[00:00:03]
WE'RE GONNA GO AHEAD AND GET STARTED.
IF WE CAN GET FOLKS IN THE ATTACK MEETING ROOM TO GO AHEAD AND TAKE YOUR SEATS, PLEASE.
I WILL GO THROUGH THE REMINDERS VERY QUICKLY TODAY.
IF YOU ARE HERE IN THE MEETING ROOM AND WANT TO USE, UH, THE QUEUE TO MAKE A MOTION OR COMMENT, YOU CAN RAISE YOUR CARD PHYSICALLY IN THE ROOM, AND ELIZABETH IS OVER HERE IN THE RIGHT HAND CORNER.
SHE WILL ENTER YOU IN THE CHAT, OR YOU CAN ENTER YOURSELF IN THE CHAT.
ALSO, OF COURSE, IF YOU'RE ON THE WEBEX, PLEASE ENTER YOURSELF AND WAIT FOR THE CHAIR TO RECOGNIZE YOU BEFORE YOU BEGIN SPEAKING.
UM, ALSO, IF YOU'RE HERE TODAY IN PERSON, PLEASE MAKE SURE YOU USE A SIGN IN SHEET OUTSIDE THE MEETING ROOM.
UM, IF THE WEBEX ENDS FOR ANY REASON, GIVE US A FEW MINUTES AND WE WILL RESTART THE WEBEX AND YOU CAN REJOIN WITH THE SAME MEETING DETAILS, OR WE WILL SEND SOMETHING TO THE LISTSERV.
UM, ALSO, I NEEDED TO MENTION WHEN YOU GET TO THE BALLOTING PROCESS, FOR THOSE OF YOU ON THE WEBEX, IF YOU WILL.
SO KINDLY UNMUTE YOURSELF BEFORE WE BEGIN YOUR SEGMENT, AND THEN IMMEDIATELY RETURN TO THE MUTE FUNCTION THAT WILL HELP US BE A LITTLE MORE EFFICIENT IN THAT VALIDATING PROCESS.
AND WITH THAT, UM, WE DO HAVE A QUO AND ARE READY TO BEGIN WHEN YOU ARE KAITLYN.
THIS IS OUR REGULAR, UH, FEBRUARY TECH MEETING.
WE WILL TAKE A LUNCH BREAK AROUND 12, UM, WHEN THERE'S A GOOD STOPPING POINT FOR ALT REPS AND PROXIES TO TODAY.
UM, WE HAVE NEWLY SEATED, UH, RESIDENTIAL CONSUMER WILL, UH, RE ROAD ALT REPS TODAY IN THE CO-OP SEGMENT.
JOHN PACKARD HAS LUCAS TURNER AS HIS ALT REP AND THE IPM SEGMENT.
UH, JEREMY CARPENTER HAS AMANDA DELEON AS HIS, UH, ALT REP FOR PART OF THE TAC MEETING.
I DON'T HAVE A TIME, BUT PART OF IT, UM, MUNICIPAL SEGMENT.
AND FOR PROXIES IN THE INDEPENDENT GENERATOR SEGMENT, BOB HILTON HAS GIVEN HIS PROXY TO ME.
AND IN THE IRE SEGMENT, CHRIS HENDRICKS HAS GIVEN HIS PROXY TO BILL BARNES.
AARON, ARE WE STILL DOING THEMES OF THE MONTH FROM, UH, NO PRESSURE, NO PRESSURE.
WELL, YOU DON'T HAVE TO MAKE ONE UP.
OH, WELL, NO, IT'S A GREAT ONE.
ARE WE, DO WE KNOW IF WE'RE GONNA GET, UH, RICHARD ONES EVERY MONTH? WOW, THAT'S HURTFUL.
WELL, I'M SORRY, BUT MINE WAS NOT GOOD.
WELL, I HAD AN IDEA IF WE'RE NOT, BUT I DIDN'T WANNA HURT RICHARD'S FEELINGS.
MY IDEA WAS WE LET, WE ROTATE SEGMENTS AND HAVE ANOTHER SEGMENT DO NEXT MONTH.
SO NEXT MONTH IS, UH, I REP, I REP TURN FOR THEME, OR, UH, IAN'S COVERING HIS FACE.
UM, SO THIS WEEK IS SHENANIGANS.
I DON'T KNOW WHERE GOFF IS, BUT I, HE KNOWS I'M A BIG FAN OF, OF SHENANIGANS AND BITS AND ALL OF THAT.
SO WE'LL TRY TO KEEP IT UNDER CONTROL TODAY.
NEXT MONTH THE I REPS ARE IN CHARGE, AND THEN THE NEXT MONTH IN APRIL, IAN'S IN CHARGE.
[1. Antitrust Admonition]
UH, THE ANTITRUST ADMONITION IS ON THE SCREEN.TO AVOID RAISING CONCERNS ABOUT ANTITRUST LIABILITY.
PARTICIPANTS IN
AND, UH, I THINK WITH THAT, WE CAN GET GOING.
DO YOU, DO YOU HAVE A COMMENT ABOUT THE THEME? NO.
UH, ACTUALLY, I WAS JUST GONNA ADD ON TO THE ANTITRUST ADMONITION.
UM, YOU CAN TAKE THAT UP WITH CHAD.
BUT, BUT I THINK THAT'S FINE FOR TODAY.
[2. Approval of TAC Meeting Minutes (Vote)]
ARE ONTO, UH, THE, THE NED SECTION.UM, FIRST, SIR, THE MEETING MINUTES.
I DON'T BELIEVE WE'VE HAD ANY SUGGESTED EDITS OR CORRECTIONS.
NED, YOU HAVEN'T FOUND ANY ISSUES? NO MINUTES SHENANIGANS.
NO SHENANIGANS IN LAST MONTH'S MEETING MINUTES, BECAUSE THAT WASN'T THE THEME LAST MONTH.
UM, SO WE ARE LOOKING TO APPROVE THE JANUARY 21ST, UH, 2026 MEETING MINUTES AS PRESENTED.
[00:05:01]
ASSUME WE CAN PUT THIS ON THE COMBO BALLOT.[3. Meeting Updates]
ARE ONTO OUR MEETING UPDATES.UH, WE PROVIDE AN UPDATE ON THE, THE BOARD IN PUC OPEN MEETINGS WHERE OUR CART REVISION REQUESTS HAVE BEEN CONSIDERED SINCE OUR LAST MEETINGS.
UH, THE FEBRUARY BOARD APPROVED ALL REVISION REQUESTS RECOMMENDED BY TAX.
THOSE WERE FROM OUR JANUARY TAC MEETING.
AND ALL OF THOSE, I BELIEVE, WILL GO TO THE 3 26 PUC OPEN MEETING FOR CONSIDERATION.
THE OTHER THING I WANTED TO RAISE WAS AT THE FEBRUARY 6TH OPEN MEETING AT THE, THE COMMISSION.
YOU KNOW, THIS SEEMS LIKE OLD NEWS WITH HOW FAST THINGS ARE MOVING, BUT AT THE FEBRUARY 6TH OPEN MEETING COMMISSION LET ERCOT KNOW THEY WOULD NOT GRANT A GOOD CAUSE EXEMPTION FOR BATCH ZERO, AND THAT THEY SHOULD PURSUE BATCH ZERO THROUGH A REVISION REQUEST THROUGH THE STAKEHOLDER PROCESS.
I THINK WE ALL KNOW THAT THAT IS HAPPENING AND, AND THAT WE ARE HOPING, OR WE WILL GET THE REVISION REQUEST TO THE JUNE BOARD.
WE WILL HAVE A FURTHER MORE SUBSTANTIVE DISCUSSION ABOUT THIS UNDER THE PRIORITY BOARD ITEMS. BUT JUST WANTED TO PUT THAT UNDER MEETING UPDATES.
DOES, UH, COMMISSION STAFF, IS THERE ANYTHING YOU'D LIKE TO ADD ABOUT, UH, PUC PROJECTS OR RULE MAKINGS AT THIS POINT IN THE AGENDA? YES.
UH, ONE THING IS, YOU MAY HAVE NOTICED PROJECT 3, 8 5, 3 3 OR CUT BUDGET.
REALLY THAT WAS SO MUCH STUFF GOING ON.
WE HAVE TO POSTPONE IT AGAIN TO MARCH 12TH, OPEN MEETING THE PERFORMANCE MEASURE.
SO THAT'S HOPEFULLY WE'LL BE TAKEN CARE OF.
THEN ANOTHER IS REALLY A FRIEND REMINDER, UH, IN THE RELIABILITY STANDARD PROJECT.
COMMENTS ON THE ASSUMPTIONS ARE DUE MONDAY, MARCH 2ND.
AND WE REALLY NEED FEEDBACK FROM THE STAKEHOLDERS ON ALL THE QUESTIONS AND ANYTHING YOU, YOU THINK WE SHOULD KNOW ABOUT.
THE THIRD ONE IS, THERE WAS A QUESTION AT I THINK RTC TASK FORCE MEETING.
MY STAFF TOLD ME, UH, TAG 25 5 0 9 D, IT REQUIRES REVIEW OF SYSTEMWIDE OFFER CAPS EVERY FIVE YEARS.
SO THIS PROJECT IS ON OUR WORK PLAN.
IT'S JUST WITH SO MANY STUFF GOING ON, WE HAVE NOT BEEN ABLE TO FOCUS ON IT, BUT DEFINITELY WE WANNA OPEN IT MAYBE LATE MARCH SO THAT IT CAN ALIGN WITH THE, ANY MARKET DESIGN OPTION COMING OUT OF THE RELIABILITY STANDARD AS WELL AS EVALUATING THE CONE PICKER NECK MARGIN.
SO THAT'S THE REVIEW FOR EVERY FIVE YEARS, UH, COMMISSION NEEDS TO DO.
SO THAT'S ALL I WANTED TO ANSWER, UH, THAT QUESTION IN THE RTC TASK FORCE ABOUT THE UPPER CAPS.
UM, ANY QUESTIONS OR COMMENTS, SIR? ALL RIGHT.
[4. Review of Revision Request Summary/ERCOT Market Impact Statement/Opinions]
UH, NEXT IS OUR REVIEW OF REVISION REQUEST SUMMARIES OR CUT MARKET IMPACT STATEMENTS AND OPINIONS.UM, WE HAVE FIVE REVISION REQUESTS HERE FOR TAC CONSIDERATION, FOR REASONS FOR REVISION.
ALL OF THEM FALL IN THAT GENERAL SYSTEM PROCESS AND IMPROVEMENT.
UM, ALL OF THEM HAVE NO IMPACT EXCEPT FOR OBDR 55, WHICH IS LESS THAN 5K ERCOT, UM, IS IN FAVOR OF ALL THE REVISION REQUESTS.
WE ARE RATE WAITING ON NPR 1307, WHICH IS STILL PRS.
AND THEN FOR THE IMM OPINIONS, THEY HAVE NO OPINION ON THE REVISION REQUESTS.
AND OBDR 55 AND NORE 2 81 ARE STILL PENDING WITH IMM, UM, CREDIT REVIEW.
NONE OF THE NPRS HAVE ANY CREDIT IMPLICATIONS.
ANY QUESTIONS OR COMMENTS ON THOSE? ALL RIGHT, LET'S
[5. PRS Report (Vote)]
MOVE TO THE PRS REPORT.DIANA, THIS IS A SHORT ONE, SO GO AHEAD AND, AND GIVE THE WHOLE THING.
AND I THINK WE'LL TAKE THE VOTING ITEMS UP AFTER THAT.
DIANA COLEMAN WITH CPS ENERGY WITH THE FEBRUARY PRS REPORT.
WE HAVE TWO ITEMS FOR YOUR CONSIDERATION.
THAT COMES TO US FROM ERCO, WHICH RELOCATES THE TERMS AND ACRONYMS FROM THE PLANNING GUIDES TO THE PROTOCOLS.
ON JANUARY 14TH, WE VOTED UNANIMOUSLY TO RECOMMEND APPROVAL AS SUBMITTED.
ON FEBRUARY 11TH, WE VOTED UNANIMOUSLY TO ENDORSE AND FORWARD ATTACK THE JANUARY 14TH PRS REPORT AND THE DECEMBER 16TH IA, WHICH SHOWS NO COST BUDGETARY IMPACT, AND NO PROJECT REQUIRED.
SECOND, WE HAVE A LEADERSHIP CHANGE.
ANDY'S ROLE HAS RECENTLY SHIFTED, WHICH IMPACTED HIS AVAILABILITY TO CONTINUE SERVING AS PRS VICE CHAIR, AND AS A RESULT, THE GROUP VOTED TO APPOINT ERIC BLAKEY WITH PROGNOS AS THE NEW VICE CHAIR.
[00:10:01]
AND THAT'S ALL WE HAVE UNLESS THERE'S ANY QUESTIONS? ANY QUESTIONS? OKAY.SO WE ARE LOOKING TO RECOMMEND APPROVAL OF 1314 AS, UH, NPR 1314 AS RECOMMENDED BY PRS IN THE TWO 11 PRS REPORT.
CAN WE COMBO BALLOT THIS? YES.
AND THEN WE ARE ALSO LOOKING TO APPROVE THE PRS VICE CHAIR AS PRESENTED.
UM, I THINK WE CAN COMBO BALL THIS MORE THUMBS UP.
UM, AND WE SCHEDULED A BUNCH OF PS MEETINGS FOR YOU IN, IN APRIL AND MAY.
[6. Project Prioritization Update]
NOW WE CAN MOVE ON TO PROJECT PRIORITIZATION WITH TROY.UH, I GUESS IN KEEPING WITH THE THEME, THE BANDAIDS ON MY HEAD ARE NOT DUE TO ANY SHENANIGANS,
I'M HERE TO GIVE THE, UH, AN UPDATE ON THE AGING REVISION REQUEST PRIORITIZATION PROJECTS.
AS YOU RECALL, BACK IN AUGUST, WE HAD A GET TOGETHER TO TALK ABOUT THE ITEMS ON THE LIST THAT HAD BEEN OUT THERE QUITE A WHILE.
UH, WE FLAGGED 10 OF THEM AS HIGH PRIORITY.
MANY OF THE OTHERS WERE DEEMED, UH, MEDIUM PRIORITY OR NO ACTION, OR EVEN CANDIDATES FOR REMOVAL.
I'LL TALK ABOUT ALL THAT IN A LITTLE BIT.
BUT FOR STARTERS, THE 10 HIGH ITEMS ARE HERE ON THIS CHART.
AS YOU CAN SEE, SIX OF THE 10 ARE ALREADY IN FLIGHT, MEANING THE PROJECT TO DELIVER THEM IS UNDERWAY IN SOME STAGE OR ANOTHER.
MOST OF THEM ARE PLANNING, ALTHOUGH 1277, THE REVISIONS TO EAL IS, UH, SCHEDULED FOR GO LIVE ON THE 2ND OF MARCH.
ANOTHER 1, 11 90 EIGHT'S APPROVED TO START, UH, IN APRIL.
SO THAT WILL BE UNDERWAY WHEN WE GET TO APRIL.
AND THEN THE OTHER THREE HAVE KIND OF OTHER SCENARIOS.
10 91 IS PENDING AN RDPA ANALYSIS, RDPA ANALYSIS THAT WE BELIEVE, UH, WILL, WILL RE AT LEAST ALLOW US TO RECONSIDER A HANDFUL OF REVISION REQUESTS.
I'VE BEEN TRYING TO FIGURE OUT WHERE THAT FITS IN THE PLAN.
IT, IT'S KIND OF LOOKING LIKE PERHAPS THE LATTER PART OF THIS YEAR, SO I'M STILL WORKING ON THAT ONE.
AND THEN, UH, 1216, THE EMERGENCY PRICING PROGRAM, WE HAVE A WORKAROUND IN PLACE.
SO WHILE THE, UH, MARKET PARTICIPANTS DEEMED IT HIGH, UM, WE AGREE, BUT WE ALSO BELIEVE WE HAVE A WORKAROUND THAT WILL WORK FOR US FOR NOW, SO WE CAN FOCUS ON SOME OF THE OTHER PRIORITIES OUT THERE.
SO THAT'S WHERE WE ARE WITH THAT TOP 10.
YEAH, REAL QUICK, ON, UH, ON 12 38, 1 NEAR DEAR OUR ARTICLE, GOLDEN SPREAD.
CAN YOU GIVE US A DATE THAT YOU THINK THAT THAT WOULD BE COMPLETED? I CANNOT YET, BUT I CAN SAY OUR INTENT IS TO DELIVER 1238 HERE IN 2026.
IN FACT, WE ARE PLANNING FOR A SUMMER DELIVERY OF PART OF THAT, OF THE CHANGES AND THE REMAINDER TO COME LATER IN THE YEAR.
I CAN'T TELL YOU YET, WELL, WHERE THE 1238 IS IN THAT SUMMER DELIVERY OR THE YEAR END DELIVERY.
WE'RE STILL WORKING ON THE PLANNING, BUT WE DO THINK 2026.
OTHER ITEMS, UH, THAT ARE MEDIUM OR OTHERWISE ARE ALSO BEING WORKED BASED ON RESOURCES.
YOU KNOW, IF SOMETHING, LIKE IN THE CRR REALM, IF THOSE THINGS CAN PROCEED, 'CAUSE THEY DON'T HAVE THE IMPACT ON THE MMS AND EMS RESOURCES THAT A LOT OF THE HIGH ONES HAVE.
SO THINGS THAT ARE IN FLIGHT THERE, NORE 2 2 6 2 4 7.
UH, THE 9 36 CRR ACCOUNT HOLDER LIMITS IS IN FLIGHT ALREADY.
WE'VE GOT THE SCR EIGHT 18 PHASE TWO APPROVED TO START IN APRIL.
AND THEN 1201, I'VE GOT SOME NOTES ON 1201 LATER HERE IN THE DECK.
1201 IS TARGETING A JULY START WITH THE GO LIVE IN LATE 2026, SO THAT THOSE ARE ALL MEDIUM FROM THE AUGUST MEETING AND HAVE SOME KIND OF A PLAN ALREADY UNDERWAY.
AND THEN IN ADDITION TO THAT, THERE WERE OTHER THINGS THAT WERE EITHER IN FLIGHT AT THAT AUGUST TIMELINE, WHICH MEANS WE WEREN'T TALKING ABOUT THEM, OR THEY'VE BEEN APPROVED AFTER AUGUST AND ARE NOW IN THE MIX.
THAT GROUP'S HERE AT THE BOTTOM, 1245, OF COURSE WAS ALREADY UNDERWAY.
1288 IS PAIRED WITH 9 36 FOR THE CRR PROJECT IN FLIGHT.
EIGHT 20 WAS IN FLIGHT BACK IN AUGUST, AND IT'S GOING LIVE MAY OR JUNE OF THIS YEAR.
AND THEN 8 31 IS, WAS APPROVED AFTER
[00:15:01]
AUGUST, BUT WE'RE GONNA BUNDLE IT WITH THAT SCR EIGHT 18 PHASE TWO.SO A LOT OF THINGS GOING ON AND, BUT WE'VE HAD A BACKUP ONE, ONE HIGH FOCUS ON THE HIGH PRIORITIES TO MAKE SURE WE'RE WORKING THEM AS QUICKLY AS WE CAN.
NOW, YOU MAY ASK, WELL, WHEN ARE WE GONNA TALK ABOUT THIS AGAIN? WELL, I'VE BEEN TALKING WITH DIANA AND OUR PLAN IS APRIL PRS.
WE WILL HAVE THE 2026 VERSION OF THE PRIORITIZATION DISCUSSION.
SO WE WILL TAKE A LOOK AT WHAT'S LEFT ON THE LIST, NOT STARTED, SEE IF THERE'S ANY RESHUFFLING THAT NEEDS TO BE DONE, AND THAT CAN HELP SET OUR PLANS FOR 2027.
SO SPEAKING OF THAT, I'VE BEEN WORKING ON THIS VIEW OF CAN WE PAUSE FOR A COUPLE QUESTIONS? SURE.
AND FOR, FOR YOU AND DIANA, IS APRIL THE APPROPRIATE TIME TO DO THAT, OR WOULD YOU LIKE TO WAIT UNTIL AFTER THE PRIORITY REVISION REQUESTS THAT GO TO JUNE BOARD OR COMPLETED? TROY, I THINK SINCE OUR CONVERSATION THAT WE'VE HAD IN JANUARY AND FEBRUARY, THERE'S BEEN A LOT OF FLUCTUATION BETWEEN NOW AND THEN.
MAYBE WE HOLD OFF ON THAT UNTIL AFTER THE JUNE BOARD SO WE CAN GET THOSE PRIORITIES, UM, COMPLETED FIRST AND THEN WE CAN REEVALUATE IN THE SUMMER IF THAT WORKS FOR YOUR TIMELINE.
DOES THAT SOUND OKAY? KAYLYN? SO YEAH, MAYBE MOVE THAT TO JUNE PRS INSTEAD OF APRIL PRS THAT WILL WORK.
THAT WAY WE CAN JUST FOCUS OUR RESOURCES WHERE THEY'RE NEEDED.
I'LL DEFER TO, TO YOUR DECISION ON THAT.
BUT I THINK JUNE WOULD PROBABLY BE MORE APPROPRIATE.
THAT WAY WE HAVE SOME BANDWIDTH AND WE CAN LOOK AT IT THEN.
AND THEN WE HAD A QUESTION FROM NED.
THIS IS, UH, SOMETHING THAT I THINK WAS ACTUALLY LOOKED AT LAST SUMMER, AND THE DECISION WAS TO WAIT UNTIL TO, TO REVISIT IT AFTER REAL TIME CO OPTIMIZATION GO LIVE.
AND THAT WAS THE, UH, IMPLEMENTATION, I THINK IT WAS NPR 8 26.
IT WAS THE MITIGATED OFFER CURVES FOR RMR RESOURCES.
AND, UM, JUST RECENT EXPERIENCE OVER THE, THE LAST MONTH OR SO, UM, HAS, YOU KNOW, KIND OF BROUGHT THAT BACK INTO FOCUS.
WE'LL PROBABLY DISCUSS THAT A LITTLE BIT MORE LATER.
AND FRANKLY, WE PROBABLY NEED TO SEE SOME MORE INFORMATION, UH, TO REALLY FIGURE OUT WHAT THE RIGHT, UH, PATH FORWARD IS THERE.
BUT I WANTED TO FLAG THAT AS SOMETHING THAT MIGHT BE WORTH PUTTING IN THE HOPPER TO, TO SLOT IN, UM, SOONER RATHER THAN LATER IF, IF, UH, WE CAN FIND ROOM FOR IT.
THAT ONE AT THE TIME LAST YEAR WAS FLAGGED AS MEDIUM, BUT, UH, OF COURSE THINGS CHANGED.
I, I THINK WE ARE GONNA RAISE THIS ONE AS PART OF A DISCUSSION LATER THIS, THIS MORNING.
SO I, I DO ALSO THINK THAT IT'S LIKELY TO BUMP UP IN PRIORITY, UM, IN SOME OF THESE OTHER DISCUSSIONS.
SO I, I WAS, I THOUGHT IT WOULD BE HELPFUL TO TRACK HOW HAS THE AGING REVISION REQUEST PROJECT INVENTORY CHANGED OVER THE YEARS? AND, UH, I KIND FEEL LIKE THIS DISCUSSION STARTED IN AUGUST OF 2020.
THAT'S WHERE, IN THAT PRS WE HAD A DISCUSSION ABOUT, YOU KNOW, THINGS THAT WERE PENDING ON THE LIST AND WHAT'S GOING ON WITH THEM, AND HOW DO WE GET CAUGHT BACK UP.
AT THAT TIME, THERE WERE 47 ITEMS ON THE LIST.
YOU CAN SEE 36, WERE NOT YET STARTED.
THAT'S THE DARKER ORANGE, UH, 10 WERE IN FLIGHT.
NOW, EVERY MONTH SINCE THEN, THIS SHOWS HOW THE, I NEVER TAKE ANYTHING OFF THE LIST, BY THE WAY, WHEN THE, WHEN THE COLUMN INCREASES, THAT'S AN INDICATION THAT THE COMMISSION HAS APPROVED ANOTHER BATCH OF REVISION REQUESTS.
SO THAT'S HOW IT'S GROWN OVER TIME.
AND AS YOU CAN SEE, THE, THE IN FLIGHTS, THE BLUE, IT KIND OF VARIES FROM AS HIGH AS IT LOOKS LIKE 31, 32, SOMEWHERE IN THE MIDDLE THERE, UH, THE, THE KNOT STARTED, WHICH IS REALLY WHERE MOST OF THE AGING CONCERN IS.
IT PEAKED AT ABOUT 61 IN, WHEN IS THAT? UH, FEBRUARY, 2023.
AND IT'S CURRENTLY SITTING AT 51.
SO I GUESS ONE WAY TO LOOK AT THIS IS, WHILE WE STILL HAVE A PROBLEM THAT WE HAVE THESE AGING ITEMS, IT HAS NOT BEEN GROWING UNCONTROLLABLY OVER THE YEARS, WE'VE KIND OF BEEN ABLE TO KEEP A LID ON IT.
AND I THINK PART OF IT IS SOME OF THE EFFORTS WE'VE DONE LIKE LAST AUGUST IN THAT DISCUSSION, IT HELPS US RAISE SOME OF THEM TO THE TOP AND GET THEM INTO THE QUEUE.
SO YOU CAN ALSO SEE 91 HAVE BEEN, UH, DELIVERED IN ALL THIS TIME SINCE, UH, 2020.
SO, AND A LOGICAL QUESTION THAT COMES OUT OF THIS THOUGH IS WHAT'S IN THE 51 THAT'S THERE AT THE, THE BOTTOM ORANGE, RIGHT? SO IF YOU TAKE A QUICK LOOK AT THAT ANALYSIS, SIX OF THOSE HAVE BEEN APPROVED IN THE LAST SIX MONTHS.
SO ONE MIGHT SAY THEY'RE NOT REALLY EVEN AGING, THEY'RE FAIRLY NEW.
26 WERE DEEMED MEDIUM AT THAT LAST AUGUST MEETING.
ALSO AT THAT AUGUST MEETING EIGHT WERE DEEMED NO ACTION AT THIS TIME.
[00:20:01]
FIVE ARE CANDIDATES FOR REMOVAL.FOUR ARE HIGH PRIORITY, WHICH ARE THESE FOUR AT THE BOTTOM OF THIS SLIDE.
THOSE ARE THE HIGH WINDS THAT AREN'T YET IN FLIGHT.
BUT WE HAVE PLANS AS YOU, AS WE DISCUSSED.
AND THEN TWO ARE ALREADY APPROVED TO START.
WE JUST HAVEN'T REACHED THAT DATE WHERE THEY'VE STARTED.
SO THAT'S HOW THAT 51 BREAKS DOWN.
YOU COULD KINDA LOOK AT IT AS IT'S, IT'S REALLY ABOUT 20 SOMETHING.
BUT, SO ANYWAY, I THOUGHT THAT WOULD BE HELPFUL TO, FOR US TO UNDERSTAND THE, THE HISTORY OF HOW THIS HAS KIND OF EVOLVED OVER TIME IN MY APPENDIX.
I HAVE A FEW ADDITIONAL SLIDES.
THIS IS A WAY I'VE BEEN TRACKING THINGS AT PRS SO FOLKS KNOW WHAT'S IN FLIGHT.
AND THIS MIGHT HELP SOME FOLKS TOO.
UH, 1290 PHASE TWO, WE WERE ALL READY TO START.
WE FOUND AN ISSUE WITH THE LANGUAGE ERCOT FILING AN NPRR TO ADDRESS IT.
SO THAT'LL BE DISCUSSED AT AN UPCOMING PRS 1198.
I THINK I MENTIONED THE APRIL START, 12 0 1, 12 38.
AND THEN WE'VE JUST CHANGED THE LAST BULLET TO JUNE INSTEAD OF APRIL FOR THE NEXT PRIORITIZATION DISCUSSION.
MY PLAN IS TO COME BACK HERE EVERY TWO OR THREE MONTHS AS WE HAVE ENOUGH NEW INFORMATION TO REPORT.
UM, THE THING I WANTED TO RAISE HERE THAT I SORT OF ALREADY RAISED WAS, UM, THE, THE ISSUE OF ALL THE PRIORITY ITEMS THAT WE NEED TO JUNE.
UM, AND WE'VE SCHEDULED A BUNCH OF EXTRA APRIL, PRS, APRIL AND MAY PRS IN TCC MEETINGS.
SO I THINK, UM, I WAS HOPING TO REQUEST THAT REVISION REQUESTS, IT WOULD OTHERWISE GO TO APRIL OR MAY PRS AND TCC, BUT DON'T NEED TO GO TO THE JUNE BOARD IF WE CAN START HOLDING OFF ON SOME OF THOSE UNTIL AFTER JUNE.
COREY'S FROWNING AT ME, BUT JUST, YOU KNOW, IF WE'RE GONNA HAVE AN EIGHT HOUR MEETING IN APRIL PRS TO TALK ABOUT BATCH LOAD AND DRS AND VOLTAGE RIDE THROUGH, DO THEY ALSO WANT TO TAKE UP FOUR OTHER OR SEVEN OTHER RANDOM NPR THAT MIGHT NOT NEED TO GET TO JUNE BOARD? NO, BRIAN SAMS AGREES WITH ME.
SO, UM, I, I THINK, YOU KNOW, I'M, I'M HOPING THAT'S OKAY WITH PEOPLE, BUT I CAN WORK WITH STAKEHOLDERS AND, AND ERCOT ON THAT.
ARE WE OKAY, COREY AND KEITH IS GONNA ADD ONE MORE.
ALL RIGHT, SO THAT'S MY REQUEST IS THAT, YOU KNOW, THINGS THAT WOULD GO TAKE TIME AT APRIL PRS OR, OR TAC OR MARCH PRS OR TAC.
UM, BUT DON'T NEED TO GO TO THE JUNE BOARD IF WE CAN WAIT ON THOSE.
[7. OBDRR055, Revisions to Non-Spinning Reserve Deployment and Recall Procedure for RTC+B (Vote)]
ALL RIGHT, NEXT WE ARE ON TO O-B-D-R-R 55.UM, I BELIEVE TIKA IS GOING TO SPEAK TO US ON THIS.
SO LUIS IS GONNA SPEAK TO YOU.
LUIS HAS A INTRODUCTORY SLIDE TO TELL YOU MORE ABOUT THIS OBD.
UH, SO YES, I WANTED TO GIVE A QUICK TWO SLIDE UPDATE ON O-B-D-R-R 0 5 5.
IT RELATES TO THE REVISIONS TO NONS SPIN RESERVE DEPLOYMENT AND RECALL PROCEDURE FOR RTCB.
UM, SO A COUPLE THINGS HERE THAT YOU'LL SEE, UH, OVERALL THE, WE HAVE SUBMITTED AN O-B-D-R-R TO ALIGN THE, THIS, THIS PROCEDURE WITH RTCB IMPLEMENTATION.
UH, I'VE LISTED A COUPLE THINGS HERE BRIEFLY ON THINGS THAT NEEDED TO CHANGE AS FAR AS LANGUAGE GOES.
THE WAY WE'VE DEPLOYED NONS SPIN HAS CHANGED.
THERE WAS SOME REFERENCES THAT ARE OUTDATED.
UH, SO THAT'S WHAT THE OBDR, UH, WAS TRYING TO CLEAN UP.
UH, WE'VE, WE'VE TALKED ABOUT THIS WITH R-T-C-B-T-F, UH, TWICE NOW.
UH, AND WE ACTUALLY TOOK THIS TO P-D-C-W-G HERE IN FEBRUARY AS WELL TO TALK ABOUT THE O-B-D-R-R.
NOW, ONE THING THAT IS, AS WE WERE WORKING THROUGH A CHANGE TO ALIGN THIS WITH RTCB IS WE FOUND THAT WE WOULD, WE WANTED TO ENHANCE THE OFFLINE NONS SPIND TRIGGER THAT IS INCLUDED IN THAT PROCEDURE.
UM, SO THE, THE MAIN THING THERE AS FAR AS THE ENHANCEMENT GOES IS WE WANT TO ENSURE THAT THE OFFLINE DEPLOYMENT TAKES INTO ACCOUNT AVAILABLE ENERGY.
