSED TO WAIVING NOTICE.
UM, I CERTAINLY AM GONNA HAVE COMMENTS AND DISCUSSION AND ON, ON THE PROJECT ITSELF.
SO WAIVE NOTICE, DO WE NEED TO VOTE ON THAT? YEAH, YOU DO.
SO WE'RE GONNA VOTE TO, TO WAIVE NOTICE.
HOW ABOUT I MAKE A MOTION THAT WE, UH, WAIVE NOTICE ON CONSIDERATION OF THE BAYTOWN PROJECT.
IF WE CONSIDER DOING IT BY VOICE, REASSESS OUR PROCESSES.
I TALK ABOUT IT IN THE, IN THE FUTURE.
WE'LL PUT IT IN THE TAC PROCEDURES.
I DON'T, I TOTALLY WANT TO REWRITE THE WHOLE T PROCEDURES.
I WANT ROBERT'S RULES IN THERE.
SO WE'D HAVE TO, WE DO HAVE TO DO WE HAVE TO TAKE A VOTE? VOTE NOW OR NOT? I MEAN, I, I THINK WE SHOULD GO AHEAD, COREY.
I GUESS HE'S WORKING, WORKING ON IT.
YEAH, IT'S, Y'ALL WERE ONLY GIVEN SIX AND THREE QUARTERS, DAYS NOTICE AND NOT YOUR FULL SEVEN.
SO WE WOULD NOT WANT TO BELABOR A MEETING WITH Y'ALL POTENTIALLY DISCUSSING, DISCUSSING OR A PRESENTATION FOR THREE HOURS THAT YOU WERE NOT GOING TO WANT TO VOTE ON.
SO JUST TO BUTTON UP EVERYTHING, WE WILL TAKE THIS MOTION, WE'LL TAKE THIS MOTION TO WAIVE NOTICE FOR THE CENTER POINT BAYTOWN AREA LOAD EDITION PROJECT.
SO AGAIN, THIS IS NOT YOUR VOTE ON THE PROJECT ITSELF, IT'S JUST YOU ACKNOWLEDGING THAT THE FULL SEVEN DAYS WAS NOT REQUIRED FOR YOU TO MAKE YOUR INFORMED, EDUCATED DECISION ON THIS PARTICULAR ITEM.
SO WE'LL START UP WITH THE CONSUMERS, WITH MARK.
DO YOU DISAPPEAR ON US AGAIN? HE WALKED OUT AGAIN.
THAT'S ME FOR NOT BEING ENTERTAINING ENOUGH, THAT'S ALL.
MARTHA? YES, THANK YOU, ROB FOR KEITH? YES.
YES, THANK YOU, ALICIA? YES, THANK YOU.
AND ANDREW FOR JOSE? YES, THANK YOU.
YOU'LL NOW FREE TO DISCUSS AND POTENTIALLY TAKE ACTION ON THIS RPG PROJECT.
UH, THIS IS THE CENTER POINT ENERGY, BE ON LOW RADIATION PROJECT.
[02:45:01]
OH, SO CENTERPOINT SUBMITTED THIS PROJECT, UH, FOR THE BAYTOWN AREA LOAD EDITION.AND THIS IS A TIER ONE PROJECT, UM, ESTIMATE.
ORIGINAL ESTIMATE WAS $141.65 MILLION, WHICH WOULD NOT REQUIRE A CCN PRIMARILY, YOU KNOW, REBUILDING, UH, OR UPGRADING 1 38 KB SYSTEMS I'LL TALK ABOUT LATER.
SO THIS IS TO ADDRESS AGAIN, THE PROPOSED LOAD EDITION IN THE HARRIS COUNTY, ROUGHLY AROUND 500 MEGAWATTS OF NEW LOAD, UH, THAT'S DRIVING THIS PROJECT.
UM, AGAIN, I WILL, I'LL SKIP THIS.
UH, THIS FALLS UNDER THE TIER ONE CATEGORY, A HUNDRED MILLION DOLLARS PLUS, UH, THE, YOU KNOW, AND ANY COMMENTS FROM TAX SHALL BE PRESENTED TO THE BOARD.
SO THE, THE NEED FOR THE PROJECT, WE LOOKED AT THE, YOU KNOW, THERE'S A RELIABILITY NEED.
THERE WAS THERMAL, UH, VIOLATIONS, WHICH WAS DRIVING THE BASE NEED FOR THE PROJECT, PRIMARILY DRIVEN BY N MINUS ONE G MINUS ONE N MINUS ONE CONDITIONS.
AND X MINUS ONE AND MINUS ONE CONDITIONS ARE SHOWN AT THE TABLE HERE.
IN ADDITION TO THAT, WE STARTED LOOKING AT THIS MAINTENANCE CONDITIONS, WHICH IS, UH, PART OF THE PLANNING CRITERIA.
NOW IT'S JUST LOOKING AT THE N MINUS ONE MINUS ONE CONDITION.
AND WE DID IDENTIFY SIGNIFICANT, UH, ISSUES IN TERMS OF VOLTAGE VIOLATIONS AND THERMAL VIOLATIONS.
THERE WAS NO UN UNSOLVED POWER FLOW, BUT THERE WAS SIGNIFICANT, UH, THERMAL AND VOLTAGE VIOLATIONS.
SO CENTERPOINT DID LOOK AT THIS AS PART OF THEIR SUBMITTAL.
THEY CONSIDERED SOME OF THE OUTAGES, UH, SOME OF THE PRIORITIES, CONDITIONS.
WHEN WE LOOKED AT THE NEED, WE IDENTIFY ADDITIONAL SYSTEM ISSUES IN THAT AREA.
