[00:00:03]

ALL RIGHT.

GOOD MORNING.

THIS IS SUSIE CLIFTON WITH ERCOT.

UM, IF YOU'RE HERE IN THE MEETING ROOM, IF YOU WOULD PLEASE GO AHEAD AND TAKE YOUR SEATS.

WE'RE GONNA GO AHEAD AND GET STARTED.

I WILL GO THROUGH THE MEETING REMINDERS VERY QUICKLY.

UM, IF YOU ARE HERE IN THE MEETING ROOM, YOU CAN ENTER YOURSELF INTO THE CHAT.

WE ARE USING THE CHAT FUNCTIONALITY TO QUEUE FOR MOTIONS OR FOR DISCUSSION ITEMS. IF YOU ARE ON THE WEBEX, OBVIOUSLY YOU'LL NEED TO ENTER YOURSELF.

UM, BUT AGAIN, AS I STARTED TO SAY WITH THOSE IN THE ROOM, YOU HAVE THE OPTION TO ENTER YOURSELF, OR IF YOU HOLD UP YOUR CARD, BRITTANY'S IN THE RIGHT HAND CORNER AND SHE WILL ENTER YOU INTO THE CHAT.

PLEASE WAIT FOR THE CHAIR TO RECOGNIZE YOU BEFORE YOU BEGIN SPEAKING.

ADDITIONALLY, AS WE GO THROUGH THE BALLOTING PROCESS, IF YOU'RE ON THE WEBEX AND VOTING, PLEASE MAKE SURE TO UNMUTE YOURSELF AS WE APPROACH YOUR SEGMENT.

AND THEN AFTER YOU'VE CAST YOUR VOTE, PLEASE RETURN TO THAT MUTE FUNCTION THAT WILL HELP US BE A LITTLE EFFICIENT WITH THE BALLOTING PROCESS.

AND THEN IF YOU'RE HERE IN PERSON TODAY, PLEASE MAKE SURE TO SIGN IN AND THE SIGN IN SHEET OUTSIDE THE MEETING ROOM SO THAT WE CAN CAPTURE YOUR ATTENDANCE HERE IN THE MEETING MINUTES.

AND FINALLY, IF THE WEBEX ENDS FOR ANY REASON, GIVE US JUST A FEW MOMENTS AND WE WILL RESTART THE WEBEX WITH THE SAME MEETING DETAILS.

OR IF THERE'S SOMETHING WRONG WITH THAT, WE'LL SEND IT TO THE TAC LIST SERVE.

AND WITH THAT, CAITLIN, I CAN CONFIRM WE DO HAVE A QUORUM AND ALREADY AT YOUR CONVENIENCE.

ALL RIGHT, THANKS, SUSIE.

I HEARD SOME CHATTER WHILE YOU WERE TALKING, BUT HOPEFULLY EVERYONE WAS LISTENING.

UM, IT IS APRIL 29TH.

THIS IS OUR REGULAR APRIL TECH MEETING.

WE'RE IN PERSON AND WE HAVE A BIG MEETING.

WE ARE GOING TO START TO VOTE ON SOME OF OUR PRIORITY ITEMS FOR JUNE BOARD, AND IT'S, IT'S GONNA BE WONDERFUL.

SO, UM, LET'S GET READY.

AND I'M GONNA DO THE ANTITRUST FIRST, SO I'M NOT JUST CHATTERING.

BEFORE WE DO THE ANTITRUST.

TO AVOID RAISING CONCERNS

[1. Antitrust Admonition]

ABOUT ANTITRUST LIABILITY, PARTICIPANTS IN ERCOT ACTIVITIES SHOULD REFRAIN FROM PROPOSING ANY ACTION OR MEASURE THAT WOULD EXCEED ERCOT AUTHORITY UNDER FEDERAL OR STATE LAW.

THERE'S MORE INFORMATION ON THE WEBSITE.

UM, COUPLE OF AGENDA NOTES, UH, THIS MONTH FOR THE SUBCOMMITTEE REPORTS THAT DON'T HAVE VOTING ITEMS, WE ARE WHAT, OKAY.

UM, SO AGENDA FOR SUB SUBCOMMITTEE REPORTS THAT DON'T HAVE VOTING ITEMS, UH, R-M-S-W-M-S AND CFSG, WE ARE NOT GONNA TAKE UP THOSE REPORTS ON, ON CFSG.

WE'LL TAKE UP THE ONE VOTING ITEM ON THE MEMBERSHIP.

AND THEN IF PEOPLE HAVE QUESTIONS, UM, WE'LL, WE'LL KIND OF ANNOUNCE A TIME WHERE YOU CAN ASK QUESTIONS ON THOSE FILED REPORTS.

UM, ON THE PRIORITY REVISION REQUESTS, THE PLAN IS TO TAKE UP NPR 1309 AND NOER 2 83, BOTH OF THOSE ON DRRS, UNDER THE PRS REPORT.

BUT TO TAKE UP NPR 1308 AND NOER 2 82, BOTH OF THOSE ON VOLTAGE RIDE THROUGH UNDER THE ROSS REPORT.

AND MY SORT OF DREAM IS THAT WE WILL FINISH THOSE TWO VOTING ITEMS BEFORE LUNCH.

MAYBE A LATE LUNCH.

UM, BUT WE WILL SEE HOW THAT GOES.

AND THEN FINALLY, ON THE PRIORITY REVISION REQUESTS THAT WE'RE NOT VOTING ON TODAY, UM, 13, 15 AND BATCH ZERO, WE ARE GONNA TAKE THOSE UP AT THE END OF THE AGENDA, SO AFTER COMBO BALLOT, SO WE CAN KIND OF SPEND WHATEVER TIME LEFT AND APPROPRIATE ON THE BATCH ZERO DISCUSSION ALT REPS AND PROXIES TODAY IN THE, UH, INDUSTRIAL CONSUMER SEGMENT.

UH, GARRETT KENT HAS HIS GI HAS GIVEN HIS PROXY TO MIKE REED STARTING AT 1:00 PM WE WILL STILL BE GOING THEN, UM, IN THE CO-OP SEGMENT, MIKE WISE, HIS ALT REP, JOE DAN WILSON, IN THE INDEPENDENT POWER MARKETER SEGMENT, REMI HAS ALT REP SHANE THOMAS IN THE RETAIL ELECTRIC PROVIDER SEGMENT.

UM, JAY HARPO HAS GIVEN HIS PROXY TO BILL BARNES AT 3:00 PM WE WILL STILL BE GOING.

UM, AND IN THE IOU SEGMENT, KEITH NICKS HIS ALT REP, ROB BEVEL.

AND THEN, UH, THEME OF THE MONTH, IT IS THE CO-OPS TURN.

BLAKE, YOU LOOK READY? YEAH.

DO YOU WANT TO HAVE FUN TODAY, CAITLYN? YES.

OKAY.

OKAY.

HERE'S THE SUGGESTION.

UH, RHYME TIME TECH.

SO THERE ARE TWO LEVELS TO THIS, OKAY? LEVEL ONE, YOU MAKE YOUR POINTS WITH A CATCHY RHYMING PHRASE.

UH, SOMETHING LIKE, UH, WHOEVER'S ABLE TO DISTILL THE BIGGER 1 45 COMMENTS DOWN TO A SINGLE VERSION, I WOULD CONSIDER A BATCH ZERO

[00:05:01]

HERO.

SO THAT'S LEVEL ONE.

NOT GONNA HAPPEN TODAY, BUT LEVEL TWO, UH, REALLY JUST TRYING TO TEE NET UP HERE ON SOMETHING YOU MIGHT SAY.

UH, MAKE YOUR POINTS USING LYRICS TO YOUR FAVORITE SONG.

SO, FOR EXAMPLE, IF BILL AND I WERE ARGUING ABOUT SOMETHING, I MIGHT SAY, BILL, YOU CAN'T ALWAYS GET WHAT YOU WANT.

AND IF BILL'S REALLY ON HIS TOES, HE MIGHT RESPOND BACK WITH THE NEXT LINE OF THE SONG, COME ON, BILL, ON THE SPOT.

SOMETIMES YOU GET WHAT YOU NEED.

THERE YOU GO.

SO, NO, THAT'S, THAT'S GOOD ENOUGH.

SO THAT'S MY PROPOSAL.

YOU MISSED THE MOST IMPORTANT PART, BUT IF YOU TRY, SOMETIMES YOU'LL GET WHAT YOU NEED.

I SHOULD HAVE PICKED ON BETH.

GOOD JOB, BETH.

OKAY.

UM, , I HAVE A LOT OF THOUGHTS ABOUT THIS.

I FEEL LIKE IT, YOU KNOW, I DON'T KNOW.

I FEEL LIKE IT'S TURNING INTO A CONTEST, RIGHT? BUT I ALSO FEEL LIKE PEOPLE ARE GONNA USE AI AND JUST BE, YOU KNOW, TALKING TO CLAUDE OR CHAT GPT, THE WHOLE MEETING TO COME UP WITH RHYMES AND LYRICS, WHICH I THINK IS OKAY.

SO EVERYBODY GOOD WITH BLAKE'S SUGGESTION? LET'S DO IT.

RHYME, RHYME TIME, LYRICS, TIME, AND NEXT MONTH, UH, CONSUMERS HAVE TO PICK THE THEME.

ALRIGHT? UH, ALL THAT SAID, WE CAN GET STARTED.

FIRST

[2. Approval of TAC Meeting Minutes (Vote)]

ARE MEETING MINUTES.

I DON'T BELIEVE WE HAVE ANY SUGGESTED EDITS OR CORRECTIONS, CORRECT? CORRECT.

SUSIE, CORRECT.

NED.

OKAY.

UM, SO WE ARE LOOKING TO APPROVE THE MARCH 25TH MEETING, MINUTES AS PRESENTED.

CAN WE PUT THAT ON THE COMBO BALLOT? OKAY.

WE HAVE TO FIND A RHYME FOR COMBO BALLOT.

SOMETHING MALLET.

OKAY.

UM, NOW WE ARE ON TO OUR MEETING UPDATES

[3. Meeting Updates]

WHERE WE PROVIDE AN UPDATE ON THE BOARD AND PUC OPEN MEETINGS WHERE OUR REVISION REQUESTS HAVE BEEN CONSIDERED.

UM, SO AT THE APRIL 20TH AND 21ST BOARD MEETING LAST WEEK, THE BOARD APPROVED ALL REVISION REQUESTS RECOMMENDED FOR APPROVAL BY TECH FROM OUR FEBRUARY AND MARCH MEETINGS.