THAT IS A AVAIL, UH, ASSISTING CAPABILITY TO MEET THE 30 MINUTE OUT NET LOAD FORECAST.
SO WE WANT TO ACCOUNT FOR, UH, S OS E THE ACCOUNT, UH, ENERGY AVAILABLE AT THAT TIME AS WELL IN, IN WHAT WE HAVE, UH, CAPABILITY
[00:25:01]
TO PROVIDE.UM, AND SINCE RTCB HAS HAS BEEN IMPLEMENTED, WE'VE SEEN HOW IT WORKS.
WE ALSO WANTED TO ACCOUNT FOR THE AS PLAN.
UH, THAT IS ANOTHER IMPORTANT FACTOR.
AND, AND I HAVE ONE OTHER SLIDE TO TRY TO EXPLAIN THAT HERE, UH, IN THE NEXT SLIDE TO, TO GIVE THAT, TO SHOW THAT EXAMPLE.
UM, SO THOSE ARE THE, THE, THE ENHANCEMENTS THAT COME WITH, WITH THIS, UH, O-B-D-R-R.
AND, AND TO GIVE YOU THE, WHAT WE'RE LOOKING FOR TODAY IS WE'RE HOPING TO GET TAX ENDORSEMENT TODAY OR, OR AT THE NEXT MEETING.
REALLY THE GOAL IS WE WANT TO GET THIS BOARD APPROVED AND PUC APPROVED BY SUMMER.
UH, THAT IS OUR OVERALL GOAL, AND THAT'S WHAT WE'RE ASKING FOR TODAY.
UM, THIS TRIGGER IS AVAILABLE IN THE CONTROL ROOM.
THEY ARE LOOKING AT IT FOR SITUATIONAL AWARENESS TO KIND OF BE AWARE.
AND, AND AGAIN, THIS NEXT SLIDE WILL SHOW KIND OF WHY THAT'S IMPORTANT.
UM, I, I'LL TRY NOT TO GET TOO FAR IN THE WEEDS HERE, BUT WHAT I'M SHOWING ON THIS DISPLAY IS A PURPLE LINE, WHICH IS OUR CURRENT, UH, NON OFFLINE NONS SPIND DEPLOYMENT TRIGGER FOR JANUARY 28TH.
AND THEN THE GREEN LINE IS WHAT THAT ENHANCED PROPOSED TRIGGER IS LOOKING AT.
UH, I DON'T HAVE THE DETAILED CALCULATIONS.
THOSE ARE IN THE LINKS, UH, POSTED FOR PREVIOUS PRESENTATIONS.
BUT THE KEY THING HERE IS LOOKING AT STATE OF CHARGE, WHICH IS THE PINK LINE, AND HOW THINGS HAVE CHANGED AND HOW THIS ENHANCEMENT WILL BETTER GIVE US AN IDEA OF WHAT'S HAPPENING IN REAL TIME.
SO ON THIS MORNING, YOU'LL SEE THE PURPLE LINE NEVER ACTUALLY CROSSES.
ZERO, ZERO IS WHEN WE ARE INTENDED TO DEPLOY OFFLINE NONS SPEND FOR THE CO CONTROL ROOM.
UH, AND THERE ARE MANY REASONS FOR THAT.
UH, OR ONE MAIN REASON IS WHEN WE GO SHORT ON THE AS PLAN, THAT BECOMES CAPACITY AVAILABLE FOR SC.
AND, AND, BUT IT'S WHEN IT'S MISSING THE FACT THAT WE'RE BEING SHORT ON OUR, AS ON THE, WHAT WE HAVE FOR INSURANCE.
SO ESSENTIALLY WE WANT, WE PUT THAT BACK INTO THE, THE GREEN LINE, AND WE'RE ALSO LOOKING AT STATE OF CHARGE IS THE NEXT KEY HERE IS, AS YOU SEE ON THIS DAY, WE GOT DOWN TO 10% STATE OF CHARGE.
UH, IF WE WERE ACCOUNTING ABOVE HOW MUCH ENERGY WE HAD TO MEET THAT 30 MINUTE OUT, UH, NET LOAD FORECAST, UH, THE GREEN LINE STARTS SHOWING YOU THAT YOU NEED TO DEPLOY YOUR OFFLINE ENERGY TO ENSURE YOU CAN MEET YOUR, THE NET LOAD FORECAST AND THE, AND MEET THE AS PLAN TOGETHER.
UM, ONE THING I'LL MENTION HERE EARLY ON BEFORE THE DEPLOYMENT, YOU'LL SEE THE GREEN LINE IS ABOVE THE, THE PURPLE LINE.
UH, THAT'S BECAUSE WE DO PROCURE ABOVE THE AS PLAN IN NONS NONS SPIN SOMETIMES.
AND SO WE DON'T WANT TO ACCOUNT FOR ALL THE EXTRA THAT'S BEING PROCURED THERE.
WE REALLY WANT TO ONLY THINK ABOUT WHAT THE AS PLAN ASKED OF.
UH, SO THAT'S WHY YOU SEE THAT LINE A LITTLE BIT HIGHER JUST BEFORE.
SO AGAIN, TRY NOT TO GET INTO THE WEEDS HERE, BUT REALLY THE GOAL HERE IS, IS, UH, THE ONE DETAIL I MISSED IS CONTROL ROOM DEPLOYED OFFLINE NONS SPIN AT 7:00 AM THE TRIGGER WOULD'VE, UH, RECOMMENDED TO DEPLOY AT 6:00 AM UH, ACCOUNTING FOR THE ENHANCEMENTS.
UM, SO THIS IS WHERE I'LL LEAD INTO QUESTIONS.
WE GOT A COUPLE OF FOLKS IN THE QUEUE HERE.
CAN YOU JUST, UH, EXPLAIN A LITTLE BIT MORE ON WHAT CAUSED THE DROP IN THE GREEN LINE? IS THAT RESOURCES COMMITTING? UM, YEAH, JUST RIGHT.
SO THE, THE GOAL OF THE TRIGGER IS WE WANT TO ENSURE WE CAN MEET THE 30 MINUTE OUT NET LOAD FORECAST.
THAT'S HOW LONG IT TAKES OFFLINE ANNOUNCEMENT TO COME ONLINE.
OR WE, WE EXPECT THEM TO BE ONLINE AND AVAILABLE.
A COUPLE THINGS HAPPEN ON THIS DAY AND WHEN IT, WHEN IT CHANGES.
SO ONE, WE START SEEING THAT WE'RE BECOMING LIMITED ON STATE OF CHARGE IN THAT 30 MINUTE OUT AND NOT BEING ABLE TO MEET THE AS PLAN.
WE ARE STARTING TO GO SHORT ON, AS IN REAL TIME RTCS DECIDING, I'M GONNA, I NEED THE ENERGY AND I WILL NO LONGER PROCURE AS, OR I'LL PROCURE LESS AS, AND, UH, IT IS TOP OF THE HOUR AT THE TIME, UH, SIX O'CLOCK.
AND THE AS PLAN ACTUALLY INCREASED FOR THAT HOUR.
SO WE'RE ALREADY SHORT AND WE ARE ASKING FOR ADDITIONAL AS, BECAUSE IT'S A, IT'S BEEN IDENTIFIED AS A POTENTIAL RISKY HOUR.
UH, AND, AND SO ALL OF THOSE THINGS COMBINED SHOW YOU THAT THE, THE, THAT'S WHY YOU SEE THAT DROP IN THE TRIGGER.
SO THAT'S JUST THE HOURLY CHANGE IN THE AMOUNT OF PROCUREMENT THAT YOU, YOU NEED TO FULFILL THE, OKAY.
AND THEN FOR THE LINKED PRESENTATIONS THAT ARE OUT THERE, THERE ARE OTHER DAYS THAT YOU CAN GO AND LOOK AT WITH, I USE THIS ONE 'CAUSE I FEEL LIKE IT SHOWED ALL THREE THINGS THAT WE'RE TRYING TO ADJUST FOR.
AND ARE YOU, YOU'RE USING THE, UM, STATE OF CHARGE THAT'S IN THE COP? NO, THIS IS REAL TIME STATE OF CHARGE.
SHAYA, THIS IS SHAKI WITH CRESCENT POWER REPRESENTING A HUNT ENERGY NETWORK ON THIS TOPIC.
SO, UM, THE FORMULA USED TO CALCULATE THE THRESHOLD TRIGGER HAS SOME SERIOUS PROBLEMS WITH IT.
UM, SO I WOULD JUST SAY THAT, UH, AND I'VE INFORMED SEMINAR
SO THEY'RE REDUCING NOT ONLY THE, UH, ESRS, UH,
[00:30:01]
HSL, BUT THEY'RE ALSO REQUIRING EVEN MORE, YOU KNOW, TWICE THAT AMOUNT TO BE CARRIED, UH, ON THE OTHER RESOURCES.SO THERE'S A SERIOUS PROBLEM WITH THE FORMULA, AND I'M HOPING THAT IT, THIS GETS REFERRED TO SOME, UM, SOME COMMITTEE WHERE WE CAN, YOU KNOW, REALLY TAKE UP THAT DISCUSSION AND, AND FIND A SOLUTION TO THAT.
SO, UH, SO SHAMS, ACTUALLY, WE DID GET THE EMAIL THAT YOU SENT OVER.
IT DID GET PASSED ON TO ME AND, AND SOME OF MY ENGINEERS.
SO WE ARE LOOKING AT SOME OF THE DETAILS THAT YOU PROVIDED, SEEING IF, IF, IF TRULY THERE IS A CONCERN THERE WITH WHAT, WITH HOW YOU'VE, UH, IDENTIFIED SOME OF THOSE CONCERNS.
SO WE, WE ARE LOOKING AT THAT, I WOULD SAY, I DON'T THINK THAT WAS OUR, THAT DEFINITELY WAS NOT OUR INTENTION.
UM, I THINK FOR THE GROUP HERE, WE ARE LOOKING AT THAT, AND THIS IS ONE OF THE REASONS WHY WE TAKE IT TO THE WORKING GROUPS AND IN HERE IS, IS TO GET THAT FEEDBACK.
BUT, UH, ONE THING I WANNA SAY IS THAT WAS NEVER OUR INTENTION AS YOU READ THE OBD, THE GOAL IS WE WANNA ACCOUNT FOR ENERGY, WE WANNA ACCOUNT FOR THE AS PLAN, AND CAN WE MEET THE NET LOAD FORECAST 30 MINUTES AHEAD.
SO IF THERE IS A TWEAK THAT WE CAN MAKE TO THE CALCULATION, WE'RE WILLING TO LOOK AT THAT AND SEE IF THAT NEEDS TO BE MADE.
BUT THE INTENTION WAS NEVER TO DOUBLE COUNT.
UH, AND THAT, I THINK AS THE O-B-D-R-R STANDS, UH, I DON'T EVEN THINK ANY OF THAT LANGUAGE, I, I KNOW NONE OF THE LANGUAGE WOULD NEED TO CHANGE IN THE DOCUMENT.
BUT SHAMS TO, TO ANSWER YOUR POINT, WE ARE LOOKING AT IT AND WE WILL GET BACK TO YOU TO SEE IF WE NEED TO MAKE ANY ADJUSTMENTS.
THERE ARE OTHER QUESTIONS FOR LUIS.
YEAH, AND REALLY MY QUESTION IS BACK TO SHAMS, WHICH IS DID YOU'VE IDENTIFIED A CONCERN? HAVE YOU, UH, SHAMS, HAVE YOU COMMUNICATED A, UH, AN ALTERATION THAT WOULD MAKE SENSE THAT HER CAN CONSIDER? OR DID YOU JUST, I'M JUST TRYING TO UNDERSTAND WHERE THE DEBATE IS AT THIS POINT.
I DID PROVIDE THE, THE FIX TO THAT, YOU KNOW, THE CORRECTION TO THE EQUATIONS.
SO I PROVIDED THAT AS PART OF MY FEEDBACK TO
I I, I, I KIND OF ASSUMED YOU WOULD, BUT, UH, THANK YOU FOR CLARIFYING THAT.
UM, ANY OTHER QUESTIONS OR COMMENTS? UH, RASHMI? YEAH.
SO, UH, YOU ARE LOOKING AT THE CHANGES.
DOES IT REQUIRE AN OBD CHANGE? ARE WE LIKE APPROVING THIS TODAY? AND WITH NO, FROM THE PERSPECTIVE OF THE O-B-D-R-R, IT DOESN'T REQUIRE A LANGUAGE CHANGE.
THE, THE WAY THE OBDR IS NOW IS, IS GOOD.
IT'S JUST THE CALCULATION BEHIND HOW THE TRIGGER'S BEING CALCULATED THAT WE'RE LOOKING AT.
THAT WAS WHERE SHAS HAD THE CONCERN.
I, I DON'T THINK WE'RE SEEKING APPROVAL TODAY, THOUGH.
I, MY UNDERSTANDING FROM ERCOT IS THEY'D LIKE THIS TO THE APRIL BOARD.
SO WE, THE SUGGESTION FOR TODAY WOULD BE TO KEEP IT TABLED AT TAC OR, OR MAKE IT TABLED AT TAC TODAY, BRING IT BACK TO TAC IN MARCH TO VOTE ON, AND THEN THE INTERIM GO TO WMWG, THEY'VE BEEN TO RTC AND, AND PDC.
I THINK THE QUESTION IS, IF ANY OF THE DISCUSSION TO NECESSITATES THIS GOING BACK TO, TO PDC OR, OR RTC.
OKAY, BLAKE? YEAH, THESE, THAT WAS WHERE I WAS GOING TO GO ABOUT NEXT STEPS ON THIS ONE.
JUST WANTED TO POINT OUT THAT WMWG DOESN'T MEET UNTIL MARCH 23RD, AND THEN THE NEXT T WOULD BE MARCH 25TH.
UH, SO MAYBE SOME TIMING ISSUES.
SO, LUIS, IF YOU'D BE WILLING TO COME TO OUR MARCH 4TH WMS MEETING, IF YOU'D LIKE A COUPLE TOUCH POINTS ON THAT, AND THEN MAYBE WE CAN HEAR SOMETHING BACK ON SEAN'S SUGGESTION AND DRIVE MORE DISCUSSION AT THE 23RD WMWG MEETING.
BUT, UM, I THINK TWO TOUCH POINTS ARE BETTER THAN ONE.
YEAH, THAT'S A GOOD SUGGESTION.
UM, I MEAN, WE CAN DO THAT AND WE'RE, WE'RE WORKING ON, UH, LOOKING AT WHAT SEAN'S RECOMMENDED.
SO, UH, WE SHOULD HAVE SOMETHING BY THEN, AND THEN WE CAN CONTINUE THE CONVERSATION.
AGAIN, OUR GOAL IS WE WANT TO TRY TO MEET THAT SUMMER DEADLINE TO HIT HIT BOARD AND PUC.
SO IF, IF IT'S TABLED HERE AND WE CONTINUE THE DISCUSSION SO LONG AS WE COME BACK NEXT MONTH, THAT WORKS FOR US.
ON THE OBDR, I MEAN, I HAVE TO LOOK AT THE LANGUAGE AGAIN, WHETHER IT NEEDS TWEAKING OR NOT, BUT I THINK IT IS, YOU KNOW, THIS IS AN IMPORTANT TOPIC AS TO WHEN NONS SPIN, UH, OFFLINE NONS SPIN IS TRIGGERED.
UM, SO THE EQUATION, YOU KNOW, UM, THAT ERCOT IS PROPOSING OR THAT I'VE, THE FIX THAT I PROVIDED, I THINK SOME FORM OF THAT NEEDS TO BE IN THE OBDR SO PEOPLE KNOW EXACTLY WHAT THAT TRIGGER IS, YOU KNOW, SINCE IT DOES IMPACT MARKET PRICES AND SO ON.
SO, UM, THAT'S SOMETHING WE CAN DISCUSS AT WMS
[00:35:01]
OR WMWG.UH, FIRST JUST WANNA SAY THANK YOU FOR PRESENTING THIS.
UH, IT, IT, I KNOW I'VE GOT A BUNCH OF QUESTIONS AFTER THE 28TH, AND SO HAVING CLARITY ON THE TRIGGER, JUST LIKE SEAN SAID, IS SOMETHING WE VALUE, UM, AND SUPPORT BLAKE'S COMMENT ABOUT TWO TOUCH POINTS.
AND JUST AGAIN, UH, UH, THANK YOU FOR, FOR BEING HERE TODAY.
ANY OTHER QUESTIONS OR COMMENTS? GOOD.
I, I DO HAVE SHENANIGANS ON THIS ONE, BUT CAN'T DECIDE IF I SHOULD BRING IT UP.
UM, I THINK, YOU KNOW, NETIKA AND LUIS, YOU DO A REALLY GOOD JOB ON REVISION REQUESTS IN THE ANCILLARY SERVICE METHODOLOGY, AND YOU HAVE TO TAKE IT SORT OF ON THE ROAD SHOW TO PDC AND WMWG.
SO, AND IT'S BEEN BROUGHT UP IN THE PAST, HAVING JUST ONE ANCILLARY SERVICE WORKING GROUP.
I, YOU KNOW, PEOPLE CAN TELL ME I'M STUPID OR NOT RESPOND TO IT, BUT I THINK IT'S SOMETHING TO THINK ABOUT FOR, FOR THE FUTURE SO THAT YOU DON'T HAVE TO GO TO, YOU KNOW, TWO DIFFERENT WORKING GROUPS EVERY TIME WE HAVE ONE OF THESE REVISION REQUESTS.
AND THEN FOR, FOR THREE MEETINGS EVERY SUMMER ON THE METHODOLOGY.
ERICA, I JUST HAD A QUICK QUESTION.
UH, DID IMM OPINE ON THIS ONE? I DON'T SEE JEFF HERE, OR I HAVE NOT ANY, HAD ANY DIRECT, UH, COMMENTS FROM THEM.
YEAH, SO I REVIEWED THIS, AND THIS IS, THIS FALLS TO ME, THIS FALLS A LITTLE BIT MORE IN A, IN A SORT OF AN OPERATING PROCEDURE CATEGORY.
UM, I THINK IT'S, YOU KNOW, I LOOKED AT THE, THE SHIFTS IN THE CRITERIA FOR DEPLOYMENT.
WE DO, IN THE END, WE DIDN'T HAVE A POSITION ON WHETHER THIS SHIFT WAS BETTER OR WORSE FOR THE MARKET.
IT LOOKS LIKE IT'S DRIVEN BY EMPIRICAL ANALYSIS.
AND SO, UM, BECAUSE IT, BECAUSE IT FALLS MORE INTO THE OPERATING PROCEDURE CATEGORY FOR US, WE CHOSE NOT TO EXPRESS AN OPINION ON IT.
SO, BUT, BUT I, I DID REVIEW IT.
SO THIS WILL GO TO WMS ON THE FOURTH, FIFTH, I DON'T KNOW AT SOME POINT.
AND THEN, UM, WMWG, WHICH IS JUST A COUPLE DAYS BEFORE THE NEXT TAG MEETING.
AND I CAN TUNE INTO THAT ONE AND BRING A REPORT BACK ON WHERE THAT DISCUSSION ENDED UP.
AND THAT'S JUST A REQUEST, NOT A REFERRAL.
AND WE DO, NOW I'M LOOKING AT COREY TO MAKE SURE HE DOESN'T MAKE FACES TO ME AGAIN, BUT WE DO NEED TO TAKE ACTION ON THIS TODAY BECAUSE IT'S THE FIRST ONE.
BUT THE ACTION WOULD BE TABLE KEEP IT HERE AT TAC, ALTHOUGH IT WILL BE DISCUSSED AT THOSE TWO PLACES.
CAN WE PUT THE TABLE O-B-D-R-R UH, 55 ON THE COMBO? SEEMS FINE.
AND THEN WE'LL GET TO RUMI'S COMMENT.
SO, UH, IF I LOOK AT IT KIND OF LIKE A VERY HIGH LEVEL, UM, WHENEVER YOU ARE GOING TO DEPLOY NONS SPIN, YOU MIGHT DEPLOY IT EARLIER BECAUSE YOU ARE LOOKING AT THE STATE OF CHARGE AND IT'S RUNNING OUT.
BUT IF THERE IS A LOT OF STATE OF CHARGE, THEN YOU MIGHT REDUCE THE NUMBER OF DEPLOYMENTS.
UH, BUT AT THE END OF THE DAY, IT IS KIND OF PRESERVING STATE OF CHARGE OVER, UH, BRINGING ONLINE OFFLINE GENERATION TO PRESERVE THE STATE OF CHARGE.
IS THAT, IS THAT KIND OF THE GENERAL OBJECT? SO IT'S ACCOUNTING FOR STATE OF CHARGE AS A, AS YOU'RE TRYING TO DETERMINE HOW MUCH CAPACITY YOU HAVE AVAILABLE.
YOU'RE LOOKING AT STATE OF CHARGE TO DETERMINE IF YOU HAVE THAT ENOUGH ENERGY TO MEET WHAT IS COMING IN 30 MINUTES IF YOU DO NOT, AND, AND TO MEET THE AS PLAN.
IF YOU DO NOT, THEN WE'LL BRING ON OFFLINE RESOURCES.
SO IT'S PRESERVING THE STATE OF CHARGE, KIND OF.
BUT MY QUESTION IS, WOULD WOULD IT END UP INCREASING THE NONS SPIN DEPLOYMENT OR REDUCE IT, OR WOULD IT IN LIKE PREPONE IT DURING THE TIME WHEN YOU ANYWAY HAVE TO DEPLOY AND LIKE AVOID IT WHEN YOU DON'T NEED TO DEPLOY KIND OF SOMETHING LIKE THAT? HAVE YOU LOOKED AT IT LIKE, KIND OF LIKE A, SO BASED ON THE CURRENT TRIGGER RIGHT NOW, THE, SOMETIMES THE CURRENT TRIGGER WOULDN'T SHOW IT, WHICH IS THE RELIABILITY CONCERN WE HAVE TODAY IS WE WANT IT TO BE AWARE THAT WE'RE RUNNING OUT OF
[00:40:01]
ENERGY TO MEET LOAD.SO, UH, IN THE, SOME OF THE OTHER TECHNICAL PRESENTATIONS, WE HAVE FOUR OR FIVE OTHER DAYS, AND OF WHEN WE DEPLOYED NONS SPIND, AND REALLY IT'S SHOWING YOU THERE'S, IN SOME OF THOSE DAYS, THERE'S A 12 MINUTE, 20 MINUTE SHELL, UH, SHIFT IN WHEN WE WOULD'VE NEEDED TO DEPLOY OFFLINE NONS SPIND.
UM, AND THEN IN SOME DAYS IT SHOWS WE DIDN'T NEED, WE MAY NOT HAVE, IT MAY NOT HAVE TRIGGERED IF THINGS HAD PLAYED OUT THAT THAT WAY.
ANY OTHER QUESTIONS OR COMMENTS? OKAY.
SO WE WILL PUT, UH, TABLE O-B-D-R-R 55 ON THE COMBO BALLOT.
WE WILL TALK AT WS AND WE'LL TALK AT WMWG.
[8. TAC Priority Items]
ARE ON ONTO OUR TECH PRIORITY ITEMS. WE WILL START, UH, WITH KEITH ON DRS.UH, FOR FOLKS AT THE, THE LAST WORKSHOP, UH, THERE WERE, WE DID RECEIVE COMMENTS, UH, WRITTEN COMMENTS, AND THEN OBVIOUSLY SOME VERBAL COMMENTS DURING THE MEETING ON BOTH, UH, THE, UH, MOST OF THEM ARE RELATED TO NPR 1310.
UH, THE, THE FIRST PIECE WAS RELATED TO THE RELIABILITY ELEMENT OF 1310.
AND THEN THE SECOND PART OF DISCUSSION WAS ON THE ESR ELEMENT OF 1310.
AND SO I THINK I'LL TAKE THE, THE FIRST POINT IS OUR, OUR SORT OF THOUGHTS ON, ON 1310 IS WITH REGARDS TO THE RELIABILITY ELEMENT, UH, THE MOST OF THE COMMENTS WERE CENTERED AROUND HAVING TO WAIT TILL, INCLUDE THAT AS PART OF THE RELIABILITY ASSESSMENT.
I THINK FOR THE PURPOSES OF CONTINUING 1309, UH, FORWARD TO MEET THE JUNE TIMELINE.
I THINK WE, WE ALSO AGREE WITH THAT POSITION THAT 1310 CAN BE ADDRESSED AS PART OF THE MARKET DESIGN ELEMENTS OF THE RELIABILITY ASSESSMENT, UH, LATER THIS YEAR.
UH, SO WE'RE, UH, WE, WE DO VIEW THAT AS, AS, UH, A PATH THAT, THAT WE WOULD APPRECIATE THAT WE, WE, WE APPRECIATE THE POSITIONS ON THAT.
WITH REGARDS TO THE ESR ELEMENT, WHAT WE ARE INTENDING TO DO, UM, IS TO SEEK MORE INFORMATION.
UH, WE ARE GOING TO BE, UH, DROPPING A COUPLE QUESTIONS, UH, LATER THIS WEEK WITH REGARDS TO, UH, ESSENTIALLY, UH, ONE OF THE ELEMENTS HAD TO DO, AND IT'S COME UP A FEW TIMES IN THE WORKSHOP, RELATED TO HOW TO CONSIDER THE FOUR HOUR CAPABILITY, UH, AT HSL AND HOW TO CONSIDER THAT ELEMENT.
AND SO WE'LL HAVE A FEW QUESTIONS THAT WILL HOPEFULLY INFORM SOME DISCUSSION AT THE NEXT WORKSHOP ON MARCH 9TH.
SO, UH, AT THIS TIME, WE DON'T HAVE A, UH, A FORMAL POSITION OTHER THAN, HEY, WE'RE, WE'RE GONNA TRY TO SEEK SOME MORE INFORMATION ON THAT PARTICULAR ELEMENT AND, AND WE'LL HELP HOPEFULLY INFORM THAT DISCUSSION THAT WE'LL HAVE ON MARCH 9TH.
SO THAT'S THE UPDATE ON THE DRS.
SO I'LL PAUSE IF THERE ARE ANY QUESTIONS ON THAT.
AT THIS POINT, I DON'T SEE ANY QUESTIONS.
CAN I LET, CAN I MAKE MY OWN COMMENTS? SO CHAIR COMMENTS, THERE YOU GO.
BEFORE YOU'RE DONE WITH DRS, WE DO, WE HAVE A WORKSHOP SCHEDULED FOR MARCH 9TH AND A PRS MARCH 11TH.
I AM SORT OF HOPING THESE CAN, THAT CAN BE OUR LAST WORKSHOP, BUT I THINK IT IS DEPENDENT ON PEOPLE GETTING COMMENTS IN AHEAD OF TIME.
I'VE SPOKEN TO PEOPLE, YOU KNOW, I KNOW ARE INTERESTED, INCLUDING TO CHAIR KAITLYN SPEAKING TO JUPITER, KAITLYN.
UM, SO I'M HOPING COMMENTS CAN BE IN A WEEK BEFORE THE, THE WORKSHOP AND THE PRS AND WE CAN REALLY GET TO A DECISION POINT ON, ON THESE.
I THINK THAT'S NOT INCONSISTENT, BUT GO AHEAD.
I, I WILL ADD ONE OTHER ELEMENT ON 1309 MM-HMM
THAT'S CURRENTLY UNDER DISCUSSION.
UH, ONE OF THE ELEMENTS THAT THE IMM HAD BROUGHT UP YEAH.
WAS WITH REGARDS TO THE DEMAND CURVE.
AND I'M, I'M HAPPY TO SAY THAT THE IMM AND, UH, ERCOT STAFF ARE COLLABORATING ON WHAT THAT COULD LOOK LIKE.
SO, UM, THERE ARE ELEMENTS RELATED TO 1309 THAT REQUIRED FURTHER DISCUSSION AND THOSE DISCUSSIONS ARE OCCURRING, UM, UH, AND, AND WITH THE IMM AND ERCOT ON, ON WHAT THEY MAY BE.
AND I THINK THERE'S A, A GENERAL ALIGNMENT ON HOW THAT MAY WORK.
[00:45:01]
ALSO LIKELY TO BE DISCUSSED AT THE MARCH 9TH, BUT WOULD WOULD DEFINITELY REQUIRE FURTHER DISCUSSION.SO, SO THERE MAY BE THE QUESTION OF WHERE THE ESR QUESTION LIVES, BUT I, I DO WANT TO NOTE THAT 1309 DOES HAVE ITS OWN SPECIFIC SET OF ADDITIONAL QUESTIONS THAT WE STILL NEED TO FOCUS ON GOING FORWARD.
YEAH, THERE'S 1309 HAS THE ESR COMPONENT.
THERE WILL BE DEMAND CURVE COMMENTS, AND THEN 1310, I THINK THE QUESTION IS IF STAKEHOLDERS WOULD LIKE TO TABLE, UM, I, YOU KNOW, I'M JUST, I'M HOPEFUL THAT WE CAN GET SORT OF THE SUBSTANTIVE COMMENTS IN AHEAD OF TIME AND, AND TRY TO MAKE SOME DECISIONS AT THE WORKSHOP, EVEN IF THE DECISION IS, YOU KNOW, CONTINUE TO TALK ABOUT TWO ISSUES AT PRS OR CONTINUE TO, TO TABLE 1310 AND REFER IT TO WMS OR WHATEVER.
BUT, UM, I THINK WITH THE, THE WORK WE HAVE COMING ON OTHER ITEMS, WE'VE DONE A PRETTY GOOD JOB ON THIS SO FAR.
I THINK WE'RE TRACKING A LITTLE BIT AHEAD OF SCHEDULE.
UM, SO, SO HOPING MAYBE ONE MORE WORKSHOP OR MAYBE TWO MORE WORKSHOPS, UM, BUT THAT WE CAN FOCUS IN ON, ON THE ISSUES WE NEED TO GET THIS, GET 1309 DONE QUICKLY.
SHAMS, IS THAT A QUESTION ON THIS DISCUSSION? YES.
UM, SO SHA UM, WITH CRESCENT REPRESENTING PLANT ENERGY AGAIN ON THIS TOPIC, UM, SO WITH THE DRS, YOU KNOW, IF IT'S 1309, IF IT'S AN ANCILLARY SERVICE, THEN I THINK, UM, YOU KNOW, THE PROPOSAL OR HAS IN SORT OF, UH, INTERPRETING THE STATUTE, EVEN THOUGH WE DON'T SEE IT THAT WAY, TO ALLOW EVEN A TWO HOUR BATTERY OR ONE HOUR BATTERY TO PROVIDE THERY SERVICE MAY BE OKAY.
BUT IF YOU'RE LOOKING AT IT FROM RESOURCE ADEQUACY PERSPECTIVE, ESPECIALLY IF YOU'RE TRYING TO, UH, MEET THE WINTER STORM CHALLENGE, YOU KNOW, UM, IT SEEMS LIKE THE RESOURCE ADEQUACY, UM, QUALIFICATIONS MAY BE QUITE DIFFERENT AND EVEN QUESTIONABLE WHETHER ANYTHING LESS THAN FOUR HOURS, UM, THAT WOULD QUALIFY, YOU PROBABLY NEED MORE THAN THAT.
SO CAN WE HAVE LIKE, UM, THAT'S, THAT'S THE CONNECTION BETWEEN 1309 AND 1310.
SO I'M WONDERING IF WE GO AHEAD WITH 1309 AS AN ANSLEY SERVICE AND THEN WE DECIDE TO ADD RESOURCE ADEQUACY, CAN WE HAVE TWO SETS OF CRITERIA OR DOES THE DRS HAVE QUALIFICATIONS HAVE TO BE THE SAME FOR BOTH NPR? AGAIN, I, I WOULD SAY THAT WOULD BE SOMETHING THAT THE, THAT YOU WOULD PUT IN COMMENTS, RIGHT? THAT YOU VIEW THAT WAY.
SO I, I DON'T THINK WE'RE AT ANY POINT NOW TO SAY YES OR NO, BUT, YOU KNOW, IF YOU HAVE COMMENTS THAT YOU FEEL THAT IT SHOULD BE TREATED DIFFERENTLY OR 1309 VERSUS 1310, FEEL FREE TO MAKE THOSE COMMENTS.