I WAS, UH, YOU KNOW, WE WERE, LOOK, THEY WERE LOOKING AT, UH, WE WERE LOOKING AT, UH, MAINTENANCE OUTAGE CONDITION.
WE DID IDENTIFY ADDITIONAL ISSUES THAT, UH, THAT WAS NOT IN THE ORIGINAL SUBMITTAL.
SO, IN ORDER TO ADDRESS ALL THIS ISSUES, UH, WE LOOKED AT FOUR DIFFERENT OPTIONS.
AMONG THE FOUR OPTIONS AS YOU AS COMPARED HERE.
OPTION TWO A, UH, MEETS THE BASELINE ERCOT, NERC AND RELIABILITY CRITERIA IMPROVES THE LONG TERM LOAD SERVING CAPABILITY AND ALSO IMPROVES THE OPERATION FLEXIBILITY WHEN IT COMES TO LOOKING AT THE N MINUS ONE MINUS ONE ISSUES PRIMARILY.
SO ERCOT RECOMMENDS OPTION TWO A, AND AS YOU CAN SEE ON THE, UH, IN THE TABLE HERE, UM, THERE IS A SIGNIFICANT COST INCREASE COMPARED TO THE, THE, THE ORIGINAL SUBMITTAL.
THE OPTION TWO A IS, UH, FOR HUNDRED 54.5 MILLION, $545.3 MILLION, UH, SIGNIFICANT INCREASE IN THE COST.
PRIMARILY THAT'S DRIVEN BY A LOT OF ADDITIONAL UPGRADES THAT'S NEEDED.
I'LL, I'LL GO THROUGH THAT AT THE, UH, AT THE END.
BUT AGAIN, UH, LOOKING AT OTHER ASPECTS, THERE'S NO SSR ISSUES RELATED TO THIS UPGRADES.
UM, AGAIN, LOOKING AT SENSITIVITIES, UM, CONGESTION COST, UM, WE DID NOT SEE THAT THE OPTION TWO A DID NOT CAUSE ANY ADDITIONAL CONGESTION IN THIS, IN THIS AREA.
AND NO FUTURE POTENTIAL GENERATOR STUDIED, IMPACTED THIS PREFERRED OPTION, WHICH IS OPTION TWO A.
SO ONE THING TO NOTE IS, AS I SAID, THE COST IS SIGNIFICANTLY HIGH.
THIS IS IN, IN THE CENTER POINT AREA.
UH, IF YOU LOOK AT THE TOTAL COST, $545.3 MILLION APPROXIMATELY, UH, THIS, SOME OF THE UPGRADES, MOSTLY IT'S PRIMARILY 1 38 KB UPGRADES.
UM, THEY REQUIRE SIGNIFICANT, UH, WORK TO ACCOMMODATE LIKE, YOU KNOW, OUTAGE ISSUES, WHICH IS ALSO PUTTING TEMPORARY, UH, WORK AND ALL STRUCTURES TO REPLACE THIS, UH, YOU KNOW, EXISTING STRUCTURES.
AND SOMETIMES LIKE, YOU KNOW, FULL TEMPORARY BYPASS, ALL THOSE THINGS ADDS TO THE COST.
SO OUT OF THE TOTAL COST, ROUGHLY AROUND, BASED ON THE TSPS ESTIMATE, WE PROB WE GOT THIS ESTIMATE FROM CENTER POINT.
45% OF THE COST IS ASSOCIATED WITH THIS TEMPORARY WORK, WHICH WOULD REQUIRE, YOU KNOW, ALL THOSE, UH, TEMPORARY STRUCTURES AND, UM, BYPASSES THAT WOULD BE NEEDED TO UPGRADE ALL THOSE 1 38 KB UPGRADES.
AGAIN, THE, THE PROJECT IS PRETTY LENGTHY.
THERE IS SEVERAL, LIKE IF YOU LOOK AT THAT, I, I DON'T WANNA WALK THROUGH EVERY ONE OF THEM, BUT I'M JUST GONNA HIGHLIGHT LIKE MOST OF THEM ARE, YOU KNOW, UPGRADES OF EXISTING 1 38 KV.
IN ADDITION TO LOOPING THIS, YOU KNOW, A COUPLE OF SUBSTATIONS TO SERVE THE NEW LOAD.
SO I WILL SKIP ALL THIS THREE PAGES.
AND IN ADDITION, WE ALSO IDENTIFIED NEED FOR, YOU KNOW, ADDING, UH, ADDITIONAL CAPACITORS TO SUPPORT THE VOLTAGE ISSUES.
SO THERE'S A NUMBER OF THOSE LOCATIONS LISTED THERE.
UM, ROUGHLY IT'S AROUND LIKE 140 MEGAWATTS MEGAWATTS OF, UH, UH, CAPACITORS THAT'S NEEDED TO ADDRESS ALL THOSE VOLTAGE ISSUES.
[02:50:01]
I'M GONNA JUMP TO THE LAST SLIDE, WHICH KIND OF HIGHLIGHTS THE, THE 1 38 KV PATHS AND THE LOCATIONS WHERE THOSE CAP BANKS ARE ADDED.SO, UM, ROUGHLY AT THE END IT'S AROUND LIKE 15 MILES OF, UH, UPGRADES, 1 38 KV REBUILDS AND UPGRADES.
THAT'S, THAT'S THE BULK OF THE PROJECT PLUS ADDITION OF, UH, CAPACITORS.
SO I'LL STOP HERE AND I KNOW I HAVE SOME QUESTIONS.
UM, SO I'LL BE HAPPY TO TAKE THE QUESTIONS NOW.