THOSE REVISION REQUESTS WILL BE CONSIDERED AT THE MAY 29TH PUC OPEN MEETING.

AND I WILL GO TO, UM, IKA FOR, FOR ANYTHING TO ADD FROM COMMISSION STAFF.

THANK YOU, CAITLYN.

SO I HAVE JUST TWO UPDATES.

UH, NEXT OPEN MEETING, MAY SEVEN.

I JUST WANNA ALERT YOU.

PROJECT 5, 8, 7, 7, 7 RELIABILITY STANDARDS WILL BE TAKEN UP AGAIN AND STAFF, WE ARE ABOUT TO FILE A MEMO.

AND THE MAIN THING IS GONNA BE THE ADJUSTMENT FOR THE LARGE LOAD.

WE ARE FIRST TIME, WE ARE GONNA USE THE PROCESS IN 25 3 7 0.

SO WE'RE JUST GONNA BRING THAT TO OUR ATTENTION TO YOUR ATTENTION.

AND THE OTHER ONE, YEAH, WE ARE EXPECTING THIS MONTH, STATE OF THE MARKET REPORT FROM IMM.

SO, UH, WE ARE GONNA REVIEW IT AND IT'LL BE FILED MAY 30TH, AND THEN IN AROUND AUGUST, SEPTEMBER TIMEFRAME, STAFF WILL HAVE REPLIES THE WAY WE HAVE BEEN DOING ON IT.

UM, YEAH, THAT'S ALL I HAVE.

THANK YOU.

OKAY.

THANK YOU.

ANY QUESTIONS OR COMMENTS? GO AHEAD, BRIAN.

JUST WHEN YOU SAY ADJUSTMENT, YOU'RE TALKING ABOUT TO THE SCHEDULE BECAUSE OF THE LOAD FORECAST OR BOTH OF IT? BOTH OF THEM, YEAH.

SCHEDULE WILL BE ADJUSTED AS WELL AS THE LOAD WILL BE.

GOT IT.

THANK YOU.

OKAY.

ANY OTHER QUESTIONS, COMMENTS? NEXT IS OUR REVISION REQUEST.

SUMMARIZE OR COMMENT, MARKET IMPACT STATEMENTS AND OPINIONS.

I WILL TURN IT OVER TO ANNE.

YOU HAVE A RHYME? I DON'T, I CAN'T THINK OF A RHYME RIGHT NOW.

THAT MAY BE HALFWAY THROUGH.

I'LL THINK OF SOMETHING.

ALL RIGHT.

WE HAVE

[4. Review of Revision Request Summary/ERCOT Market Impact Statement/Opinions]

10 REVISION REQUESTS FOR T CONSIDERATION THIS MONTH.

NO, GRADE 2 81 WILL STILL REMAIN TABLED, STILL WAITING.

1307 FOR REASONS FOR REVISION, WE HAVE SIX THAT FALL IN THAT GENERAL SYSTEM PROCESS IMPROVEMENT.

CATEGORY TWO UNDER STRATEGIC PLAN, OBJECTIVE ONE, AND THEN TWO.

UNDER REGULATORY REQUIREMENTS, UM, FOR ERCOT OPINIONS, WE DO SUPPORT ALL REVISION REQUESTS HERE AND HAVE PROVIDED POSITIVE MARKET IMPACT STATEMENTS.

AND THEN FOR CFSG, UM, NO CREDIT IMPLICATIONS EXCEPT FOR NPR 1309.

THEY DID FILE COMMENTS YESTERDAY.

UM, AND I THINK WE CAN DISCUSS THAT ONCE WE GET DOWN TO 1309

[00:10:01]

AND IMM, UM, NO OPINION ON ALL OF THE REVISION REQUESTS EXCEPT FOR, UH, 1309, WHICH THEY DO OPPOSE.

AND I BELIEVE WE'RE GONNA WAIT TILL WE DISCUSS 1309 TO BRING THAT UP AS WELL.

THAT'S CORRECT.

WE'LL TAKE THE IMM COMMENTS UP WITH 1309.

ANY QUESTIONS OR COMMENTS FOR ANN? OKAY, DIANA,

[5. PRS Report (Vote)]

LET'S GO, LET'S KICK IT OFF WITH THE PRS REPORT.

UM, LET'S DO THE FIRST SLIDE OF THE UNOPPOSED REVISION REQUESTS AND, AND TAKE A PAUSE THERE.

OKAY.

GOOD MORNING EVERYBODY.

DIANA COLEMAN WITH CPS ENERGY WITH THE APRIL PRS REPORT.

WE'RE GONNA TAKE UP ON THIS PAGE.

UH, 13 18, 13 22 AND 1324.

UH, 1302 AND 1306 ARE GONNA REMAIN TABLED.

1318 COMES TO US FROM ERCOT.

THIS EXCLUDES THE INCENTIVE FACTOR TO ERCOT APPROVED COST RELATED TO ADDITIONAL ADMISSIONS ALLOWANCE PURCHASES, AND ERCOT APPROVED OUTSIDE ATTORNEY FEES.

ON MARCH 11TH, PRS VOTED UNANIMOUSLY TO RECOMMEND APPROVAL AS SUBMITTED.

AND ON APRIL 15TH, WE VOTED UNANIMOUSLY TO ENDORSE HIM.

FORWARD TO TAG.

THE MARCH 11TH PRS REPORT IN THE 12 23 25 IA FOR 13 18 13 22 ALSO COMES TO US FROM ERCOT.

THIS CORRECTS THE ABSENCE OF A REPORT POSTED TO THE ARCA WEBSITE THAT DISCLOSES TODAY HEAD MARKET AS ONLY OFFER AWARDS ON MARCH 11TH.

WE VOTED UNANIMOUSLY TO RECOMMEND APPROVAL AS THIS, AS SUBMITTED ON APRIL 15TH, WE VOTED UNANIMOUSLY TO ENDORSE AND FORWARD ATTACK THE MARCH 11TH PRS REPORT AND THE FEBRUARY 20TH IA.

AND THEN LASTLY, WE HAVE 1324 ALSO FROM ERCOT.

CLARIFIES THE PROCESS USED BY ERCOT TO DETERMINE THE STARTUP WARMTH STATE OF A BLOCK OF CONTIGUOUS ROOK COMMITTED HOURS.

ON MARCH 11TH, WE VOTED UNANIMOUSLY TO RECOMMEND APPROVAL AS SUBMITTED.

AND ON APRIL 15TH, WE VOTED TO UNANIMOUSLY ENDORSE AND FORWARD ATTACK THE MARCH 11TH PRS REPORT AND THE FEBRUARY 24TH IA ALL WITH NO IMPACT.

OKAY, UM, LET'S START WITH 1302 AND 1306.

AS DIANA SAID, I BELIEVE WE'RE LOOKING TO TABLE BOTH OF THESE TODAY.

CAN WE HAVE SOMEBODY FROM ERCOT SPEAK TO BOTH OF THOSE? CATHERINE ANN CATHERINE'S HERE.

OKAY, I CAN, YEP, I'M HERE.

CAN YOU HEAR ME OKAY? YES.

DID WE PUT YOU ON THE SPOT? ARE YOU OKAY TO NO, THAT'S OKAY.

I CAN, I'M, YOU DON'T HAVE TO RHYME.

YEAH, SORRY.

, I'M NOT PREPARED, ANN.

UM, BUT I CAN'T SAY THAT WE CAN'T HEAR.

I'M NOT SURE WE CAN HEAR YOU.

OH, OKAY.

OKAY.

THAT'S GOOD.

IS THAT OKAY? UM, FOR 1302 AND 1306, THEY NEED TO GO TOGETHER.

IT WOULD BE IDEAL IF THEY WENT TOGETHER BECAUSE THEY'RE, UM, EDITING THE SAME, SOME OF THE SAME PROVISIONS.

AND THEN FOR 1306, THERE'S SEVERAL, UH, REVISION REQUESTS THAT ARE STILL TIED UP IN OTHER SUBCOMMITTEES.

SO, UM, WE COULD TABLE THIS FOR JUST BOTH OF THEM FOR JUST ONE MONTH.

THEN SUPERVISION REQUESTS COULD GET OUT OF THOSE SUBCOMMITTEES AND THEN PUT ALL TOGETHER AT THE BACK.

YEAH, MAYBE ANN.

OKAY.

YEAH, JUST TO REITERATE WHAT CATHERINE SAID, 1306 ITSELF HAS TO BE TABLED, AWAITING A COUPLE GUIDE REVISIONS TO MOVE FORWARD.

AND THEN 1302 HAS CROSSOVER LANGUAGE WITH 1306.

SO WE'D LIKE THEM TO MOVE TOGETHER.

UM, SO WE'RE REQUESTING THAT BOTH 1302 AND 1306 BE TABLED THIS MONTH.

OKAY.

ANY, UM, QUESTIONS OR COMMENTS ON 1302 OR 1306 AND OR, OKAY.

ANY ISSUE WITH, UH, TABLING THOSE AND PUTTING THAT ACTION ON THE COMBO BALLOT? ALRIGHT, SO, COREY, LET'S, UH, TABLE 1302 AND 1306.

ALL RIGHT, MOVING ON.

UM, WE WOULD ALSO BE LOOKING TO RECOMMEND APPROVAL OF NPR 1318 AS RECOMMENDED BY PRS IN THE FOUR 15 PRS REPORT TO RECOMMEND APPROVAL OF 1322 AS RECOMMENDED BY PRS IN THE FOUR 15 PRS REPORT AND RECOMMEND APPROVAL OF 1324 IS RECOMMENDED BY PRS IN THE FOUR 15 PRS REPORT.

ANY QUESTIONS OR COMMENTS ON THOSE THREE REVISION REQUESTS? CAN WE PUT THOSE ON THE COMBO BALLOT? ALL RIGHT.

OKAY, DIANA, LET'S MOVE ON TO THE NEXT SLIDE.

UM, WE,

[00:15:01]

AGAIN, WE ARE GONNA TAKE NOUR 2 82 AND NPR 1308 UP WITH THE ROSS REPORT.

BUT, BUT GO AHEAD AND COVER THAT ON THIS SLIDE FOR 1308.

YEAH, JUST GO AHEAD AND COVER THIS SLIDE.

BUT FOR, UM, YOU KNOW, THE, THE PEOPLE OUT THERE, WE'RE NOT GONNA TAKE COMMENTS ON 1308 RIGHT NOW.