I'LL JUST TAKE IT UP A LEVEL FROM, I THINK WHAT SHA WAS GETTING AT.
AND THAT IS, UM, REGARDLESS OF WHICH PATH THE DRS IMPLEMENTATION TAKES, UM, YOU KNOW, IT DOES HAVE TO BE ABLE TO ADDRESS THE OPERATIONAL, UH, UH, CRITERIA, HAS TO BE ABLE TO SUPPORT THE RESOURCE ADEQUACY AND RELIABILITY STANDARD CRITERIA AND HAS TO BE ABLE TO, TO, YOU KNOW, HAVE A REDUCTION IN RUCKS.
THOSE ARE THE, THOSE ARE THE THREE THINGS THAT WE'RE TRYING TO CO OPTIMIZE FOR, WITH, WITH THAT.
AND, UH, SO WHETHER IT'S 13 0 9, 13 10 OR PERMUTATIONS IN BETWEEN, WE JUST WANNA MAKE SURE THAT IT'S A DISPATCHABLE RELIABILITY RESERVE SERVICE AND NOT DISPATCHABLE RELIABILITY RESERVE SHENANIGANS, SHENANIGANS.
UM, KEITH, FOR CLARITY, THE ERCOT COMMENTS, WE'LL HAVE SOME QUESTIONS FOR STAKEHOLDERS.
YES, THERE ARE GONNA BE SOME QUESTIONS OUT LATER THIS WEEK, BUT WE PROBABLY WON'T BE ABLE TO GET THOSE QUESTIONS OUT AND WRITTEN RESPONSES TO THOSE QUESTIONS BEFORE THE WORKSHOP.
I, I THINK OUR GOAL IS TO, WELL, IF YOU THINK ABOUT IT, RIGHT, SO IF WE GET THE QUESTIONS OUT AND THEN LET'S SAY TOMORROW MM-HMM
UH, THEN, UH, FOLKS CAN RESPOND TO THOSE COMMENTS IN ADVANCE OF THE MEETING.
NOW, WE MAY NOT HAVE A FULL WEEK.
UH, BUT I THINK WE'RE HOPING TO HAVE AN EDUCATED DISCUSSION, UH, LEADING INTO THE MARCH NIGHT, MARCH NIGHT WORKSHOP.
SO WE DON'T HAVE TO BE OVERLY AMBITIOUS, BUT I, I THINK, YOU KNOW, TO THE EXTENT WE CAN NARROW THE ISSUES AND, AND TABLE WHAT WE CAN TABLE, WE CAN START DOING THAT, UM, AT THE MARCH 9TH WORKSHOP AND THE MARCH 11TH PRS BRIAN.
UH, CAN YOU, UH, LET US PERCOLATE ON WHAT SOME OF THESE QUESTIONS MIGHT BE? ANY PREVIEW IT, IT REALLY GETS, SO THERE WAS A QUESTION ASKED AT THE FIRST WORKSHOP, AND I BELIEVE IT WAS FROM, UM, I SEE IT WAS EITHER BOB AND I KNOW STEVE REY MADE A, A COMMENT ON THIS, AND IT, IT HAD TO DO WITH THE PARTICULAR PROVISION ABOUT WHAT
[00:50:01]
CAPABLE OF OPERATING FOR FOUR HOURS AT HSL.HOW IS THAT INTERPRETED? AND SO THAT'S THE PRIMARY ELEMENT OF THE QUESTION.
UM, UM, IS IT WORTH CONSIDERING IN QUESTIONS WHETHER OR NOT, UH, DGR OR A DES ARC CAN PROVIDE DRRS IN THE WAY THAT NO, THEY'LL BE ABLE TO PROVIDE ECRS AFTER THE IMPLEMENTATION OF, I THINK, 1171? WE ARE NOT, UH, LOOKING TO ASK THAT QUESTION AT THIS TIME.
UH, WELL, OTHER PEOPLE MIGHT ASK THAT QUESTION, YOU'RE FREE, FREE TO ASK THAT QUESTION, BUT THAT'S NOT ONE THAT WE'RE LOOKING TO ASK AT THIS TIME.
I, I THINK, YOU KNOW, I, I'LL LEAVE IT TO ERCOT, BUT I, I THINK I'D BE WORRIED ABOUT ERCOT QUESTIONS THAT ASK STAKEHOLDERS WHAT THEY THINK LEGISLATIVE INTENT WAS, BUT MAY MAYBE IT WILL BE WORDED LIKE, WHAT DO YOU THINK THIS SHOULD BE BASED ON THE STATUTE? BUT I, I THINK WE'LL JUST HAVE TO SEE WHAT THE QUESTIONS ARE.
I THINK THAT COULD BE HANDLED WITH WORDSMITHING BY MATT ARTHUR, WHO'S VERY CAPABLE.
BUT MATT, MATT IS VERY CAPABLE.
BUT THAT SORT OF STANDS OUT TO ME IF, IF IT'S A
IF I MAY CONTINUE FORWARD, I KNOW THAT ULTIMATELY WE HAVE SOME OTHER THINGS THAT WE WANT TO HIT, BUT I DID WANNA RAISE TWO, UM, I WOULD SAY NON BOARD PRIORITY ITEMS, BUT THINGS THAT ARE COMING UP THAT ARE PRIORITIES FOR ERCOT, ONE OF THEM IS NPR 1315.
THIS WAS RELATED TO THE CONTRACT FOR CAPACITY.
UH, WE, UH, WE HAVE HAD, UH, UH, SIGNIFICANT DISCUSSION ON THAT, UH, AND, AND SOME VERY VOCAL DISCUSSION ON, ON THAT ITEM.
UH, GIVEN THE DISCUSSION AT THE LAST BOARD MEETING THAT DAN WOODFIN PROVIDED ON THE FAR WEST SITUATION, THAT HAS KIND OF ELEVATED THE NEED FOR 1315.
AND THE WAY WE VIEW THIS GOING FORWARD IS, UH, WE WOULD LIKE TO WORK COLLABORATIVELY WITH THE STAKEHOLDERS TO COME UP WITH A SOLUTION THAT CAN BE APPLIED THIS SUMMER, UH, FOR, UH, A SOLUTION, UH, FOR LATER IN THE YEAR.
AND SO WE HAVE MADE SOME MODIFICATIONS TO 1315 THAT SHOULD BE COMING OUT LATER TODAY, I BELIEVE, UH, THAT, UH, WE'VE, WE'VE WORKED WITH, UH, SOME OF THE VOCAL FOLKS AND, UH, I'VE REACHED OUT TO A NUMBER OF OTHER FOLKS ON THE MODIFICATIONS THAT, THAT ARE BEING MADE TO 1315.
MY HOPE IS THAT IT ADDRESSES MOST OF THE CURRENT CONCERNS THAT HAVE BEEN VOCALIZED.
I SUPPOSE IF YOU DIDN'T, IF YOU HAD A PROBLEM BUT DIDN'T SAY ANYTHING, WE DIDN'T, UH, WE DIDN'T ADDRESS IT.
UM, I WILL NOTE THAT, UH, THERE WAS AN ELEMENT, AND, AND I KNOW SETH'S GOT HIS, HIS TENT UP THAT WAS RAISED, UH, HE AND I DISCUSSED IT DOES HAVE AN INTERACTION WITH NPR 8 26, IS MY UNDERSTANDING.
AND, UH, FROM OUR PERSPECTIVE, AND, AND AS NED MENTIONED EARLIER, THAT, UH, 8 26 IS FROM OUR PERSPECTIVE, LIKELY TO BE SOMETHING THAT WOULD NEED TO BE ELEVATED FROM AN IMPLEMENTATION STANDPOINT TO BE CONCURRENT WITH, UH, THE 1315, UH, WHEN THAT, UH, THAT OCCURS.
SO, UH, AGAIN, I THINK JUST TO, TO HIGHLIGHT THE, THE TWO SIGNIFICANT CHANGES TO 1315 IS IT WILL BE LOCAL.
UH, IT'S VERY EXPLICIT IN HOW IT WILL BE LOCAL ONLY.
UH, AND UH, THE SECOND ELEMENT IS THAT IT IS, UH, RELATED TO AN EXIT STRATEGY SPECIFICALLY.
SO THESE, THESE THINGS ARE INCLUDED IN THE, UH, SOON TO BE UPDATED VERSION OF 1315.
THAT WILL BE COMING OUT LATER.
OUR VIEW IS, IT IS A PRIORITY GIVEN THAT, UM, GIVEN THE TIMING OF THE ISSUES THAT WERE HIGHLIGHTED BY DAN IN HIS PRESENTATION AND THE LIKELIHOOD OF POTENTIAL ISSUES, WE HAVE A WINDOW OF OPPORTUNITY OF COLLABORATING ON A SOLUTION THAT CAN BE APPLIED HOPEFULLY, UH, FOR THE FAR WEST SITUATION.
THAT'S, THAT'S SORT OF BEEN DEVELOPING.
SO I'LL PAUSE AND SEE IF THERE ARE ANY QUESTIONS ON, ON THAT ITEM.
IT SOUNDS LIKE SETH HAS A QUESTION.
WELL, SO YOU'RE, YOU'RE RAISING A NEW PRIORITY ITEM, RIGHT? KEITH? IT'S 1315.
[00:55:01]
FOR CAPACITY.DO YOU HAVE A TIMING? WE'VE DISCUSSED ONE, BUT I DON'T THINK YOU JUST NOW MENTIONED ONE.
WELL, OUR, OUR, OUR HOPE IS TO GET THIS ADDRESSED BY THE, UM, THE JUNE BOARD MEETING AS WELL.
I KNOW THERE, WE'VE GOT A LOT ON THE PLATE.
AND, AND YES, WE, WE'D LIKE TO ADD THIS TO THAT, THAT PLATE, GIVEN THE, THE ISSUES IN THE FAR WEST, WE SEE THIS AS SOMETHING THAT IF WE CAN GET A COLLABORATIVE OUTCOME BY THE JUNE TIMEFRAME, UH, AND UH, IF THE COMMISSION WERE TO APPROVE, WE, WE COULD USE THAT SOLUTION, UH, TO HELP ADDRESS, UH, THE FAR WEST SITUATION.
I, I'LL GET TO SETH AND WE'LL ALLOW SOME DISCUSSION ON THIS, BUT I JUST WANTED TO LEVEL SET 'CAUSE IT'S NOT SPECIFICALLY ON THE AGENDA.
WE, WE OF COURSE, KNEW IT WAS COMING, BUT, UM, SO IT'S, IT'S 1315.
UM, ERCOT IS FILING COMMENTS THAT WILL BE, NARROW IT A LITTLE BIT, MAKE IT LOCAL AND PROVIDE AN EXIT STRATEGY.
UM, AND, AND ERCOT WOULD LIKE THIS TO JUNE BOARD FOR USE AS SOON AS POSSIBLE.
UM, AND I WILL OPEN IT UP FROM THERE.
SO, UH, THANK YOU FOR THE UPDATE.
I THINK THE OTHER ELEMENT IN TERMS OF WHAT ELSE TO TIE TO THIS IN TERMS OF ENSURING THAT THERE'S CORRECT PRICE FORMATION GOING FORWARD, I THINK THERE'S A MITIGATION PLAN OUT THERE INTO THOSE FAR WEST GTCS.
SO IN OTHER WORDS, LOAD CAN BE DUMPED.
I THINK IT'D BE IMPORTANT TO HAVE THAT LOAD REPRICED.
AND I KNOW THAT WE HAVE A SYSTEM WIDE ADDER, BUT I STILL THINK IT WOULD BE HELPFUL TO HAVE THAT REPRICED.
AND I THINK MAYBE NED CAN HELP ME OUT, BUT I THINK HE HAS AN NPR COMMENTS OUT THERE THAT WOULD REPRICE LOCALIZED LOAD DUMP THROUGH THE RDPA.
I THINK SOMETHING TO THAT NATURE.
ARE YOU THINKING OF, I THINK THAT WAS SEAN'S, UH, THAT'S 1, 2 1 4.
BUT I THINK YOU HAD COMMENTS, UH, SOMEWHERE IN AN MPR THAT WOULD TAKE, THAT WAS FOR THE LOCALIZED TRANSMISSION INSTRUCTED LOAD SHED.
SO I THINK THAT WOULD BE SOMETHING THAT WOULD BE IMPORTANT TOO TO, TO PUT IN WITH THIS ALONG WITH 8, 2 6, I THINK WE CAN DEFINITELY CONSIDER.
UM, BUT AT THE SAME TIME, YOU KNOW, WE, WE CAN CONSIDER THAT ABSOLUTELY.
AND THEN THE OTHER THING I WAS THINKING ABOUT, MAYBE I CAN RESERVE SOME OF THIS, BUT, UM, IF THIS IS GOING TO BE, UH, SPECIFIC TO LOCAL CONDITIONS, IT WOULD, UM, SORT OF BASIC QUESTION TO ME ARISES, UH, THE QUESTION TO ME THAT, UM, SHOULD THE, SHOULD THE AMOUNT THAT YOU BE, SHOULD THE AMOUNT THAT YOU GO TO PROCURE BE LIMITED TO THE AMOUNT NEEDED TO RESOLVE THE LOCALIZED VIOLATION, TRANSMISSION VIOLATION YOU'RE SEEKING TO RESOLVE? SO DO WE NEED GUARD LINES GUARDRAILS, SORRY, GUARDRAILS IN THE NPR THREE 15 THAT SAYS WHEN YOU GO OUT AND PROCURE THIS EXTRA CAPACITY, WHETHER IT'S DR OR NEW RESOURCES OR, OR WHAT IT IS THAT YOU, THAT THE SPECIFICITY OF THOSE MEGAWATTS IS TIED TO THE AMOUNT OF MEGAWATTS THAT YOU NEED TO RESOLVE THE TRANSMISSION VIOLATION THAT YOU'RE SEEKING TO ADDRESS? I, THE, THE CHALLENGE WITH THAT IS THAT, AGAIN, WITH DAN'S SLIDE IS THAT IT'S A GROWING ISSUE, RIGHT? IT IS NOT SOMETHING THAT'S A STATIC NUMBER.
IT'S NOT LIKE IT'S GONNA BE A 400 MEGAWATT PROBLEM, AND IT'S GONNA BE THAT FOR THREE OR FOUR YEARS, IT'S GONNA BE A SHIFTING NUMBER.
AND, UM, IT ALSO IS DEPENDENT ON, YOU KNOW, TO THE EXTENT THAT, HEY, THERE ARE SOME OUTAGES AND WHATNOT.
SO AT DIFFERENT TIMES AND DIFFERENT PERIODS, THAT NUMBER WILL BE DIFFERENT.
SO I DON'T KNOW THAT I CAN ADDRESS THAT AT THIS POINT.
BUT AGAIN, SOMETHING TO RAISE DURING THE PROCESS.
WELL, ON THE LATTER, WE COULD USE THE WORST OF CONDITIONS THAT YOU WOULD ANTICIPATE.
UH, I DO UNDERSTAND IT'S A GROWING ISSUE AND YOU HAVE THE ABILITY TO USE A LOAD FORECAST TO PROCURE AGAINST IT.
SO MAYBE THERE COULD BE A, A, A PROJECTION, UH, THAT WOULD BE USED TO FIGURE OUT THE AMOUNT OF MEGAWATTS THAT COULD BE PROCURED FOR THE ISSUE THAT YOU'RE SEEING.
MY CONCERN IS, IS THAT YOU'RE ABLE TO GO OUT, AND I'M NOT SAYING THAT YOU WOULD DO THIS, BUT MAYBE DOWN THE ROAD.
'CAUSE THESE THINGS LIVE ON, WE FIRST STARTED ALL THIS BACK IN 2011, I THINK, WITH SR.
UM, BUT I I, YOU KNOW, THE WAY IT'S WRITTEN TODAY IS ERCOT COULD GO OUT AND PROCURE LIKE A THOUSAND MEGAWATT GENERATOR AND THEY MAY OVERDO IT.
AND THAT WOULD IMPOSE ALL SORTS OF OTHER MARKET DYNAMICS THAT WOULD, YOU KNOW, NOT PLAY WELL WITH OUR ENERGY ONLY MARKET.
AND, AND I THINK ONE OF THE THINGS THAT I THINK IS PROBABLY GOOD
[01:00:01]
HOMEWORK IS, YOU KNOW, HOW DO WE AVOID THIS IN THE FUTURE? AND THAT'S SOMETHING THAT I WOULD HOPE THAT WE WOULD THINK ABOUT IN SOME FASHION, BECAUSE I DON'T THINK OUR CURRENT DESIGN IS EFFECTIVE ENOUGH TO ADDRESS THIS TYPE OF PROBLEM.WELL I DEFINITELY APPRECIATE THAT.
I THINK THAT, UM, YOU KNOW, SEEING, I'M GLAD THAT YOU TIED A TWO SIX OF THIS 'CAUSE THAT'S SORT OF THE POSTER CHILD WHERE WE HAVE SOMETHING THAT WOULD IMPROVE PRICE FORMATION, BUT WE'VE SAT ON IT FOR YEARS.
UH, AND I THINK WE NEED TO STOP DOING THAT, THAT WHEN WE HAVE SOLUTIONS TO CRAIG PRICE FORMATION AND WE NEED TO ACCELERATE THOSE SO WE DON'T END UP IN THESE SORT OF STATES THAT WE'RE IN TODAY WHERE WE HAVE TO NOW OUR BACKS ARE AGAINST THE WALL AND WE HAVE TO DO THESE DRACONIAN, UH, METHODS TO RESOLVE THE, THE SITUATION THAT WE'RE IN.
CAN WE HAD A COUPLE PEOPLE FROM ERCOT JUMP IN THE QUEUE DURING YOUR QUESTION? SETH? CAN WE SEE IF, IF THEY CAN ADD DAVE, GO AHEAD.
I, ONE THING I JUST WANTED TO NOTE, AND, UH, KATIE PUT THE NPR NUMBER IN THE CHAT WITH 1307.
UH, ONE POINT OF CLARITY I JUST WANNA MAKE SURE IS CLEAR TO FOLKS WITHIN THAT MPRR, WHAT'S CURRENTLY BEING PROPOSED IS THAT WE DO HAVE A PRICE ADJUSTMENT ASSOCIATED WITH LOAD SHED FOR TRANSMISSION CONSTRAINTS.
I DID WANNA JUST MAKE SURE IT'S CLEAR TO THE GROUP THAT THAT IS STILL UNDER THE PARADIGM WHERE THE ADJUSTMENTS ARE SYSTEM WIDE.
SO UNDER THAT NPRR, THE THERE WOULD NOT BE A LOCAL ADJUSTMENT TO PRICES THAT REALLY ONLY EXIST UNDER THE PROPOSAL WITH 1214.
AND I UNDERSTAND THAT AND THAT'S THE BEST WE CAN DO FOR NOW.
NPR 1 2 1 4 CAN BE SOMETHING THAT WE HAVE OUR EYES ON LATER ON DOWN THE ROAD.
THAT WOULD ACTUALLY BE THE ULTIMATE SOLUTION, UH, FOR THIS TYPE OF ISSUE.
FREDDY, DID YOU WANNA ADD SOMETHING TOO? YEAH, SURE.
AND, AND I JUST WANTED TO GIVE AN UPDATE OF, OF WHERE THAT, THAT NPRR IS, AND WE DID TALK TO DRA ABOUT, ABOUT THEIR COMMENTS.
AND REALLY WHERE THAT'S AT IS IT'S, I WILL BE FILING COMMENTS, UM, REALLY JUST, UH, KEEPING MOST OF THE LANGUAGE THAT THEY, THEY SUBMITTED REALLY ASSOCIATED WITH THE ADDING THE MEGAWATTS DIRECTED BY ERCOT AND INCLUDING THAT INTO GTPD.
UH, BUT WE WILL BE STRIKING THE PORTION OF WHERE THE CHEN INSTRUCTION IS IMPLEMENTED BY THE TO AND, AND REALLY NOT AS PART OF AN INSTRUCTION BY ERCOT.
SO, UM, I, I'LL BE FILING THOSE COMMENTS SOON.
AND THEN, UH, MY EXPECTATION IS THAT THAT SHOULD BE MOVING FORWARD, UM, FAIRLY QUICKLY AFTER THAT.
SETH, ARE WE, ARE YOU GOOD FOR NOW? I'M GOOD, THANK YOU.
YOU TOUCHED AT THE END ON SOME GENERAL PRICE FORMATION ISSUES THAT KEITH AND I HAVE BEEN DISCUSSING AS WELL.
DO YOU WANT TO TALK ABOUT ANYTHING THERE RIGHT NOW? UH, MAY, MAYBE NOT RIGHT NOW, BUT I DO THINK THAT ONE OF THE CHALLENGES AND, AND I THINK WHERE, WHERE SETH WAS GOING IS THAT WHEN YOU HAVE THIS ISSUE, HOW DO YOU CORRECTLY FORM THE PRICE? AND I THINK OUR CONCERN IS HOW DO YOU AVOID BEING IN THIS SITUATION TO START WITH? BECAUSE ONE COULD ARGUE IS THAT WHERE'S THE GENERATION NOW, RIGHT? AND THE POINT IS THERE'S NO PRICE
AND SO I THINK THAT'S, THAT'S SOMETHING WE NEED TO THINK ABOUT AND, UH, I DON'T KNOW THAT WE HAVE SOLUTIONS OR MAYBE WE NEED A WAY TO THINK ABOUT THAT.
BUT I, I THINK THAT WHEN YOU LOOK AT THE CONSTRUCT, YOU WILL END UP HERE AGAIN.
AND THAT'S SOMETHING THAT'S A PROBLEM.
I THINK I JUST WANTED TO FLAG THAT BECAUSE I THINK IT'S REALLY TWO ISSUES WE'RE TALKING ABOUT.
RIGHT? AND, AND YOU ALLUDED TO IT IN YOUR COMMENTS ABOUT 13, 15, REALLY, YOU KNOW, YOU CAN MAKE IT NARROW AND LOCAL, BUT YOU DON'T WANT IT TO HAPPEN AGAIN.
SO IF WE DON'T WANT IT TO BE USED AGAIN, THERE'S, THERE'S OTHER WORK TO BE DONE AS WELL.
AND I THINK MY, THE INITIAL COMMENT I HAD HAS NOW BEEN, UH, HAS MORPHED A LITTLE BIT AS THIS DISCUSSION'S GOING ON.
UH, I'M REALLY GLAD THAT WE'RE HAVING IT BECAUSE I THINK YOU, THE FRAMING, KEITH THAT YOU, YOU JUST PUT OUT IS REALLY IMPORTANT, RIGHT? THIS IS, UM, YOU KNOW, THIS IS CLEARLY NOT EVERYONE'S FIRST CHOICE.
AND UM, YOU KNOW, I THINK IT'S, IT'S INCUMBENT UPON STAKEHOLDERS TO TRY TO HOLD THAT, THAT LINE THAT, YOU KNOW, HEY, THIS HAS TO WORK WITH THE MARKET DESIGN THAT WE HAVE NOW.
UM, BUT WE ALSO NEED TO BE LOOKING INTO THE FUTURE.
AND WE'VE GOT THE, THE TRIENNIAL RELIABILITY STANDARD ASSESSMENT GOING ON.
AND THIS IS PROBABLY SOMETHING THAT IS, THAT'S REALLY HELPFUL TO, YOU KNOW, CONSIDER AS WE LOOK
[01:05:01]
IN, IN THAT, TO MAKE SURE THAT WE'RE SENDING SIGNALS TO, YOU KNOW, HELP AVOID THIS IN, IN THE FUTURE.UM, 'CAUSE YOU'RE RIGHT, THIS ISN'T WHERE ANYONE WANTS TO BE, UH, IN, IN THE, YOU KNOW, IN REPEAT.
WE WANT THIS TO BE AS LIMITED AS POSSIBLE.
UM, AND YOU KNOW, THE, THE ONLY THING THAT I'LL, I'LL JUST ADD ON, 'CAUSE A LOT OF FOLKS HAVE SAID GOOD THINGS ALREADY, UM, IS AS YOU'RE LOOKING AT THIS, WE ALSO HAVE TO TAKE INTO ACCOUNT THAT THE LOAD FORECAST MAY CHANGE SOME, AS SOME OF THE SENATE BILL SIX CRITERIA ARE IMPLEMENTED.
AND SO WHILE, YOU KNOW, LOOKED A LOT AT DAN'S SLIDE FROM THE BOARD MEETING AND THAT, THAT'S HELPFUL, UM, YOU KNOW, THERE ARE A FEW THINGS IN THERE THAT I HAVE TO, I HAVE TO PRESUME THAT MAYBE SOME OF THAT WON'T HAPPEN AT QUITE THE SAME WAY THAT IT'S PROJECTED.
AND LIKE I NOTICED THERE'S A, A VERTICAL CLIFF THAT SEEMS LIKE IT'S GONNA HAPPEN IN THE NEXT COUPLE WEEKS OF ABOUT A GIG, GIG AND A HALF.
AND I, I AM NOT AWARE OF A BIG FLIP, UH, SWITCH THAT'LL FLIP ON ALL AT ONCE.
MY GUESS IS THAT'LL COME IN A LITTLE BIT MORE GRADUALLY.
THE CRYPTO LOAD, YOU KNOW, IF YOU LOOK IN THE PAST, IT SEEMS LIKE IT'S A LOT MORE PRICE RESPONSIVE IN THE FUTURE.
IT SEEMS LIKE IT'S MORE STEADY.
SO THERE'S PROBABLY SOME OPERATIONAL CONSIDERATIONS THERE, BUT, UM, JUST ENCOURAGE THAT, YOU KNOW, AS, AS, AS WE LOOK AT WHATEVER THE NEW 1315, UH, POSTERIOR COMMENTS LOOK LIKE, THAT WE, UM, WE ALSO TAKE IT INTO ACCOUNT HOW MUCH IS ACTUALLY NEEDED AS, UH, AS WE SHARPEN THE PENCIL.
BRIAN, UH, KEITH, I, I APPRECIATE YOUR, UM, ACKNOWLEDGEMENT OF HOW CONTROVERSIAL, UH, OF, OF TOPIC THIS IS OF, OF, UH, ERCOT PROCUREMENT OF CAPACITY.
UM, YOU SAID SOMETHING THAT, YOU KNOW, I WANT STAKEHOLDERS TO BE CONSTRUCTIVE.
YOU MENTIONED, UH, EXIT STRATEGY, SO I'M TRYING TO THINK ABOUT WHAT THAT LOOKS LIKE.
UM, DO YOU HAVE ANY MORE COLOR AROUND THAT CONCEPT? WELL, I, I THINK, YOU KNOW, OBVIOUSLY EVERY SCENARIO MAY BE DIFFERENT, BUT I THINK THE ULTIMATE EXIT STRATEGY IN THIS CASE IS THE 7 65, RIGHT? BUT THERE MAY BE SOME INTERIM THINGS ALONG THE WAY, BUT I THINK AT THIS POINT WHAT WE WANTED TO BE WAS CLEAR THAT IF WE WERE TO DO SOMETHING LIKE THIS, WE DON'T WANT AN, AN OPEN, LIKE, WELL, WE'LL FIGURE IT OUT LATER, RIGHT? I THINK THERE IS A PATH FORWARD, UH, EVENTUALLY.
AND I THINK WHEN WE THINK OF THE FAR WEST, YES, THERE WILL BE 7 65, YES, IT WILL HELP THIS SITUATION.
IT'S NOT HERE, THERE IS GOING TO BE A GAP IN TIME.
AND AND THAT'S WHAT THE GAP WE'RE TRYING TO COVER.
WE'RE NOT TRYING TO SAY, HEY, WE NEED 10 YEARS OF THIS STUFF.
NO, WE'RE TRYING TO COVER THE GAP.
KIND OF A COROLLARY FOR ME THEN IS TO THINK ABOUT THIS LIKE THE, UM, THE BRO RMR OR THE LIFECYCLE POWER UNITS WHEN THEY, UH, WHEN THE TRANSMISSION UPGRADES ARE COMPLETE.
AND THAT'S WHEN WE EXPECT THOSE TO GO AWAY.
UM, I, I GUESS, UH, ANOTHER, UH, QUESTION I HAD JUST AS I WAS LISTENING TO THIS CONVERSATION WAS THE LOAD SHED, UH, FOR PRICING WOULD BE INITIATED BY THE TO AND NOT ERCOT.
AND SO UNDERSTANDING HOW WE CAN HAVE A DIGITAL RECORD OF WHEN THAT, UH, THAT LOAD SHE OCCURS SO THAT WE CAN INCLUDE IN PRICING IS A BIG QUESTION MARK FOR ME.
'CAUSE I DON'T THINK THAT EXISTS NOW.
SO TRYING TO TACKLE THAT I THINK IS GONNA BE AN IMPORTANT PART OF THE SOLUTION.
WELL, THANK YOU FOR YOUR FEEDBACK.
WITHROW WITH CUSTOMIZED ENERGY SOLUTIONS.
BRIAN'S QUESTION MAY HAVE COVERED THIS, BUT I JUST WANT TO CONFIRM.
WHEN YOU'RE TALKING ABOUT YOUR, YOUR UPDATES ARE GOING TO COVER EXIT STRATEGY, YOU'RE TALKING ABOUT EXITS FROM THE CONTRACTS THEMSELVES.
UM, YOU MENTIONED GTCS, AND I JUST WANNA MAKE SURE YOU'RE NOT TALKING ABOUT GTC EXIT STRATEGIES.
THIS WAS NOT A GTC EXIT STRATEGY.
THIS WAS FOR THE SPECIFIC CONTRACTS THAT WERE BEING SIGNED TO ADDRESS THE WHATEVER ISSUE THAT WE'RE, WE'RE DEALING WITH.
UM, SO JUST TO CLARIFY, WHEN WE, WHEN YOU SAY CHANGING 1315 FROM SYSTEMWIDE TO LOCAL, THE, UH, YOU ARE LOOKING AT THE NEED LOCALLY, BUT ARE YOU ALSO THEN, UH, IN THE, UH, PROTOCOL LANGUAGE SAYING THE DEPLOYMENT WILL ONLY BE FOR THE LOCAL AS WELL? I MEAN, DURING AN EMERGENCY, HOW THESE RESOURCES PARTICIPATE WILL ALSO HAVE IMPACT ON THE MARKET? UH, I DON'T HAVE THE SPECIFIC PROTOCOL LANGUAGE MEMORIZED, SO I DON'T KNOW THAT I CAN ANSWER THAT QUESTION OTHER THAN SAY THE PROCUREMENT IS, THIS IS JUST THE CONDITION THAT, THAT MAY BE SOMETHING WE NEED TO LOOK INTO.
[01:10:01]
UH, THEN THE SECOND QUESTION IS, UH, YOU, THERE WILL BE, I THINK AS, UH, SOME OTHERS HAD SAID EARLIER, LIKE FLEXIBLE LOADS WHO CAN PARTICIPATE.SO, UH, THE THOUGHT COULD BE LIKE DR OR UH, GEN WHATEVER IS AVAILABLE, RIGHT? IT IT COULD, YES.
THERE, THERE COULD BE A MULTIPLE MULTITUDE OF SOLUTIONS.
UH, AND WE ARE OPEN TO A VARIOUS SET OF OPTIONS.
UH, SO IF I UNDERSTAND CORRECTLY, 1315 IS LIKE THE RMR RESOURCE.
SO THE OFFERS WILL BE AT THE CAP SYSTEM WHERE OFFER CAP FOR THESE RESOURCES, RIGHT? THAT IS MY UNDERSTANDING AS WELL.
SO IF THAT IS THE CASE AND WE ARE USING IT FOR LOCAL CONGESTION, IT MAY NOT WORK BECAUSE THE MAC SHADOW PRICE IS AT 5,000.
SO ARE YOU LOOKING AT REDUCING THE SYSTEMWIDE CA UH, CAP OFFER OF, FOR THOSE RESOURCES OR INCREASING THE MAC SHADOW PRICE FOR THOSE CONSTRAINTS? AGAIN, SOMETHING, SOMETHING THAT WE'RE AWARE OF BUT IS NOT IN THE PRESENT LANGUAGE.
BECAUSE THOSE THINGS CAN HAVE A SIGNIFICANT IMPACT ON LOCAL PRICING AND SYSTEM-WIDE PRICING AND HOW IT IMPACTS THE MARKET.