UM, SO IT, LET'S START WITH JUST THE OPTIONS, UH, LAID OUT HERE ON, ON ON UH, SLIDE FIVE.
MY FIRST QUESTION HAS TO DO WITH, WE HAVE FOUR OPTIONS PRESENTED ONLY ONE OF WHICH MEETS THE CRITERIA, WHICH TELLS ME THAT THAT'S ONLY, THERE AREN'T REALLY ANY, ANY OPTIONS HERE.
AND, AND SO I GUESS MY SPECIFIC QUESTION IS, MY UNDERSTANDING IS THE TWO A, YOU KNOW, PART OF THAT REALLY GET GOT TO THE OUTAGE CONDITION IS, DO I UNDERSTAND THAT CORRECTLY? YES.
SO NONE OF THE OTHER, YOU KNOW, NONE OF WHAT CENTERPOINT SUBMITTED OR INITIAL TAKE AT AN OPTION TWO, OPTION THREE, NONE OF THOSE MET THE OUTAGE CONDITION.
SO THIS IS, THIS IS, AGAIN, AS I SAID, THIS IS LOOKING AT THE MAINTENANCE CONDITIONS AT THE OFF PEAK OR THE EXPECTED OFF PEAK SYSTEM CONDITION, LOAD LOAD CONDITIONS.
SO, WHICH, WHEN WE LOOK AT THAT, WE DID IDENTIFY MOST OF THE ISSUES ARE OVERLOADS OF EXISTING ONE 30 KV LINES.
AND, UH, OF COURSE, LIKE THERE WERE ALSO VOLTAGE ISSUES.
SO THE BEST WAY TO ADDRESS THIS IS LIKE, YOU KNOW, UPGRADE THOSE LINES.
AS I SHOWED IN THE LAST, UH, SLIDE, THERE ARE SEVERAL AREAS WHERE YOU COULD SEE THERE IS UPGRADES NEEDED FOR EXISTING 1 38 KV LINES.
YOU KNOW, THE OTHER ALTERNATIVE IS TO BUILD LIKE NEW LINES OR ADDITIONAL, YOU KNOW, 3 45 KV.
I DON'T KNOW WHETHER IT'LL ADDRESS THOSE SPECIFIC MAINTENANCE OUTAGE CONDITIONS BECAUSE THESE ARE LIKE THERMAL OVERLOADS OF 1 38 KV LINES, WHICH NEEDS A HIGHER CAPACITY UNDER THOSE CONDITIONS.
AND, AND I CERTAINLY RECOGNIZE THE, THE, THE POTENTIAL NEED FOR, NO, I CAN'T BREAK UP MY SYSTEM TO BUILD NEW STUFF.
I GOTTA HAVE BYPASS, I HAVE TO HAVE TEMPORARY BUILDS.
AND THAT'S A SIGNIFICANT COST BY THAT NUMBER.
I COME UP WITH ABOUT $245 MILLION OUTTA THE TOTAL PROJECT.
THAT'S THE TOTAL IS RELATED TO THE, UM, TO ALL OF THAT.
I GOTTA, I GOTTA CREATE DETOURS TO BE ABLE TO DO THE WORK.
AND, AND THAT'S AN EXPENSIVE ASPECT.
I'M STILL STUCK, I'M STILL STUCK
SO 163 PLUS 2 45 GIVES ME FOUR OH $8 MILLION, WHICH THEN LEAVES ME 145 MILLION FOR THE, THE, THE PART OF THAT GOES FROM TWO TO TWO A REBUILD, WHICH BY MY COUNT IS LIKE 15 MILES OF UPGRADES.
I, I, I APPRECIATE YOU NODDING YOUR HEAD TO CONFIRM.
SO, AND, AND I'M LOOKING ACROSS THE WAY AT CENTERPOINT AND IF I SAY ANYTHING WRONG, I I, I WANNA BE CORRECTED AS WELL.
THE COST OF THAT INCREMENTAL 15 MILES OF, OF UPGRADE VERSUS THE COST OF THE INITIAL 40 MILES OF UPGRADE SEEMED TO BE VERY DISPARATE.
AND SO I'M, I'M INTERESTED IN UNDERSTANDING THAT ASPECT OF IT AS WELL.
WE, WE BASICALLY TOOK THIS $163 MILLION, WHAT TURNED INTO $163 MILLION PROJECT TO UPGRADE SOMETHING LIKE 40 MILES OF LINE, AND WE ADDED 15 MILES OF LINE, AND THAT'S ANOTHER $145 MILLION.
AGAIN, REALLY BIG PROJECT TRYING TO UNDERSTAND WHAT ALL OF THESE COST DRIVERS ARE, PLEASE.
SO, UM, I'LL START, MAYBE IT'S ON A POINT IF THEY WANT TO ADD, THEY CAN ADD.
SO I THINK IF YOU LOOK AT THE ORIGINAL PROPOSAL, UH, MY RECOLLECTION IS THAT'S, THAT'S AVAILABLE, BUT THAT, THAT WAS LIKE, YOU KNOW, ROUGHLY AROUND LIKE, UH, IT WAS NOT 50, 40 MILES, IT WAS WAY LESS.
IT WAS LIKE, YOU KNOW, IT WAS CLOSE TO 12 MILES OR 13 MILES OF TOTAL UPGRADES.
THAT'S WHERE WE STARTED AND NOW WE ENDED UP, YOU'RE RIGHT, CLOSE TO 50 MILES OF UPGRADES.
[02:55:01]
THE DIFFERENCE IN COST.UM, I DON'T, I DON'T HAVE THE EXACT MILES, BUT IF YOU WANT ME TO, YOU KNOW, THAT, THAT SHOULD BE AS PART OF THE REPORT, BUT YEAH, THAT'S, THAT'S HELPFUL.