OKAY.

SO, 1308 COMES TO US FROM ERCOT.

UH, THIS IS DEFINING THE LARGE COMPUTATIONAL LOAD ON APRIL 15TH.

PRS VOTED TO RECOMMEND APPROVAL AS AMENDED BY THE APRIL 13TH ERCOT COMMENTS AND FORWARD ATTACK, UH, NPR 1308 IN THE NOVEMBER 14TH, 2025 IA, THERE WAS ONE OPPOSING VOTE FROM THE CONSUMER MARKET SEGMENT.

AND THEN THAT TAKES US TO 1309 THAT COMES TO US FROM ERCOT.

THIS IS DEVELOPING THE DISPATCHABLE RELIABILITY RESERVE SERVICE AS A NEW A S ON APRIL 15TH, WE VOTED TO RECOMMEND APPROVAL OF 1309 AS AMENDED BY THE APRIL 9TH JOINT COMMENTS AS REVISED BY PRS AND FORWARD ATTACK THE REVISION REQUEST IN THE NOVEMBER 20TH IA WITH A RECOMMENDED PRIORITY OF 2026 IN A RINK OF FOUR 40.

THERE WERE TWO OPPOSING VOTES AND FOUR ABSTENTIONS, AND WE HAD SEVERAL COMMENTS THAT HAVE BEEN FILED SINCE.

OKAY.

UM, AND GARRETT, I SEE YOUR MOTION IN THE CHAT, BUT LET ME LAY OUT WHAT I, I THINK WE SHOULD DO.

SO WE WILL, UM, ON 1308 AND 2 82, WE'LL TAKE THAT UP UNDER ROSS.

UM, IF PEOPLE ARE WILLING, I THINK THAT WE SHOULD TAKE 1309 UP TOGETHER WITH, UM, NOIR 2 83, WHICH I BELIEVE WAS UNOPPOSED AT ROSS.

SO WE WOULD, WHATEVER ACTION WE'D BE DOING ON, ON 1309, I, I PROPOSE WE'D DO SORT OF A MINI COMBO BALLOT WITH NOIR 2 83.

UM, AS DIANA SAID, THERE'S BEEN A NUMBER OF COMMENTS THERE WERE SINCE PRS, UM, THERE WERE 4 23 TCPA COMMENTS.

UM, 4 23 ERCOT COMMENTS, 4 24 HEN COMMENTS, 4 24 IMM COMMENTS AND TWO SETS OF COMMENTS, UH, FROM ERCOT YESTERDAY.

AND SO I, MY THOUGHT WAS TO GIVE EACH PARTY JUST A FEW MINUTES TO GO OVER THEIR COMMENTS, UM, MAYBE NOT TAKE INTERACTIVE QUESTIONS DURING THOSE.

'CAUSE WE'RE REALLY FOCUSED ON TWO ISSUES.

SO I THINK ALL THE COMMENTS KIND OF FOCUS ON THE SAME ISSUES, TAKE ALL THE COMMENTS, AND THEN HAVE FREE DISCUSSION AFTERWARDS.

UM, SO IF THAT SOUNDS GOOD TO EVERYBODY, WE WILL GO TO GARRETT FIRST.

YES, MA'AM.

THANK YOU VERY MUCH.

NO, I JUST WANTED TO HAVE THE MOTION TO APPROVE, UM, 1309 WITH THE JOINT COMMENTER'S COMMENTS FROM APRIL 9TH.

SO, BASICALLY, UH, AROUND HAVING OR BEING CONSISTENT WITH ERCO T'S RECENT COMMENTS SUPPORTING THE TWO HOUR NONS SPEND DURATION, AND THE POSITION CONSUMERS HAVE PREVIOUSLY TAKEN OPPOSING ANCILLARY SERVICE DEMAND CURVE PRICE FLOOR AT ONE PENNY PER MEGAWATT ISLAND.

OKAY.

WHAT DAY WERE THOSE JOINT COMMENTS AGAIN? APRIL 9TH.

APRIL 9TH.

OKAY.

SO THE MOTION WOULD BE TO RECOMMEND APPROVAL OF 1309 AS RECOMMENDED NOT BY PRS JOINT COMMENT, BUT AS, I DON'T KNOW, COREY'S SHAKING HIS HEAD AT ME.

COREY, WHAT WOULD THE MOTION BE? WHAT THE JOINT COMMENTS FROM APRIL 9TH WERE MODIFIED BY PRS? AND SO NOW ANY ACTION THE T TAKES WOULD NEED TO BE COMMENTS AGAINST THE PRS REPORT.

SO IT NEEDS TO BE, YEAH, SO ONE OF THE SETS OF ERCOT COMMENTS THAT CAME OUT YESTERDAY, OR THE IMM COMMENTS I DID NOT FULLY UNDERSTAND AND INADVERTENTLY FILL OUT.

OKAY.

COULD WE MUTE THE, THE BACKGROUND NOISE? ALL RIGHT.

SO, SO GARRETT, UM, DO YOU HEAR THAT? SO WE, WE NEED TO WORK OFF THE PRS WITH WHAT COMMENTS FROM WHATEVER DATE PRS WAS.

I MEAN, SHAMELESS PLUG THE SECOND SET OF ERCOT COMMENTS ATTEMPT TO RESTORE A LOT OF THE SPIRIT OF WHAT WAS IN THE JOINT COMMENTERS COMMENTS THAT WERE JOINT BETWEEN ERCOT AND THE IMM.

SO THAT'S PROBABLY A DECENT STARTING POINT, BUT OBVIOUSLY WILL OF THE GROUP.

OKAY.

BECAUSE, SO WHAT WE HAVE IN FRONT OF US ARE THE COMMENTS AS RECOMMENDED BY PS ON THE FOUR 15 PRS REPORT.

SO WE WOULD NEED EDITS ON TOP OF THAT.

SO

[00:20:01]

WOULD IT BE HELPFUL IF WE PULLED UP THE ERCOT, THE PRS WOULD, OR WOULD IT BE ERCOT SECOND COMMENTS, BUT WITH THE ONE PENNY PRICE FOR AS A DESKTOP EDIT? YOU CAN, YOU CAN MAKE WHATEVER MOTION YOU WANT.

SO THAT WOULD, IF THAT'S YOUR MOTION, WE WE COULD PULL THAT UP.

THAT IS MY MOTION.

IF I NEED, DO I NEED TO START ALL THE WAY OVER? NOPE.

SO IT WOULD BE, UH, RECOMMENDED APPROVAL OF 1309 AS RECOMMENDED BY PRS IN THE FOUR 15 PRS REPORT AS AMENDED BY THE ERCOT 4 27 2 COMMENTS WITH DESKTOP EDITS.

COREY, IS THAT RIGHT? THE, UH, 4 28 ER CUT TWO COMMENTS AS REVISED BY TAC.

YES.

YESTERDAY WAS THE 28TH.

THAT'S RIGHT.

OKAY.

UM, AS REVISED BY TECH.

AND THEN, UM, GARRETT, WOULD YOU BE WILLING TO ALSO ADD NO GERD 2 83 AS RECOMMENDED BY ROSS AND THE FOUR TO ROSS REPORT? YES, MA'AM.

I HAVE NO ISSUE.

WELL, LET'S MAKE SURE WE GET FIRST.

OKAY.

LET'S, UM, WE'RE GONNA GO THROUGH THIS, BUT THE MO, SO THE MOTION IS ON THE TABLE.

WE GOT A SECOND FROM MARK DREYFUSS.

COREY'S TELLING ME TO SLOW DOWN.

NO, NO.

I JUST WANTED TO DOUBLE CHECK THE, I'M NOT CLEAR WHAT THE DESKTOP EDIT IS THAT WE'RE TRYING TO MAKE THE, I BELIEVE WE ARE TRYING TO CHANGE THE PRICE FLOOR.

THE PRICE FLOOR.

OKAY.

I BELIEVE IN ERCOT COMMENTS.

IT'S THE $10.

SO THE $10 SHOULD GO TO THE ONE PENNY.

SO RIGHT HERE, IS THAT CORRECT, GARRETT? YES, MA'AM.

OKAY.

THANK YOU FOR SO MOTION TO RECOMMEND APPROVAL OF NPR 1309 AS RECOMMENDED BY PRS AND THE FOUR 15 PRS REPORT AS AMENDED BY THE ERCOT 4 28.

TWO COMMENTS AS REVISED BY TAC AND MOTION TO RECOMMEND GER 2 83 AS RECOMMENDED BY ROSS IN THE FOUR TWO ROSS REPORT AS AMENDED BY ERCOT COMMENT.

WHAT DATE? THE FOUR NINE ERCOT.

FOUR NINE COMMENTS.

OKAY, IS THAT MOTION CORRECT? GARRETT AND MARK? OKAY.

YES, MA'AM.

WE'LL LEAVE THAT MOTION ON THE, THAT MOTION IS A MOTION.

UM, BUT WE'LL CONTINUE DISCUSSION, NED.

THANK YOU.

CAITLYN, I'M GOING TO BE VOTING AGAINST THIS MOTION.

UM, PROBABLY NOT A SURPRISE.

UH, THERE ARE A COUPLE OF ISSUES WITH THIS.

UM, FIRST AND FOREMOST, I GOTTA COME BACK TO WHY WE'RE EVEN TALKING ABOUT DRRS IN THE FIRST PLACE.

IT IS BECAUSE THERE WERE, UM, ADVOCATES THAT WERE OPPOSED TO THE PCM THAT SWORE UP AND DOWN THAT DRRS IS THE TOOL THAT IS NEEDED TO MEET RESOURCE ADEQUACY IN THE ERCOT MARKET.

THAT WAS HOW IT WAS PITCHED.

THAT'S HOW, UH, LEGISLATORS WERE LED TO, UH, YOU KNOW, INCLUDE THAT IN STATUTE AND PURE 39, 1 59, WHICH IS ALSO THE, UH, ALSO THE PROVISION THAT REQUIRES US TO MEET THE RELIABILITY STANDARD, CREATE AND MEET A RELIABILITY STANDARD IN ERCOT.

AND SO, WITH THE PCM BEING PUT ON THE SHELF, DRRS IS THE TOOL THAT WE ARE LEFT WITH IN REGARDLESS WHAT FORM DRS TAKES, IT HAS TO BE ABLE TO SUPPORT THAT OUTCOME.

SO, YOU KNOW, 1309 IN AND OF ITSELF IS, IS, YOU KNOW, HAS SOME, I'LL SAY, UH, QUESTIONS ABOUT HOW EFFECTIVE IT WILL BE AT THAT.