SO CHANGING FROM SYSTEM TO LOCAL MIGHT HAVE UNINTENDED CONSEQUENCES.
YEAH, I, YOU KNOW, I DEFINITELY DON'T WANT TO CUT DISCUSSION ON THIS, BUT I WANNA MAKE SURE IT'S PRODUCTIVE.
UM, SO, SO KEITH, I, I KNOW EVERYBODY TAKES MINUTES AND NOTES.
I JUST, YOU'VE GOTTEN A LOT OF SPECIFIC RECOMMENDATIONS.
UM, CAN WE FEED THIS INTO KENNETH SOMEHOW FOR, FOR NEXT STEPS? I DON'T KNOW IF THAT'S A WORKSHOP OR A OFFLINE WORKING GROUP.
'CAUSE A A LOT OF THESE, UM, YEAH, ARE ARE GOOD SUGGESTIONS AND THEY'RE, THEY'RE VERY SPECIFIC AND I THINK THEY ARE THINGS THAT EVERYBODY WILL WANT TO SEE ADDRESSED.
AND, AND AGAIN, YOU, YOU KNOW, TO THE EXTENT THAT WE CAN ADDRESS SOME THINGS.
UM, YEAH, I CAN'T PROMISE EVERYTHING, BUT I THINK IT'S ALWAYS GOOD TO HEAR WHAT PERSPECTIVES ARE AND WHAT CAN AND CAN'T BE DONE IN THE TIMELINES.
BUT, YOU KNOW, WE'RE HAPPY TO, HAPPY TO LISTEN AND I AGREE THIS IS, IT'S NICE TO HEAR THEM NOW, BUT, UM, THERE'S PERHAPS OTHER FORUM TO ADDRESS THAT AS WELL.
YEAH, I THINK WE'LL CONTINUE TO HEAR THEM, BUT I THINK MAYBE ERCOT SHOULD BE THINKING ABOUT THE, THE BEST WAY TO ADDRESS THESE, ESPECIALLY ON THE CONDENSED TIMELINE.
UM, YOU KNOW, IT DOESN'T GIVE BLAKE VERY MANY WMS MEETINGS, SO I DON'T KNOW IF WE HAVE TO DO, YOU KNOW, A WORKSHOP OR IF YOU CAN HAVE LIKE A OFFLINE GROUP WITH, WITH KIND OF THESE STAKEHOLDERS.
UM, BUT I THINK BE THINKING ABOUT THAT.
I KNOW, I KNOW KENNETH IS TAKING NOTES OVER IN, IN THE BACK AND WE'LL, WE'LL, UH, WE'LL, UH, RE REGROUP AND, AND SEE WHAT, WHAT WE CAN DO AS WE MOVE FORWARD.
UM, KEITH, I UNDERSTAND, UH, YOUR DESIRE TO ENSURE THAT THINGS LIKE THIS DON'T HAPPEN.
I WILL SAY THOUGH, THAT ERCOT REPEATED ACTIONS OVER THE PAST FEW YEARS HAVE MADE THE MARKET THINK THAT ERCOT WILL LET MARKET FORCES WORK.
UM, AND SO, UM, IF ERCOT TRULY DESIRES THAT WHEN THEY ARE DOING THESE TYPES OF THINGS NOW IT NEEDS TO COME COMPLETE WITH THE, UM, PORTION THAT IMPACTS THE MARKET.
UM, UH, THE, UM, THERE'S THE, UH, CONSUMER RESIDENTIAL DR PROGRAM I THINK IS A PERFECT EXAMPLE OF THIS.
UM, IF YOU DON'T COME WITH THE COMPLETE PACKAGE OF SAYING, HERE'S HOW WE CAN BACK IT OUTTA MARKET SIGNALS, UM, YOU'RE ALWAYS GOING TO SHOW THE MARKET AND MAKE THE MARKET THINK THAT YOU'LL NEVER BE WILLING TO LIVE WITH MARKET SIGNALS AND THEREFORE YOU'RE NEVER GONNA HAVE, UM, PRICES, UH, MOVE TO WHERE THEY SHOULD BE BECAUSE THERE'S ALWAYS THE EXPECTATION THAT ERCOT WILL PUT THEIR THUMB ON THE SCALE.
SO IS THIS ALSO PART OF THE SOLUTION? IS IT ALSO TIED TO THE MARKET NOTICE THAT WENT OUT YESTERDAY ABOUT NON-SOLAR CASES BEING USED TO INTEGRATE LOAD? SO IS THERE, IS THERE SORT OF A SUGGESTION HERE THAT MAYBE SOME LOAD WENT THROUGH THAT WASN'T, UH, THE, THE GRID WASN'T REALLY ABLE TO SERVE OR READY TO SERVE? UH, I WILL SAY I DID NOT SEE THE MARKET NOTICE WENT OUT YESTERDAY, SO I CAN'T COMMENT ON IT.
[01:15:03]
WHAT, GO AHEAD, MARTHA.WE, WE'VE BEEN CHATTING HERE ABOUT WHERE THE NEXT DISCUSSION VENUE FOR THIS IS, AND I APPRECIATE COREY'S HELP HERE, BUT THE RECORD SEEMS TO SHOW THAT THE NPR IS TABLED AT PRS.
WHAT, WHAT I'M NOT AS CLEAR ABOUT IS WHETHER WMS IS TAKING IT UP FOR FUN.
SO IF SOMEBODY CAN HELP WITH THAT PIECE.
WELL, I BELIEVE THIS WAS A WEIRD THING WHERE IT WAS AT PRS TWICE.
AND SO THE SECOND TIME YOU SAID IT DIDN'T NEED A MOTION TO JUST BE REFERRED, IT WAS LIKE, YOU KNOW, THE SPECIAL CHAIR POWER THAT'S EXACTLY RIGHT.
SO IS AT WMS, IT WAS REFERRED AT THE LAST PRS TWO WMS, ALL OF THE WMS CHAIR SPEAK TO HOW MUCH FUN HE PLANS TO HAVE WITH IT.
WE ARE PLANNING ON TALKING ABOUT IT.
HOWEVER, NEWS TO ME ABOUT THE, THE RUSH ON TIMELINES.
UM, SEEING, SEEING LANGUAGE A WEEK AHEAD OF TIME, HOPEFULLY WE GET IT TODAY.
UH, WE JUST ENCOURAGE FOLKS TO QUICKLY DOWNLOAD THAT AND COME PREPARED TO DISCUSS.
UM, I, WE ONLY HAVE TWO TOUCH POINTS TO, TO MEET THIS TIMELINE.
SO, UM, I ANTICIPATE LONG DISCUSSIONS.
WE'LL TRY, BUT, UH, WE'LL DO OUR BEST.
I I DO WANNA STRESS THAT I THINK WE'RE REALLY, WE'RE, WE SEE THIS AS COLLABORATIVE, BUT THERE IS THAT RELIABILITY TIMELINE THAT'S TICKING AND, AND SO IT'S UNFORTUNATE THAT, UH, IT'S JUST UNFORTUNATE THAT THAT'S WHERE WE ARE RIGHT NOW.
AND AS MUCH AS WE WOULD LIKE TO AVOID IT, WE, WE ARE WHERE WE ARE.
AND WE'RE ALL, WE ALL STAND READY TO WORK AND COLLABORATE WITH Y'ALL, BUT I WOULD RECOMMEND A BACKUP PLAN IF, IF WE CANNOT MAKE, GET TO A DECISION BY TWO WMS MEETINGS.
I I WOULD NOTE THAT WHAT, WHAT WE DON'T WANT TO HAVE TO DO IS, IS A LIFECYCLE TYPE SITUATION, RIGHT? WHERE THERE'S A EXCEPTION, WE NEED TO DO THIS, WE NEED TO MOVE FORWARD, WE WANT TO AVOID THAT.
AND SO IF YOU'RE TALKING ABOUT BACKUP PLANS, THAT LIFECYCLE SITUATION IS KIND OF THE POSTER CHILD, THE BACKUP PLAN.
I'M TALKING ABOUT, UM, TOUCH POINT, BACKUP PLAN IF TWO MEETINGS AREN'T ENOUGH.
IF YOU NEED MORE MEETINGS, THAT'S FINE.
WELL, THAT'S WHAT I WHY I WANTED YOU TO BE THINKING OF, OF HOW YOU WANT TO HANDLE THIS.
'CAUSE THESE ARE VERY, I DON'T WANNA SAY TECHNICAL, BUT THERE'S, THERE'S SPECIFIC RECOMMENDATIONS AND, AND REAL CONCERNS.
AND I DON'T THINK THAT ALL OF, LIKE, EVEN THE NINE THAT GOT RAISED TODAY, THAT THAT CAN'T, THOSE CAN'T GET RESOLVED IN TWO WMS MEETINGS.
SO I DON'T KNOW IF IT'S A, A WORKSHOP OR A OFFLINE WORKING GROUP OR, I, I DON'T KNOW.
BECAUSE I THINK, RIGHT, WE, THERE'S TWO WMS MEETINGS.
I THINK WE'D WANT THIS AT TWO TAC MEETINGS.
YOU, YOU KNOW, LUCKILY ENOUGH WE HAVE SPECIAL TECH MEETINGS.
UM, BUT I THINK YOU SHOULD JUST HAVE A PLAN FOR
IT'S NOT JUST, YOU KNOW, AN HOUR AND A HALF OF DISCUSSION AT TWO WMS MEETINGS.
WELL, AND, AND I THINK THAT IT, IT MAY HAVE TO EVOLVE, RIGHT? I THINK YEAH, THAT'S FINE.
I MEAN IT, HEY, IF WE, WE, IF YOU COME AND YOU SAY WE LOVE YOUR NPR AND YOU PASS IT AT THE NEXT WMS, THEN OKAY, WE'RE DONE.
RIGHT? I, I THINK THAT'S PROBABLY HIGHLY UNLIKELY.
UM, AND THERE'S LIKELY TO BE SOME, BASED ON THE DISCUSSION TODAY, THERE'LL BE SOME, UM, BACK AND FORTH.
BUT, UH, WE'RE ALSO WORKING WITH OUR OWN TIME CRUNCH HERE, RIGHT? SO, UH, WE HAVE A WINDOW OF OPPORTUNITY AND IF THAT MEANS WE STAY LATER, START EARLIER, HAVE AN EXTRA MEETING, WE'RE, WE'RE GONNA BE THERE TOO.
SO YOU'LL HAVE COMMENTS OUT IN THE NEXT TWO DAYS.
BLAKE HAS A WMS MEETING ON, UM, MARCH 4TH, WHERE THEY WILL TALK ABOUT O-B-D-R-R 55 AND 1315 AND WHATEVER ELSE WAS ALREADY ON THEIR AGENDA.
AND WE WILL TAKE IT FROM THERE.
WE CAN CHECK IN MAYBE AT MARCH TECH.
UH, IAN HALEY, MORGAN STANLEY.
UM, CHAIR, RESPECTFULLY, I KNOW WHAT YOU'RE TRYING TO DO BY, UH, SAYING THINGS LIKE CLOSED SESSIONS, BUT I REALLY THINK I DIDN'T SAY CLOSED SESSION OR CLOSED MEETINGS OR, UH, OFFLINE.
UM, MY BELIEF IS THAT THE STAKEHOLDER PROCESS WORKS SO WELL BECAUSE IT IS SO, UM, OPEN AND IT ALLOWS FOR SO MANY PEOPLE TO PARTICIPATE.
UM, SO UNDERSTAND IF THERE NEEDS TO BE ADDITIONAL MEETINGS SCHEDULED, ET CETERA.
THAT'S SOMETHING I ADVOCATED FOR IN THE BATCH STUDY PROCESS.
UM, BUT I'D BE VERY OPPOSED TO, UM, ONLY PARTICULAR PARTIES BEING INVITED.
[01:20:01]
REALLY, REALLY HEATED CONVERSATIONS AT THIS ROOM, OR, WELL, IT WAS THE FORMER ROOM TOO, ABOUT WHEN ERCOT ONLY WENT TO CERTAIN GROUPS TO TELL THEM INFORMATION, SO, OKAY.I'M, I'M TOTALLY FINE WITH THAT.
I JUST THINK WE HAVE A LOT OF WORKSHOPS, SO, UM, BUT I'M, I'M FINE WITH, WITH TAKING THE HEAT ON THAT ONE IF, IF WE NEED ANOTHER WORKSHOP.
SO YOU CAN BLAME ME, BLAKE, BUT THAT MIGHT, THAT MIGHT BE A GOOD IDEA IN THIS CASE, A HALF DAY WORKSHOP OR SOMETHING.
ANYTHING ELSE FOR KEITH? YES, I HAVE ONE MORE.
SO THAT WAS THE ONLY NUMBER TWO.
UM, AND SO NUMBER THREE, YOU'RE, YOU'RE LIMITED TO TWO
WELL, I, I CAN, IF YOU NOT WANT ME TO SAY IT, I CANNOT SAY IT.
UH, I, I THINK THAT IN THE SPIRIT OF IAN'S COMMENTS, PLEASE, PLEASE SHARE WITH US.
THE, THE THIRD PIECE, UH, THAT I WANTED TO RAISE, AND THIS IS RELATED AGAIN, TO OUR FAR WEST SITUATION, IS THINKING ABOUT ALL THE TOOLS AVAILABLE IN THE TOOLKIT.
UH, AND, UH, THINKING ABOUT THE ANALYSIS WE HAVE ONGOING WITH CHARLES RIVER ASSOCIATES ON, UH, THEIR EVALUATION.
UH, THERE IS THE, YOU KNOW, I THINK WE ARE WORKING ON AN ERS UPDATE AND AN NPR THAT WILL HOPEFULLY, UH, WE'LL SEE IN, UM, I THINK THE APRIL TIMEFRAME.
AND I THINK THERE'S AN OPPORTUNITY HERE AS WELL, UM, TO CONSIDER WHAT ERS OPTIONS, UM, MIGHT EXIST AS ANOTHER TOOL IN A TOOLKIT TO HELP ADDRESS, UH, ISSUES IN, IN THE FAR WEST.
UH, WE ARE WORKING ON SOME, SOME MODIFICATIONS THAT WOULD ALLOW FOR A LO A LOCAL PROCUREMENT AND LOCAL DEPLOYMENT, UH, AS WELL AS, UM, AN ENHANCEMENT TO THE, UH, WHAT WHAT WE WOULD SEE AS A, UH, DEPLOYABILITY MEASURE, UM, UH, ON, YEAH, DEPLOYABILITY MEASURE IS MAYBE THE BEST WAY TO SAY IT.
UH, ADVERB WE CAN CREATE, GO AHEAD.
WE CAN CREATE WORDS, UH, IN, IN THE TACK HERE.
UH, BUT, BUT THOSE ARE THE THINGS THAT WE'RE THINKING ABOUT IS, UM, AND, AND THINKING ABOUT HOW WE WOULD, UM, CRAFT SOMETHING THAT COULD BE A SOLUTION TO ASSIST IN, IN THE FAR WEST SITUATION.
SO THAT'S SOMETHING THAT'S, UH, WE'RE WORKING ON AND, UH, WE'D LIKELY SEE IN, IN THE APRIL TIMEFRAME.
NOW, THE, THE, THE TIMELINE WE WOULD SEE ON THAT IS, IS NOT JUNE.
UH, SO WE DON'T SEE IT AS JUNE.
BUT, BUT AGAIN, AS PART OF THE PRIORITY SET OF SOLUTIONS FOR THE FAR WEST, THERE'S, THERE'S THE POTENTIAL FOR SOMETHING LIKE THIS TO, TO AID IN THAT.
SO WE, WE SEE IT AS IF WE CAN GET SOME, SOME VALUE AND THERE'S SOME POTENTIAL OPTIONS, THIS COULD BE A PART OF THAT.
SO, UH, WE'LL, WE'LL HAVE FURTHER FURTHER DEVELOPMENT, BUT, UH, JUST WANTED TO GIVE FOLKS A HEADS UP.
OKAY, SO THIS IS PROBABLY A, COMES TO US IN APRIL, AND I THINK YOU WOULD WANT THIS SEPTEMBER BOARD, IT, IT WOULD BE SOMETHING MORE FOR THE, THE FALL.
SO SEPTEMBER WOULD WOULD BE A, A TIMELINE THAT, THAT COULD POTENTIALLY WORK.
UM, LET'S TALK TO BLAKE AND MARTHA.
I DON'T KNOW IF IT WOULD BE AN ACTION ITEM, BUT LET'S, 'CAUSE YOU'RE WEAVING THIS PRICE FORMATION THREAD THROUGH MULTIPLE CONVERSATIONS, SO LET'S MAKE SURE THE THREAD STAYS ALIVE.
AND WE'RE KIND OF CHECKING IN ON, NOT JUST ARE WE PASSING THESE NPR, BUT HAVE WE KIND OF CONTINUED TO TALK ABOUT WHAT WE, WHAT WE NEED TO TALK ABOUT ON, ON PRICE FORMATION.
DOES THAT MAKE SENSE? AND MAYBE, AND MAYBE IT IS AN ACTION ITEM, BUT LET'S, LET'S TALK ABOUT, LET'S HAVE THAT DISCUSSION.
THE ONE THING I WANNA REMIND EVERYBODY, THIS IS REALLY JUST STAFF'S POSITION IN THE AS STUDY WE DID, THERE WAS A FINDING SEVEN B ADDRESSING ERS, AND, UH, IT REALLY REQUIRED ERCOT TO PERFORM A HOLISTIC REVIEW OF ALL THE EXISTING AND POTENTIAL VOLUNTARY AND EMERGENCY RELATED DR PROGRAMS. SO OUR SUGGESTION IS, UH, ALL, ANY DEMAND RELATED REVISION REQUESTS SHOULD WAIT AT LEAST FOR THAT, UH, REPORT TO BE COME OUT.
BUT WHAT I'M HEARING IS IT'S GONNA BE CONCURRENT, AT LEAST YOU ARE NOT GONNA, THE, THE IDEA IS THAT THE REPORT, WHEN WE DROP THE REPORT, WE CAN DROP THE NPR CONCURRENTLY WITH THAT.
[01:25:01]
SUB GENRE SUBD WITH TIEC, DOES THE NPRR OR THE CONTEMPLATED NPRR, IS IT ALSO GOING TO IMPLEMENT SOME OF SENATE BILL SIX IN THE LONG LEAD TIME? UM, DEMAND RESPONSE PROGRAM? NO.COULD YOU EXPLAIN WHY? 'CAUSE IT SEEMS LIKE IT WOULD GO HAND IN HAND WITH REDEFINING ERS.
UH, IT'S, I THINK, YOU KNOW, PART OF, PART OF THE REASON WHY WE'VE, WE'VE CHOSEN NOT TO DO IT HAND IN HAND IS THE TIMING, UM, OF, OF THAT.
AND WE, WE THINK THAT THAT THERE IS THE, THE OTHER, UM, PROCESS THAT, THAT IS UNDER, UH, AS I UNDERSTAND THAT'S SOMETHING THAT, THAT THE COMMISSION IS GONNA WORK ON.
SO, UH, NOT TO SAY THAT IT COULD CONNECT AT SOME LATER, FUTURE POINT, UH, BUT I THINK THE TIMING IS, IS A BIT DIFFERENT IN THIS CASE.
CAN I ANSWER THAT KANAN? YEAH.
WE HAVE PROJECT 5 8 4 8 2 THAT SPECIFICALLY IS GONNA ADDRESS THAT PROGRAM AND WE ARE ABOUT TO KICK IT OFF IN THE NEXT COUPLE OF WEEKS OR MONTHS.
ERIC GOFF, UM, THAT REPORT THAT IKA MENTIONED, I THINK LAST WE HEARD IT WAS GONNA BE PUBLISHED IN JANUARY.
UM, DO YOU KNOW THE TIMING OF IT? YEAH, WE ARE, WE ARE PLANNING TO HAVE THAT REPORT AVAILABLE IN ADVANCE OF THE APRIL BOARD MEETING.
AND SO IT WILL BE AT LEAST A WEEK BEFORE THE BOARD MEETING, IF NOT A LITTLE SOONER.
SO DEFINITELY NOT FEBRUARY OR MARCH.
DEFINITELY NOT FEBRUARY OR MARCH.
UM, MARTHA HENSON SPEAKING ON BEHALF OF ENCORE.
I, I JUST WANTED TO SAY THANKS TO KEITH FOR LIKE REALLY DIGGING DEEP INSIDE THINGS THAT ARE PENDING OR THAT COULD BE DONE IN THE NEAR FUTURE TO ADDRESS THE CHALLENGES THAT WE HAVE IN WEST TEXAS.
UM, ENCORE SEES THIS ISSUE TOO.
IT'S NOT BASED ON A LOAD FORECAST, IT'S ACTUALLY BASED ON CUSTOMERS THAT HAVE SERVICE TODAY THAT ARE APPROVED TO RAMP UP IN THE VERY NEAR FUTURE.
SO THE CHALLENGE IS IMMINENT, AND IF WE DON'T USE ALL THE TOOLS IN THE TOOLBOX AND TRY TO ACCELERATE THE THINGS THAT WE HAVE CONTROL OVER, IT'S GONNA BE REAL BAD.
SO I JUST WANTED TO SAY THANKS TO KEITH FOR THINKING ABOUT THIS.
I KNOW HE'S LAID OUT SOME THINGS THAT ARE GONNA BE REAL CHALLENGING FROM A TIMELINE STANDPOINT, BUT I HOPE FOLKS WILL COME TO THE TABLE AND BE COMMITTED TO HELPING LOOK AT SOLUTIONS THAT CAN GET US THROUGH THE NEXT FEW YEARS.
DO YOU HAVE A FOURTH ITEM? NO, THAT IS IT FOR ME TODAY.
UM, MATT MARINAS, YOU HAVE TO, YOU HAVE TO FOLLOW THAT.
SO, UM, WE'LL, WE'LL SEE YOUR PRESENTATION NOW.
SEE IF I CAN PROVIDE SOME RELIEF AND TALK ABOUT SOMETHING EASY.
UM, SO THE LARGE LOAD INTERCONNECTION, THERE'S ALL THINGS LARGE LOAD.
UM, SO THERE'S THIS SLICE OF LARGE LOAD, WHICH IS THIS LARGE INTERCONNECTION PROCESS, AND WHAT DOES IT LOOK LIKE TO MOVE IT FORWARD? AND IF CHAIR ALLOWS, I'M GONNA ACTUALLY SPEND ABOUT 10 MINUTES TO JUST KIND OF UNPACK, BECAUSE WE'RE ASKING A LOT ATTACK AND STAKEHOLDERS OVER THE NEXT 12 WEEKS.
AND SO I WANTED TO SAY WHAT THE PROBLEM IS, HOW WE'RE TRYING TO ADDRESS IT, AND WHAT Y'ALL'S PART IS.
SO JEFF HAS BEEN, AND JEFF CAN TALK, TALK TO THIS SLIDE BETTER THAN I CAN, BUT I'LL JUST GIVE IT THE 32ND SHOT.
IT IS THE IDEA THAT THE CURRENT BATCH PROCESS AND WHAT, WHAT WE'RE INTRODUCING IS THAT LARGE LOADS TODAY, OVER 75 MEGAWATTS THAT WANT TO INTERCONNECT TO THE SYSTEM, ENTER A STUDY WITH THE TSP, IT COMES INTO ERCOT, STUDIES ARE GOING ON, AND THEN ANOTHER NEIGHBORING LOAD SHOWS UP AND ANOTHER NEIGHBORING LOAD SHOWS UP.
AND ALL OF A SUDDEN NOW WE HAVE AN OVERSUBSCRIBED AREA.
AND SO THESE PANCAKE OR STACKING EFFECT CREATES A NEED TO UD TO SAY, CAN I ACTUALLY HOLD ALL THREE OF THESE NOW? SO THAT LOOP IS THAT RED, YOU KNOW, SWIRL IN THE MIDDLE.
THERE IS, WE'RE STUCK AND WE NEED A WAY TO GET UNSTUCK.
AND SO THE IDEA IS WHETHER OR NOT WE BATCH THE PROCESS TOGETHER, USE SOME AREAS, CALL IT CLUSTER AND CALL IT WHAT YOU WILL.
BUT THIS IS A SYSTEM-WIDE PROCESS ACROSS ERCOT TO SAY, TAKE EVERYTHING THAT'S IN THE QUEUE, RUN IT THROUGH A SET OF CRITERIA AND SAY THAT IS WHAT WILL BE STUDIED.
AND THAT BECOMES THE ANSWER FOR THAT WAVE.
AND THEN WE GO TO ANOTHER BATCH.
AND SO WHAT WE'VE BEEN TALKING ABOUT WITH MARKET PARTICIPANTS IS, IF WE WERE TO IMPLEMENT SOMETHING LIKE THAT, WHAT DOES IT LOOK LIKE? AND SO WE PITCH THIS IN JANUARY.
I'VE NEVER BEEN INVOLVED IN SOMETHING LIKE THIS, BUT WE TALKED
[01:30:01]
TO 60 DIFFERENT COMPANIES.CLOSEST THING I'VE EVER BEEN TO SPEED DATING.
WHAT'S THE ISSUES, WHAT'S THE PROBLEMS? THESE ARE LANDOWNERS.
THESE ARE, UM, YOU KNOW, SOFTWARE COMPANIES.
THESE ARE, YOU KNOW, IT'S, IT IS EVERYBODY.
IT'S, IT IS NOT THE TYPICAL, IT'S NOT ALL Y'ALL, IT'S ALL THESE OTHER FOLKS TOO.
UM, AND THEN WE HAD OUR FIRST BATCH WORKSHOP.
AND SO THE PEOPLE THAT SHOWED UP ON FEBRUARY 3RD, WE HAD 175 IN THE ROOM.
WE HAD 600 PEOPLE ONLINE AND THEN SAID, OKAY, LET'S SEE HOW THIS GOES.
AND AT POINTS WE HAD 30 PEOPLE IN THE QUEUE READY TO ASK A QUESTION.
UM, AND SO WE'RE TRYING TO AVOID PROJECT SPECIFIC THINGS.
WE'RE TRYING TO STAY ON POLICY THINGS, BUT WHEN YOU HAVE EVERYONE WITH DIFFERENT INTERESTS AND DIFFERENT LEVELS OF, UM, KNOWLEDGE IN THE SYSTEM, IT'S, IT'S COMPLICATED.
SO WE DID GET WRITTEN COMMENTS IN, UH, WE'VE BEEN OPEN ABOUT RUNNING SURVEYS AND GETTING FEEDBACK.
AND SO OVER TO THE RIGHT IS WHAT WE'VE HARVESTED SO FAR IS THIS SWEET SPOT OF PEOPLE HOPE THAT ERCOT CAN WORK WITH THE TSPS TO FORMULATE A WAY TO RUN THIS PROCESS EVERY SIX MONTHS.
AND THAT WAY YOU COULD GET THESE WAVES GOING TWICE A YEAR, AND THEN THAT WOULD HELP INVESTMENT SIGNALS THAT WOULD GIVE ENOUGH TIME FOR STUDYING.
UM, YOU KNOW, IT, IT'S FUNNY WHEN WE RUN THIS SURVEY, IT'S LIKE, WELL, DO YOU WANT THIS OR THAT? AND THE ANSWER IS BOTH.
SO WE, WE ARE NOT GETTING A LOT OF, UM, WHAT DO YOU CALL IT, ABSOLUTES ON EITHER SIDE.
THERE'S A LOT OF COMPROMISE AND GIVE AND TAKE IN THIS.
SO I WON'T GO THROUGH ALL THESE BECAUSE THEY'RE AT THE WORKSHOP TOMORROW, BUT HERE'S, HERE'S Y'ALL'S ROLE.
AND THE BAD NEWS IS, I WAS JUST EMAILING SANDEEP UNDER THE TABLE HERE A FEW MINUTES AGO.
ERCOT BELIEVES THIS WILL BE AN NPR AND A PIGGER.
SO NOW WE'RE GONNA HAVE A COUPLE OF
I SAW THE, IT CREATES THE BENEFIT OF HAVING A PIGGER IS THAT THE DETAILS WILL LIVE WHERE ALL THE OTHER ACTIVITIES LIVE WITH IT.
UH, WE HAD HOPED TO, AND MAY STILL GO BACK TO WHETHER OR NOT AN OVERARCHING NPR THAT JUST SAYS, THIS IS THE LAW OF THE LAND FOR BATCH ZERO, AND THAT'S WHAT'LL TRUMP EVERYTHING ELSE.
BUT THE TEAM HAS BEEN ABLE TO START TO WEAVE THE STORY INTO IT.
AND WE'VE CREATED AN EASIER WAY TO UNDERSTAND WHAT'S BEING IMPLEMENTED AND HOW.
AND SO WHAT WE'RE LOOKING AT IS WE HAVE THIS WORKSHOP TOMORROW, AND THEN WE ARE DROPPING THE REVISION REQUESTS, WHICH ARE LIKELY AN NPR AND A PICKER.
AND THEN WE HAVE A WORKSHOP THE FOLLOWING WEEK, THEN THERE'S A SPRING BREAK WEEK, AND THEN WE MEET EVERY WEEK FOR THE END OF MARCH AND INTO APRIL.
AND THAT SETS THE STAGE FOR OUR SYMPATHIES TO EVERYONE THAT SPECIAL PRS INTACT MEETINGS AS NEEDED TO GET THIS WORK DONE.
SO THAT IS THE ROAD TO THE FINISH, RECOGNIZING THAT IT'S NOT EASY.
UM, BUT I THINK THAT WAS THE MAIN PIECE OF THE STAKEHOLDER PROCESS.
AND THEN IN TERMS OF THE WORKSHOP, MY APOLOGIES, WE HAVE NOT POSTED MATERIALS YET.
THEY'LL BE OUT AT FIVE O'CLOCK TODAY.
WE, WE WANTED TO HAVE AT LEAST A DAY AHEAD FOR EVERYONE TO CHEW ON IT, BUT WE DIDN'T GET THERE.
I'LL, I'LL JUST TAKE THE HIT ON THAT ONE.
UH, WHAT WE'RE GOING TO TALK ABOUT TOMORROW IS THE TIMELINE AND GOVERNANCE.
LIKE WE'VE SEEN, HOW DO WE GET TO THE END GAME ON THIS? THEN THAT HELPS REMIND THE STAKEHOLDERS OF WHAT WE TALK ABOUT AND WHAT WE DON'T TALK ABOUT, UH, WHAT THE OVERALL SCOPE OF THE STUDY IS.
SO AGENDA TWO IS WE'RE GONNA GO DEEP INTO HOW THE BATCH PROCESS, THE ASSUMPTIONS, THE MECHANICS OF THAT WORK, AND THEN A DEEP DIVE ON THE DESIGN ELEMENTS, WHICH IS ONE OF THE KEY PIECES IS HOW DOES THIS FIT INTO OVERALL TRANSMISSION PLANNING, UH, AND APPROVAL.
SO THERE'S A DEEP DIVE ON THAT.
AND THEN I DID KIND OF OPEN THE MICROPHONE UP TO IF THE MARKET PARTICIPANTS WANTED TO START TO PULL A THREAD, ONE OF THE THINGS THAT THE PUC DID NOT, UM, WHAT THEY ENCOURAGED AND DID NOT ENCOURAGE, WHICH IS THE ABSOLUTE WAS GET TO, SORRY, PUC GUIDANCE IS THE PROPER TERM TO COME BACK ON JUNE 1ST WITH BOARD CONSIDERATION APPROVAL OF A BATCH PROCESS OR BATCH ZERO PROCESS SPECIFICALLY.
AND IF YOU CAN ALSO FIGURE OUT THE CONTROL LOAD RESOURCE PATH, AND IF YOU CAN ALSO FIGURE OUT A, BRING YOUR OWN GEN SCENARIOS AND HOW THOSE FIT TOGETHER.
SO THE IDEA IS WE'RE STILL GONNA MAKE SPACE FOR WORKING THROUGH THAT, BUT WE HAVE TO FOCUS ON FIRST THINGS FIRST, AND THAT IS INDEED GETTING THE BATCHER PROCESS OUT.
SO, UH, THERE'LL BE 30 MINUTES FOR EACH OF THOSE TOPICS TO START TO GET IDEAS OUT ON THE TABLE.