UM, THAT'S HELPFUL FOR ME TO UNDERSTAND.
AGAIN, UH, THE, THE GOING IN QUESTION IS HOW DOES 140 TURN INTO A HALF A BILLION? UM, AND UNDERSTANDING THOSE PIECES AND DRIVERS IS SUPER IMPORTANT.
DO YOU, I THINK WE HAVE WES ON THE LINE AS WELL, IF WE WANT TO KIND OF ADDRESS SOME OF THAT CAUSE AND ADDRESS, UH, BEST CONCERN.
UH, SO I'M GONNA LET, UH, WES SPEAK TO THE QUESTIONS THAT WAS RAISED.
YEAH, SO THE, THE ORIGINAL, UH, ESTIMATE OF 140 MILLION, YOU KNOW, DID HAVE A LOT LESS, UH, SORT OF MILEAGE OF UPGRADES, UH, THAT WE HAD INCLUDED.
WHEN ERCOT CAME BACK TO US AND SAID, HEY, WE FOUND A LOT MORE OF THESE MAINTENANCE OUTAGES, UM, ISSUES.
UH, PLEASE PROVIDE US ESTIMATES FOR THOSE.
UM, WE ALSO AT THE TIME DID A RE-ESTIMATE OF EVERYTHING WE HAD SUBMITTED.
SO THAT ORIGINAL 140, UM, BASICALLY THE SAME SCOPE AND UPGRADES IN INCREASED TO ABOUT, I WANT TO SAY TWO 20, UM, UH, 220 MILLION.
AND THEN THERE WAS SORT OF THE LEFTOVER NEW PROJECTS THAT WE HAD NOT IDENTIFIED, UH, THAT ARE SORT OF THE NEW MAINTENANCE OUTAGE.
THAT WAS ABOUT 300 MILLION OF THE, OF THE PROJECTS.
AND THEN, UM, THERE'S THE CUSTOMER PAY PORTION THAT'S SOMETHING JUST SOUTH OF ABOUT 30 MILLION.
SO THAT, THAT'S WHERE YOU GET TO THE, THE 540.
UM, I, I WOULD SAY THAT TYPICALLY THE, THE 1 38, UM, REBUILD COSTS, EVEN THE ORIGINAL ONES AND THEN THE NEW MAINTENANCE OUTAGES WERE VERY SIMILAR.
UM, I MEAN, IT COMES OUT TO ROUGHLY SOMETHING ABOUT $10 MILLION PER MILE WHEN YOU ADD IN THE TEMPORARY WORK.
I'M, I'M LAUGHING 'CAUSE I'M SITTING HERE NEXT TO, UH, MIKE WISE FROM GOLDEN SPREAD AND HE'S JUST INCREDULOUS AT $10 MILLION A MILE.
AND I SAID, YEAH, THAT'S THE DIFFERENCE BETWEEN AN URBAN AND, AND HIS RURAL AREA.
UM, THE, I I FULLY ACCEPT AND ACKNOWLEDGE THAT THAT COSTS ARE MORE EXPENSIVE IN CONGESTED AREAS.
AND, UM, UM, AND YOUR INFORMATION ON THE, WHAT I WOULD CONSIDER SORT OF THE, UH, COST ESCALATION INFLATION ASPECT DRIVER TAKING THAT INITIAL 140 TO TWO 20, UH, IS HELPFUL INSIGHT, UM, INTO, BECAUSE I KNOW, I KNOW THAT THAT'S A, THAT THAT'S A HUGE ISSUE THAT THE WE AS CONSUMERS, AS THE INDUSTRY ARE ALL, ARE ALL DEAL DEALING WITH AT THIS POINT.
UH, THE, THESE QUESTIONS ARE JUST GONNA BE ASKED OUT OF TOTAL IGNORANCE.
UM, SO WHEN I SEE 45% OF THE ESTIMATED CAPITAL COST FOR TEMPORARY WORK, UM, IS THAT SOMETHING THAT IS ELIGIBLE FOR RATE OF RETURN? IS IT STILL, UM, USED AND USEFUL IF IT'S TEMPORARY OR IS IT SOMEHOW CATEGORIZED AS SOMETHING THAT'S NOT A CAPITAL COST? AND, UM, IF IT'S NOT A CAPITAL COST, WE SHOULD JUST BE A LOT MORE, UM, UH, DELIBERATE WITH OUR WORD CHOICES HERE.
YEAH, THAT'S SOMETHING WE, I HAVE, I DON'T HAVE AN ANSWER, BUT THAT'S SOMETHING WE WILL, WE ALWAYS KEPT, YOU KNOW, CHARACTERIZED EVERYTHING TO BUILD A TRANSMISSION PROJECT, INCLUDING MAIN, YOU KNOW, SUPPORTING OUTAGES AS CAPITAL COST.
I CAN TAKE IT UP TO THE TSPS OR, OR FOR INTERNAL DISCUSSION.
WESTER CAN CORRECT ME IF I'M WRONG, BUT, UH, UM, I THINK THAT'S ALL GONNA BE CAPITAL COSTS AND
[03:00:01]
THAT'S TYPICALLY THE WAY IT WOULD FOR US TO BE ABLE TO REBUILD THOSE LINES.THAT'S INCLUDED IN THE CAPITAL COSTS.
YEAH, I BELIEVE THAT'S CORRECT.
I MEAN, THAT'S JUST SORT OF PART OF DOING THESE UPGRADES IS IN, IN A LOT OF CASES YOU HAVE TO USE, UH, YOU KNOW, TEMPORARY WORK, UH, TO GET THE PROJECTS BUILT WHILE MINIMIZING OUTAGES.