I CERTAINLY HAVE QUESTIONS ABOUT HOW EFFECTIVE IT WILL BE AT REDUCING RUCKS, WHICH WAS ANOTHER ONE OF THE STATUTORY REQUIREMENTS.

UM, I CAN ALMOST GUARANTEE YOU THAT SETTING A PRICE FLOOR OF ONE PENNY ON THE ANCILLARY SERVICE DEMAND CURVE WILL CREATE SIGNIFICANT PRICE FORMATION ISSUES.

AND YOU WILL STRUGGLE MIGHTILY TO BE ABLE TO PROCURE THE DRRS PLAN, IN PARTICULAR, IN ANY AMOUNT OF OFFS.

SPIN DR OR OFF SPIN OFFLINE, NOT, UH, DRRS.

THAT IS WHAT THIS STRUCTURE CRITICALLY DEPENDS UPON TO REDUCE RUX.

UM, I MEAN, THAT'S THE ONLY WAY THAT THIS STRUCTURE IS, IS

[00:25:01]

TRYING TO ACHIEVE THAT OUTCOME.

SO IF YOU PRICE OUT OFFLINE RESOURCES THAT HAVE TO BE ABLE TO MAKE THEIR, THEY HAVE TO REASONABLY EXPECT TO BE ABLE TO COVER THEIR COMMITMENT COSTS THROUGH THAT AWARD, BECAUSE RECALL, IF THEY ARE ACTUALLY COMMITTED THROUGH DRRS, THEY DON'T GET A MAKE HOLE FOR THEIR COSTS.

SO IF YOU THINK THAT YOU CAN COMMIT AN OFFLINE UNIT FOR A PENNY, I DON'T KNOW HOW TO , I DON'T KNOW HOW TO MAKE, UH, MAKE THIS MAKE MORE SENSE.

BUT, UM, I'LL JUST TELL YOU THAT'S NOT GONNA BE SUFFICIENT, AND WE'RE ALL GOING TO BE VERY, UM, DISAPPOINTED IN THE OUTCOMES THAT WE RECEIVE.

SO, CHOICES HAVE CONSEQUENCES.

I'M SIMPLY TRYING TO LAY OUT WHAT THE CONSEQUENCES OF THIS CHOICE WILL BE.

SO IF YOU WANT AN INEFFECTIVE DRRS STRUCTURE, GO AHEAD AND VOTE FOR THIS.

UM, IF YOU WOULD PREFER A MORE EFFECTIVE DRS STRUCTURE, I'M NOT GONNA PRETEND THAT IT'S PERFECT, BUT IF YOU WOULD LIKE A MORE EFFECTIVE ONE THAT ACTUALLY LETS, AND, AND PROVIDES SOME OPPORTUNITY FOR COMPETITIVE MARKET DISCIPLINE AND DYNAMICS TO SET THE PRICE AT THE, UH, AT THE DRRS PLAN, THEN WE NEED TO HAVE SOME AMOUNT OF HEADROOM WHERE COMPETITIVE OFFERS CAN TRY TO BEAT EACH OTHER UP, OTHER UP IN ORDER TO GET THAT AWARD.

AND THAT'S WHAT HAVING THE PRICE FLOOR AT THE DRS PLAN IS INTENDED TO DO.

UM, WHILE, YOU KNOW, WE'VE SUPPORTED TPAS COMMENTS THAT RECOMMENDED USING THE SAME $15 FLOOR THAT APPLIES FOR OTHERS, RECOGNIZE, YOU KNOW, ERCOT HAS ALSO PUT OUT $10.

IF YOU LOOK AT THE HISTORY OF HOW ANCILLARY SERVICES SINCE REAL-TIME IZATION GO LIVE HAVE CLEARED, UH, RELATIVE TO THE $15 ANCILLARY SERVICE DEMAND CURVE PRICE FLOOR ALREADY, YOU'LL SEE THAT THEY CLEAR MUCH, MUCH BELOW THAT BECAUSE COMPETITION WORKS AND FOLKS WILL, UH, COMPETE TO, UH, OUTBID EACH OTHER TO GET TO THAT AWARD.

AND YOU WILL GET THAT AT THE LOWEST COST BECAUSE COMPETITION IS A VERY EFFECTIVE, UH, PRICE, DISCIPLINE, FUNCTION, AND INCENTIVE.

SO, UM, I HAVE SIGNIFICANT CONCERNS WITH THIS.

UM, THERE'S ALSO SOME OTHER LANGUAGE CLEANUPS THAT, UM, ARE IN THE TCPA AND HEN COMMENTS FROM, OH, SHOOT, I'M GONNA LOSE TRACK OF THE DATES.

UM, IT'S 4 23.

4 23, THANK YOU.

AND 4 24 FOR THE HEN COMMENTS.

I THINK THERE, THERE IS SOME OTHER LANGUAGE IN THOSE THAT WOULD BE, UM, THAT IS ALSO WORTHWHILE OF TAX CONSIDERATION.

UM, NOT ALL OF THOSE ARE INCLUDED IN THE ERCOT TWO COMMENTS AND CERTAINLY NOT INCLUDED WITH THIS DESKTOP EDIT.

SO, UM, I WANTED TO VOICE THAT OVER, I'LL BE VOTING AGAINST THIS.

AND IF THIS FAILS, I WOULD LIKE TO, YOU KNOW, PUT FORTH AN ALTERNATIVE MOTION TO, UH, TO ENDORSE ONE OF THOSE, UH, SETS OF COMMENTS AND WILLING TO DISCUSS IF THERE ARE, YOU KNOW, DESKTOP EDITS THAT ARE NEEDED OR IF WE NEED A, A DANCE PARTY, UH, TO GET GOING.

UM, OKAY.

YEP.

I'M GLAD YOU TEE THAT UP.

YOU KNOW, I DO THINK WE SHOULD STILL GO THROUGH THE COMMENTS THAT WERE FILED, SO LET'S DO THAT BEFORE WE GET TO THE QUEUE.

SOMEBODY CAN ALWAYS CALL THE QUESTION IF, IF THEY'RE EAGER TO VOTE.

UM, AND THEN ANN REMINDED ME, UH, WE, THERE IS A IMPACT TO, TO 1309.

IT'S A THREE TO $5 MILLION IMPACT.

SO LET'S, UM, NED, DO YOU WANNA DO TCPA COMMENTS? IS IT MICHELLE, LET'S START WITH TCPA COMMENTS.

SORRY.

UH, MICHELLE RICHMOND, TCPA, UM, I THINK NED PRETTY WELL LAID OUT WHAT OUR, OUR COMMENTS ARE.

WE WOULD LIKE TO MAKE SURE THAT DRRS IS A COMPETITIVE MARKET PRODUCT THAT HAS IN MARKET CLEARING.

UM, AND A PENNY IS NOT GOING TO DO THAT.

UM, THIS IS SUPPOSED TO BE A PRODUCT THAT INCENTIVIZES INVESTMENT AND THERMAL DISPATCHABLE GENERATION.

UM, IT IS ALSO SUPPOSED TO REDUCE THE USE OF R AND THOSE ARE STATUTORY PROVISIONS.

UM, WE ARE VERY CONCERNED THAT PUTTING THE FLOOR AT A PENNY DOES NEITHER OF THOSE THINGS AND WILL FAIL TO ACCOMPLISH THE STATUTORY REQUIREMENTS THAT WERE PUT IN PLACE BY THE LEGISLATURE.

UM, YOU KNOW, A A FLOOR IS NOT THE MINIMUM PRICE, AND I THINK IT'S REALLY IMPORTANT FOR PEOPLE TO REMEMBER THAT IT'S MAKING SURE THAT YOU HAVE COMPETITIVE MARKET OFFERS.

THE OTHER COMPONENT OF THE TCPA COMMENTS ARE TO RETAIN THE FOUR HOUR DURATION FOR NONS SPEND.

UM, WE HAVE AN ANCILLARY SERVICES METHODOLOGY REVIEW THAT'S ONGOING FOR 2027, AND IT WOULD BE MOST APPROPRIATE TO HAVE THAT VETTED PROPERLY WITH FULL ANALYTICS, UM,

[00:30:01]

AS PART OF THE ANCILLARY SERVICES METHODOLOGY REVIEW, AS OPPOSED TO DOING THIS PIECEMEAL IN AN NPRR THAT IS INTENDED TO, UH, DESIGN A NEW PRODUCT.

AND I'LL DEFER TO ANY OF OUR MEMBER COMPANIES WHO MAY WANNA ADD TO THAT.

YEP.

MICHELLE, IF I CAN, UH, JUST MAKE A QUICK POSTSCRIPT ON THAT.

'CAUSE THERE ARE TWO OTHER, UH, ELEMENTS THAT ARE INCLUDED IN THE TPA COMMENTS THAT ARE ALSO IMPORTANT TO TEE UP.

UM, I'LL START WITH THE EASY ONE, AND THAT IS, UH, THERE IS SOME STATUTORY LANGUAGE THAT TALKS ABOUT DRS BEING, UH, INTENDED TO ADDRESS MARKET UNCERTAINTY.

UM, WHEREAS THE, THE LANGUAGE IN THE NPRR ONLY ADDRESSES UNCERTAINTY.

AND SO, UH, WE THINK IT'S IMPORTANT TO CLARIFY THAT THAT'S THE, THOSE ARE THE WORDS THAT THE LEGISLATURE CHOSE.

AND, UM, FAR BE IT FROM US TO SECOND GUESS THAT, UH, THE, THE BROADER ISSUE IN THERE IS, UM, YOU KNOW, THE, THE OTHER ISSUE THAT'S IN THERE IS, UH, THE NONS SPEND DURATION BEING AT FOUR HOUR, CONTINUING TO BE AT FOUR HOURS VERSUS TWO HOURS AS, UH, THE JOINT COMMENTERS HAD HAD AMENDED.

AND I THINK IS IN THE, UH, THE ERCOT TWO COMMENTS.

UH, MAIN ISSUE THERE IS THAT WE'RE, WE'RE HERE TO DISCUSS IMPLEMENTING DRRS AND WHILE, UH, BE THE FIRST TO RECOGNIZE THAT THERE'S BEEN A LOT OF DISCUSSION ABOUT REDUCING THE NONS SPEND DURATION TO TWO HOURS, THAT REALLY IS A SEPARATE TOPIC.