UH, AND THEN WE'RE GONNA DO A POST-MEETING SURVEY.
UH, WE'RE AT THE END OF THE MEETING, WE'RE GONNA KIND OF OPEN UP THE MIC TO SAY, BASED ON THE QUESTIONS YOU'VE HEARD TODAY, THERE'S A LOT OF PEOPLE INVOLVED.
WHAT ARE THE BEST SURVEY QUESTIONS TO ASK? THEY'RE GONNA GET US INTO THE RIGHT SPOT.
SO, YOU KNOW, ERCOT DON'T GO OFF IN A VACUUM AND ASSUME THAT SOMEBODY WANTS TO CO-LOCATE THIS WITH THAT INTO THIS SCENARIO.
LET'S LET THIS COMMUNITY TELL US WHAT NEEDS TO BE DEVELOPED AND FIND WHERE THE CRITICAL MASS OF THOSE ELEMENTS ARE.
UH, THERE'S JUST NO WAY TO FIGURE OUT EVERY COMBINATION OF GENERATION AND LOAD THAT SOMEBODY COULD COME UP WITH.
YOU THINK ABOUT WIND, SOLAR BATTERIES, YOU KNOW, BIG LOAD, SMALL LOAD, A CLR CAN KIND OF MOVE, KIND OF NOT.
SO WE HAVE TO, WE HAVE TO GET THE UNIVERSE SMALLER INTO THESE OPTIONS OF WHAT WE'RE PURSUING.
[01:35:01]
AND THEN AGAIN, THE, THE BEAUTY OF HAVING THE NPR FILED NEXT WEEK IS NOW THEN ALL THE FORMAL PROCESSES BECOME PART OF A, UM, THOSE COMMENTS BECOME PART OF THE STAKEHOLDER PROCESS ON VETTING, RESPONDING TO AND WORKING THROUGH THOSE AT THE WORKSHOP.SO, UH, AGAIN, APOLOGIES FOR US NOT GETTING THE MATERIALS OUT SOONER.
UH, TOMORROW IS VERY MUCH A WORKING SESSION.
IT'S THE SAME STUFF WE'VE ALREADY BEEN TALKING ABOUT.
JUST GOING INTO THOSE DETAILS.
SO WITH THAT, WE'LL OPEN IT UP FOR QUESTIONS.
YOU HAVE A BUNCH OF QUESTIONS.
LET'S START WITH, DO YOU HAVE A WORKSHOP TOMORROW FOR SOME OF THOSE QUESTIONS? OKAY, THANKS.
LET'S, LET'S SEE WHAT THE QUESTIONS ARE.
UH, LET'S GO TO IAN, MATT, ON YOUR TIMELINE.
UM, SO I'M JUST GONNA ASK YOU, IS THIS ONE UPDATED TO THE DATES YOU WERE CONSIDERING CHANGING FROM THE LAST WORKSHOP? THESE ARE THE DATES THAT WERE, YES.
SO FOR EXAMPLE, MARCH 30TH IS CORRECT NOW.
UM, APRIL 9TH IS CORRECT NOW 'CAUSE I HAD THAT ON GCPA BY ACCIDENT, SO YES.
UM, WE CAN, WE CAN DISCUSS THIS FURTHER, BUT IF THERE SOUNDS LIKE THERE WILL BE A PICKER SO WE CAN DISCUSS IF WE NEED A SPECIAL ROSS MEETING.
WE DIDN'T SCHEDULE ANY EXTRA ROSS MEETINGS.
AND SO THERE IS THIS CONCEPT OF HOW MUCH DO YOU LET THE TASK FORCE VET AS MUCH AS YOU CAN AND THEN GET IT IN FRONT OF THE GROUPS THAT ARE GONNA BE VOTING ON IT TO CYCLE THROUGH THEIR QUESTIONS TOO.
SO, UM, AGAIN, MAYBE THIS IS THE, THIS IS THE NEWS AND NOW HOW DO WE ADAPT TO IT AND SEE HOW TOMORROW GOES.
DOES OTT VISION, TOMORROW'S MEETING BEING A HALF DAY OR FULL DAY? FULL DAY, SORRY, FOUR 30.
NINE 30 TO 4 31 HOUR LUNCH IN THE MIDDLE.
IS THAT YOUR WHOLE QUESTION? ONE OF THOSE, PLEASE.
YOU COULDN'T TEXT THAT TO HIM.
THE HOT CALENDAR DOESN'T ALWAYS HAPPEN IN TIME, SO YES.
UH, JIM OVER HERE WITH, UH, CENTER POINT ENERGY.
SO MY, MY QUESTION IS MORE MAY IT'S NOT AS EASY AS JOHN'S QUESTION AH, BUT, UM, IT, IT'S MORE OF A, MORE THE IMMEDIATE TERM TO KIND OF HELP MY COMPANY BETTER UNDERSTAND ERCOT VISION, UM, FOR THE INTERACTION BETWEEN THE RTP, THE RRP G BATCH ZERO.
SO THIS, THIS COULD BE BETTER SUITED AS AN ANSWER FOR TOMORROW'S WORKSHOP.
SO I'LL, UM, UH, UH, I, I RECOGNIZE THAT, BUT SO IT WAS, IT WAS COMMUNICATED THAT, UM, TO THE MARKET THAT UNTIL BATCH ZERO NPRR IS EFFECTIVE, THAT THE TSP SHOULD CONTINUE FOLLOWING PICKER ONE 15 PROVISIONS.
AND SO THIS MEANS THAT IF A LOAD EDITION THAT COMES TO US NOW, UH, DRIVES TRANSMISSION UPGRADES, TSP SHOULD FILE AN RPG PROJECT.
UM, PIVOTING OVER TO THE RECENTLY ADOPTED PUC 58 4 80, THE LOW FORECASTING CRITERIA RULE IN PARAGRAPH H OF THAT RULE, IT STATES THAT ERCOT MUST USE THE LOAD DATA SUBMITTED IN THE 2026 RTP COMPLIANCE, COMPLIANCE FILING IN ERCOT INDEPENDENT REVIEW OF ANY RPG PROJECTS THAT ARE SUBMITTED UNTIL ERCOT CONSTRUCTS NEW PLANNING CASES WITH THE LOAD DATA.
SO THEN MY QUESTION IS IN THE MEDIA TERM, RIGHT, IF A LOAD EDITION THAT DRIVES AN RPG PROJECT IS NOT PART OF A TSPS 2026 RTP COMPLIANCE FILING, HOW WILL ERCOT HANDLE THE EIR? YOU ARE NOT THE FIRST ONE TO ASK THE QUESTION AND I THINK BARKSDALE AND OUR LEGAL GROUP HAVE TALKED ABOUT, SO TOMORROW WE COULD TAKE THAT QUESTION ON.
CHRIS MATOS, GOOGLE, I, SO I AM CURIOUS, DO WE INTEND TO JUST STRUCTURE THEM AS OPEN WORKSHOPS OR DO WE THINK WE'LL KIND OF THEMATICALLY TAKE ON VARIOUS ISSUES WITHIN THESE WORKSHOPS? YEAH, I GUESS THIS MEANS HERE, MY THOUGHT IS TO START TO HAVE THEMATIC, WELL, MAYBE NOT A THEMATIC WORKSHOP.
IT'S THE, THE FIRST TWO HOURS ARE GONNA BE DEDICATED TO X, THE NEXT TWO HOURS WILL BE DEDICATED TO Y AND NEXT ONE IS Z.
BECAUSE WHAT WE CAN'T HAVE IS JUST A CLR WORKSHOP ONLY AND CLOSE THE DOOR ON EVERYTHING ELSE.
'CAUSE I THINK WE NEED TO KEEP MOVING THE BALL ON THINGS, FOR EXAMPLE.
SAME THING ON THE TRANSMISSION PLANNING.
WE DON'T WANNA SPEND THE WHOLE DAY ON THAT AND MISS THE CHANCE TO MOVE THE BALL FORWARD ON THINGS.
SO, AND NOT THE LACK OF END TIMES MEANS YOU MIGHT KEEP US HERE TILL MIDNIGHT.
THE WHAT THE LACK OF END TIMES MEANS YOU MIGHT THREATEN TO KEEP US HERE TILL MIDNIGHT.
THERE, THERE HAVE BEEN TALKS LIKE THAT.
SOMEBODY TALKED ABOUT ORDERING DINNER FOR SOME OF THESE MEETINGS.
I'M SORRY THAT WAS A DIFFERENT MEETING.
IF ERIKA GETS THE WORKSHOP DINNER, THEY HAVE TO GET TACK DINNER IN MAY.
IT'S NOT EVEN A REQUEST, IT'S A MANDATE.
IF FOOD IS THE CONSTRAINT, WE SHOULD BE TALKING ABOUT THAT.
UM, SORT OF GOING OFF CHRIS'S QUESTION, AND, AND MATT WE'VE SPOKEN ABOUT THIS, I THINK YOU AND LARGE LOAD WORKING GROUP AND WHOEVER ELSE JUST BE THINKING
[01:40:01]
ABOUT, BECAUSE AFTER THE BATCH ZERO, YOU KNOW, THIS, THIS WORKSHOP RUN TO BATCH ZERO, THERE'S STILL GOING TO BE BATCH ONE C-L-R-B-Y-O-G.SO THINK ABOUT THE BEST FORUM FOR THAT AS AN EXISTING WORKING GROUP TASK FORCE.
VERY GOOD QUESTION BECAUSE YOU WILL GET REQUESTS TO HAVE, YOU KNOW, CERTAIN MEETINGS FOCUSED ON, ON SPECIFIC TOPICS.
SO YEAH, YOU'RE HITTING THE NAIL ON THE HEAD BECAUSE WE ARE GONNA START PARKING DECK ITEMS THAT AREN'T NECESSARILY PART OF BATCH BUT ARE PART BATCH ZERO, BUT MAYBE PART OF THE LONGER TERM DESIGN AND HOW DO WE TACKLE THOSE? YEAH.
ONE, UH, I, I NOTICED YOU HAVE CO-LOCATION WITH GENERATION ON HIGHLIGHTED IN THERE ON SOME OF THE THINGS THAT TO CONSIDER APPRECIATE THAT.
UM, AS GENERAL PSA, I KNOW WE'VE, YOU KNOW, TOLD YOU THIS BEFORE AND OTHERS HAVE HEARD IT, YOU KNOW, BYOG AND CO-LOCATED WITH EXISTING GENERATION DO HAVE SOME, YOU KNOW, SLIGHT DIFFERENCES.
SO I WANT TO MAKE SURE THAT WE'RE JUST FLAGGING THAT TO KEEP SPACE TO, TO TREAT BOTH, UH, APPROPRIATELY.
UM, SO THAT, THAT'S JUST GENERAL COMMENT.
UM, QUESTION FOR YOU ON THE TIMELINE.
SO WE'VE GOT THE MONTHLY TAC UPDATES, WE'VE GOT A WHOLE LOT OF WORKSHOPS.
UM, YOU MENTIONED THAT WE MIGHT, YOU KNOW, DIVE INTO CERTAIN DETAILS IN CERTAIN, IN OTHER WORKSHOPS.
DOES THAT, UM, I WAS A LITTLE UNCLEAR FROM YOUR LAYOUT.
ARE YOU PLANNING TO HAVE ALL OF THE NPRS PLUS PIGGER, UH, RELEASED AT THE SAME TIME? OR WILL THOSE BE COMING IN IN SERIAL? YEAH, SO, AND I MEANT TO ADD THIS, SO THE ONE WE'VE BEEN FOCUSING ON, THE ONE ON THE SCREEN FROM MARCH 4TH IS JUST THE PIGGER SLASH NPR FOR BATCH ZERO VANILLA, GENERIC.
THEN THE IDEA, MY THING WOULD BE IS WHETHER A MONTH LATER IS THE DEADLINE FOR AN APRIL 4TH TYPE FILING OF ANY REVISION OR NPRS FOR THAT CONTROLLABLE LOAD OR THE CO-LOCATED GENERATION.
AND SO AS WE'RE THINKING THROUGH WHAT THIS SEQUENCE LOOKS LIKE, IS IT, IT MAY BE THAT SOME OF THOSE LATER WORKSHOPS BECOME MORE FOCUSED ON THE SUBSEQUENT NPRS YES.
AND THEN THE, THE EARLIER ONES, IT'S POSSIBLE THAT WE MAY HAVE PRS KICK IT PRS AND OR ROSS, YOU KNOW, SEND IT TO AS EARLY AS THE APRIL TAC MEETING FOR WHERE THOSE MIGHT COME TO US.
I, I AM NOT SAYING THAT'S HAPPENED.
I'M JUST TRYING TO SET EXPECTATIONS FOR THIS GROUP ON WHEN, WHEN IS IT GOING TO BE POTENTIALLY, WHAT'S THE EARLIEST POINT AT WHICH WE COULD, YOU KNOW, HAVE CRUNCH TIME FOR US.
'CAUSE I LOOK AT THIS SCHEDULE AND YOU'VE GOT 1, 2, 3, UH, DIAMONDS IN THAT SECOND TO BOTTOM ROW.
MY THINKING IS NOTHING'S GONNA GET APPROVED EARLY.
WE JUST NEED TO BE READY TO MUSCLE THROUGH IT ALL.
SO THE IDEA OF HANGING ONE UP ON THE SHELF AND SAYING, APRIL WE GOT IT, AND HERE'S, THERE'S A LOT OF, UM, THERE'S A LOT OF PLAY IN A LOT OF THESE THINGS MM-HMM
AND, UM, I DON'T THINK, WE'LL, I DON'T THINK THERE'S AN EASY BUTTON TO SAY THAT'S OUTTA THE WAY.
NOW I WILL SAY WE ARE LOOKING FOR THOSE OTHER, UH, CO-LOCATED GEN AND CLRS TO BE SOMETHING WORKED WITH WHERE ERCOT WILL FILE THOSE SO THAT IT FITS WITH THE INFLIGHT ACTIVITIES.
SO LET'S SAY THE BATCH ZERO GOES FORWARD, THESE OTHER NPRS WILL FIT IF APPROVED AND READY, BUT IF THEY'RE NOT APPROVED, THIS BATCH ZERO WILL STILL WORK WITHOUT 'EM.
SO THAT WAY EVERYTHING FITS TOGETHER.
IT'S A SMALL MODULAR REVISION REQUEST.
AND, AND THE REASON, THE ONLY REASON I FLAGGED THAT IS BECAUSE, LIKE YOU SAID, THIS IS, WE, WE ALL KNOW THIS IS GONNA BE A, A, YOU KNOW, A DETAILED AND TOUGH CONVERSATION.
AND WHEN WE'VE HAD THOSE IN THE PAST, SOMETIMES IT HAS HELPED TAC TO HAVE MULTIPLE DISCUSSIONS WHERE THIS WHOLE GROUP CAN REALLY DIVE IN AND MAKE SURE THAT WE'RE, WE'RE MAKING THE, THE RIGHT DECISION FOR, FOR TEXAS AND THE, IN THE, IN THE MARKET.
SO, UM, THANKS FOR THAT BE THAT'S WHAT WE WERE TRYING TO ACCOMPLISH.
YOU KNOW, THERE MIGHT NOT BE VOTING LANGUAGE COMPLETELY FINISHED IN APRIL, BUT I THINK WE WANT TO GIVE PRS AN OPPORTUNITY TO START HAVING FOCUSED DISCUSSIONS LIKE THEY WILL VOTE ON THIS, WHICH THEY WILL.
AND THEN, YOU KNOW, THE, THE TECH MEETING IN APRIL, MAYBE IF, IF MATT HAS IDENTIFIED AREAS WHERE WE NEED KIND OF A DIRECTIONAL GUIDANCE FROM, FROM TECH OR IF PRS HAS, THAT WAS SORT OF MY, MY THOUGHT THERE BECAUSE I THINK, YOU KNOW, AS MATT DESCRIBED ON THE SLIDE, HE HASN'T SEEN ANYTHING LIKE THIS BEFORE.
THEY'VE DONE THESE INTERVIEWS, THEY HAVE 700 PEOPLE AT THE WORKSHOP.
THIS IS A DIFFERENT ENVIRONMENT.
SO I AM SORT OF ANTICIPATING, YOU KNOW, A LITTLE BIT OF A BREAKDOWN THERE WHEN WE GO FROM, FROM A WORKSHOP TO THESE 34 PEOPLE HAVE TO VOTE ON THIS.
SO I, EVEN IF THE LANGUAGE ISN'T READY, I THINK WE SHOULD START ACTING LIKE WE'RE GOING TO VOTE ON THINGS IN, IN APRIL.
[01:45:01]
AGREE 100%.AND IF NOTHING ELSE, WE MAY NOT DECONSTRUCT THE TASK FORCE AT EVERY MEETING, BUT ALBEIT EVERY ROS ATTACK AND CONTROL AND, UM, LARGE LOAD WORKING GROUP OF WHAT ARE THE KEY ISSUES THAT ARE RESOLVED AND NOT RESOLVED.
SO AT LEAST EVERYONE KNOWS WHERE WE'RE AT.
IS THE, UH, BYOG BRING YOUR OWN GENERATION? IS THAT NEW GENERATION OR IS THAT CONTRACTS WITH EXISTING GENERATION? THAT'S WHAT WE'RE IT COULD BE EITHER.
WE'RE TRYING TO FIGURE THAT OUT.
I THINK IT'S MORE FOCUSED ON THE NEW, BUT WE, I DON'T KNOW.
WE'LL, WE'LL SEE WHAT COMES UP TOMORROW.
WE'RE TRYING TO FIGURE OUT WHICH ISSUES WE HAVE TO TACKLE AND WHAT ARE THE PRIORITY ONES.
HEY, SAM, BRANDON WITH AGENT DICK.
I GUESS JUST TO MAKE SURE I HEARD CORRECTLY, SO FOR THE FOLLOW ON RULES TO BE SUBMITTED AROUND APRIL, ERCOT ISS ENVISIONING THOSE TO BE ERCOT SPONSORED, UM, EFFORTS RATHER THAN STAKEHOLDER? YEAH, I MEAN, ANY STAKEHOLDER CAN DO ANYTHING THAT THEY WANT, BUT ERCOT IS WILLING TO SPONSOR THOSE TO TRY AND GET IT TO ALL FIT TOGETHER, SO.
AND THEN FOR THOSE, UH, RULE REVISIONS SUBMITTED IN APRIL, THERE'S STILL THE POSSIBILITY OF BEING INCLUDED IN BATCH ZERO, BUT IT JUST HAS TO MEET THE TIMELINE.
AND WE DEFINITELY WANT THE SCOPE OF THOSE TO BE FOCUSED ON WHAT IS BATCH ZERO CAPABLE NOT TO COME UP WITH NEW IDEAS THAT DON'T FIT INTO THIS DESIGN REALM.
YOU'RE, YOU'RE TRACKING, I'M TRACKING WITH YOU.
NED, DO YOU HAVE A NEW QUESTION? OKAY.
ANY OTHER QUESTIONS OR COMMENTS FOR MATT? THAT WAS, THAT WAS PRETTY EASY ACTUALLY, MATT.
YOU GOT UP EASIER THAN, THAN KEITH TODAY? I THINK SO.
UH, THE LAST PRIORITY ITEM ON OUR LIST IS THE LARGE ELECTRONIC LOAD RIDE THROUGH REQUIREMENTS.
UM, WE'RE GONNA HEAR FROM ERCOT AND THEN I JUST WANTED A, A UPDATE FROM ROSS AS WELL.
HELLO EVERYONE, THIS IS PATRICK WITH ERCOT.
UM, I CAN GIVE THE UPDATE ON NOER 2 82.
IT'LL JUST BE A VERBAL UPDATE.
UM, IT IS STILL TABLED AT ROSS AND I THINK SANDEEP KIND OF MAYBE MENTIONED A LITTLE BIT, BUT WE, IT'S REFERRED TO DWG AND SPWG.
SO WE MET WITH DWG DISCUSSED NORE 2 82 ON, UH, FEBRUARY 12TH.
UH, REALLY DISCUSSED THE A EP COMMENTS FROM FROM DECEMBER.
UH, THERE ARE A COUPLE OF MODIFICATIONS THAT A EP WAS SUGGESTING.
UM, DWG IS LOOKING TO ENDORSE NORE 2 82 WITH SOME REVISIONS.
UM, A COUPLE OF THOSE REVISIONS FROM A EP COMMENTS, UM, AND A COUPLE OTHER SMALL LANGUAGE THINGS FOR CLARITY.
UH, SO THEY'RE GONNA REPORT BACK AT ROSS ON, ON MARCH 5TH.
UM, I THINK ERCOT IS GOING TO ULTIMATELY SUBMIT SOME COMMENTS, UM, AT DWGS, UM, REQUEST FOR THOSE REVISIONS.
UH, PROBABLY ABOUT THE SAME TIME AS AS ROSS HAPPENS AS WELL.
UM, WE DISCUSSED AT SPWG, UH, YESTERDAY, UH, SPWG HAD NO OBJECTIONS, NO REAL COMMENTS.
UM, THEY WERE PRETTY GOOD WITH THE, UM, REQUIREMENTS, THE TECHNICAL REQUIREMENTS AS WRITTEN.
YOU KNOW, WE SPECIFICALLY, UM, TALKED ABOUT AND AN OVER CURRENT ALLOWANCE DURING A VOLTAGE DISTURBANCE FOR THE CONSTANT POWER LOAD.
UM, AND THEY WERE GOOD WITH THAT, UH, THRESHOLD THAT ERCOT ORIGINALLY PROPOSED.
UM, SO THEY'RE GONNA REPORT BACK TO ROSS AS WELL THAT THEY'RE, UM, ENDORSING AND GOOD WITH THE, UM, NO OR NO OBJECTIONS TO THE REQUIREMENTS.
UM, WE ALSO DISCUSSED NOER 2 82 AT LLWG ON FEBRUARY 19TH.
UH, WE MOSTLY DISCUSSED THE ERCOT JANUARY 30TH COMMENTS.
UH, WE WENT OVER SOME OF THE CHANGES TO THE EXEMPTION CRITERIA.
UH, IN THOSE COMMENTS WE TALKED ABOUT, UM, SOME OF TESLA'S COMMENTS.
UM, ERCOT ACCEPTED, GENERALLY ACCEPTED THOSE COMMENTS AND ADDED THAT LANGUAGE WITH A SMALL, UM, LANGUAGE CHANGE.
UM, WE ALSO DISCUSSED THE ONWARD ENERGY COMMENTS ABOUT HER, HOW ERCOT WOULD HANDLE EVENTS, UM, WITH CO-LOCATED LS AND GENERATION.
UM, WE RESPOND, ERCOT RESPONDED TO THOSE COMMENTS AS WELL.
AND, UH, THE DATA CENTER COALITION INTRODUCED THEIR COMMENTS, UM, THAT THEY SUBMITTED A COUPLE WEEKS AGO.
UH, ERCOT IS WORKING ON A RESPONSE TO THOSE COMMENTS AS WELL.
[01:50:01]
IS STILL LOOKING FOR SOME TECHNICAL REQUIREMENT COMMENTS FROM THE DA DATA CENTER DEVELOPERS.UH, WE ASKED TO HAVE THOSE COMMENTS BY THE END OF FEBRUARY.
UM, SO WE COULD ADDRESS THOSE COMMENTS AND MAYBE DISCUSS THEM AT THE NEXT LLWG ON MARCH 13TH.
BUT WE ARE STILL TARGETING A, AN APRIL ROSS VOTE.
UM, AND I BELIEVE IT'S, UH, EARLY MAY T VOTE IS STILL THE TARGET DATE.
UM, THAT'S ALL I HAVE FOR THE NOER 2 82 UPDATE.
ANY QUESTIONS FOR PATRICK? GO AHEAD.
HAS ERCOT RECEIVED ANY ADDITIONAL, UH, DIRECTION FROM THE COMMISSION ABOUT THE VOLTAGE WRITE THROUGH REQUIREMENTS? NOT THAT I'VE HEARD.
UM, MY DIRECTIVE FROM THE ENGINEERING SIDE OF THE HOUSE IS TO PROCEED WITH THE TECHNICAL REQUIREMENTS AND WORK THROUGH THE WORKING GROUP MEETINGS ON THE TECHNICAL REQUIREMENTS.
UH, I HAVEN'T HEARD ANYTHING ELSE ABOUT FROM THE PUC.
UM, SO I THINK LAST, UH, LLWG MEETING, WE ALSO HAD A PRESENTATION FROM JONATHAN ABOUT, UH, LOAD SMOOTHING.
UH, NOT EXACTLY LOAD SMOOTHING, BUT SSR UH, DO WE HAVE ANY DIRECTIVES ON LOAD SMOOTHING APART FROM WHAT JONATHAN PRESENTED LAST TIME ON, UH, HOW MANY ON, ON IN TERMS OF FREQUENCY OF HOW MANY TIMES IT CAN GO BEYOND 10 MEGAWATT IN ANY DIRECTION? ON, ON THAT AS WELL BECAUSE WE, WE ARE TRYING TO BUILD, UM, OUR DATA CENTER, SO WE JUST NEED TO UNDERSTAND HOW DO WE, UH, PROCEED WITH THE DESIGN AND STUFF.
I, I BELIEVE THEY'RE WORKING ON THOSE REQUIREMENTS AND THEY PLAN ON GETTING THOSE SUBMITTED, UM, SOON.
I DON'T HAVE THE EXACT TIMELINE FOR THAT.
IF SOMEONE ELSE FROM ERCOT WANTS TO CHIME IN ON THIS ONE, I DON'T SEE ANYONE.
ONE OF THE QUESTIONS I HAD PROBABLY CARRIES OVER A LITTLE BIT FROM THE LLWG IN THAT THERE WAS A REQUEST FOR ADDITIONAL STUDY ON HOW BEST IMPROVE OR BEST ON THE SYSTEM CAN IMPROVE THE OVERALL GRID RELIABILITY THROUGH, UH, LARGE LOAD LOSS CONTINGENT OR LARGE LOAD LOSS PLANNING.
AND I WAS WONDERING IF ERCOT WAS GONNA DO ANY ADDITIONAL FOLLOW UP ON THAT IN TERMS OF LOOKING AT ANCILLARY SERVICE PRODUCTS OR OTHER GRID FACING SOLUTIONS AND MARKET FACING SOLUTIONS THAT COULD ULTIMATELY PROBABLY BETTER ADDRESS THE ACTUAL RELIABILITY OF QUESTION AT HAND.
AND, AND SOME OF THIS RIGHT STEMS FROM THE INCREASED BATTERY STORAGE IN, IN ONE OF THE LLWG REPORTS THAT SHOWED THE SYSTEM COULD HAVE GREATER CAPACITY FOR, UH, THE OPERATING LIMITS.
SO Y'ALL WENT FROM I THINK 2,800 TO 3,500 IN THAT, IN THAT REPORT.
AND SO I WAS JUST WONDERING IF THERE'S ANY FOLLOW UP FROM ERCOT ON, ON FURTHER STUDY OF THAT, OF THOSE SOLUTIONS.
UH, I BELIEVE THOSE STUDIES ARE STILL BEING WORKED ON.
WHEN THOSE RESULTS ARE READY, UH, WE WILL BRING THAT TO THE APPROPRIATE WORKING GROUP.
UH, BUT REGARDLESS OF WHAT THOSE STUDIES TELL US, WE ARE PROCEEDING WITH THE, WITH THE RIDE THROUGH REQUIREMENTS ON THE LARGE ELECTRONIC LOADS.
UM, ERCOT UM, STRONGLY BELIEVES THAT, UM, THIS ISSUE NEEDS TO BE ADDRESSED FROM BOTH SIDES.
IT'S GONNA REQUIRE BOTH THE LARGE, THE RIGHT VOLTAGE, RIGHT, THE REQUIREMENTS AND SOME SYSTEM IMPROVEMENTS TO, TO ADDRESS THE RISK I RIGHT.
AND, AND SOME OF THIS DOES STEM IN, IN GOOGLE OR OTHERS ARE WORKING ON COMMENTS ON IT, THAT CURRENT PROPOSAL, THE, THE RANGE THAT ERCOT IS WANTING IS, IS BEYOND THE LIMIT OF CURRENT TECHNOLOGY IN SOME AREAS.
AND SO WE DO STILL FEEL STRONGLY THAT GRID FACING SOLUTIONS ARE ABSOLUTELY NECESSARY AND AN UPDATE ON THE TIMELINE OF THOSE REPORTS WOULD BE REALLY HELPFUL.
WHETHER THAT'S AN L AN, I ASSUME THAT THAT UPDATE COULD BE AT LLWG.
I'LL TAKE THAT BACK AND I'LL SEE WHAT KIND OF TIMELINE WE'RE LOOKING AT, UM, FOR THAT, FOR THAT STUDY.
UM, SANDEEP OR SHANE, ARE YOU ON FOR ROSS TO, TO UPDATE US ON THE RIDE THROUGH REVISION REQUEST TOO? YEAH, I'M HERE.
[01:55:01]
UPDATE.OF COURSE, PATRICK DID A GREAT JOB OF SUMMARIZING ALL THE COMMENTS, UH, AND ALL THE DISCUSSIONS WE'VE HAD.
UH, AT THE PREVIOUS ROSS, WE DID GO THROUGH THE PRIORITY AND THE TIMELINES THAT YOU ALL HAVE LAID OUT.
WORKING GROUPS ARE AWARE OF THAT AND AT LEAST WE ANTICIPATE WORKING THROUGH THESE, UH, COMMENTS AND APPROVALS BY APRIL.
UH, PENDING ANY, ANYTHING NEW, UH, THAT, THAT THAT'S FILED THAT'S, UH, OUT, OUT OF WHAT HAS BEEN DISCUSSED SO FAR? SO FAR? UM, IT SEEMS LIKE OUR CARD HAS BEEN WORKING WELL WITH ON COORDINATING AND ACCEPTING CHANGES, UH, PROVIDED BY STAKEHOLDERS SO THAT, THAT WOULD BE THE LAST UPDATE FOR THIS.
ANY OTHER QUESTIONS OR COMMENTS ON THIS? OKAY.
[9. Large Load Working Group (LLWG) Report (Vote)]
LET'S GO TO LARGE LOAD OF WORKING GROUP.IF YOU HAVEN'T HAD ENOUGH LARGE LOAD DISCUSSION ALREADY THIS MORNING, HERE WE GO.
NOTHING HAPPENING HERE AT ALL.
ALL, ALL LARGE LOADS ALL THE TIME.
UM, SO AS, AS UM, MATT JUST POINTED OUT, WE HAVE A VERY AGGRESSIVE ERCOT WORKSHOP LED PROCESS.
WHILE I WOULD LOVE TO TAKE A BREATH ON THE LARGE LOAD WORKING GROUP, WE PROBABLY CAN'T DO THAT EITHER.
THERE'S STILL A NUMBER OF ITEMS THAT ARE REQUIRED THAT NEED TO MOVE FORWARD THAT ARE NOT PART OF THE BATCH PROCESS.
SO THOSE ARE, UM, NOBU 2 82 SSO REQUIREMENTS.
UM, WE'RE GONNA BE TALKING ABOUT, UM, THE REALISTIC CONSTRUCTION TIMELINES FOR LARGE LOADS, MODELING ASSUMPTIONS AND BOTH THE CLR AND BRING YOUR OWN GENERATION.
IF MATT CAN SOLVE THAT IN THE BATCH PROCESS, GREAT.
BUT, UM, I SUSPECT THERE'S GONNA BE MORE WORK TO BE DONE ON THAT.
FEBRUARY 19TH MEETING WE HAD THE, THE GRID ASTOR PRESENTATION.
UM, IT WAS, IT WAS FRANKLY QUITE, QUITE IMPRESSIVE.
UH, THEY WERE RUNNING 16,000 CONTINGENCIES PER RUN.
EVERY RUN THEY DID WAS UNDER WAS UNDER A MINUTE UM, THIS WAS A REAL LOAD THAT THEY SIMULATED IN 2031, UM, OUT IN, IN WEST TEXAS.
THAT WOULD BE THIS, THIS.HERE.
UM, AND THEY LOOKED AT ALL OF THAT, A LOT OF SKEPTICISM AT FIRST AND HOW FAST THIS THING RAN.