I MEAN, THESE, UM, MOST OF THESE UPGRADES THAT WERE IDENTIFIED EARNING EXTREMELY INDUSTRIAL AREAS WITH SOME LARGE, YOU KNOW, FACILITIES, YOU KNOW, INDUSTRIAL PLANTS, YOU KNOW, WHATEVER, UM, THAT, YOU KNOW, WE TRY TO MINIMIZE OUTAGES.
YOU DON'T WANNA HAVE THOSE GUYS, YOU KNOW, RADIALLY FED FOR EXTREMELY LONG PERIODS OF TIME.
SO, I MEAN, THAT'S JUST KIND OF A NORMAL, UH, WAY WE HANDLE THE UPGRADES IN, IN, IN MOST OF THESE AREAS.
UM, AND I SAW ONE OF MY PLANTS THAT AS A COGEN FACILITY IS, YOU KNOW, WITHIN THIS TERRITORY AND, UH, CERTAINLY DON'T WANNA LOSE SERVICE OR THE ABILITY TO HAVE EXPORTS TO, UH, WHEN, WHEN THAT, UH, FACILITY MIGHT BE DOWN.
UM, IT JUST, PART OF, PART OF THE REASON FOR MY QUESTION WAS TO MAYBE TAKE SOME OF THE, THE STEAM OFF OF LIKE THE HALF BILLION DOLLAR NUMBER IF IT'S REALLY NOT A CAPITAL COST.
ANY OTHER QUESTIONS OR COMMENTS OF, OKAY, CAN I, CAN I ASK A QUESTION? SO I, I GUESS BASED ON THE COMMENTS, I DIDN'T, I DIDN'T HEAR ANY, ANY RECOMMENDATION TO THE BOARD.
I I THINK IT'S, IT'S, IM, I WOULD SUGGEST IT'S IMPORTANT TO, FOR THE BOARD WHO WILL ULTIMATELY, YOU KNOW, APPROVE THIS PROJECT TO KIND OF FULLY UNDERSTAND THOSE, THE, THE GROWTH OF THIS PROJECT.
IT STARTED AS THIS, YOU KNOW, A A GRAPEFRUIT SIZE BLOB THAT HAD THIS AMOUNT OF COST, AND THEN WE NEEDED TO ADD THESE PROJECTS AND THEN COST ESCALATED AND THEN WE REALIZED WE NEED TO DO ALL THIS TEMPORARY WORK.
AND ALL OF THAT I THINK IS IMPORTANT TO UNDERSTAND THE FULL SCOPE OF THIS.
UM, AND I GUESS, AND I WANNA MAKE SURE THAT I'VE, I'VE FULLY, UH, UNDERSTAND THAT THE DRIVER FOR THIS PROJECT AT ALL IS BECAUSE THERE'S SOME BIG NEW LOAD THAT WANTS TO LOCATE IN IN HARRIS COUNTY.
AND SO ALL CONSUMERS IN, IN ERCOT ARE BEING ASKED TO SPEND A HALF A BILLION DOLLARS FOR, UM, FOR, UH, CENTER POINT TO BE ABLE TO UPGRADE THEIR SYSTEM, TO BE ABLE TO ACCOMMODATE, ACCOMMODATE THIS BIG NEW LOAD.
SO WE, WE CAN VOTE AS WE USUALLY DO.
IF, IF PEOPLE WANT, WE'D BE LOOKING TO ENDORSE THE RPG PROJECT, UH, CENTER POINT BAYTOWN AREA LOAD ADDITION PROJECT OPTION TWO A IS PRESENTED.
DOES, DOES ANYONE WANT TO DO THAT? WE CAN PUT IT ON THE COMBO BALLOT OR WE COULD DO A SEPARATE BALLOT.
I WOULD PREFER, I WOULD PREFER THIS NOT TO BE ON THE COMBO BALLOT.
I'M NOT IN A POSITION TO MAKE A MOTION.
DOES ANYONE WANT TO MAKE THAT MOTION? HILTON.
BOB HILTON, CAN WE GET A SECOND? I'D BE SECOND.
SO THE, THE MOTION IS ENDORSE RPG PROJECT CENTER POINT BAYTOWN AREA LOAD ADDITION PROJECT OPTION TWO A IS PRESENTED.
UH, WE GOT A MOTION AND A SECOND.
[03:05:03]
OKAY.WE GOOD? SUSIE, YOU GOT YOUR MOVER AND SECONDER.
ON THE MOTION TO ENDORSE THE RPG PROJECT FOR CENTERPOINT AS PRESENTED OPTION TWO A, WE WILL START UP WITH THE CONSUMERS, WITH MARK DREYFUS.
APPRECIATE IT, SIR GARRETT? YES SIR.
BETH, I'M GONNA GO AHEAD AND VOTE NO.
ONTO OUR INDEPENDENT GENERATORS.
AND THEN ANDREW FOR JOSE? YES.
90%, FOUR, THREE OPPOSED? AND ONE ABSTENTION.
UM, SO I'M TOLD LUNCH IS HERE, SO WHY DON'T WE BREAK FOR LUNCH AND COME BACK AT 1 10, 3 PEOPLE AT ONE.
[7. PRS Report (Vote) (Part 2 of 2)]
SOMETHING UP BEFORE I FORGOT.UH, NPR 1283, WHICH WE PUT ON THE COMBO BALLOT.
COREY HAS FOUND, UH, MINOR CORRECTION, CHANGING, SYNCHRONIZED, ENERGIZED OR SO SOMETHING.
UM, BUT LOOK, I'M DOING THIS OFF THE TOP OF MY HEAD.