THAT IS, YOU KNOW, WE THINK IS MORE APPROPRIATELY TEED UP IN THE ANCILLARY SERVICE METHODOLOGY DISCUSSION, IN PART BECAUSE I HAVE A STRONG SUSPICION THAT IF THE, IF THE, UH, DURATION REQUIREMENTS ARE REDUCED FOR NONS SPEND, ONE OF THE TRADE-OFFS OR ONE OF THE OUTCOMES OF THAT DECISION, THE CONSEQUENCES OF THAT DECISION WILL BE ERCOT MADE.

I DON'T KNOW WHY I'M GETTING A RINGING SOUND.

ARE Y'ALL HEARING THAT TOO? YEAH, WE'RE, WE'RE TRYING TO FIGURE THAT OUT IN THE ROOM.

OKAY.

UM, DOES ANYBODY HAVE THEIR MIC ON? OH, THAT DOES IT.

OKAY.

WHO'S MIC? SUZIE DID THE RESCUE.

THANK YOU, SUSIE.

UH, SO I, I SU BACKING UP A SECOND.

I SUSPECT THAT IF, CAN WE WRAP THIS UP IN TWO MINUTES? NED, THOUGH, YOU GUYS HAVE HAD THE FLOOR FOR A WHILE.

I'M A WORDY PERSON.

YOU'RE A VERY WORDY PERSON VERB, AND WE LOVE THAT ABOUT YOU.

UH, SO, ALL RIGHT, IF WE REDUCE THE, THE DURATION FROM FOUR HOURS TO TWO HOURS, WHAT'S OUR CALL LIKELY TO DO? THEY'RE LIKELY TO SAY, HEY, WE'RE NOT ACTUALLY GETTING THE SAME QUALITY OF RESOURCES FOR THIS RESERVE THAT WE USED TO GET.

AND SO WHAT'S THE SOLUTION TO THAT? THEY'RE PROBABLY GONNA SAY, WE NEED TO BUY MORE NONS SPEND TO FILL THAT GAP.

BECAUSE IF YOU HAVE A BUNCH OF DURATION LIMITED RESOURCES THAT ARE PROVIDING WHAT THEY'RE EXPECTING TO, UH, BE A DURABLE, UM, A DURABLE SOURCE OF ENERGY AND CAPACITY WHEN RELEASED, THAT'S GONNA BE THE, THE, THE LEVER THAT'LL BE THERE.

SO THERE'S PROBABLY AN EFFICIENCY, UH, FRONTIER, UH, BETWEEN QUALITY DURATION AND QUANTITY PROCURED THAT WOULD REALLY BE BENEFICIAL FOR STAKEHOLDERS TO LOOK AT AND UNDERSTAND BEFORE MAKING THIS DECISION.

AND SO I, I THINK THAT'S SOMETHING THAT WE SHOULD, UM, EXTRICATE FROM THIS PARTICULAR VOTE AND TRYING TO GET DRRS TO THE BOARD.

AND I REALIZE THAT'S PROBABLY GONNA BE A LOT OF FEEDBACK ON THAT POINT, BUT WANTED TO AT LEAST MAKE THAT THANKS.

OKAY, THANKS NED.

LET'S GO TO THE, UM, HUNT, HUNT COMMENTS.

SO ERCOT ACTUALLY HAS A PRESENTATION.

SO MY PLAN NOW IS TO GO TO HUNT COMMENTS, IMM COMMENTS, TAKE THE QUEUE, AND THEN LET ERCOT PRESENT.

AS ALWAYS, IF, IF WE'RE EAGER TO VOTE ON THE MOTION, UH, JUST CALL THE QUESTION OR BEFORE THAT POLITELY ASK TO, TO STOP CONVERSATION.

ALL RIGHT.

DOES SOMEONE WANT TO SPEAK TO THE 4 24, UM, HUNT ENERGY NETWORK COMMENTS? IS THIS SHAM? YEAH, THIS IS, YES.

THIS IS SHA SIKI.

CAN YOU HEAR ME? YEP.

OKAY.

YEAH.

UH, SHAM SIKI WITH CRESCENT PARK CONSULTING REPRESENTING HUNT ENERGY NETWORK ON THIS TOPIC.

UM, SO WE, UH, YOU KNOW, SUPPORT THE TCPA COMMENTS.

UH, WE ADD SOME CLARIFYING LANGUAGE ON HOW THE FLOOR IS.

UH, THIS IS AN A SDC FLOOR, JUST TO MAKE SURE THAT PEOPLE ARE UNDERSTANDING THAT THAT FLOOR IS NOT A PRICE FLOOR, IT'S AN A SDC, UH, THE DEMAND CURVE FLOOR.

SO WE ADDED SOME CLARIFYING LANGUAGE TO REALLY MAKE IT CLEAR HOW THAT FLOOR IS APPLIED TO DIFFERENT, UH, PRODUCTS.

UM, SO WE, UH, SUPPORT THE CONCEPT, AND I KNOW THAT, UH, YOU KNOW, IN THE ERCOT PRESENTATION, THEY'RE GONNA TALK ABOUT, IF YOU GO TO THE MINIMUM PRICE LEVELS, UH, IN THIS COMMENTS, YOU'LL SEE THAT, UH, YOU KNOW, THE MINIMUM PRICES WERE CHANGED AS WELL.

SO, UH, YOU KNOW, OUR, UH, HENCE POINT OF VIEW IS THAT,

[00:35:01]

AND I THINK THEORETICALLY THIS IS THE RIGHT POINT OF VIEW, IS THAT YOU, THE ORDC, YOU KNOW, WHEN YOU DO THE LOLP FOR THE ORDC, IT'S BASED ON A 30 MINUTE UNCERTAINTY.

SO IT'S A 30 MINUTE PRODUCT AT MOST, YOU KNOW, FIVE TO 30 MINUTE PRODUCT THAT YOU'RE EVALUATING THROUGH THAT PROCESS.

NOW, YOU'RE TRYING TO FIT IN A TWO HOUR PRODUCT INTO A 30 MINUTE, UM, DEMAND CURVE, UM, WHICH IS THE A-O-R-D-C, WHICH IS WHY, YOU KNOW, ERCOT IS SAYING, HEY, REALLY ON A 30 MINUTE BASIS, THIS HAS VERY LITTLE VALUE, AND WE DON'T DISAGREE WITH THAT ON A 30 MINUTE, AN SERVICE LIKE AN OPERATING RESERVE MEANT TO ARREST FREQUENCY AND STUFF.

UM, AND, UM, YOU KNOW, DRS DOESN'T HAVE THAT MUCH VALUE, BUT IT SHOULDN'T REALLY BE IN THAT CURVE TO BEGIN WITH.

IT SHOULD BE A SEPARATE DEMAND CURVE BECAUSE IT DOES HAVE SIGNIFICANT VALUE WHEN YOU LOOK AT WHAT IT'S TRYING TO SOLVE THE STATUTE, UH, INTENDED IT TO SOLVE, WHICH IS, YOU KNOW, THE UNCERTAINTY AND INTERMITTENT AND ALL THESE RESOURCES, ESPECIALLY DURING A LONG WINTER STORM.

AND THAT'S WHERE YOU WANT TO INCENTIVIZE DISPATCHABLE RESOURCE AND TO AVOID DRUGS.

IN ORDER TO DO THAT, YOU REALLY NEED A SEPARATE DEMAND CURVE, UH, FOR, UH, APART FROM THE A-O-R-D-C, WHICH IS A 30 MINUTE PRODUCT, UM, YOU KNOW, AND, AND VALUE THAT BASED ON THAT SEPARATE, UH, ANSWER SERVICE DEMAND CURVE.

SO THE FEEDBACK WE'VE GOTTEN FOR IS THAT, YEAH, WE'LL ADDRESS THAT IN 1310.

UM, SO, YOU KNOW, I DON'T KNOW HOW, I DON'T KNOW WHERE 1310 IS GOING, BUT THE FACT IS, YOU KNOW, TREATING DRS AS JUST ANOTHER ONE OF THESE ANSP SERVICES WITH VERY LITTLE VALUE ON A 30 MINUTE BASIS, REALLY THERE'S A DISSERVICE AND DOESN'T PROVIDE THE INCENTIVE FOR DISPATCHABLE RESOURCES THAT THEY STARTED INTENDED.

SO, UM, SO THE $15 FLOOR, UM, A SDC FLOOR IS NEEDED JUST TO NOT REDUCE ANS SERVICE PRICES FURTHER BY INTRODUCING THIS NPRR, UH, BECAUSE WE CURRENTLY HAVE A $15 A SDC FLOOR, SO IT JUST MAKES SENSE TO MAINTAIN THAT $15 FLOOR.

UM, AND THE NEXT, UH, THE OTHER POINT IS THAT THIS NPR REALLY DOESN'T TAKE INTO THE GUIDANCE THAT THE PUC PROVIDED.

THE PUC SAID THAT, UH, YOU KNOW, THE HSL REALLY REPRESENTS THE, THE MAXIMUM YOU CAN PRODUCE, WHICH IS SORT OF WHAT WE CALL, YOU KNOW, THAT, UH, NAMEPLATE HSL, YOU COULD SAY, UM, AND THAT, YOU KNOW, THE A AND B TWO A AND B SHOULD BE TAKEN TOGETHER, WHICH MEANS THAT THE RESOURCE HAS TO BE, YOU KNOW, START UP AND GO TO HSL, UH, WITHIN THE TWO HOURS, AND THAT'S WHAT QUALIFIES YOU, UH, FOR THE RRS.

SO WE DIDN'T SEE ANY ACCOUNTING OF THE PUC GUIDANCE.

UM, WE THINK THAT THAT SHOULD BE TAKEN INTO ACCOUNT.

SO THOSE WERE OUR MAJOR ISSUES.

UM, AND THE REASON WE PROVIDED OUR COMMENTS.

SO FOR NOW, I GUESS, GIVEN THAT WE ARE NOT LOOKING AT A SEPARATE ANSLEY SERVICE, UH, OR DEMAND CURVE, UH, SO WE, THAT'S WHY OUR MINIMUM, WE SUPPORT THE TCPA INCREASING THE MINIMUM PRICE FOR THE D-R-S-A-S-D-C TO $15 TO, TO GIVE IT A LITTLE BIT MORE VALUE, UH, WHEN YOU GET INTO DRS AND, UH, YOU KNOW, WITHOUT THE $15 FLOOR ON THE A SDC CURVE, YOU REALLY WON'T GET ANY OFFLINE, UH, DRS BECAUSE THERE'S AN OPPORTUNITY COST TO, YOU KNOW, TO FOREGO YOUR MAKE CALL PAYMENT.