THEN THE MODEL DID A SELF CHECK ON ITSELF AFTER IT COMPLETED, AND THAT SEEMED TO QUIET DOWN A LOT OF THE, UM, A LOT OF THE CONCERNS.
UH, THEY WENT THROUGH SOME OF THEIR CERTIFICATIONS AND THOSE THINGS AS WELL.
UM, CERTAINLY NOT THE COMPLETE SOLUTION TO THE BATCH STUDY, BUT A LIKELY A SIGNIFICANT, UM, AID TO THAT PROCESS.
UM, CLAYTON GREER GAVE HOW HE THINKS BATCH STUDIES SHOULD BE DONE.
MATT GAVE AN UPDATE ON THE BATCH PROCESS.
JONATHAN GAVE AN UPDATE ON LLL, UH, LEL POWER VARIATIONS.
PATRICK, UM, RESPONDED TO THE DATA CENTER COALITION ON NORE 2 82 AND SUN W TALKED ABOUT THE DYNAMIC MODEL SUBMISSIONS FOR LARGE LOADS.
UM, SO THERE WERE CONCERNS EXPRESSED, PARTICULARLY BY ME, UM, ON THIS MODELING PROCESS THAT ERCOT IS, IS WANTING COMPLETELY UNDERSTAND WHY THEY WANT THEM, BUT THEY WANT, THEY WANT FULL AND COMPLETE MODELS GOING INTO THE LLIS STUDY, THAT COULD BE UP TO SIX YEARS BEFORE THE LOAD ACTUALLY ENERGIZES.
IF YOU THINK ABOUT AN ANALOGY OF WHAT ERCO ISS ASKING FOR, THEY WANNA KNOW WHAT THE RE HOW A 28, IPHONE 2023 IS GOING TO OPERATE.
LARGE LOADS ARE HAVING A DIFFICULT TIME PREDICTING THAT THAT FAR IN THE FUTURE, THE EQUIPMENT THEY'RE GOING TO INSTALL HAS NOT EVEN BEEN DESIGNED YET.
UM, AND SO WE'RE GONNA HAVE TO THINK, I THINK ABOUT HOW WE, HOW WE DO MODELING GOING FORWARD.
WE'RE GONNA NEED SOMETHING, UM, THAT DOES A BETTER JOB OR DOES IT A WHOLE LOT FASTER THAN WHAT WE CAN DO TODAY.
UM, UH, THIS IS ANOTHER ISSUE THAT'S ABOUT TO COME TO YOU.
UM, IT'S LARGE LOAD OSCILLATIONS.
THE ISSUE IS SUB SYNCHRONOUS OSCILLATIONS CAN TEAR, CAN TEAR, UH, SYNCHRONOUS GENERATORS APART.
ERCOT, UM, IS LOOKING AT, AND THEY FLOATED THIS PROPOSAL FOR THE FIRST TIME THAT THEY WOULD LIMIT ALL LARGE LOADS, UM, TO NO MORE THAN 10 MEGAWATT SWING OVER ROLLING FIVE SECOND WINDOW.
UM, THERE WAS SOME DISCUSSION OVER, WELL, MAYBE IT SHOULD BE SITE SPECIFIC OR CUT CLEARLY DEFINED THAT IF THEY DID SITE
[02:00:01]
SPECIFIC LIMITATIONS THAT WOULD ALLOW THINGS TO GO BIGGER THAN THIS, THEN POTENTIALLY WE ARE RESTRICTING WHERE FUTURE SYNCHRONOUS GENERATORS CAN BE INSTALLED ON THE SYSTEM.UM, AND I DON'T THINK ANY OF US WANT THAT.
UM, ERCOT SUGGESTED THEY COULD SOLVE THIS.
UH, THEY COULD, UM, THEY WOULD NEED TO INSTALL, UH, PHASER MEASUREMENT UNITS NEAR THE, NEAR THE LOADS.
THERE WAS SOME CHATTER IN THE, IN THE MEETING THAT THOSE MIGHT NOT BE THE RIGHT, THE RIGHT TOOLS.
UM, AND THERE'S A LOT OF CONCERN OVER HOW TO MEASURE THIS, UM, IN, YOU KNOW, MULTIPLE TIMES PER SECOND AND THE DATA STORAGE THAT'S GONNA BE REQUIRED THERE.
BUT THOSE ARE ALL THINGS WE'RE GONNA HAVE TO FIGURE OUT.
UM, FOR THAT REASON, WE CAN'T JUST GET RID OF THE LARGE LOAD WORKING GROUP, ALTHOUGH I'D LIKE TO TAKE A BREAK FOR TWO MONTHS, BUT THAT'S NOT GONNA HAPPEN.
UM, MARCH 13TH, WE'RE GONNA TALK ABOUT DATA CENTER, BUILD OUT TIMELINES.
UM, WE WILL LIKELY TALK ABOUT CLRS AND BRING YOUR OWN GENERATION, THOSE SSO REQUIREMENTS AND CONTINUE DISCUSSION ON NOER 2 82.
WHILE THESE MIGHT PLAY INTO BATCH STUDIES IN THE FUTURE, THEY'RE NOT REALLY DIRECTLY PART OF THE BATCH PROCESS AT THIS POINT.
AND WITH THAT, I SEE MR. BARNES IN THE QUEUE.
BOB, I HAD A QUESTION ON THE GRID ASTRA, UM, EFFORT.
IT WASN'T, IT'S NOT CLEAR WHAT THIS TOOL'S INTENDED TO DO.
ARE WE, IS THIS CONTEMPLATED TO, TO BE THE SYSTEM TO PERFORM THE BATCH STUDY OR TO ASSIST IN SOME WAY? I THINK IT'S TO ASSIST IN SOME WAY, BUT I'M HAPPY TO LET SOMEONE FROM ERCOT RESOURCE INTEGRATION.
AND WILL THIS CHANGE THE SIM FORMAT OF ALL THE DATA YOU SUBMIT FOR THE NETWORK MODEL? 'CAUSE THAT WOULD BE A BIG PROBLEM.
I DON'T BELIEVE SO BECAUSE THEY'RE RUNNING ON THE CURRENT ERCOT MODELS, WAS MY UNDERSTANDING.
SO THIS, THIS WOULD SOMEHOW INTEGRATE IN THE CURRENT PROCESS AND NOT CHANGE THE FORMAT OF THE INFORMATION THAT YOU HAVE TO SUBMIT TODAY? I DON'T BELIEVE IT'S GONNA CHANGE THE FORMAT.
I MEAN, THEY, THIS WAS A REAL, THIS WAS A REAL STUDY.
THEY RAN ON THE REAL 20 20 31, UH, REGIONAL TRANSMISSION PLAN.
SO, AND THEN, UM, WE REALLY VALUE OUR MONTHLY UPDATES FOR THE LARGE LOAD INTERCONNECTION QUEUE.
THE, UH, THEY, AND I THOUGHT WE HAD MADE THE DECISION.
THEY'RE NOT, WE DID, DID, AND I SCREWED THAT UP.
JUST TO CONFIRM, WE, THEY WILL BE AT L-L-L-W-G IN THE FUTURE.
THEY, THEY, THE FORMER CHAIR WILL SEE IF HE'S ABOUT TO BE THE CURRENT CHAIR OR NOT, UM, SHOULD HAVE PUT THAT ON THE AGENDA.
AND BOTH HE AND THE VICE CHAIR MESSED THAT UP.
SO THINK ABOUT THAT WHEN WE GET TO THE NEXT PART OF THIS, WHICH IS APPROVING THE CHAIR AND VICE CHAIR FOR NEXT YEAR.
THERE'S A LOT GOING ON, SO I GET IT.
DO YOU HAVE A RECOMMENDATION ON HOW WE VOTE ON
UH, ERIC, UM, JUST TO FOLLOW UP ON BILL'S QUESTION ABOUT THE REPORT, I APPRECIATE THAT YOU DIDN'T PUT ON THE AGENDA, BUT DID ERCOT CREATE THE PRESENTATION AND PUBLISH IT ANYWHERE? I DON'T BELIEVE THEY DID.
SO HOW IS THAT YOUR FAULT? BECAUSE IF I HAD PUT IT ON THE AGENDA, ERCOT WOULD'VE GENERATED THE REPORT.
I'M, I'M SURPRISED THAT THEY'RE NOT ALREADY GENERATING IT.
I THOUGHT THAT WAS KIND OF WHAT THE EXPECTATION WAS.
I'M NOT ASKING YOU TO ANSWER THAT QUESTION, OBVIOUSLY, ERIC, WE, YEAH, WE FRANKLY SCREWED UP.
UM, DOES ERCOT PLAN TO PUBLISH THAT SOON? HEY, ERIC, THIS IS AG SPRINGER ERCOT.
SO, UH, UH, WE CAN, UM, LOOK AT, AT DOING A, UH, A FEBRUARY UPDATE AND ADDING IT TO THE LWG MEETING PAGE, UH, SOMETIME THIS WEEK.
UM, YOU KNOW, AS, AS MATT, MATT COMMUNICATED, YOU KNOW, THERE'S QUITE A LOT OF WORK WITH THE, THE BATCH STUDY GOING ON AND, UH, JUST, UH, UH, WITHOUT IT ON THE AGENDA, UH, WE NEGLECTED TO POST IT, BUT WE CAN, UH, UH, GENERATE AND GO BACK.
I, I GUESS, ERIC, I'D ASK YOU THOUGH, DO YOU REALLY WANT A FEBRUARY UPDATE OR WOULD NEXT LLWG IS MARCH 13TH? I DON'T WANT ERIC OUT TO DO TWO BETWEEN NOW AND I, I APPRECIATE THAT.
UM, YOU KNOW, JUST THIS IS ONE OF THE MOST IMPORTANT INDICATORS IN THE AIRCAP MARKET RIGHT NOW.
BUT YOU KNOW, WHETHER THE ANSWER IS 236 OR 245 OR 310, DOES IT MAKE ANY DIFFERENCE? I THINK IT DOES.
[02:05:04]
NO PROBLEM.YEAH, BOB, I, I CAN COORDINATE WITH YOU ABOUT, UH, WELL, WE CAN GENERATE IT AND, UH, WE WILL, WE WILL GET IT POSTED.
UH, DURGA, UH, I, I, I ASKED THIS QUESTION LAST TIME IN THE BATCH LLWG MEETING AS WELL.
IS THERE ANY DIRECTIVE ON HOW THE FICTITIOUS GENERATORS THAT NEEDS TO BE ADDED TO SOLVE THE CASE? I, I'M SORRY, I I CAN'T HEAR YOUR QUESTION.
COULD YOU SPEAK LOUDER? SOMEBODY IN THE ROOM.
CAN YOU HEAR ME NOW? YEAH, TRAIN.
WHAT ABOUT, CAN YOU HEAR ME NOW? WORSE.
UH, SO WE, WE TALKED ABOUT, I ASKED THIS QUESTION IN THE LAST LLWG MEETING ABOUT ADDING FICTIOUS GENERATOR INTO THE STUDIES, UH, TO MAKE THE CASE SOLVE.
UM, IS THERE ANY DIRECTIVE RIGHT NOW THAT'S, UH,
UH, IS THERE A DIRECTIVE ON HOW TO ADD THE FICTIOUS GENERATORS BECAUSE THE LOCATION OF THE FICTIOUS GENERATOR IMPACTS THE RESULTS? SO IS THERE ANY DIRECTIVE THAT'S, UH, THAT OUR COURT IS WORKING ON RIGHT NOW? AG? CAN YOU TAKE THAT ON? THAT, THAT'S SOMETHING I THINK WE WILL TOUCH ON AT TOMORROW'S WORKSHOP.
SO I THINK IT'S BEST TO LEAVE THE DISCUSSION TILL THEN.
UH, MY, MY SECOND QUESTION IS, UH, I THINK SOMETIME IN DECEMBER LAST YEAR OR JANUARY, WE HAD THIS, UH, UH, THE, THIS, UH, GRAPH FROM A TC, I THINK FROM PJM, UH, WITH THE RAMP RATE AND THE AMPLITUDE OF THE LOADS WHERE SHOWCASED, UH, IT WAS.
SO, IS, IS THERE SOMETHING SIMILAR TO THAT THAT REPORT IS WORKING ON RIGHT NOW FOR OUR DESIGN PURPOSES? APART FROM WHAT, UH, JONATHAN SHOWED LAST TIME, UH, I'M SORRY.
I'M NOT SURE WHAT GRAPH YOU'RE REFERRING TO.
SO YEAH, I, I THINK IT, IT NOTHING MORE THAN WHAT JONATHAN SHOWED AT THE WORKSHOP, OR SORRY, AT THE, UH, LOWG MEETING.
UH, BUT WE ARE WORKING ON REVISION REQUESTS THAT WOULD LAY OUT WHAT THOSE SPECIFIC REQUIREMENTS ARE.
SO NO RESTRICTION ON RAMP RATES AND AMPLITUDE YET? UH, NOT, NOT AT THIS TIME.
MARTHA HENSON, I APPRECIATE THE UPDATE THAT PATRICK GAVE EARLIER ON NO, GO 2 82.
I THINK MAYBE THAT ISSUE HAS HAD A LITTLE BIT LESS VISIBILITY HERE OVER THE LAST SEVERAL MONTHS SINCE IT'S BEEN, AS IT'S BEEN WORKED ON.
AND GIVEN THAT THERE'S PROBABLY ONLY TWO MORE LLWG REPORTS THAT YOU'LL BE GIVING BOB, UH, PRESUMING MARCH AND THEN APRIL, AND THEN WE'LL NEED TO CONSIDER ATTACK VOTE ON THAT ITEM.
IF, IF THERE'S SOME WAY YOU COULD MAYBE WORK WITH PATRICK AND POTENTIALLY SANDEEP IF NEEDED, TO SORT OF START BRINGING A MORE GRANULAR BREAKDOWN OF ISSUES THAT HAVE BEEN RESOLVED AND ARE STILL OUTSTANDING AND LIKE MORE OF A PAPER TRAIL ON WHERE THE ISSUES ARE WITH THAT NOUR STARTING NEXT MONTH.
I THINK THAT WOULD BE SORT OF INFORMATIVE TO PEOPLE.
UH, BECAUSE I THINK THAT THE SECOND REPORT IN APRIL THAT YOU GIVE IS KIND OF THE LAST
AND SO IF Y'ALL COULD THINK ABOUT DOING THAT LIKE IN A LITTLE MORE DETAIL NEXT MONTH AND IN APRIL, THAT COULD BE REALLY HELPFUL.
I THINK CERTAINLY IN MARCH WE NEED TO DO THAT.
APRIL, WE MAY ALREADY HAVE A RECOMMENDATION FROM ROS BEFORE, UM, LLWG MEETS.
SO REALLY APRIL OR MARCH IS GONNA BE REALLY IMPORTANT.
AND, UM, I GUESS JUST TO THE EXTENT THAT THERE'S NOT A CLEAR RECOMMENDATION OR CONSENSUS AT LLWG, BUILDING THAT INTO THE RECORD SOMEWHERE, EVEN JUST IN SLIDES, I THINK IS GONNA BE REALLY IMPORTANT.
UM, SANDE, YEAH, BACK ON THE QUESTION ON THE CHARTS, UH, THAT'S MORE OF A QUESTION TO AG IN DECEMBER.
I THINK WE, WE ALL SUBMITTED RESPONSES TO THE RFIS THAT WILL GIVE YOU OR GIVE
UH, WILL THAT BE REFLECTED IN THE NEXT CHART THAT GETS POSTED? AND WILL THAT CHANGE, DO YOU ANTICIPATE CHANGE, UH, THAT IT'LL CHANGE THE, THE GIGAWATTS, WHETHER IT'S 200 OR TWO 30 OR, UH, OR, OR THAT FORECAST, OR IS IT DRIVEN BY A DIFFERENT SOURCE? HEY, SANDEEP, UH, SO I CAN'T COMMIT, WE'RE STILL PROCESSING, PROCESSING THE RFI RESPONSES, SO I CAN'T COMMIT TO WHETHER IT WILL IMPACT DATA FOR FEBRUARY.
I WOULD EXPECT IT TO BE REFLECTED IN THE MARCH UPDATE.
UM, YOU KNOW, TO THE EXTENT THAT WE ARE MADE AWARE THAT PROJECTS HAVE WITHDRAWN, THAT WOULD OBVIOUSLY BE REFLECTED.
[02:10:01]
SOME OF THE, THE INFORMATION THAT'S ASKED FOR IN THE RFI IS NOT REALLY DIRECTLY REFLECTED IN THOSE CHARTS.SO, UM, THERE MAY BE SOME SHUFFLING, BUT I, I DON'T KNOW HOW VISIBLE, VISIBLE IT'LL BE IN THE, IN THOSE CHARTS SPECIFICALLY.
YEAH, I, IF ANY, YOU MAY SEE MORE REQUESTS IN THAT THAN WHAT YOU WERE AWARE OF.
MANNY, YOU WANNA READ YOUR QUESTION OR WOULD YOU LIKE ME TO DO IT? UH, EITHER WAY, BOB, WHICHEVER WORKS FOR ME.
SO THE ONLY QUESTION I HAD, I, I SAW THE MARKET MINISTER FROM LAST, FROM YESTERDAY OR A COUPLE DAYS AGO, UM, HAD A QUESTION ON AND ALSO SAW THE MATERIALS FROM THE, FROM THE BOARD MEETING.
BUT DOES IT EFFECTIVELY PLACE A CAP OR LIMIT ON THE LOADS BE INTERCONNECTING TO THE FAR WEST TEXAS SYSTEM? IT SEEMED, IT WOULD SEEM THAT A LOW WIND, NO SOLAR SCENARIO WOULD BE, WOULD BE PRETTY CONSTRICTING.
SO I WANTED TO GET SOME, UH, IF THERE WAS ADDITIONAL COLOR THAT ERCOT CAN PLACE, UH, CAN PROVIDE, THAT WOULD BE VERY HELPFUL.
AND THAT QUESTION'S ERCOT, RIGHT? YEAH, THAT'S RIGHT.
I, I CAN SPEAK TO THAT ONE AS WELL.
UM, SO THE INTENT IS NOT TO PLACE A, A CAB.
IT IS, UM, TO RECOGNIZE THAT, YOU KNOW, THERE IS NOW A RELIABILITY ISSUE THAT HAS BEEN IDENTIFIED IN THAT AREA.
AND TO ENSURE THAT THE, UH, PLANNING ASSESSMENTS, UH, THE INTERCONNECTION STUDIES ARE, UM, ASSESSING THE IMPACT OF THE PROPOSED LOADS ON THAT, UH, UH, RELIABILITY, UH, ISSUE HAS BEEN IDENTIFIED.
AND SO, UM, THE REQUIREMENT IS THAT IF, IF THE STUDIES DID NOT PREVIOUSLY CONTAIN A NO SOLAR SCENARIO, UM, THEN THEY NEED TO BE UPDATED WITH ONE.
AND THAT WOULD, UH, BE APPLIED TO ANY PROJECTS THAT HAVE NOT MET, UH, SECTION 9.5 OF THE ER COMP PLANNING GUIDE.
UH, SO WE RECEIVED THE MARKET NOTICE, UH, THIS MONTH, UH, THIS WEEK.
UH, ONE QUESTION, AG FOLLOW UP QUESTION ON THAT.
SO WHAT CASE WOULD BE PICKED UP FOR THAT SENSITIVITY? IS IT, UH, SUMMER P CASE OR HRML CASE? SO, UH, THERE IS NO CURRENT, NO DEDICATED, NO SOLAR OR PEAK NET LOAD CASE.
THAT IS, I BELIEVE SSW IS IN THE PROCESS OF CREATING THE FIRST ONE.
BUT, UM, I, IF, UH, IN THE MEANTIME, UH, TSPS, UH, SHOULD REACH OUT TO THE ERCOT LARGE LOAD INTEGRATION TEAM, I THINK WE'VE ALREADY GOTTEN SEVERAL INQUIRIES.
UM, AND SO WE'RE WORKING WITH TSPS TO HELP THEM, UH, ESTABLISH THE STUDY CRITERIA.
SO THIS IS FOR A NIGHTTIME SCENARIO, RIGHT? AG UH, SO THE BEST DISPATCH CAN BE TO FULL AT THIS TIME BECAUSE WE ARE THINKING NO SOLAR SCENARIO.
SO IT IS, UM, PRACTICAL TO DISPATCH THE BEST OF FULL.
IS THAT A FAIR ASSUMPTION? UH, I, I DON'T THINK I'M READY TO, TO COMMENT ON SPECIFIC STUDY ASSUMPTIONS.
WE'RE WORKING WITH, UH, THE TSPS TO DEVELOP THOSE, BUT WHAT EXACT SCENARIO ARE WE TALKING? IT'S A, IT'S A STEADY STATE STUDY IS A SNAPSHOT SCENARIOS, RIGHT? SO IT'S NOT A, LIKE, IT'S NOT LIKE 87 60 STUDY.
SO WHAT SNAPSHOT SCENARIO ARE WE TRYING TO REPLICATE HERE? THE INTENT IS TO REPLICATE A NO SOLAR OR LOW WIND TYPE SCENARIO.
YEAH, I'M JUST TRYING TO CONNECT THIS CONVERSATION WITH THE CONVERSATION WE WERE HAVING EARLIER.
NO, NO, THEY'RE ALL CONNECTED.
YEAH, THEY'RE ALL CONNECTED, RIGHT? IT'S A, IT'S A SHENANIGAN QUESTION.
SO IT'LL BE AN ACTION ITEM AS IT AS ERCOT IS LOOKING AT THE NO SOLAR SCENARIO.
WILL THAT INCORPORATE ANYTHING THAT COMES OUT OF THE NPR 1315? UH, WHATEVER COMES OF THAT? UH, I DON'T KNOW THAT I HAVE A RESPONSE AT THIS TIME ON THAT PARTICULAR INTERACTION.
IT WAS FOR QUESTION JUST CAME TO MIND EVAN, EVAN A WITH LANCIA.
I HAVE JUST A COUPLE QUESTIONS HERE.
UM, I GUESS FIRST IS, DO THESE CASES EXIST TO PERFORM THESE STUDIES? SO, AS I SAID A MOMENT AGO, S-S-W-G-I BELIEVE IS DEVELOPING THEM, BUT THEY DO NOT CURRENTLY, UH, EXIST.
SO THIS, THIS SCENARIO CANNOT BE STUDIED AS IS RIGHT NOW, NOT WITH AN OFF THE SHELF CASES.
[02:15:02]
OKAY.IT LOOKS LIKE IT'S SIMILAR TO, TO WHAT BAR ROTH HAD PUT IN THE CHAT IS, UM, IT JUST SEEMED LIKE THERE WERE SOME INCONSISTENCIES WITH THE MARKET NOTICE AND THE MATERIALS THAT WERE PROPO OR SHARED WITH THE BOARD ABOUT WHAT COUNTIES REALLY IMPACTED THE, UH, IROL THAT IS, UM, BEING DISCUSSED.
AND SO I'M JUST KIND OF CURIOUS WHY THE, UH, INCLUSION OF COUNTIES FOR THE MARKET NOTICE WAS, WAS SO BROAD WHEN, UM, IT DOESN'T SEEM LIKE LOAD ADDITIONS IN THOSE COUNTIES WOULD HAVE ANY IMPACT ON THE EXISTING ROOLS.
UM, SO JUST TO ANSWER THAT QUESTION, WE, WE DID DO AN EVALUATION ON WHAT SUBSTATIONS HAVE, UH, WHERE IF YOU WERE TO ADD LOAD TO THAT SUB SUBSTATION WOULD HAVE A NEGATIVE IMPACT ON THE FAR WEST, UM, IOL AND THOSE WERE THE COUNTIES, UH, THOSE COUNTIES INCLUDED THOSE SUBSTATIONS AND THOSE WERE THE COUNTIES THAT WERE INCLUDED IN THE, IN THE MARKET NOTICE.
ARE, ARE Y'ALL PLANNING ON SHARING THE DETAILS OF THAT ANALYSIS? I'M GUESSING, I'M JUST CURIOUS WHAT THE, THAT THRESHOLD IS.
SO THEY'RE BASICALLY ANY COUNTY THAT HAS A, A HURTING SHIFT FACTOR OR HAS A HURTING SHIFT FACTOR, UM, I DON'T KNOW IF WE CAN NECESSARILY SHARE THAT JUST BECAUSE OF THE ECII, BUT, UH, I'LL SEE WHAT WE CAN, WHAT WE CAN DO.
I MEAN, JUST 'CAUSE THINKING OF SENSITIVITY THERE, LIKE IS IT A 1% HURTING SHIFT FACTOR, LIKE A 15% HURTING SHIFT FACTOR, I THINK WOULD, WOULD BE, UM, SIGNIFICANT INFORMATION.
AND THEN JUST ONE LAST CLARIFICATION QUESTION ON THE MARKET NOTICE ITSELF IS AJ, YOU JUST SAID THAT IT ONLY APPLIES TO LOADS THAT HAVEN'T MET THE SECTION 9.5 REQUIREMENT.
SO WHAT ABOUT LOADS THAT ARE KIND OF OUTSIDE THAT INTERIM PROCESS? SO I, I COULD THINK THAT THERE'S PROBABLY LOADS ON THE SYSTEM THAT HAVE MET 9.5 REQUIREMENTS, BUT MAYBE HAVEN'T MET 9.4 REQUIREMENTS BECAUSE THEY WEREN'T REQUIRED TO MEET 9.4 REQUIREMENTS OR, OR, YOU KNOW, CAN YOU JUST HELP ME RECONCILE, UM, THINGS THAT WERE OUTSIDE THE INTERIM LARGE LOAD PROCESS WHERE THOSE FIT IN? SO, UM, IF, IF STUDIES ARE NOT COMPLETE, THIS APPLIES TO AS, AS WELL.
SO, UM, YOU KNOW, IF THE PROJECT HAS NOT MET SECTION 9.4, WHICH IS THE COMPLETION OF STUDIES, THEN UH, THAT WOULD ALSO FALL UNDER THE SCOPE OF THE NOTICE AND THAT NEED TO BE UPDATED.
SO ANY PROPOSED RPG PROJECT WITH LOADS THAT MEET THAT IN, UM, THOSE COUNTIES WOULD, WOULD BE IMPACTED? YEAH, I'M SORRY.
I DON'T HAVE THE NOTICE PULLED UP IN FRONT OF ME RIGHT NOW.
UH, BUT YEAH, IT'S, IT'S INTENDED TO IMPACT ANY INTERCONNECTION STUDIES IN BUROUGHS INTERCONNECTING IN THAT REGION.
I APPRECIATE, UH, THE ANSWERS.
UM, BAR, HEY, BAR, I GUESS I'M TRYING TO UNDERSTAND WHAT ARE THE OUTCOMES OF THE STUDY? WHAT ARE THE CONCLUSIONS AND HOW DOES IT IMPACT THE LOADS THAT ARE IN THESE COUNTIES? THE, THE GRID AFTER STUDY OR NO, NO, NO.
THE MARKET NOTICE, THE, SO THE, THE MARKET NOTICE REQUIRES THAT THE INTERCONNECTION STUDIES FOR PROJECTS IN THE AFFECTED COUNTIES BE UPDATED TO INCLUDE A, UH, NO SOLAR SCENARIO, UM, TO ASSESS THE IMPACT ON THE, UM, THE I RLS THAT HAVE BEEN IDENTIFIED.
AND SO, UH, THE OUTCOME COULD BE A CHANGE TO THE PREVIOUS, UH, STUDY RESULTS.
UM, AND SO, UH, YEAH, THAT, THAT'S THE POTENTIAL OUTCOME.
SO IF, IF A LOAD THAT WAS, THAT, THAT SATISFIED 9.4 NOW WORSE SINCE THE IROL WITH THE SHIFT FACTORS, THAT APPROVAL WILL BE TAKEN UP, TAKEN BACK BY OUR CARD.
IS THAT ACCURATE? YES, PER, I THINK IT'S PARAGRAPH EIGHT OF THE, UH, SECTION 9.4.
THIS WOULD CONSTITUTE A MATERIAL CHANGE TO THE STUDY ASSUMPTIONS AND REQUIRE THE STUDIES TO BE UPDATED.
UH, JOHN RUSH, JOHN RUSH SUBURB WITH TIEC.
UM, DOES, DOES ERCOT PLAN TO HAVE KIND OF, I, WELL, ONE, I APPRECIATE ERCOT HAVING SUCH A ROBUST DISCUSSION, UH, WHEN THIS WASN'T REALLY ON THE AGENDA, BUT DOES ERCOT PLAN TO HAVE A MORE ROBUST DISCUSSION ON THIS?
[02:20:01]
UM, AT SOME STAKEHOLDER FORUM? I, I JUST ASKED BECAUSE THERE WAS A PREVIOUS KIND OF CONSENSUS AT ATTACK MEETING THAT TO THE EXTENT POSSIBLE, ERCOT WOULD AVOID GOVERNING OR CHANGING POLICIES THROUGH MARKET NOTICES AND NOT WORKING THROUGH THE STAKEHOLDER PROCESS.UM, AND SO I'M HOPEFUL THAT, UH, THERE WILL BE MORE DISCUSSION ON THIS THERE.
HEY, JOHN? YEAH, I, UH, CERTAINLY AM HAPPY TO SUPPORT DISCUSSION THAT OTHER, OTHER FORMS OF STAKEHOLDERS WOULD LIKE TO CONTINUE IT, BUT I WOULD NOT CHARACTERIZE THIS AS A CHANGE IN POLICY.
UH, THIS IS A NEWLY IDENTIFIED RELIABILITY RISK THAT, UM, YOU KNOW, PER OUR RELIABILITY OBLIGATIONS NEEDS TO BE ALSO ASSESSED, UH, FOR PROJECTS THAT ARE, UH, LOOKING TO INTERCONNECT IN THAT REGION.
UH, SO I, I WOULD CHARACTERIZE THIS NOT AS A POLICY CHANGE, BUT AS A, UM, A CHANGE TO OUR UNDERSTANDING OF THE SYSTEM THAT PER EXISTING LANGUAGE THAT HAS BEEN APPROVED BY STAKEHOLDERS IN THE COMMISSION, IN THE PLANNING GUIDE, UH, MODIFIES, UH, THE STUDY ASSUMPTIONS FOR LOADS LOOKING TO INTERCONNECT IN THAT REGION.
AND AS A RESULT, UH, THE PLANNING GUIDE REQUIRES THAT THOSE STUDIES BE UPDATED.
I, I APPRECIATE THAT CLARIFICATION.
I GUESS, UM, MY POINT WAS THAT CURRENTLY THE PLANNING GUIDE LISTS THE STUDIES THAT, UH, LOAD INTERCONNECTING LOADS HAVE TO GO THROUGH.
AND THIS WOULD NOT BE ON THAT LIST, RIGHT? NO.
THIS, THIS WOULD BE A MODIFICATION TO BOTH THE STEADY STATE AND POTENTIALLY THE STABILITY STUDIES, UH, WHICH ARE, ARE DESCRIBED IN SECTION 9.3 IN THE PLANNING GUIDE.
UH, SANDY, CAN I, CAN I INTERJECT HERE? ARE THERE QUESTIONS RELATED TO THIS WORKING GROUP PRESENTATIONS STILL OUTSTANDING, OR THE REST JUST ABOUT THE MARKET NOTICE? I DON'T, I DON'T MEAN THIS IN A MEAN WAY, IT'S A REAL QUESTION.
UM, OKAY, SO LET, BUT LET'S TAKE QUESTIONS FIRST.
IF WE, WE NEED BOB UP HERE STILL.
I, I HAVE ONE ON THE NEXT ISSUES, THE SSO REQUIREMENTS, ARE WE HEADED TOWARDS A REVISION REQUEST THERE? YES.
AND THEN, UM, ON THE CLR AND BYOG, JUST COORDINATE WITH MATT.
I THINK WE'RE TRYING TO KEEP, YOU KNOW, ABSOLUTELY THE NEW INFORMATION AT THE BATCH AND THE UPDATES THERE, BUT, BUT THAT'S WHAT YOU'RE ALREADY DOING.
AND THEN ON SLIDE FOUR, NEXT TIME, CAN YOU PUT EMOJIS? CAN YOU SAY LIKE, CLEAN GRID, DID THIS SAD FACE OR HAPPY FACE? UM, OKAY.