UM, SYNCHRONIZATION TO ENERGIZATION.
IS THAT WHAT YOU SAID THE CHANGE WAS? THAT'S EXACTLY RIGHT.
UH, 1283 IS CHANGING INITIAL SYNCHRONIZATION TO INITIALIZATION THROUGHOUT, WELL, IN THE COURSE OF ITS LIFE, NEWLY APPROVED NPR 12 80 12 34 ADDED A GRAY BOX IMMEDIATELY BELOW THERE.
THAT'S CHANGING SSR TO SSO IN A BUNCH OF PLACES, BUT IT DID NOT CARRY THAT SAME CHANGE.
SO 12 80, 12 34 IS NOT TRYING TO UNDO WHAT WE'RE DOING WITH 1283.
SO IF Y'ALL ARE AMENABLE TO SOME DESKTOP EDITS.
THAT'S THE ENTIRETY OF 'EM THERE ON YOUR SCREEN WHERE IT'S JUST TAKING WHAT 1283 IS ALREADY DOING AND MAKING SURE THAT 1234 DOESN'T ACCIDENTALLY UNDO THAT.
BY CHANGING ENERGIZATION BACK TO SYNCHRONIZATION.
SO IT'S PUTTING THE CHANGES BACK INTO THE GRAY BOX.
AND SO THE, THE CHANGE TO OUR COMBO BALLOT WOULD JUST TO BE, TO CHANGE THE MOTION, UM, TO, TO APPROVE THIS AS RECOMMENDED BY PRS AS REVISED BY TAC.
THE, THE MOTION THAT Y'ALL HAD IS PERFECT AND JUST TACKING AS REVISED BY TAC ON IT.
SO IF Y'ALL ARE STILL OKAY WITH LEAVING THAT ON THE COMBO BALLOT, YOU HAVE MY APPRECIATION.
UH, ACTUALLY, BUT ONE THING I WOULD LIKE TO SAY, AND I DON'T THINK WE NEED TO DO ATTACK ACTION, BUT TIED ONTO THIS ONE, ONCE WE GET IT THROUGH, UH, EITHER ROS OR I NEED TO GET WITH THE T DSPS, WE NEED TO LOOK AT THAT SSO STUDY PROCESS AND SEE IF THERE'S SOME THINGS WE CAN DO TO MOVE THAT, OR IF THERE'S ADDITIONAL SCREENING YOU CAN DO UP FRONT.
SOMETHING WE CAN DO TO NOT GET US INTO SOME SITUATIONS WHERE WE'RE PUSHING PROJECTS OUT TOO FAR.
SO I, THAT'S ON MY MIND AND I'M, I'M GONNA BRING THAT UP AND I CAN'T SOLVE IT WITHOUT YOU GUYS.
WE'RE HAPPY TO PARTICIPATE IN ANY DISCUSSIONS.
JUST LET US KNOW WHEN AND WHERE TO BE.
SO EVERYONE'S OKAY WITH CHANGING THAT MOTION SLIGHTLY ON THE COMBO BALLOT.
[03:10:01]
OKAY.[17. Other Business (Part 1 of 2)]
NOW WE ARE GOING TO GO TO, UM, THE PUC STAFF UPDATE ON ANCILLARY SERVICE COST ALLOCATION STUDY WITH JULIE.I AM JULIE GADEN WITH PUC STAFF, AND I WAS THINKING THAT I WOULD START MY PRESENTATION WITH A GOOD CORNY JOKE.
HOWEVER, I DECIDED IN THE INTEREST OF EFFICIENCY, I WILL NOT TELL A JOKE.
INSTEAD OF TAKING UP ANY EXTRA OF THESE GROUP'S.
VALUABLE TIME WITH A HUMOROUS ANECDOTE, I'LL BE JUMPING INTO MY PRESENTATION WITH ABSOLUTELY NO JOKING AROUND
THIS, UH, I'M GONNA BE INTRODUCING A PROJECT THAT WE JUST KICKED OFF THIS MONTH.
THIS, UH, SLIDE SHOWS THE BACKGROUND OF THIS PROJECT.
IN THIS PROJECT, THE PUC, UH, AND ERCOT ARE REQUIRED TO PERFORM A STUDY ANALYZING THE COST ALLOCATION OF ANCILLARY SERVICES AND RELIABILITY SERVICES, UM, IN PURE, THIS REQUIREMENT WAS DEFINED IN 39 15 93, AND THIS STUDY, AND ALSO ALL DESIGN, PROCUREMENT AND COST ALLOCATION OF ANCILLARY SERVICES NEED TO BE CONSISTENT WITH SECTION 35 0 0 4, UH, WHICH SPECIFIES THAT THESE SERVICES, UH, THE DESIGN, PROCUREMENT AND COST ALLOCATION NEEDS TO BE CONSISTENT WITH COST ALLOCATION PRINCIPLES.
AND ON A NON-DISCRIMINATORY BASIS, THERE ARE SOME THRESHOLD SCOPE ISSUES THAT WE'RE DEFINING RIGHT NOW, AND YOU'LL SEE THE, UM, TIMELINE FOR THE PROJECT LATER ON.
ONE OF THE KEY THINGS, AND ONE OF THE KEY REQUIREMENTS OF THE STUDY IS THAT WE NEED TO EVALUATE TWO COST ALLOCATION METHODS.
NUMBER ONE, THE CURRENT METHOD, AND NUMBER TWO, EITHER THE SPECIFIC METHOD THAT'S DEFINED IN PIRA OR ANOTHER METHOD IDENTIFIED BY THE COMMISSION IN PUR.