SO THOSE ARE SORT OF THE, THE SUMMARY OF THE HAND COMMENTS.

OKAY.

THANK YOU, SHAS.

UM, NEXT IN CHRONOLOGICAL ORDER WITH IMM COMMENTS.

JEFF, DO YOU WANNA SPEAK OR DO YOU WANNA WAIT TILL PRESENTS? OR SORRY FOR MOVING.

IT'S, IT'S JUST EASIER FOR PEOPLE TO TAKE SHOTS AT ME IF I'M FAIR ENOUGH.

YEAH.

HI, UH, JEFF MCDONALD, DIRECTOR OF IMM.

SO I, FIRST I WANTED TO THANK ERCOT FOR CONSIDERING OUR COMMENTS ON FRIDAY AND, AND COMING FORWARD WITH A SEPARATE SET OF COMMENTS ON MONDAY.

I VERY MUCH APPRECIATED, AND THANK YOU FOR THAT.

UM, I'D LIKE TO, SO, SO OUR BIG ISSUE, UH, WITH OUR COMMENTS ON FRIDAY HAD TO DO WITH THE TWO HOUR VERSUS FOUR HOUR.

I APPRECIATE THE COMMENTS THAT SHAMS HAS MADE.

UM, I DO THINK THAT, YOU KNOW, WE'VE BEEN, SO THIS HAS BEEN AN ONGOING DISCUSSION FOR ABOUT A YEAR AND A HALF.

I THINK WE, WE FIRST CAME INTO THIS, UH, IN THE AS STUDY IN, YOU KNOW, THE SECOND HALF OF 2024.

AND THERE HAVE BEEN NUMEROUS PUBLIC CONVERSATIONS SINCE THEN.

WE, WE PRESENTED OUR, OUR POSITION AND OUR EMPIRICAL

[00:40:01]

ANALYSIS SUPPORTING A MOVE AWAY FROM A FOUR HOUR REQUIREMENT.

I THINK WE'D ORIGINALLY, UM, PROPOSED A ONE HOUR REQUIREMENT, BUT TWO HOURS SEEMS FITTING, GIVEN THE TWO HOUR START TIME.

THE ISSUE THAT HAS COME ABOUT, UH, THAT WE'VE NOTICED, AND, AND I THINK WE'VE PRESENTED THIS AT THE PEC AND POSSIBLY AT THE BOARD, I'M SURE IT WILL BE IN THE STATE OF THE MARKET REPORT, THAT IT WILL BE OUT IN A MONTH, AND IS THAT WE'RE SEEING PRICE FORMATION ISSUES RESULTING FROM THE CHOICE OF, UM, DURATION REQUIREMENT FOR ESRS.

SO WHAT WE'RE SEEING IS NONS SPIN PRICES BEING, UH, NONS SPIN, WHICH IS CURRENTLY THE LOWEST QUALITY OF THE RESERVES, UM, BEING, YOU KNOW, MULTIPLES OF HIGHER RESERVES.

AND THOSE MULTIPLES ARE DIRECTLY, UM, ATTRIBUTABLE TO THE DURATION REQUIREMENT, WHERE YOU CAN SEE THE DURATION REQUIREMENT IN RRS IS A FRACTION OF THE DURATION REQUIREMENT FOR NONS SPIN.

AND YOU'RE SEEING THE PRICES IN NON SPIN CLUSTERING AROUND THAT MULTIPLE OF THE RRS PRICE, UH, AND SO FORTH.

SO THAT, FROM A PRICE FORMATION PERSPECTIVE, THAT DOESN'T, UM, MAKE SENSE TO US.

UH, SINCE NONS SPIN IS A, A LOWER, UM, QUALITY RESERVE, WE'D LIKE TO SEE THE, AND, AND ALSO JUST FRANKLY, IT, IT ARTIFICIALLY RESTRICTS THE AMOUNT OF CAPACITY AVAILABLE, UM, IN THE RESERVE SPACE TO ERCOT AND TO THE MARKET.

SO, SO IF, YOU KNOW, SPEAKING JUST BRIEFLY TO SHAWN'S COMMENTS, IF THERE'S AN ISSUE WITH, IF THERE'S A SPECIFIC ISSUE WITH THE QUALITY OF THE RESERVE THAT YOU'RE GETTING FROM A PARTICULAR TECHNOLOGY THAT SHOULD BE ADDRESSED, I DON'T BELIEVE THAT ADDRESSING THAT THROUGH THE DURATION REQUIREMENT FOR ESRS IS THE APPROPRIATE WAY TO ADDRESS IT.

I THINK IT, IT MAY BE MORE OF A PRODUCT DEFINITION PROBLEM, BUT, UM, BUT ALL THE SAME.

WE'RE SEEING PRICE FORMATION THAT DOESN'T MAKE SENSE TO US.

SO I'VE HAD TO DEAL WITH WHAT I PRESUME WILL BE COMMENTS COMING AT ME IN A COUPLE MINUTES ABOUT, WELL, ON THE ONE HAND YOU SAY WE NEED MORE REVENUE IN THE WHOLESALE MARKET TO GET PRICE SIGNALS.

ON THE OTHER HAND, YOU'RE SAYING THE PRICES ARE TOO HIGH IN NONS SPIN AND YOU'D LIKE TO SEE LESS REVENUE.

SO THERE I, YOU KNOW, I'LL ADDRESS IT AND WE CAN ADDRESS IT AGAIN IN A MOMENT OR TWO WHEN THE QUESTION COMES AT ME.

BUT, UM, BUT WHAT WE LIKE TO SEE ARE IS PRICE FORMATION THAT MAKES SENSE GIVEN THE PRODUCT DEFINITION AND THE NEED AND, AND THE DEMAND FOR THAT PRODUCT, WHICH IS PART OF THE PRODUCT DEFINITION, REALLY.

SO, SO WHAT WE'D LIKE TO SEE IS THAT IF, IF ERCOT WINDS UP, UM, SEEING SHORTAGE CONDITIONS THAT DRIVE HIGHER PRICES, THEN WE WOULD LIKE TO SEE THOSE HIGHER PRICES MAKE SENSE AS WELL.

UM, AND THAT'S WHERE THE A SDC AUGMENTATION COMES IN, UH, FOR THE CURVES.

SO, SO WE VIEWED THE A SDC CURVES AND THE DURATION REQUIREMENT AS BEING COMPLIMENTARY TO EACH OTHER, BOTH IN THE DIRECTION OF BETTER PRICE FORMATION, ARTIFICIALLY PUMPING, ARTIFICIALLY PUMPING REVENUE INTO THE MARKET IS, IS NOT GOING TO GET, UH, A SATISFACTORY RA RESULT.

SO RA WILL COME WHEN, WHEN THE MARKET STARTS PERCEIVING SHORTAGES AND PRICING THEM AND, AND PUTTING MORE MONEY IN THE MARKET.

SO, SO THAT'S, YOU KNOW, AT A HIGH LEVEL, I THINK THAT'S WHERE, WHERE WE ARE ON THIS.

AND AGAIN, I REALLY APPRECIATE THAT ERCOT CAME BACK WITH, UM, THEIR COMMENTS TO, TO NED'S COMMENTS EARLIER.

AND I, I'M NOT TRYING TO PICK ON ANYBODY.

I JUST, SINCE I'M UP HERE, I JUST THOUGHT I WOULD, UM, DEAL WITH EVERYTHING.

SO, SO THERE IS THIS OTHER DRRS PRODUCT, UH, IN 1310, AND I DO APPRECIATE THAT THERE WAS IN SOME SENSE OF AN RA CONCEPT WRAPPED AROUND DRS, UH, AS IT CAME FROM THE LEGISLATURE, BUT, BUT THEY'VE BEEN SEPARATED HERE, UM, INTO TWO DISTINCT INITIATIVES AND TWO DISTINCT PRODUCTS.

AND SO, SO I DON'T THINK THAT LOOKING TO DRRS AS AN OPERATING RESERVE VIA 1309 AS A RESOURCE ADEQUACY VEHICLE IS, IS APPROPRIATE.

I, I, AND I, AND I TRULY MEAN, I DON'T THINK IT'S APPROPRIATE IN THE SENSE THAT IF YOU, IF YOU LOOK AT THE LOAD GROWTH CURVES AND YOU NET OUT WHATEVER LOAD GROWTH MIGHT HAVE TO BRING ITS OWN GENERATION, YOU, YOU, YOU WOULD REALLY HAVE TO THINK ABOUT HOW MUCH REVENUE YOU THINK DRRS WOULD PUMP INTO THE MARKET, UM, ON ITS OWN AS, AS WE ROLL THROUGH INCREASING LOAD OBLIGATION.

AND DRS ON ITS OWN ISN'T GOING TO ADD THAT MUCH REVENUE.

UM, AND AGAIN, ALL THIS GETS TO THE ERCOT SYSTEM HAS TO GET SHORT AND PRODUCE HIGHER SHORTAGE PRICES IN ORDER TO GET ENOUGH REVENUE IN THE MARKET.

IF, IF, IF THE LOAD GROWTH CURVES ARE EVEN 25% ACCURATE, WE'LL GET TO MORE REVENUE WITHIN

[00:45:01]

A COUPLE OF YEARS.

UH, SO, AND, AND, AND THAT, THAT WON'T BE SPECIFIC TO DRS.

UM, ON THE PRICE FLOOR MATTER, WE HAVE PREVIOUSLY OBJECTED TO THE PRICE FLOOR, BUT ERCOT ISS IN AN ODD SPOT, I THINK, I THINK THE SOLUTION TO THE PRICE FLOOR MATTER IS PUSHING TOWARDS ERCOT, NOT WRECKING TO, UH, AS TARGET, BUT RATHER WRECKING TO AN AS PROCUREMENT AN AN AN AVAILABILITY THAT WOULD AT LEAST SATISFY, UM, RESERVES THAT WOULD KEEP, UM, ERCOT OUT OF AN EEA ONE.

SO THAT'S, THAT'S A, A FAIRLY LARGE DIFFERENCE BETWEEN EEA ONE AND THE PROCUREMENT TARGET IN TOTAL, I THINK, UM, IF I'M NOT MISTAKEN.