WOULD YOU LIKE TO TAKE QUESTIONS ON THE MARKET NOTICE NOW, OR DO YOU WANT LIKE A BREAK AND TO COME BACK AFTER LUNCH AND, AND MAYBE RESUME QUESTIONS ON THAT? UH, I WILL DEFER TO THE, THE WILL OF TACK ON THAT ONE.
I'M, I'M HAPPY TO SUPPORT EITHER WAY.
I THINK IT'S, IT'S UP TO YOU, BUT TO THE EXTENT IT'S SORT OF A BIG DISCUSSION IN ITS OWN DISCUSSION, UM, IF ORCUTT WOULD RATHER DO THAT LATER UNDER ORCUTT REPORTS OR OTHER BUSINESS, UM, WE, WE CAN DO THAT, OR WE CAN SEE IF WE CAN WRAP UP WITH THESE THREE QUESTIONS NOW.
I THINK LET'S, LET'S SEE IF WE CAN, CAN WRAP UP RATHER THAN BREAKING UP THE DISCUSSION.
SO, EXTERNAL EXIT STRATEGY THAT I'VE GOT IS HATCHING OUT RIGHT NOW, OR THAT'S, THAT'S GONNA TAKE SOME TIME FOR THE GTCI.
I'M SORRY, UH,
CAN YOU REPEAT PLEASE? UH, IS THERE AN EXIT STRATEGY FOR THIS GTC THAT'S ALREADY PLANNED OUT OR IT'S GONNA TAKE SOME TIME TO COME UP WITH AN EXIT STRATEGY FOR THIS GTC, THESE TWO GTCS ACTUALLY NOT TOO FAR EAST, SOUTH TO FAR WEST THAT I'M LOOKING TO SEE IF, UH, SO THIS IS FRED.
I CAN, I CAN PROBABLY HELP WITH THAT.
UM, SO THAT, THAT'S CURRENTLY BEING EVALUATED BY OUR, UH, ASSISTANT PLANNING TEAM.
UM, AND I THINK KEITH ALLUDED TO THIS EARLIER, BUT I THINK ULTIMATELY WHAT IT, WHAT IT WILL BE IS, IS THE 7 65 KV WILL PROBABLY BE, THAT PART OF IT WILL BE THE, THE EXIT STRATEGY.
BUT, UH, OFFICIALLY THAT'S BEING REVIEWED, ANALYZED, AND I EXPECT THAT SHOULD BE, UH, PRESENTED, UH, SOMETIME IN THE NEAR FUTURE.
SO WE SHOULD BE, UH, LIVING WITH THESE TWO GTC STILL 2030.
IS THAT, IS THAT TRUE? IF 7 65 ARE THE SOLUTION, THEY'RE GONNA COME IN 2030.
SO IS THAT THE SOLUTION? AND, AND IF YES, THEN YEAH, IT, IT KEEPS BINDING FOR WESTERN FAR WEST PROJECT.
SO JUST TRYING TO UNDERSTAND IF WE HAVE TO LIVE WITH THIS FOR THE NEXT FOUR
[02:25:01]
YEARS.AND IS THERE A STUDY THAT'S COMING? BECAUSE THERE IS NO SPECIFIC STUDY REPORT THAT SHOWS THE HOW THE GTC CAME ALONG.
I, I THOUGHT IT'S A VSAT ISSUE, BUT IS THERE A REPORT THAT'S COMING ALONG FOR THESE GTCS? SO IT, INITIALLY WHEN WE, WHEN WE EVALUATED, UH, IT WAS A THERMAL CASCADING, UH, CONSTRAINT.
UH, AND, AND THAT'S WITH ALL LINES IN SERVICE.
UH, AS YOU CAN IMAGINE, UH, THERE ARE SOME OUTAGES THAT WILL NEED TO BE TAKEN IN THE, UH, FAR WEST TO HELP CONSTRUCT ADDITIONAL, UH, TRANSMISSION.
BUT WHAT WE ARE SEEING IS THAT, UH, DEPENDING ON WHAT LINES ARE OUTAGE, IT CAN INTRODUCE A VOLTAGE STABILITY PROBLEM.
UM, SO THESE ARE ALL THINGS THAT WE ARE LOOKING AT, WE ARE CONSIDERING.
UM, BUT IT, IT, IT, IT CAN BE OF OLD STABILITY PROBLEM UNDER CERTAIN CONDITIONS, UM, AND CERTAIN OUTAGES.
IF, IF SOME AN INTERIM SOLUTION IS SOMETHING THAT WE CAN COME UP WITH, THAT'LL BE GREAT BECAUSE IF WE KEEP ON WAITING FOR THE SEVEN 60 FIVES TO HAPPEN, THEN IT'S FOUR YEARS AND PROJECTS WHICH ARE IN WESTERN AND FOREST SEE THESE TWO GTCS BINDING AND IMPACTS THE, ANY PROJECT THAT SETTLES IN UP IN NORTH HUB, IT, IT JUST, UH, IS A LOT OF, UH, FINANCIAL HIT.
SO, UH, IF THERE'S INTERIM SOLUTION THAT CAN COME UP, THAT'LL BE, THAT'LL BE GREAT, RIGHT? AND, AND THAT'S SOMETHING THAT AT LEAST FROM A RELIABILITY PERSPECTIVE, WE, WE WE'RE LOOKING AT EVERY DAY, UM, UH, BECAUSE THIS IS A VERY IMPACTFUL, UH, CONSTRAINT.
UM, AND THAT'S SOMETHING THAT WE ARE, ARE ACTIVELY INVESTIGATING AND SEEING WHAT, WHAT OPTIONS WE HAVE, UM, AND, AND HONESTLY WILLING TO, UM, ENTERTAIN ANY IDEAS.
I THINK FREDDY ACTUALLY JUST ANSWERED MOST OF MY QUESTION RELATED TO IF IT'S A THERMAL OR VOLTAGE STABILITY ISSUE.
BUT YEAH, I GUESS MAYBE THERE'S, UM, SOLUTIONS THAT COULD BE MADE FOR THE VOLTAGE INSTABILITY AND THEN USE RE-DISPATCH FOR THE THERMAL ISSUES.
THANKS, UH, SETH? YEAH, I, I ACTUALLY THINK ERCOT IS DOING THE RIGHT THING HERE.
I KNOW IT'S A CHANGE IN POLICY, BUT IF WE DON'T DO THIS AND WE CONTINUE TO HAVE LOAD COME INTO THE FAR WEST, WE'RE JUST GONNA PROCURE MORE CONTRACTS FOR CAPACITY AND INTERFERE WITH THE MARKET.
SO I, YOU KNOW, I THINK ERCOT IS DOING THE RESPONSIBLE THING HERE WITH THIS CHANGE.
UM, NEXT UP ON THE AGENDA IS, IS THE BIGGER IDIOT THEORY.
AND, UM, WE DID PULL THE LARGE LOAD WORKING GROUP FOR STUPID VOLUNTEERS, AND WE HAVE THE SAME IDIOTS WE HAD LAST TIME.
SO, UM, YOU COULD, I WOULD RECOMMEND YOU PUT THIS ON THE COMBO BALLOT, HOWEVER, I WOULD BE OKAY IF SOMEONE SAID THIS WAS A REALLY BAD IDEA AND HAD A BIGGER IDIOT.
I THINK IT'S A GREAT IDEA AND WE SHOULD PUT IT ON THE COMBO BALLOT.
UH, SO WE'RE GONNA PUT LWG LEADERSHIP ON THE COMBO BALLOT.
UM, I'LL BE FEELING LUNCH RIGHT NOW, OR ARE WE FEELING ANOTHER COUPLE OF REPORTS? OH, MAN, I'M GETTING CONFLICTING.
LET'S DO THE RMS UPDATE SO THAT YOU, SO YOU DON'T HAVE TO STAY UNTIL AFTER LUNCH
OH, THAT'S, WE DO NOT HAVE LARGE SLOWED ITEMS. YEAH.
[10. RMS Report (Vote)]
WE DO HAVE ONE ITEM, UH, FOR TAC APPROVAL, AND THAT IS THE RMS, UH, OBJECTIVES, WHICH COREY IS GONNA PULL UP.WE DISCUSSED THESE AT THE LAST RMS AND THAT THEY'RE, THEY ARE A CARRYOVER FROM WHAT WE HAD ESTABLISHED IN 25.
THE ONLY, UH, CHANGE THAT IS BEING MADE IS THE REMOVAL OF 25 TO MAKE THEM LESS TIME STAMPED.
SO RECOMMENDATION IS THAT THIS ITEM BE PLACED ON THE COMBO BALLOT.
NO OTHER UPDATE FROM RMS. JUST, JUST A COUPLE QUICK THINGS.
REAL QUICK, WHAT WE ACCOMPLISHED THE LAST MEETING, WE DID APPROVE ALL OF OUR WORKING GROUP LEADERSHIP.
WE APPROVED SERVICE LEVEL AGREEMENTS FOR, UM, MARKET DATA TRANSPARENCY, RETAIL IT
[02:30:01]
SERVICES, AND THE RETAIL LISTSERV ALSO APPROVED TWO CHANGES TO TEXAS SET, UH, FOR A FUTURE TEXAS SET RELEASE.UH, THE RETAIL OR THE TEXAS RETAIL MARKET TEST PLAN IS LARGELY FINISHED AS FAR AS EDITS AND DISCUSSIONS ARE UNDERWAY.
NOW, WHETHER OR NOT THAT TEST PLAN SHOULD RESIDE IN THE PROTOCOLS OR IN THE RETAIL MARKET GUIDE.
AND WE'RE CONSULTING WITH, UH, ERCOT MARKET RULES ON THAT.
AND LAST, THE MARCH RMS HAS BEEN CANCELED.
SO WE ARE LOOKING TO APPROVE THE RMS STRATEGIC OBJECTIVES WITH THE BIG CHANGE OF TAKING THE YEAR OFF.
CAN WE PUT THIS ON THE COMBO BALLOT? AWESOME.
[11. ROS Report (Vote)]
DO HIS REPORT.IF WE CAN BRING UP OUR SLIDES FOR THE FE ROSS MEETING.
WE HAVE, UH, TWO, COUPLE, UH, TWO VOTING ITEMS FROM THIS ROSS.
UH, BOTH WERE IMPACT ANALYSIS, UH, THAT WE HAD LOOKED AT LANGUAGE IN THE PAST.
FIGURE 1 39 WAS A FAIRLY ADMINISTRATIVE TYPE WORK, UH, THAT HELPS CLEAN UP SOME DEFINITIONS AND, UH, OR OTHER LOCATIONS OF DEFINITIONS.
AND NO, 2 81 ALSO WENT THROUGH, UM, OWG AND, UM, WAS APPROVED.
AND THIS IS, AGAIN, IMPACT ANALYSIS THAT WE SAW EARLIER, UH, IN THE DAY, UM, THE NPRR 1307 CONTINUES TO BE DISCUSSED AT WMS. MOVING ON INTO ROSS ACTIONS.
UM, WE HAVE, SO WE HAVE ABOUT, UH, COUNTED.
WE HAVE 25 REVISION REQUESTS, UH, IN OUR QUEUE, UH, OF DIFFERENT SORTS.
UM, 10 OF THEM I THINK, ARE RELATED TO LARGE LOADS.
UH, SOME OF THEM WOULD, ONE OF THEM WAS DISCUSSED HERE, BUT A LOT OF THEM KIND OF FALL IN THAT CATEGORY WHERE THEY'LL BE ADDRESSED VIA THE BATCH PROCESS.
IN, UH, THE PREVIOUS ROSS WE LOOKED AT FIGURE 1 41.
IT WAS TABLED AND REFERRED TO PLWG, UH, NPRR 1317.
THAT IS NON SETTLE GENERATION.
UH, THAT'S ALSO, UH, GOT REFERRED TO PLWG AND N-D-S-W-G.
THEY'RE ALSO LOOKING AT, UH, BIGGER ONE 40, WHICH IS RELATED TO THAT, UM, AT THE SAME TIME.
AND THEN WE HAVE NPR RR 1319 SEASONALLY MARK BALLED, UH, PERIODS, UH, THAT IS STABLE AT ROSS.
UH, EXPECT MORE DISCUSSION AT WMS TO KINDA GUIDE WHAT THAT LOOKS LIKE.
NEXT FEW SLIDES, I WON'T, UH, WALK THROUGH THEM, BUT THAT'S, THEY ARE IN, IN SOME FORM OF EITHER TABLE FOR MORE REVIEW OR WAITING ON A BATCH PROCESS OR ON, ON ON OTHER THINGS.
SO, IF WE SCROLL DOWN TO THIS SLIDE, UH, THIS IS, AGAIN, APPRECIATE ALL THE, UH, MEMBERS OF THE COMMUNITY WHO HAVE STEPPED IN AND STEPPED UP TO, UH, REPRESENT THESE WORKING GROUPS.
UH, THIS LEADERSHIP WAS ENDORSED, UH, AT, UH, FEBRUARY ROSS, AND IT'S, UH, UP HERE, UH, FOR YOUR REVIEW.
MOVING TO THE NEXT ONE WE HAVE, UM, NEXT MEETING WILL BE HYBRID MARCH FIVE, UH, AND THEN APRIL 2ND IS CURRENTLY PLANNED AS A WEBEX ONLY MEETING.
UH, ONE THING TO NOTE, UH, DIDN'T MENTION, DON'T HAVE A SLIDE FOR, IT WAS AN OPEN ACTION ITEM.
WE HAD ACTION ITEM ON, UH, UH, EPA REGULATIONS AND HOW THEY IMPACT
IT, IT HAD BEEN OPEN WITH US FOR A COUPLE OF, UH, I WOULD SAY YEARS NOW.
UH, ROSS NEVER REALLY TOOK IT UP BECAUSE IT WAS ALMOST LOOKED AS A WMS LED ACTION.
AND SO WE ARE, WE ARE LOOKING TO TACK AGAIN TO SEE IF, IF, IF WMS HAS WORKED THROUGH IT AND THERE'S NO NEED TO TAKE IT UP AT ROSS AGAIN, WE, WE WOULD SEEK THAT
BRIAN, JUST ON THAT SPECIFIC TOPIC, UM, I THINK THIS IS GOING TO CONTINUE TO BE AN ISSUE AND THINK ABOUT LARGE LOADS THAT HAVE, UH, DIESEL RESETS THAT ARE, UH, BACKUP GENERATORS.
IF ERCOT IS USING ITS ABILITY TO CURTAIL LARGE LOADS IN ADVANCE OF AN EEA, UH, THEN THOSE LOADS ARE GONNA WANT TO STAY ON AND, OR STAY ONLINE.
MAYBE NOT STAY CONNECTED TO THE ERCOT SYSTEM, BUT, UM, JUST THE FREQUENCY OF THAT COULD CAUSE ISSUES FOR, FOR HOW LONG, UM, THOSE, UH, THOSE BACKUP GENERATORS CAN RUN.
SO THAT, I THINK THAT'S GONNA BE AN IMPORTANT THING FOR US TO, UH, UNDERSTAND.
[02:35:04]
UM, YEAH.MARTHA HENSON, JUST KIND OF THINKING AHEAD TO LATER IN THE MEETING WHERE WE'LL TALK ABOUT THIS UNDER THE OPEN ACTION ITEMS. I GUESS I'D JUST LIKE TO ASK YOU TO THINK, BRIAN, ABOUT WHETHER THAT'S SOMETHING ROSS CAN TAKE ACTION ON RIGHT NOW.
IT'S NOT CLEAR TO ME THAT THERE'S SOMETHING THEY CAN ACTUALLY DO.
SO MAYBE JUST BE THINKING ABOUT THAT SO WE CAN, YOU KNOW, KIND OF FIGURE OUT WHAT TO DO WITH THAT LATER IN THE AGENDA.
IS BRIAN THE CHAMPION ON THIS ONE? I THINK IT'S GONNA BE RELATED TO THE PROTOCOLS FOR, UH, NET METERING CONDITIONS.
UH, THAT, WHEN YOU SAY RIGHT NOW, UM, PROBABLY NOT RIGHT NOW, BUT IT WILL BE SOMETHING THAT, UH, IS IN OUR WORKFLOW AT SOME POINT.
AND, YOU KNOW, LAST, JUST LAST SEPTEMBER, I THINK IT WAS, YOU KNOW, ERCOT HAD THIS REALLY GREAT SLIDE THAT SHOWED HOW THEY WERE THINKING ABOUT CURTAILMENT IN ADVANCE OF AN EEA OR DURING AN EEA.
AND SO THEN THERE COULD BE CONDITIONS THAT PLA ARE PLACED ON, UH, YOU KNOW, A LARGE LOAD THAT'S CO-LOCATED WITH AN EXISTING LOAD OR THAT HAS 50% BACKUP GENERATION.
AND SO THAT, THAT THE, I THINK THE, THE DIRECTIVE IN, UH, THE PFA IN, UH, WHICH PROJECT IS IT? IT'S, UM, UH, 5 8 4, 7 9 DIRECTS ERCOT TO, UH, UH, PUT TOGETHER PROTOCOLS.
AND SO THIS IS, THIS IS RELATED TO THAT.
BLAKE, YOU'RE NOT PREPARED TO GIVE A WMS UPDATE ON THIS ACTION ITEM RIGHT NOW, ARE YOU? YEAH, IF YOU'D LIKE, LIKE IT NOW, I WAS GONNA GIVE IT IN A, DO YOU WANNA TAKE IT UP IN THE AGENDA? IS THIS GOING AT THE END WHERE WE'RE DOING ACTION ITEMS OR DOES IT REQUIRE MORE OFFLINE CONVERSATION? WELL, I'LL JUST GIVE MY PERSPECTIVE.
UH, WMWG HAD DISCUSSED THIS EPA ACTION ITEM HAD DECIDED CONVERSATIONS HAD CONCLUDED.
UM, I THINK WE'RE, BRIAN BRINGS UP A REALLY GOOD POINT.
AND, BUT ALSO ACTION ITEMS ARE USED FOR SOMETHING TO TRACK AN ISSUE THAT MAY NOT BE COVERED BY, UH, RULEMAKING OR, UH, AN NPRR.
SO MAYBE NOT A NEED TO HAVE THIS AS A ACTION ITEM, HOPING THAT IT WILL FALL INTO ONE OF THOSE BUCKETS, UH, AS SOMETHING TO THINK ABOUT YOU.
I THINK YOU SHOULD THINK ABOUT IT.
AND, UH, I MEAN, THERE'S ALSO ANOTHER USE CASE THAT NED AND I WERE JUST TALKING ABOUT, AND, AND THIS APPLIES TO JOHN RUST TOO.
UM, THINK ABOUT THE, UH, THE, UH, LONG LEAD LARGE LOAD, UM, CURTAILMENT, RIGHT? SOME OF THOSE LARGE LOADS MIGHT HAVE THESE, THESE TYPES OF RESOURCES.
AND SO JUST UNDERSTANDING LIMITATIONS, UM, FOR ENVIRONMENTAL LIMITATIONS THAT, UH, THAT, YOU KNOW, UM, ALLOW FOR, UM, THAT CAPACITY TO BE ACCESSED IS, IS IMPORTANT.
AND THIS IS LATELY ALL I'VE BEEN THINKING ABOUT.
IN ADDITION TO JUST ALL THESE OTHER LAR LARGE LOAD THINGS, BUT YES, WE'LL THINK ABOUT IT
WELL, IT MAY BE, IT MAY BE A DIFFERENT, IT MAY BE RELATED, BUT A DIFF MAYBE WE CAN GET RID OF WHAT WE HAVE NOW, BUT YOURS IS SORT OF A DIFFERENTLY ORDERED YES.
I JUST, I DIDN'T WANT TO THROW THE CONCEPT IN THE TRASH CAN.
WE'LL, WE'LL, WE, WE'LL, WE'LL, WE'LL WORK ON THAT.
YOU'RE THE NEW CHAMPION OF IT.
SO MARTHA, WE'LL PUT YOUR NAME BY IT AND YOU CAN WORK ON NEW WORDS FOR IT.
IS THAT OKAY WITH YOU, MARTHA? YEAH, SOMEWHAT.
I, I GUESS SOMEWHAT, I DON'T THINK THAT THIS AS WORDED CAPTURES WHAT YOU JUST TALKED ABOUT.
MY PREFERENCE WOULD BE JUST TO GET RID OF THIS ONE AND LET'S START OVER WITH SOMETHING NEW WHEN, WHEN YOU HAVE AN IDEA CRYSTALLIZED.
THIS IS GONNA ADD IN THE NEAR TERM THE DOE, BUT ISSUING 2 0 2 C ORDERS WHERE YOU CAN ACTUALLY JUST GENERATE ANTICIPATION OF THESE EMERGENCY CONDITIONS AND NOT WORRY ABOUT YOUR AIR PERMITS.
SO IT, IT KIND OF TIES INTO IT, BUT, YOU KNOW, I DON'T KNOW HOW LONG THIS WILL BE AROUND, BUT OKAY.
AND JUST STACKING HANDS ON WHAT'S ACCEPTABLE FOR CLARITY IS SUPER IMPORTANT.
YEAH, I THINK WE CAN WORK ON THAT.
I THINK TO THE POINT SOMEONE MADE JUST KIND OF ACTIONABLE FOR US.
UM, BUT I, I AGREE THAT MAYBE WE SCRAP THE CURRENT ONE AND, AND THIS IS A NEW WORDED ONE.
UM, WELL, CAN WE GO BACK TO THE FUTURE MEETING SLIDE? SO WE, WE HAD A REQUEST, UM, FROM THE TECH VICE CHAIR TO,
[02:40:01]
I THINK HAVE A, KIND OF IDENTIFY BETTER IN THE VOLTAGE DRIVE THROUGH REQUIREMENTS WHERE, WHERE WE, WE ARE AT MAYBE NEXT T RIGHT? LIKE WHERE, WHERE WE HAVE AGREEMENT, WHERE THE ISSUES STILL ARE.UM, AND THEN WE CAN WORK WITH YOU IF YOU FEEL LIKE YOU NEED TO SCHEDULE MORE ROSS MEETINGS.
MAYBE, MAYBE ONE MORE JUST IN, IN THE CASE OF THE, THE BATCH LOAD, UH, PICKER GO GETTING THROUGH, ROSS.
SO JUST, JUST LET US KNOW AND WE CAN SUPPORT YOU ON THIS.
YEAH, I WAS LOOKING, SOUNDS LIKE WE HAVE TWO OPPORTUNITIES TO REVIEW AND MAYBE APPROVE AND DEPENDING ON HOW WE GO ABOUT THAT REVIEW, IF MOST OF IT HAPPENS VIA THE WORKSHOPS YEAH.
BUT WE'LL, WE'LL STAY IN, UH, TOUCH ON PENDING WHAT, WHAT SORT OF LANGUAGE WE SEE ON THE, NO, UH, 2 82 SOUNDS LIKE WE SHOULD BE ON THE RIGHT TRACK, AT LEAST FROM THE ROSS ITEMS. UM, BUT TO THE EXTENT THERE ARE ANY, I'LL BRING THEM UP AT THE T NEXT TAG MEETING.
AND WE'LL JUST WORK WITH YOU ON THE, THE BATCH PIGGER AND YEAH.
MAY, MAYBE THAT COULD BE BACK TO BACK WITH ONE OF THE SPECIAL PRSS OR SOMETHING, BUT WE'LL, WE'LL, WE'LL WORK WITH YOU ON THAT.
UM, CAN WE BREAK FOR LUNCH NOW AND THEN TWO VOTING ITEMS? TWO VOTING ITEMS, YES.
THAT ARE IN FRONT OF ME, OR WERE IN FRONT OF ME.
SO FROM ROSS, UM, WE HAVE TWO VOTING ITEMS. WE'RE LOOKING TO RECOMMEND APPROVAL OF PI 1 39, AS RECOMMENDED BY ROSS IN THE TWO FIVE ROSS REPORT AND TWO TABLE NOER, UH, 2 81.
CAN WE PUT THESE ON THE COMBO BALLOT? YES.
UH, THAT'S ACTUALLY, I THINK IT'S ACTUALLY PROBABLY A RECORD.
UM, SO BEFORE WE GO TO WMS REPORT, WE ARE GOING TO DO A, UH, VERY SPECIAL ANNOUNCEMENT, UH, FROM, FROM KEITH.
BUT THIS IS, THIS IS A GOOD OR SAD.
IT'S, IT'S DIFFERENT THAN THE EARLIER, VERY SPECIAL ANNOUNCEMENTS FROM KEITH.
THESE ARE, THESE ARE NOT THE SAME SPECIAL ANNOUNCEMENTS,
SO THIS IS HIS LAST T MEETING.
AND SO I KNOW MANY OF YOU, UH, KNOW DAVE.
HE'S BEEN, AND HE'S BEEN AROUND SINCE 2007.
SO, UH, MANY OF YOU HAVE WORKED WITH HIM.
HE WAS INSTRUMENTAL, OBVIOUSLY IN THE NODAL LAUNCH.
HE WAS ALSO INSTRUMENTAL, UH, WITH THE MOST RECENT RTC, UH, PLUS B LAUNCH.
UM, HE'S, HE'S DEFINITELY WAS IMPORTANT WHEN I CAME ON BOARD, WAS ONE OF THE FIRST PEOPLE THAT I HAD MET.
AND SO HE'S BEEN A, A BIG PART OF, UH, OF, OF ERCOT.
UM, HE IS STARTING THE NEXT CHAPTER OF HIS LIFE, AND, UH, THAT'S COMING UP IN, IN A FEW WEEKS, BUT HIS, HIS LAST DAY IS COMING UP.
AND SO, YOU KNOW, WHEN I LOOK AROUND THE ROOM HERE, THERE'S A LOT OF FORMER, EITHER FORMER ERCOT OR FORMER IMM OR FORMER PUC.
AND, AND SO I KNOW THIS ISN'T, THIS ISN'T GOODBYE AND FAREWELL.
THIS IS, UM, UH, WE'LL SEE YOU LATER, UH, IN SOME WAY OR FASHION.
WE'LL SEE YOU LATER SOMEWHERE OR SOMEPLACE SOMEHOW, UH, MAYBE IN A DIFFERENT HAT, MAYBE A DIFFERENT PLACE AT TIME.
BUT WE'LL SEE DAVE AGAIN FOR SURE.
AND SO I WANTED TO GIVE FOLKS A HEADS UP AND TURN IT BACK TO CAITLIN.
OKAY, I'M GONNA GO TO, UH, UE.
UH, YOU'VE MORE THAN DURING THE RIGHT.
DAVE, ARE YOU ON? ARE YOU ON? WELL,
WE WON'T MAKE YOU GIVE A SPEECH YET, BUT IT WOULD BE, IT'S GOOD TO KNOW YOU'RE THERE.
I SEE, I SEE YOUR FACE HERE ON THE, THE TOP OF MY LITTLE, UM, UM, WEBEX.
UM, YOU, YOU SET THE STANDARD FOR ME IN A LOT OF THINGS.
UH, YOU KNOW, ONE OF THEM IS JUST HOW TO, HOW TO WORK WITH SOMEONE WHEN YOU DISAGREE WITH THEM ON, ON AN IDEA THAT, THAT THEY'RE SAYING.
AND IT'S JUST, UH, YOU'VE ALWAYS BEEN A JOY TO WORK WITH.
UM, MAY NOT BE THE PRESIDENT OF THE DAVE MAGGIO FAN CLUB, BUT I'M DEFINITELY A MEMBER.
AND, UH, JUST I, I WISH YOU THE BEST AND, UM, UH, CONGRATULATIONS.
UH, SOME OF Y'ALL MAY NOT KNOW THIS, BUT I ACTUALLY DID A SIX YEAR BID WORKING FOR DAVE ON THE, UH, MARKET ANALYSIS AND DESIGN TEAM.
AND HE REALLY TOOK A CHANCE ON ME.
[02:45:01]
I WAS A FINANCE GUY AND THAT TEAM WAS PHDS AND VERY, VERY SMART ENGINEERS.UH, BUT I'LL FOREVER BE GRATEFUL FOR THAT OPPORTUNITY.
UH, THERE WAS NEVER A MEETING OR AN INTERACTION WITH DAVE THAT I DIDN'T LEARN SOMETHING NEW, AND THAT STILL CONTINUES TODAY.
SO DAVE, I REALLY APPRECIATE, UH, YOUR GUIDANCE OVER THE YEARS.
PROUD OF YOU, EXCITED FOR YOU.
AND, UH, BEST OF LUCK UNTIL THAT COMMENT.
I THOUGHT YOU WERE A VERY SMART ENGINEER, BUT IT'S GOOD, IT'S GOOD TO KNOW YOU'RE, YOU'RE A FINANCE GUY.
I THINK WE HAVE ANDREW TRYING TO CALL IN FROM A PLANE.
I'M COMING IN FROM THE AIRPORT.
MY FLIGHT WAS DELAYED, SO THAT GAVE ME JUST ENOUGH TIME TO CALL YOU GUYS.
UH, I ACTUALLY WORKED FOR DAVE WITH BLAKE ON THAT MARKET ANALYSIS TEAM, AND, UH, IF YOU GUYS THINK I'M OBNOXIOUS NOW, I SHOULD HAVE SEEN HOW OBNOXIOUS I WAS WHEN I WAS 27.
UH, BUT DAVE WAS A VERY, UH, GENEROUS AND SUPPORTIVE BOSS, AND I HAD THAT JOB FOR A FEW YEARS AND THEN DID A BUNCH OF OTHER THINGS.
AND SINCE I'VE BEEN BACK IN THE MIX THROUGH THE IMM, DAVE HAS BEEN MY MAIN POINT OF CONTACT AT ERCOT, AND HE HAS BEEN JUST SUPER SUPPORTIVE AND A GREAT EXAMPLE FOR ME AS SOMEONE, UH, WHO I ASPIRE TO KIND OF EMULATE PROFESSIONALLY.
AND IT IS DEFINITELY MY JOB WOULD NOT HAVE GONE AS SMOOTHLY, AND I WOULD NOT HAVE BEEN SO SUCCESSFUL IN THIS POSITION SO FAR IF I DIDN'T HAVE DAVE TO WORK WITH.
SO IT'S BEEN A PLEASURE, AND I'M SURE HE IS GONNA DO GREAT AT HIS NEXT STOP.
AND, UH, REALLY, UH, HAPPY TO HAVE HAD THE CHANCE TO WORK WITH HIM.
UM, CAN YOU GUYS HEAR ME? YES.
UM, I STILL CONSIDER MY PREVIOUS CORE GROUP AS MY FAMILY, AND DAVE IS A BIG, BIG PART OF THAT FAMILY.
UM, TO ME IT FEELS LIKE WE GREW UP TOGETHER, AT LEAST LIKE OUR CAREER FROM A CAREER PERSPECTIVE.
DAVE MADE OUR GROUP SO MUCH BETTER.
AND I STILL FONDLY REMEMBER OUR REGULAR BRAINSTORMING DEBATE SESSION.
UM, DAVE SMARTNESS AND UNDERSTANDING OF THE MARKET MADE THOSE DEBATES AND DISCUSSIONS SO MUCH FUN.
WE HAD SO MANY LENGTHY DISCUSSIONS WITH DR. HOGAN ON, UH, DESIGNING THE OTC AND SO MANY OTHER ISSUES, BUT I WOULD SAY IT WASN'T, IT WASN'T ALL WORK EITHER.
WE HAD, UH, FUN WINNING THE ERCOT OLYMPICS GAMES AND DRESSING UP FOR HALLOWEEN.
UH, YOUR LEAVING WILL BE A GREAT LOSS, I WOULD SAY, NOT JUST FOR ERCOT, BUT ALSO FOR ERCOT STAKEHOLDERS.
AND I HOPE YOU WILL CONTINUE TO BE INVOLVED IN THE ERCOT MARKET FROM THE E THREE SIDE.
I HEAR YOU ARE GOING TO WORK ON THE CALIFORNIA SIDE.
UM, MAYBE YOU CAN COME BACK FOR THE AIRPORT SIDE AS WELL, BUT ALL THE BEST.
THIS IS ANOTHER AIRPORT PHONE CALL, DAVE.
I, I, I, I HAD TO PAY THE PILOT EXTRA TO GET HIM TO LAND IN ENOUGH TIME TO BE ABLE TO DO THIS.