THE ALLOCATION METHOD IS DEFINED TO ASSIGN COSTS, NOT JUST TO LOAD AS IS DONE NOW, BUT TO LOAD AND GENERATION.
AND ONE OF THE PROVISIONS IS THIS WOULD BE BY THEIR CONTRIBUTION TO UNRELIABILITY DURING THE HIGHEST HOURS, UH, TIMES OF RELIABILITY RISK DUE TO LOW OPERATING RESERVES, ET CETERA, ET CETERA.
AND THERE'S OTHER REQUIREMENTS, OR AS I SAID, ANOTHER METHOD IDENTIFIED BY THE COMMISSION.
RIGHT NOW WE'RE WORKING ON COMMENTS FOR PUBLIC, UH, QUESTIONS FOR PUBLIC COMMENT.
AND THESE ARE SOME OF THEM AS EXAMPLES JUST TO GIVE YOU A, A FEEL FOR THE KIND OF THINGS THAT WE'RE WORKING ON.
AND WE'RE GONNA BE BRINGING THIS TO THE COMMISSION TO FINALIZE THE STUDY SCOPE BY THE END OF THE YEAR IS OUR GOAL.
AND WE ARE RIGHT HERE IN AUGUST.
WE'VE OPENED THE PROJECT AND HERE I AM TODAY, UH, KICKING IT OFF WITH YOU GUYS.
AND, UH, LIKE I SAID, WE'RE WORKING ON A MEMO WITH QUESTIONS.
WE'LL ALLOW PROBABLY THREE WEEKS FOR QUESTIONS.
AND THEN THE GOAL IS TO WRAP UP THE SCOPE AND HAVE IT WELL-DEFINED BY THE END OF THE YEAR SO THAT ERCOT CAN DIVE INTO THE ANALYSIS STARTING NEXT YEAR.
UH, THE ANALYSIS WILL TAKE, UM, ESTIMATED AROUND SIX MONTHS.
ALL OF THESE DATES HERE ARE TENTATIVE PAST TODAY.
AND AFTER THIS ANALYSIS, WE'LL HAVE, UH, AT LEAST ONE WORKSHOP AND WE'LL TALK ABOUT, UM, HOW TO MOVE THE FINDINGS INTO ACTIONABLE, UM, RECOMMENDATIONS AFTER THAT.
ANY QUESTIONS FOR ME? AWESOME.
YEAH, THAT DOESN'T MAKE IT Q YEAH, I WAS LOOKING FOR YOUR HAND.
WE REALLY APPRECIATE, UH, THE HEADS UP ON, ON WHAT YOU'RE WORKING ON AND LAYING OUT THIS, UH, TIMELINE.
UM, ONCE UPON A TIME, THIS STAKEHOLDER BODY DID ATTEMPT TO CHANGE HOW ANCILLARY SERVICE COSTS, UH, ALLOCATION, UH, WORKS.
IT WAS QUITE CONTROVERSIAL AT THE TIME.
WE DIDN'T HAVE THE DIRECTION IN STATUTE AND THE COMMISSION TO HELP GUIDE US.
SO THIS IS GOING TO CERTAINLY BE HELPFUL.
UH, IT DOES GET COMPLICATED QUICKLY, UM, AND OBVIOUSLY WE'LL HAVE A BIG, WE'LL HAVE BIG FINANCIAL CONSEQUENCES ON ALL OF US, SO I'M SURE YOU'LL GET A LOT OF ATTENTION.
THE, THE, MY MAIN QUESTION IS, IT LOOKS LIKE, JUST TO CONFIRM, THE DELIVERABLE IS NOT NECESSARILY
[03:15:01]
WE'RE GONNA CHANGE THE RULE.THAT'S WHAT IT'S GONNA LOOK LIKE.
IT IS A REPORT ON THE POTENTIAL OPTIONS THAT WILL BE CONSIDERED AT THE COMMISSION LATER NEXT YEAR.
AND THEN IT WILL GO TO THE, IS THERE A REPORT GOING BACK TO THE LEGISLATURE TO WEIGH IN ON? THERE IS.
THE, THE PEC REPORT IS FOR THE LEGISLATURE.
SO THAT IS THE ULTIMATE DELIVERABLE IS A REPORT TO THE LEGISLATURE, NOT A CHANGE IN RULE OR HOW THE ALLOCATION MECHANISM WORKS RIGHT NOW.
THAT'S THE ENVISIONED PROCESS.
THANKS BILL, BOB HILTON, YOU'RE GOOD? I'M GOOD.
UM, UH, UH, BILL BARNES ASKED THE QUESTION I WAS GONNA ASK, SO I'M, I'M GOOD.
ANY OTHER QUESTIONS OR COMMENTS FOR JULIE? AWESOME, THANKS AGAIN.
OKAY, NOW WE ARE GOING TO GO TO THE SEPTEMBER BOARD STAKEHOLDER ENGAGEMENT UPDATE FROM REBECCA, AND THEN WE WILL GO TO OUR ANCILLARY SERVICE METHODOLOGY.
UM, WE HAVE THE PRESENTERS, I KNOW WE TALKED ABOUT THE SEGMENTS LAST MONTH.
WE HAVE THE PRESENTERS AND THEN THE POLICY DISCUSSION PROMPTS FOR THE RTC PLUS B BOARD EDUCATION STAKEHOLDER ENGAGEMENT OPPORTUNITY IN SEPTEMBER.
UM, SO AGAIN, THANK YOU FOR THOSE SEGMENTS AND ALL THE PRESENTERS.
I KNOW THIS IS, UM, TIME Y'ALL ARE PUTTING INTO DOING THIS.