AND, AND SO THE, THE PROBLEM WITH THE PRICE FLOOR MATTER COMES WITH ERCOT FEELING LIKE IT NEEDS TO R TO TO HAVE ENOUGH CAPACITY AVAILABLE TO MEET THE ENTIRE, UM, AS TARGET OR, OR AS, YOU KNOW, WHATEVER THE, AS METHODOLOGY PRODUCED.

SO, SO I I KIND OF VIEW, WE, WE WE'RE NOT IN FAVOR OF PRICE FLOORS, BUT I VIEW THAT AS HAVING A SEPARATE TRACK, UM, THAT WOULD GET TO PUTTING SOME BOUNDS AROUND WHAT, WHAT ERCOT COULD RUCK FOR.

AND THEN WE POTENTIALLY WOULDN'T NEED A PRICE FOR IN R WHICH MEANS THAT WE WOULDN'T NEED A PRICE FLOOR IN THE DAY AHEAD IN THE REAL TIME MARKET.

SO I KNOW I'VE TAKEN UP A BUNCH OF TIME, I JUST WANT TO GIVE A HIGH LEVEL OVERVIEW OF, YOU KNOW, OUR POSITION.

I KNOW YOU'VE HEARD MOST OF IT REPEATEDLY, SO I'M, I'M HAPPY TO TAKE ANY QUESTIONS OR, OKAY, LET'S GO TO THE QUEUE, BUT I'LL GIVE PEOPLE IN THE QUEUE THE OPTION OF TALKING NOW OR, OR WAITING FOR OR CRACK COMMENTS.

UM, SHANE? YEAH, THANK YOU, SHANE, THOMAS, MICHELLE, UM, JUST A LITTLE BIT, I GUESS MAYBE MORE DIRECTLY ADDRESSING WHAT HE WAS JUST SPEAKING TO.

I THINK THAT, YOU KNOW, WE'RE, WE'RE, WE'RE TRYING TO, HE'S DESCRIBING IT AS A LOWER, AS LIKE THE IMPOSITION THAT IT'S A LOWER QUAL QUALITY PRODUCT.

AND WITH THAT REGARD, THEY'RE JUST TALKING ABOUT THE RAMP TIME, HOW LONG IT TAKES TO, TO SPIN UP.

BUT THERE'S OTHER FACTORS THAT ALSO ARE IMPORTANT IN THE MARKET, AND WE'RE TRYING TO ASSIGN SOME SORT OF VALUE TO THEM.

AND I, AND IN MY MIND, AT LEAST PART OF THE REASON THAT, YOU KNOW, THE DURATION IS SEEN AS IMPACTING REAL-TIME PRICES, YOU KNOW, THAT REQUIREMENT, WE SAYING THE, YOU KNOW, THE, IT'S, UH, NONS SPIN IS, IS, YOU KNOW, OFTEN, UH, CLEARING AT A MULTIPLE OF REGULATION OR RS, WHICH SEEM LIKE MORE VALUABLE SURFACES IS, THAT'S BECAUSE IT'S TRYING TO ASSIGN A VALUE TO THIS DURATION WHEN IT WE'RE SHORT OF DURATION IN, IN REAL TIME, BASICALLY.

I MEAN, SHORT OF DURATION MAY BE, UH, THE WRONG, UH, TERM THERE, BUT IT'S, IT'S, IT'S SHOWING US THAT THAT'S WHAT'S BINDING IN, IN THE MARKET AND THAT'S WHY THESE PRICES ARE, ARE HIGHER.

SO I THINK THE KIND OF THE ASSERTION THAT DURATION DOESN'T HAVE A VALUE, UM, UM, IS KIND OF ONE-SIDED ARGUMENT.

UM, AND I THINK THEN LOWERING THE QUALITY OF NONS SPIN, YOU'RE ALSO GOING TO, TO SOLVE THE SAME ISSUE, YOU'RE GOING TO NEED TO BUY MORE OF IT.

AND SO YOU'RE GONNA HAVE A COUNTERING OF THIS EFFECT.

AND WHEN WE GO TO THE AS METHODOLOGY DISCUSSION, I THINK THAT THIS COULD PROBABLY BE HANDLED MORE HOLISTICALLY AS PART OF THAT, AND WE COULD SEE WHAT IT MEANS, UH, HOW MUCH OF IT ARE WE GOING TO BE NEEDING AT FOUR HOURS OF, UH, DURATION, HOW MUCH WOULD BE NEEDING IF IT WAS ONLY, IF IT WAS STILL IT WAS REDUCED TO TWO HOURS.

AND WE CAN KIND OF EVALUATE THE ACTUAL IMPACTS OF THIS ON THE MARKET, UH, MORE DEEPLY BEFORE HAVING THAT DISCUSSION.

UM, IN GENERAL ON, ON THE KIND OF WHAT'S PROPOSED BEFORE US, WE WOULD BE AGAINST THAT, UH, THE MOTION THAT WAS MADE BECAUSE OF IT REDUCING THE, THE FLOOR.

WE, YOU HAVE TO LEAVE ROOM FOR THE MARKET TO SOLVE PUTTING A WELL, RIGHT, TYPING IT IN AS A A ONE PENNY FLOOR IS, YOU KNOW, OBVIOUSLY POINTLESS BECAUSE THAT'S THE LOWEST PRICE IT COULD BE.

SO, AND IF YOU'RE NOT LEAVING ANY ROOM FOR THE MARKET TO SOLVE, WE'RE JUST GONNA SPEND $5 MILLION AND TWO YEARS OF WORK FOR WHAT IT'S, IT'S A LOT OF EFFORT TO DO SOMETHING THAT WE KNOW WE'RE BUILDING UP TO FAIL.

AND SO WE NEED TO BUILD THIS IN A WAY THAT THE MARKET CAN SOLVE, THE MARKET CAN WORK AND, UH, YOU KNOW, WORK TOWARDS WHAT IT'S INTENDED TO DO AND REDUCE RUCKS AT LEAST WITH THIS, THIS VERSION THAT WE HAVE HERE.

AND I ALSO WANNA POINT OUT THAT I THINK, YOU KNOW, I DON'T WANNA SPEND A LOT OF TIME ARGUING ABOUT THE, YOU KNOW, EXACT SHAPE AND LEVEL OF THE FLOOR, 10 VERSUS

[00:50:01]

15 AND THINGS LIKE THAT.

I THINK THE 15 IS OUR PREFERRED OPTION, BUT REALLY WE'RE GOING TO DRAW THESE AT LEAST ONE MORE TIME, MAYBE TWO MORE TIMES BEFORE DRS GOES LIVE.

SO WE'RE GONNA HAVE OTHER CHANCES TO DO THIS.

UM, BUT WE NEED TO GET KIND OF THE FUNDAMENTALS OF IT CORRECT HERE.

AND I THINK ONE OF THAT, ONE OF THOSE IS PUTTING IN A PROPER FLOOR AND ESTABLISHING THE, THE FLOOR MECHANISM TO GET, UH, HAVE ROOM FOR THE MARKET TO WORK.

ALL RIGHT.

OKAY.

THANKS SHANE.

BILL, COMMENT NOW, OR COMMENT.

DR.

ERCOT, CAN I DO BOTH? YOU, YOU GONNA HAVE TO GET BACK IN THE QUEUE.

WE'RE, WE'RE GOING TO HEAR ER KAT'S PRESENTATION BEFORE WE VOTE ON THIS MOTION.

IS THAT CORRECT? YOU KNOW, RIGHT NOW? YES.

OKAY.

IF SOMEONE CALLS THE QUESTION, NO.

OKAY.

UH, I'LL GET A COUPLE REACTIONS NOW.

ONE IS OUR FOCUS ON THIS.

THE DESIGN OF THIS VERSION OF DRS, WHICH IS NOT DRS PLUS, IS HOW EFFECTIVE IT WILL BE AT THE STATUTORY REQUIREMENT OF REDUCING ROCKS.

AND THERE'S TWO PARTS TO THIS PROPOSAL THAT MAKE IT EFFECTIVE AT DOING THAT.

AND AS THE STRUCTURE OF THE DEMAND CURVE AND THE PRICE FLOOR AND THE DURATION LIMIT, AS WE SAW LAST WEEK AT THE BOARD MEETING, IF THERE ISN'T SUFFICIENT THERMAL GENERATION ONLINE, THEN ERCOT WILL RUCK DUE TO CONCERNS WITH STATE OF CHARGE DEGRADATION.

SO THE GOAL OF THIS IS, WHEN WE THINK ABOUT HOW THIS IS DESIGNED, WILL IT PROVIDE PROPER PRICE INCENTIVES FOR THERMAL RESOURCES TO COMMIT MORE, MORE? AND I COMPLETELY UNDERSTAND WHY THE LARGE CONSUMERS WOULD WANT THE WEAKEST VERSION OF THIS, BUT I'M NOT, IT'S NOT CLEAR TO ME THAT THAT WILL ADDRESS THE PRIMARY CONCERN WITH THE DESIGN OF THIS PRODUCT.

AND I ACKNOWLEDGED JEFF'S, UH, COUPLE JEFF'S POINTS, WHICH HE SMARTLY LEFT THE MICROPHONE IS, UH, THE DURATION LIMITS IN THE ANCILLARY SERVICES CURRENTLY DO CREATE PRICING OUTCOMES WHERE YOU HAVE LOWER QUALITY RESERVES PRICING HIGHER, BUT THAT'S INTENTIONAL.

THAT'S HOW YOU PROVIDE ADDITIONAL INCENTIVES TO COMMIT MORE THERMAL RESOURCES.

SO YOU AVOID THE OUT OF MARKET ACTION, WHICH I CERTAINLY HOPE THE IMM AGREES THAT WE NEED TO DO WHATEVER POSSIBLE TO AVOID OUT OF MARKET ACTIONS, INTERRUPT COMMITMENTS.

SO THE DESIGN OF THIS PRODUCT IS CRUCIAL TO DO THAT.

AND ALSO, UM, JUST ANOTHER REACTION TO JEFF'S COMMENTS, WHICH I ACKNOWLEDGE, DIAMOND HAS BEEN VERY CONSISTENT ON THEIR PERSPECTIVE ON CONCERNS WITH CONSERVATIVE OPERATIONS, THE AMOUNT OF ANCILLARY SERVICES WE PROCURE, THE DESIGN OF THIS PRODUCT FIRM, FUEL SUPPLY SERVICE, RESIDENTIAL DEMAND RESPONSE PROGRAM, THEIR CONCERNS ARE ALL CONSISTENT, IS THAT WE NEED TO BE DEPENDENT ON TRUE SHORTAGES.