SO, UH, SO I'M HERE AND, UH, I, YOU KNOW, I'M NOT SURE WHERE TO START, YOU KNOW, UH, EVERYTHING THAT DAVE HAS WORKED ON, ON THE CONTRIBUTIONS HE'S MADE TO THIS MARKET, AND NOT JUST TO THE MARKET, BUT TO ME PERSONALLY, WHAT I'VE PERSONALLY LEARNED FROM DAVE HAS, HAS BEEN PRETTY INSTRUMENTAL.
UH, UM, SORRY, I GOT INTERRUPTED THERE.
AND, UH, SO I JUST WANTED TO SAY THANKS FOR EVERYTHING YOU'VE DONE, DAVE.
UH, I'VE LEARNED A LOT WITH THE INTERACTIONS WITH YOU.
YOU KNOW, REMI MENTIONED JUST ONE OF THE MANY, MANY THINGS YOU'VE ACCOMPLISHED HERE AND HELPED WITH WAS, YOU KNOW, THE RDC AND THE REST, THE RTC, EVERYTHING ELSE.
SO, UH, GOOD LUCK IN THE FUTURE.
I'M BETTER FOR BEING ABLE TO WORK WITH YOU.
AND THE WORST THING ABOUT THIS WHOLE THING OF YOU MOVING OUT OF ERCOT IS YOUR NEW EMAIL ADDRESS DOESN'T HAVE ENGIE IN IT.
WELL, DAVE, I AGREE WITH A LOT OF THE, THE GREAT THINGS THAT HAVE BEEN SAID.
UM, THE ONE, ONE THING I WANT TO ADD TO THAT IS I'VE ALWAYS APPRECIATED, UM, JUST HOW TALENTED YOU ARE
[02:50:01]
AT TAKING VERY COMPLEX AND TECHNICAL MATTERS THAT A LOT OF FOLKS COME AT WITH, YOU KNOW, SOMETIMES INCLUDING MYSELF, NOT WITH FULL UNDERSTANDING, UM, BUT CERTAINLY WITH AN INTEREST TO, TO, YOU KNOW, TRY TO UNDERSTAND IT AND AN INTEREST IN THE OUTCOME.AND YOU'VE ALWAYS BEEN VERY GOOD ABOUT, YOU KNOW, ENGAGING DIRECTLY ON LEVEL AND, YOU KNOW, HELPING BREAK IT DOWN IN WAYS THAT ALL THE DIFFERENT STAKEHOLDERS CAN ENGAGE WITH IDENTIFYING, YOU KNOW, WHAT THE REAL CONCERNS ARE AND FINDING SOLUTIONS THAT HELP, UH, HELP MAKE CONSENSUS HAPPEN TO THE EXTENT THAT WE CAN.
AND THAT'S, UH, THAT'S SOMETHING THAT I THINK ALL OF US AS STAKEHOLDERS WILL, UH, WILL NEED TO, TO EMBODY AND, AND IN THE DAVE MAGGIO SPIRIT AS YOU MOVE ON TO YOUR NEXT CHAPTER.
SO THANK YOU FOR, FOR BEING A, A MODEL OF THAT.
I'LL JUST PILE ON HERE, UM, SHARE A LOT OF THE SENTIMENTS FROM MY COLLEAGUES, DAVE, THANK YOU.
UM, THE, THE PRODUCT OF YOUR WORK.
AND, UH, THOSE OF ALL OF US HAVE HELPED SHAPED THIS MARKET, UM, STRUCTURE AND SUCCESS THAT WE'VE SEEN, AND YOU HAVE HAD A, UH, GREATER THAN AVERAGE, UH, CONTRIBUTION IN TERMS OF, UM, THE DESIGN AND THE SUCCESSES THAT WE'VE EXPERIENCED TO DATE.
JUST THAT CALM VOICE, UH, WHEN WORKING THROUGH, UM, CON CONFLICTS AND ISSUES, WHICH IS INEVITABLY GONNA HAPPEN IN THE STAKEHOLDER PROCESS.
UH, THE WAY YOU DEAL WITH ISSUES IS UNIQUE AND, UH, JUST A RARE SKILL SET OF EXCEPTIONAL KNOWLEDGE, UM, ON SUBJECT MATTER AND HOW YOU DEAL WITH, UH, THESE ISSUES.
SO YOU WILL BE MISSED GREATLY.
GOOD LUCK IN YOUR NEXT CHAPTER, AND I'LL SEE YOU AT MINES FOOTBALL GAMES IN DENVER,
UM, THIS IS SANDEEP, UH, NOW I'M WITH NEXTERA, BUT I THINK YOU AND I HAD, UM, YOU KNOW, VERY LONG TIME OF WORKING TOGETHER.
IN FACT, FOR MOST OF YOU THAT DON'T KNOW, WE STARTED OUR CAREER AROUND THE SAME TIME IN ERCOT IN 2006.
AND, YOU KNOW, WE WERE SEATED, YOU KNOW, BACK TO EACH OTHER.
SAME, YOU KNOW, SAME AREA, SAME CUBE, AND WORKED ON A VERY, YOU KNOW, SAME PROJECT.
A LOAD FORECAST WAS ON OUR, ONE OF OUR FIRST PROJECT THAT WE WORKED ON RIGHT AFTER 2006, UM, JULY BROWNOUT THAT HAPPENED.
AND OVER TIME, UH, YOU KNOW, I WORKED WITH DAVE ON NUMBER OF DIFFERENT THINGS.
I STAYED IN OPERATIONS, HE WENT ON MARKET SIDE.
BUT ME BEING IN OPERATIONS AND HIM BEING IN THE MARKET WAS ALWAYS, THAT WORKED REALLY WELL BECAUSE HE UNDERSTOOD OPERATIONS AND I UNDERSTOOD, SO HE UNDERSTOOD.
AND I WAS ALWAYS TRYING TO SOLVE OPERATIONAL PROBLEM WITH MARKET.
AND, YOU KNOW, HE SPENT A LOT OF TIME ON NOLE.
THE, ONE OF THE REASON FOR NOLE SUCCESS WAS DAVE AND RTC, AS WELL AS THE BATTERY ENERGY STORIES PROJECT.
UH, YOU KNOW, I GOT A LOT OF HELP FROM DAVE, ESPECIALLY ON COMPLEX ISSUES.
AND TO HIS CREDIT, UM, AND HIS TEAM'S CREDIT, I THINK BLAKE IS HERE.
UH, YOU KNOW, WE'VE SEEN LIKE A HUGE SUCCESS WITH BATTERIES.
AND YOU KNOW, I'M A HUNDRED PERCENT SURE WHEREVER YOU GO, YOU'LL DO AMAZING.
DAVE, JUST WANNA SAY THANK YOU WHEN I, UH, CAME DOWN TO
UM, THERE WERE A LOT OF THINGS I WAS ASKED TO DO, UM, AND I DIDN'T HAVE A LOT OF KNOWLEDGE ON HOW TO EFFECTUATE THOSE IN THE PROTOCOLS.
AND YOU WERE ALWAYS EXTREMELY WILLING TO SHARE YOUR TIME WITH ME.
UM, AND YOU'RE ALWAYS EXTREMELY KIND IN WORKING WITH ME WHEN I WAS, UH, VERY, VERY GREEN.
UM, I HOPE YOUR CAREER CONTINUES IN A WAY THAT YOU CONTINUE TO HELP PEOPLE.
CAN YOU HEAR ME? WE CAN HEAR YOU.
WELL, DAVE, UH, I GUESS, UH, YOU'VE HEARD LOTS AND LOTS OF THANKS.
UH, IJI WANT TO THANK YOU ON TWO FRONTS.
ONE, AS, UH, ERCOT, UH, COLLEAGUE AND ALSO AS A STAKEHOLDER.
UH, MY KINDA RECOLLECTION OF THE WAY YOU APPROACH EVERYTHING, THE, THE WORDS THAT COME TO MIND ARE INTELLIGENCE, INDUSTRIOUSNESS, CALM, COMPASSION.
AND THE ONE I KNOW FOR SURE I DON'T, I DON'T HAVE, UH, IN, IN BUNCHES IS STRUCTURED.
[02:55:01]
PUTTING EVERYTHING TOGETHER AND, UH, MOVING THINGS ALONG.I ADMIRE YOU FOR ALL OF THOSE TRAITS.
UM, AND I GUESS ON BEHALF OF ERCOT INC.
AND THE STAKEHOLDER COMMUNITY, I WANNA SAY THANK YOU.
UM, DAVE, I'LL JUST GO, IT'S CAITLIN AGAIN.
UM, I, I AGREE WITH WHAT KANAN SAID, AND I'M, I'M WHISPERING WITH ANNE, BUT YOU DO APPROACH EVERYTHING, UM, IN A THOUGHTFUL AND STRUCTURED WAY.
AND I, I'VE BEEN REALLY LUCKY.
UH, DAVE'S DAUGHTER'S ABOUT 12 HOURS OLDER THAN MINE.
SO INSTEAD OF DOING MY OWN PARENTING RESEARCH, I CAN CALL DAVE AND HE, YOU KNOW, IT'S LIKE A CHEAT CODE.
HE HAD ENHANCED THE BOOKS, AND HE KNOWS THE VIDEOS, AND HE KNOWS THE SUPPORT GROUPS.
UM, SO IT'S JUST, YOU KNOW, I'M ABLE TO KIND OF MOOCH OFF THAT IN, UH, PERSONAL LIFE AS WELL AS PROFESSIONAL LIFE.
AND I, I WILL CONTINUE TO DO THAT WHEN DAVE DOESN'T WORK AT ERCOT.
AND I WILL LET YOU GO AHEAD, DAVE.
AND THEN I'LL, I'LL TRY, WE'LL KEEP IT SHORT, BUT, UH, NO, I, I JUST SIMPLY FEEL OVERWHELMED WITH ALL THE, THE KIND WORDS THAT YOU ALL SHARED.
UM, I WANNA SAY HOW MUCH OF AN HONOR IT'S BEEN TO WORK, NOT JUST FOR ERCOT, THE COMPANY, BUT WITH ERCOT THE MARKET AND ERCOT THE STAKEHOLDERS.
I'M VERY GRATEFUL TO YOU ALL, AND I'M PROUD OF THE WORK WE'VE DONE TOGETHER OVER THE LAST, UH, ALMOST TWO DECADES AT THIS POINT.
UM, I STILL HAVE A COUPLE MORE WEEKS AT ERCOT, UH, BUT I'M, I'M GLAD TO HAVE THIS STAGE TO SAY THANK YOU.
UH, AND PERHAPS I'LL HAVE AN OPPORTUNITY TO WORK WITH YOU ALL AGAIN IN, UH, IN ANOTHER CAPACITY.
SO, SO THANK YOU ALL VERY MUCH.
JUST, JUST REALLY APPRECIATE IT ALL.
AND I KNOW KEITH HAS A NUMBER OF PRIORITY ITEMS THAT I THINK WE CAN GET DONE IN TWO WEEKS.
ANDREW, ANDREW TOLD ME SOMETHING ABOUT, UH, 1309 COMMENTS THAT YOU'RE LEADING ON.
SO, UH, WE, WE WON'T LET YOU GO UNTIL, UNTIL YOU'RE REALLY GONE.
ALRIGHT, WELL, THANKS EVERYBODY.
YOU KNOW, OBVIOUSLY, UH, DAVE, DAVE HAS MADE A LOT OF CONTRIBUTIONS, SO I, I APPRECIATE EVERYBODY, UM, SHOWING UP WITH THE, THE KIND WORDS AND, AND THANKS KEITH FOR THE IDEA ALL
[12. WMS Report (Vote)]
BLAKE, WE ARE BACK.I GOTTA FOLLOW THAT, HUH? THE FINANCE GUY HAS TO, HAS TO FOLLOW THAT
ALRIGHT, BLAKE HOLT, UH, HERE WITH WMS WANTED TO GIVE Y'ALL A PREVIEW OF DISCUSSIONS THAT ARE TO COME AND, AND SOME DISCUSSIONS WE HAD AT OUR FEBRUARY 4TH MEETING.
UH, AS WE DISCUSSED EARLIER TODAY, NPR 1315 WILL GET ITS FIRST DISCUSSION AT, UH, OUR NEXT MEETING, WHICH WILL BE MARCH 4TH.
I DID SEE THAT SOME COMMENTS HAVE SINCE BEEN POSTED, SO I WOULD RECOMMEND, UH, FOLKS DIGESTING THOSE QUICKLY.
UH, WE'LL ALSO HAVE THREE MORE, UH, RMR RELATED DISCUSSIONS TO GET THROUGH, UM, AT OUR NEXT MEETING AS WELL.
SO, UH, MARTHA, I DID LIKE YOUR SUGGESTION FOR LLWG TO BRING BACK LIKE A MORE, UM, DISCREET SET OF ISSUES ON CERTAIN ITEMS. I WILL TRY TO DO THAT FOR 1315 FOR MY NEXT REPORT, SO, UH, WE CAN MAKE SOME MORE PROGRESS ON THAT.
UH, IN TERMS OF THINGS WE DID AT THE FEBRUARY 4TH MEETING, WE REFERRED NPR 1317 TO DSWG.
WE ALSO APPROVED NPRR 1313, WHICH IS ONE OF THE RMR, UH, SUITE THAT CAME TO US, UH, V-C-M-R-R OH FOUR SEVEN.
THAT ONE'S RELATED TO THE PLANNING GUIDE, GLOSSARY TRANSITION OR NPR 1314.
UH, WE APPROVE THAT ONE AS WELL, UH, ALONG WITH OUR WORKING GROUP LEADERSHIP, WHICH IS ON THE NEXT SLIDE AND THE ANNUAL UPDATE TO THE CRR CALENDAR.
UH, AND JUST TO CLOSE THE LOOP, WE, WMWG HAS CONCLUDED DISCUSSIONS ON THE CURRENT EPA ACTION ITEM.
JUST WANTED TO GO OVER WHO'S WORKING GROUP LEADERSHIP THIS YEAR AND THANK THEM FOR THEIR SERVICE.
UH,
UH, I BELIEVE WE HAVE SOME CANDIDATES FOR VICE CHAIRS, WHICH WE'LL HEAR AT OUR NEXT MEETING.
UH, FOR SAWG, WE HAVE KEVIN HANSON AS CHAIR, AND THEN CO VICE-CHAIRS, GREG LACKEY AND PETE WARKEN.
AND FOR WM WG WE HAVE AMANDA FRAZIER AS CHAIR.
AND TREVOR SAFCO IS VICE CHAIR.
THESE ARE THE ITEMS THAT ARE ON OUR LIST, THE ITEMS THAT HAVE COME OFF OUR LIST, AND, UH, SOME NEW ONES THAT HAVE BEEN ADDED.
AND THEN TO CONCLUDE, OUR NEXT MEETING IS MARCH 4TH, UH, READY FOR ANY QUESTIONS IF Y'ALL HAVE ANY, ANY QUESTIONS OR COMMENTS?
[03:00:02]
YOU KNOW, I THINK, UM, ON, ON 1315, LET, LET'S HAVE THE WMS DISCUSSION AND THEN SORT OF SEE IF YOU WANT A, A WORKSHOP OR, OR WHATEVER YOU THINK YOU NEED.I THINK IDENTIFYING THE ISSUES IS A, IS A GOOD IDEA.
UM, BUT I THINK WE'D WANT DIRECTION FROM KEITH ON WHAT OTHER RELATED ISSUES YOU WANNA MAKE SURE GET TAKEN UP IN, IN CONJUNCTION.
UM, YOU KNOW, A LOT OF THE ISSUES TODAY HAVE BEEN RELATED TO THE FAR WEST SITUATION.
SO IF THERE, THERE ARE A COUPLE THINGS YOU NEED TO TAKE UP IN CONJUNCTION WITH THAT.
IF, IF, UH, THERE'S ANYTHING WE CAN COMBINE WITH THAT, WE, WE WILL DO THAT.
VOTING ITEMS. VOTING ITEMS. UM, LOOKING TO RECOMMEND APPROVAL OF V-C-M-R-R 47 IS RECOMMENDED BY WMS IN THE TWO FOUR WMS REPORT.
CAN WE PUT THIS ON THE COMBO BALLOT? YES.
[13. Credit Finance Sub Group (CFSG) Report]
IS, UH, CFSG.UH, VOTING MATTERS THAT DURING OUR MEETING WERE NPRR WITH ONE NPRR, AND THEN APPROVAL OF THE MINUTES, UH, REVIEWED REGULAR CREDIT EXPOSURE UPDATES AND RECEIVED AN UPDATE ON THE IMPLEMENTATION OF NPRR 1277, WHICH WAS REVISIONED TO THE EAL FORMULA.
THE NPRR REVIEWED, UH, WAS 1313 ADJUSTMENT TO THE CALCULATION OF THE INITIAL STANDBY COSTS FOR RMR FOR RESOURCES OF DETERMINED TO HAVE NO CREDIT IMPLICATIONS.
THE NEXT SLIDE, A MONTHLY HIGHLIGHT FOR THE MARKET WIDE AVERAGE TOTAL POTENTIAL EXPOSURE INCREASE FROM 1.59 BILLION IN DECEMBER TO 2.27 BILLION IN JANUARY.
THE, UM, AVERAGE DISCRETIONARY COLLATERAL INCREASE FROM 3.93 BILLION IN DECEMBER COMPARED TO 5.66 BILLION IN JANUARY.
AND DUE TO WINTER STORM FERN, WHICH I BELIEVE YOU'LL GET A REPORT ON LATER IN THIS MEETING, THERE WERE 156 COLLATERAL CALLS ISSUED IN THE AMOUNT OF 209 MILLION IN JANUARY.
THE, UH, AVAILABLE CREDIT BY TYPE COMPARED TO TOTAL POTENTIAL EXPOSURE.
UH, SO THE DATA POINT I WANT TO CALL OUT ON THIS SLIDE IS FOR JANUARY.
YOU'LL SEE AGAIN BECAUSE OF THE WINTER STORM FERN, UH, THE NUMBER JUMPS FROM 6.9 BILLION TO 11.5 BILLION.
UH, THAT THE TPE FOR THIS GRAPH IS THE HIGHEST FOR THE CORRESPONDING MONTH.
SO OBVIOUSLY TOWARDS THE END OF JANUARY, THE WINTER STORM CAUSED THIS, THIS NUMBER TO INCREASE SIGNIFICANTLY.
UM, SIMILAR INFORMATION HERE, UH, DISCRETIONARY COLLATERAL, UH, FROM DECEMBER OF 2025 TO JANUARY, 2026.
UH, AGAIN, TOWARDS THE END OF JANUARY, YOU'LL SEE THE IMPACTS OF THE WINTER STORM.
THIS TABLE SHOWS THE ISSUER CREDIT LIMITS VERSUS TOTAL LETTER OF CREDIT AMOUNTS PER ISSUER.
UH, WHAT TO NOTE? UH, YOU'LL NOTICE THE, THE RED AND THE, UM, AND YELLOW HIGHLIGHTED ON THE FAR RIGHT.
UH, THESE FOUR ISSUERS WERE AT OR OVER THE, UM, CREDIT LIMITS THAT WERE APPROVED BY ERCOT.
UM, SINCE THE THE WINTER STORM, THESE NUMBERS HAVE ALL COME BACK DOWN BELOW 100%, MOST OF THEM BEING BACK DOWN TO AROUND 65% AND ONE REMAINING AROUND 80%, BUT ALL ARE BELOW THE THRESHOLD.
AND THEN FINAL SLIDE ON THE IMPLEMENTATION OF NPRR 1277.
IMPLEMENTATION IS SCHEDULED FOR MARCH 2ND.
THE CREDIT REPORTS PUBLISHED IN THE MORNING OF MARCH 2ND WILL REFLECT REVISIONS THAT WERE MADE TO THE REPORTS.
AND JUST A REMINDER FOR, UM, EVERYONE'S CREDIT STEPS TO MONITOR FOR THE CREDIT MONITORING AND MANAGEMENT REPORTS AND MANAGE COLLATERAL ACCORDINGLY.
ALRIGHT, ANY QUESTIONS? THANK YOU, JET.
ANY QUESTIONS FOR JET ON THE CFSG REPORT? OKAY, THANKS FOR THE UPDATE.
[14. RTC+B Task Force Report]
WE HAVE DAVID KEY AVAILABLE FOR THE RTCB TASK FORCE UPDATE? I'M LINE.CAN YOU GUYS HEAR ME? YEAH, IT'S A LITTLE MUFFLED.
IF YOU CAN TRY TO SPEAK A LITTLE LOUDER, THAT'D BE HELPFUL.
[03:05:01]
THANKS.WE'LL BE TALKING ABOUT THE R-T-C-B-F SHENANIGANS FOR THIS MONTH.
UM, COUPLE OF HIGHLIGHTS HERE.
THERE ARE POSTED, UM, THE UPDATES FOR THE PUC, UM, TALKING ABOUT THE PROGRESS MADE AND ADDRESSING THE KNOWN PROTOCOL VIOLATIONS.
SO THERE'S BEEN A FILING, UH, BY ERCOT.
I ALSO WANNA CALL OUT THE ISSUES WITH THE 60 DAY REPORTS.
UM, AND THOSE ARE, CAN BE FOUND IN THAT MARKET NOTICE.
SUPPOSED BOTH OF THOSE LINKS ARE ACTIVE.
UM, I'LL SKIP TO THE, TO THE FAR RIGHT COLUMN.
UM, NEW TO THE PROCESS IS A, UH, NPR 1323.
UH, DAVE PROVIDED AN OVERVIEW OF THAT.
UH, BASICALLY TALKED ABOUT HOW IT WAS, UM, I THINK THEY'RE GONNA REQUEST URGENCY AND IT ADDRESSES THE CAPPING OF UMM C PCS, UM, AS PART OF 1290 THAT WASN'T INCLUDED.
SO 1323 IS GOING TO, UH, TO FIX THAT ISSUE.
ALSO, GOT AN UPDATE FROM LUKE ON THE AS, UH, DEPLOYMENT FACTORS THAT HAS TO DO WITH THE R PROCESS.
UM, THERE'S A PRETTY GOOD POSTING THERE TO WALK THROUGH THOSE, THOSE ITEMS. UM, A LOT MORE DISCUSSION.
UH, I WANTED TO FOCUS REALLY ON THAT MIDDLE COLUMN OF THE WORK PLAN FOR THE INVENTORY OF THE REMAINING RTC PLUS B ITEMS. UM, THERE IS PRETTY A, A PRETTY LARGE OR RELATIVELY LARGE LIST OF ITEMS THAT NEED TO BE WORKED ON THAT ARE OUTSIDE OF THE SCOPE OF THE GO LIVE, UM, AND MAJOR PROJECT.
UH, AND SO THIS IS SOMETHING THAT WE HAVE BEEN WORKING TO BUILD AS WE GO THROUGH THE RTC.
UM, AND NOW THAT WE'RE AT GO LIVE, WE'RE READY TO BASICALLY DISPERSE THOSE ITEMS INTO THE STAKEHOLDER PROCESS, UM, LEADING TO A SUNSET OF, OF THE R-T-C-B-T-F.
UM, WE'VE HAD A COUPLE OF GOOD DISCUSSIONS.
WE, I FEEL LIKE WE GOT SOME CONSENSUS IN THE ROOM ON HOW TO MOVE FORWARD.
UM, SO IF WE GO TO THE NEXT SLIDE, WE CAN GET INTO A LITTLE BIT MORE DETAIL ON, ON THAT ITEM.
UM, BASICALLY THERE, THERE IS A, THE LIST IS POSTED WITH THE MEETING MATERIALS TODAY TO THE TAC PAGE, UM, FOR REVIEW.
AND THIS IS THE SAME LIST THAT WAS SHOWN AT THE TASK FORCE.
UH, THE, THE ITEMS THERE ARE, ARE LISTED AS TOPIC, THE PROPOSED WORKING GROUPS.
SO THIS IS OUR, OUR, OUR BEST, UH, BEST ASSIGNMENTS THAT WE CAN THINK OF.
AND IF THERE'S ADDITIONAL DISCUSSION HERE TODAY, THAT'S WHAT WE WANT TO GET.
UM, ALSO TENTATIVE TIMING FOR THE DISCUSSION.
UH, THERE ARE SOME, SOME INTERDEPENDENCIES, LIKE, LIKE IT'S NOTED HERE, UH, DIFFERENT PRIORITIES.
UM, AND WE DO HAVE TO BE MINDFUL OF ERCOT STAFF'S ABILITY TO, UH, DO EVERYTHING ALL AT THE SAME TIME.
WE DON'T WANT TO CREATE ISSUES BY DOING THAT.
SO WE NEED A THOUGHTFUL WAY TO, TO PRIORITIZE THESE.
AND WE TOOK OUR STAB AT, AT PROVIDING THAT INFORMATION IN, IN THE POSTING.
UM, DIDN'T HAVE A LOT OF OBJECTIONS.
THE, UH, SENSE IN THE ROOM WAS JUST TRYING TO GET CLARITY ON WHERE, UH, THESE BIGGER TOPICS WILL, WILL GO.
UM, WE'RE GONNA GIVE, I THINK BLAKE, UH, AND WMS CHAIR A LITTLE BIT MORE FUN, UH, 'CAUSE IT DOESN'T SOUND LIKE HE'S HAVING ENOUGH FUN.
SO WE'LL GIVE HIM SOME MORE FUN AS PART OF THAT.
AND TODAY, I, I KNOW IT'S NOT NOTICED FOR A VOTE.
UM, HAPPY TO TAKE SOME DISCUSSION OR, OR FEEDBACK ON THE LIST.
OTHERWISE, WE'LL BE LOOKING LIKE, PROBABLY TO THE TAC CHAIR, UM, USING THE TAC CHAIR SUPERPOWERS TO ASSIGN THESE AS ACTION ITEMS OR ITEMS FOR THE, FOR THE SUBCOMMITTEES.
SO I THINK THAT'S IT FOR ME, AND I'LL HAPPY TO ANSWER ANY QUESTIONS OR ENGAGE IN DISCUSSION.
AND IF WE HAVE VERY TECHNICAL DISCUSSION QUESTIONS, UH, DAVE'S ON THE LINE TO HELP SUPPORT.
UH, DO WE WANNA TAKE A LOOK AT THAT LIST? COREY, DOES ANYBODY HAVE QUESTIONS FOR DAVID KEY OR ANY INITIAL FEEDBACK ON THE SUGGESTED DESTINATION FOR THESE ITEMS? NED, SO NOT, UH, NECESSARILY ON THE DESTINATION OR, OR WHAT'S ALREADY IN THE LIST.
I KNOW THESE ARE THINGS THAT THE TASK FORCE HAS LOOKED AT.
UM, BUT THIS DOVETAILS A LITTLE BIT ON THE CONVERSATION WE HAD ABOUT, UM, NPR 8 26 AND HOW RMR RESOURCES ARE OFFERED IN THAT IT PROBABLY IS WORTH GOING BACK THROUGH AND MAKING SURE, AND THAT THIS COULD EXTEND INTO NPR 1315 AS WELL, RIGHT? AS WE'RE LOOKING AT OUT OF MARKET RESOURCES, JUST GOING THROUGH AND MAKING SURE THAT, UM, WE'VE ADDRESSED ALL OF THEIR, UM, IMPACTS IN THE REAL TIME CO OPTIMIZATION, UM, OPERATING ENVIRONMENT NOW THAT WE'RE, WE'RE SEEING HOW THOSE, HOW THOSE PLAY OUT.
OTHER COMMENTS? UH, IT LOOKS LIKE A LOT OF THESE ARE EITHER WMS OR WMS WORKING GROUPS.
UM, BLAKE, DO YOU HAVE ANY RESERVATIONS FOR ABOUT TAKING THESE THROUGH WMS
[03:10:01]
AND DISTRIBUTING THEM AS, AS A SUGGEST AS THE ASSIGNMENTS SUGGEST HERE? NO.LOOKING THROUGH THE LIST, AND I'VE, I'VE LOOKED AT THIS PRIOR TO THE MEETING, THE ASSIGNMENTS THOUGHTS SEEM APPROPRIATE TO ME.
UM, BUT WE CAN GET THIS ON THE NEXT AGENDA FOR AN INTRODUCTION TO FOLKS AND FIELD OTHER THOUGHTS IN THE ROOM, BUT THEY SEEM APPROPRIATE TO ME AT THIS POINT, AND I'LL CHECK THE GROUP'S PULSE.
UM, ANNE, IS THERE ANYTHING WE NEED TO DO PROCEDURALLY HERE? UH, JUST NO, TAKE IT, TAKE IT AND GO.
UM, WE CAN REFERENCE IT ON LIST.
SHE'S, ANNE'S SUGGESTING WE REFERENCE IT ON THE ACTION ITEMS LIST, SO WE CAN COME BACK TO THAT LATER.
HEY, MARK, I WANTED TO MENTION THIS IN LIGHT OF, OF NED COMMENTS AND JUST ONE THING I WANNA MAKE SURE FOLKS ARE VERY CLEAR ON AS THEY TAKE A LOOK AT THIS LIST IS, THIS IS REALLY CAPTURING THINGS THAT WE HAD TALKED ABOUT AS PART OF THE TASK FORCE IN IN THE LAST YEAR AND, AND A YEAR AND A HALF OR SO.
UM, IT, IT DOES NOT NECESSARILY CAPTURE ALL OF THE OTHER, UH, PRIORITY ITEMS THAT I, THAT I'M SURE ARE OUT THERE FOR FOLKS, INCLUDING, UM, DISCUSSION, FOR EXAMPLE, ON THE PRICE ADDER AND WHAT IT CAPTURES.
AND I KNOW QUESTIONS FOLKS, PE, UH, FOLKS HAVE HAD REGARDING THE, THE VARIOUS TRIGGERS AND GRAY BOX AND THINGS LIKE THAT.
SO, UH, ANYWAYS, I JUST DIDN'T WANT, UH, FOLKS TO NECESSARILY LOOK AT THIS LIST AND THINK IT WAS AN EXHAUSTIVE LIST OF ALL THE, ALL THE THINGS THAT MIGHT BE OF INTEREST TO PEOPLE.
SO, UH, I THINK IT'LL BE IMPORTANT, UH, AS WMS TALKS ABOUT IT OR OTHER GROUPS, UH, START TALKING ABOUT IT THAT, UH, KEEP IN MIND OTHER PRIORITIES THAT MAY BE OUT THERE.
UH, YOU KNOW, FOR EXAMPLE, THE DISCUSSION EARLIER THIS MORNING ON 8 26.
UH, ANY OTHER COMMENTS HERE? OTHERWISE, WE WILL, UH, GIVE THIS TO BLAKE AND MAKE THE FIRST CUT AND ASSIGNMENTS THROUGH THE WMS WORKING GROUPS.
I GUESS I, I SAW ONE STRAGGLER ON HERE FOR ROSS.
MAYBE WE LET WMS TAKE THE FIRST CRACK AT THAT ONE AND THEN SEE IF ROSS ASSIGNMENT IS ACTUALLY NEEDED.
BUT I GUESS IF YOU FIND ANY THAT AREN'T FITTING AND NEED SOME FURTHER DIRECTION, YOU CAN ALWAYS BRING IT BACK HERE, SO, OKAY.
ANY OTHER COMMENTS ON THAT BEFORE WE MOVE ON? OKAY, THANK YOU.
LOOKS LIKE WE'LL PIVOT OVER NOW INTO ITEM 15, KOT REPORTS.
RYAN KING HAS THE FIRST TWO OF THESE, THE EIGHT ARE PILOT UPDATE AND THEN THE WINTER STORM FERN ANALYSIS.
BETH? YEAH, I'M, I'M, I'M SORRY, I'M, UH, HALF A SECOND SLOW HERE.
UH, DOES THAT CONCLUDE THE WORK OF THE RTC PLUS B TASK FORCE? DAVID KEY? DO YOU WANNA SPEAK TO THAT? UH, YEAH, I THINK THAT IS LARGELY THE, THE ASK IS TO MAKE SURE THAT WE, WE'VE WRAPPED IT UP.
I THINK WE'LL PROBABLY HAVE MAYBE ONE MORE MEETING WE'LL HAVE TO TALK WITH, WITH GORDON AND PROBABLY SOME OTHERS, UH, TO SEE WHERE