IF YOU'RE ONE OF THE IDENTIFIED PARTICIPANTS, YOU SHOULD BE RECEIVING A EMAIL, UM, WITH INFORMATION ON GETTING A MEETING SET UP TO START PLANNING.
THIS MATERIALS ARE DUE IN TWO WEEKS FOR THE FIRST DRAFT, SO I KNOW IT'S A TIGHT TURNAROUND TIMELINE, BUT AGAIN, APPRECIATE THAT AND KIND OF THINK THE PROMPTS WILL HELP START GUIDING THAT DISCUSSION AND LOOKING FORWARD TO HAVING THIS AT THE SEPTEMBER BOARD.
ANY QUESTIONS OR COMMENTS FOR REBECCA? I, I CAN READ 'EM IF ANYBODY WANTS.
I DON'T, I KNOW WE'RE IN A TIGHT TIMEFRAME.
UM, LET ME JUST, WE'VE MOVED A BUNCH OF THINGS AROUND FOR PEOPLE'S SCHEDULES AND, AND OTHER TIME CONSTRAINTS.
SO, UM, I WANTED TO DO KIND OF AN AGENDA RUNDOWN.
SO, SO PRESENTERS AND, AND PEOPLE KNOW WHAT'S COMING NEXT.
WE ARE ABOUT TO TAKE UP THE ANCILLARY SERVICE METHODOLOGY DISCUSSION.
THAT'S A, A VOTING ITEM OR A POTENTIAL VOTING ITEM.
I ANTICIPATE THAT WILL TAKE SOME SUBSTANTIVE AMOUNT OF TIME.
AFTER THAT, WE WILL GO BACK TO THE LARGE LOAD WORKING GROUP UPDATE AND THE LARGE LOAD INTERCONNECTION QUEUE.
THEN WE WERE SORT OF BACK ON ON TRACK.
WE WILL GO TO THE END OF THE ERCOT REPORTS AFTER THAT TO THE, THE PRICE CORRECTION.
UM, AND THEN WE'LL GO THROUGH THE OTHER BUSINESS THAT WE DIDN'T JUST COVER.
SO THE, THE ANNUAL, UH, MEMBER MEETING, THE ACTION ITEMS LIST REVIEW AND, UH, ATTACK PROCEDURES ITEM.
[15. Proposed Changes to Ancillary Service Methodology for 2026 (Possible Vote)]
SO WITH THAT WE CAN START ON ANCILLARY SERVICE METHODOLOGY.WHAT I WAS PLANNING WAS TO HAVE ERCOT PRESENT TO HAVE THE IMM PRESENT AND THEN SOMEBODY FROM CONSUMERS OR MULTIPLE PEOPLE FROM CONSUMERS PRESENT THEIR, THEIR COMMENTS AND THEN JUST TAKE UP FURTHER DISCUSSION FROM FROM THERE.
I KNOW COMMISSION STAFF IS HERE, WHICH IS GREAT.
UM, AND, AND I'M SURE ERCOT STAFF IS IS, AND, AND JEFF ARE HERE TO ANSWER PEOPLE'S QUESTIONS AS WELL.
UH, OSA WITH ERCOT, I WILL BE COVERING THE PROPOSED 2026 ANCILLARY SERVICE METHODOLOGY AND PRELIMINARY QUANTITIES.
SO I WANNA START WITH SOME BACKGROUND.
UH, HOW DID WE GET HERE AND WHAT HAVE WE BEEN DOING? SO, JUST KIND OF WANTED TO TALK ABOUT HOW WE, THE THINGS WE'VE BEEN TALKING ABOUT AS WE REVIEW THE 2026 AS METHODOLOGY FOR THIS YEAR.
UM, AS PART OF THE REVIEW THIS, WE WANNA GO BACK AND KIND OF PICK UP THE PUC 2024 AS STUDY THAT HAPPENED.
UM, UH, AND I'VE PROVIDED SOME LINKS FOR THOSE OF YOU THAT THAT WOULD LIKE TO GO AND READ THOSE.
UM, THERE WERE A COUPLE TOPICS, FINDINGS AND, AND NEXT STEPS THAT WE WANTED TO TALK ABOUT THAT CAME OUT OF THAT PUC STUDY.
AND IN PARTICULAR, I'VE HIGHLIGHTED TWO BOXES HERE, UM, THAT WE'RE TACKLING IN THIS 2026 AS METHODOLOGY.
[03:20:01]
WAS TALKING ABOUT APPROPRIATE CRITERION FOR PROCURING QUANTITIES.UH, SO OUR CURRENT POSTURE IS MAINTAINING AS QUANTITIES AND MINIMIZE ENTERING A PRE EMERGENCY OPERATION CONDITION OF AN OPERATIONAL WATCH.
UM, AND THIS SHOULD BE MAINTAINED IN ORDER, UH, AFTER IMPROVEMENTS THAT HAVE MADE AFTER, AFTER YOUR, EXCUSE ME.
UM, AND WHAT WAS ASKED WAS, UH, HAVING THE ABILITY TO, TO DEVELOP A CAPABILITY TO PROVIDE ESTIMATES AND COST ON PROBABILITIES OF EXPERIENCE, A WATCH, AN EMERGENCY ALERT LOAD SHED, AND LOOK AT SEVERAL OTHER THINGS, UH, RELATED TO THE ANCILLARY SERVICES AND THE, THE, THE CRITERIA.
AND WE'RE USING FOR QUANTIFYING AS, UH, ONE THING I'LL NOTE IS, IS THIS WAS, UH, THIS, DID BOTH OF THESE POINTS HAVE A POINT TO BE INCLUDED AS PART OF THE 2027 AS, BUT WE TOOK THE OPPORTUNITY IN 2026 TO TRY TO COVER