THE PROBLEM IS WE CAN'T, WE CAN'T HAVE SHORTAGES IN SOME MARKET, AND WE GOTTA STOP ACTING LIKE WE CAN.

SO THE WAY THAT WE AVOID THAT IS WE DEFINE A SHORTAGE AS SOMETHING THAT'S FAR AWAY FROM A SHORTAGE.

AND THAT'S WHAT WE'RE TRYING TO DO HERE WITH THE DESIGN OF THIS PRODUCT AND SUPPLEMENT THE CURRENT DESIGN WITH ADDITIONAL INCENTIVES.

SO FOCUS HERE IS WELL REDUCE ROCK.

SO THAT'S WHAT I'M GONNA BE ASKING A LOT OF QUESTIONS ON OUR ACCOUNT IN THEIR PRESENTATION.

THANK YOU.

OKAY, THANK YOU, JEFF.

I'LL JUST ASSUME THAT WHEN YOU WANNA REP REPLY, REPLY TO SOMEONE, YOU'LL, YOU'LL COME UP HERE.

OKAY? UM, LET'S GO TO DAVID KEY.

THANKS.

THERE'S, THERE'S A LOT GOING ON.

SO I WAS GONNA ASK JEFF A QUESTION.

UM, WHAT WE'RE SEEING TODAY AS FAR AS WHAT'S BEING CONSIDERED, WHAT'S, UH, THE MOTION THAT'S ON THE TABLE? UH, WHAT'S THE, I'S OPINION OF THE EFFECTIVENESS OF THIS? AND I'VE HEARD A LOT OF CONCERNS ABOUT THE WAY WE SET THIS UP IS GONNA MAKE IT EITHER WORK OR IT WON'T WORK.

SO GIVEN WHAT WE'RE GONNA VOTE ON RIGHT NOW, OR WHAT'S ACTION ON THE TABLE TO BE VOTED ON, UH, COULD YOU GIVE US YOUR OPINION ON IF THIS WILL WORK? IN WHAT SENSE? SO, I'M SORRY.

LET, LET ME, LET ME CLARIFY.

THANK YOU, BRIAN.

UM, IS THIS BEST FOR THE MARKET? IS THIS GONNA BE A REASONABLE OUTCOME TO THE PRICE FLOORS AND THE DURATION? GIVE US SOMETHING THAT WILL ACTUALLY, UM, HAVE PARTICIPATION AND MEET THE OBJECTIVES THAT ARE SET FORTH.

SO THE MOTION ON THE TABLE HAS THE 1 CENT, RIGHT? WAS DESKTOP EDITS TO THE 1 CENT PRICE FLOOR AND THE TWO HOUR DURATION? YES.

I BELIEVE, I BELIEVE THAT THE MOTION ON THE TABLE WITH THE 1 CENT PRICE FLOOR AND THE TWO HOUR DURATION, WE'LL MEET THE REQUIREMENTS.

I THINK WHAT WE'RE TALKING ABOUT IS MOVING THE NEEDLE ONE DIRECTION OR THE OTHER.

ALRIGHT, THANK YOU.

AND SO, UH, AND TO, AND THANK YOU FOR ASKING THE QUESTION, WHAT'S BEST FOR THE MARKET, OBVIOUSLY, I, I BELIEVE THAT A TWO HOUR REQUIREMENT AND A 1 CENT PRICE FLOOR IS BEST FOR THE MARKET, UM, TO BILL'S COMMENT OF WE CAN'T EXPERIENCE SHORTAGE CONDITIONS HERE.

THAT'S, UM,

[00:55:01]

THAT'S SOMETHING THAT HAS TO BE DISCUSSED, IF THAT'S TRUE, BECAUSE THE ACCO MARKET IS VERY CLEARLY NOT SET UP TO, TO DO ANYTHING, UH, IN THE DIRECTION OF RESOURCE ADEQUACY IF IT'S NOT ALLOWED TO EXPERIENCE ANY SHORTAGE CONDITIONS.

THANK YOU.

THANKS, JEFF.

YEAH, I DON'T SEE THIS 1309 AS A RESOURCE ADEQUACY MEASURE.

I THINK THAT'S WHAT WE'RE TALKING ABOUT IN 1310.

BUT, UM, THAT COULD BE SOMETHING FOR LATER.

BUT, UH, THAT ANSWERS MY QUESTION.

THANK YOU.

THANKS DAVID.

BOB? YEAH, JUST REAL QUICK, I JUST WANNA HIT ONE PIECE OF THAT 'CAUSE RESOURCE ADEQUACY PIECE KEEPS COMING UP AND, UH, IT'S KIND OF BEEN HIT ON A LITTLE BIT OF BOTH SIDES.

THIS KIND OF REMINDS ME OF THE DISCUSSION WE HAD WITH THE RDC.

EVERYONE KEPT TRYING TO CALL THAT A RESOURCE ADEQUACY TOOL.

IT WAS NOT, NEVER HAS BEEN, NEVER WILL BE.

IT WAS DESIGNED FOR SHORT TERM PRICING OF RESERVES TO ADD RESOURCES INTO THE MARKET, WHICH YOU WOULD SAY WOULD CHANGE THE MARKET EQUILIBRIUM RESERVE MARGIN, BUT IT WAS NOT A CAPACITY MARKET.

AND THIS SHOULD BE TREATED THE SAME WAY, IT SHOULD BE LOOKED AT AS A SHORT TERM OPERATIONAL DESIGN, UH, PROCESS HERE.

AND THAT WHATEVER REVENUES COME OF THAT, WE'LL DO THE SAME THING THAT THE RDC WAS DESIGNED TO DO.

AND I DON'T DISAGREE.

WE DON'T HAVE A RESOURCE ADEQUACY ISSUE, AND WE NEED TO DISCUSS THAT, AND I'M HOPING THAT WHATEVER WOULD COME OUT OF THE, THIS FALL RESOURCE, UH, THE RELIABILITY STANDARD IS WHERE WE'RE GOING TO ADDRESS THAT.

SO I'D HOPE WE KIND OF KEEP THIS TO THE OPERATIONAL SIDE AND THE PRICING OUTCOME MECHANISMS IN REAL TIME.

THANKS, BOB.

BRIAN, WE'RE JUST GOING BACK TO OUR GAME.

I WAS TRYING TO THINK OF THE WORD THAT RHYMES WITH UNINVESTIBLE AND I COULDN'T THINK OF ONE.

UM, BUT THAT'S WHAT THIS VERSION OF THE, OF THE NPRR IS, IS IT'S NOT GONNA RESULT IN, UH, ANYONE ACTUALLY INVESTING, UH, UH, CAPITAL TO, TO BUILD, UH, FOR LONGER DURATION RESOURCES.

SO IF THAT'S THE OUTCOME YOU WANT, COOL.

UM, I HATE TO BE A, UM, REGULATORY NIHILIST, BUT, UH, I DO KIND OF FEEL LIKE THAT'S, THAT'S WHERE WE ARE RIGHT NOW BECAUSE, UH, THE POINT THAT SHANE WAS MAKING EARLIER THAT WE'RE GONNA LOOK AT ALL OF THIS AGAIN, AND IT IN SOME WAYS DOESN'T MATTER WHAT YOU DO WITH, WITH THIS VERSION, BECAUSE HOPEFULLY THERE'S AN OPPORTUNITY TO, UM, RECONFIGURE SOME OF THE, THE SHAPES OF THE DEMAND CURVES.

BUT, UH, THIS VERSION, IT, IT'S DECK CHAIRS, TITANIC, WHATEVER THING YOU WANT TO USE.

OKAY, THANKS BRIAN.

UM, LET'S GO TO SETH.

IT'S BEEN ADDRESSED.

OKAY, THANKS.

LET'S GO TO EY.

EY, ARE YOU ON? YES, I'M, OH, YOU'RE HERE, HERE, HERE IN PERSON.

I WAS TYPING MY NOTES, UH, IN CASE I FORGET.

UH, I JUST WANT TO MAKE A COUPLE COMMENTS, UH, BECAUSE FIRST, UM, UM, UH, SEEMS LIKE THE IMM IS INDICATING THAT A REVERSE OF, UH, PRICES SOLELY THE DEMAND CURVES FAULT OR RESPONSIBILITY.

UM, BUT, YOU KNOW, UM, THE PROBLEM IS VERY COMPLICATED.

YOU KNOW, YOU, YOU ALSO HAVE TO LOOK AT THE, UH, OFFER STACK, YOU KNOW, NOT JUST THE BED STACK, RIGHT? AND THEN YOU HAVE TO ALSO LOOK AT WHAT'S GOING ON IN THE SYSTEM, YOU KNOW, UH, WHERE THE UNITS ARE.

SO YOU HAVE TO LOOK AT ALL THIS AND ALSO SHADOW PRICES, YOU KNOW, THE PENALTY, YOU KNOW, UH, PRICE, ALL THE THINGS.

SO, UM, TO JUST TO SAY, HEY, YOU KNOW, WE HAVE A RE REVERSE OF PRICES.

OH, IT'S JUST, YOU KNOW, IT'S BECAUSE THE DEMAND CURVE AND IT'S NOT WORKING.

LET'S FIX THAT.

I DON'T THINK SO.

WE HAVE TO LOOK AT THIS WHOLE PROBLEM, UM, HOLISTICALLY AND COMPREHENSIVELY TO FIGURE OUT WHAT'S GOING ON.

UM, THAT'S ONE, UM, COMMENT.

SECOND, AND, UH, IS IT BAD THAT WE HAVE A, UH, REVERSE OF PRICES? UM, MAYBE SOME, YOU KNOW, IT DEPENDS, RIGHT? YOU KNOW, EACH ENTRY SERVICE IS DESIGNED TO ADDRESS A CATEGORY OF, UH, OPERATIONAL ISSUES.

SO EACH SERVICE, YOU KNOW, HAS ITS UNIQUE VALUE, UH, JUST LIKE A PARENT LOOK AT HIS CHILD, RIGHT? CHILDREN, YOU KNOW, EACH VALUE, UH, EACH CHILD IS UNIQUE AND VALUABLE

[01:00:01]

TO, TO, TO HAVE AN ABSOLUTE, UM, HIERARCHY OF, UH, ASSET SERVICES.

UM, YOU KNOW, KIND OF RE I DON'T THINK SO.

IT DEPENDS ON, AGAIN, DEPENDS ON WHAT'S GOING ON IN THE SYSTEM.

AND IF THAT PARTICULAR ASSET SERVICE OR JUST AN ISSUE AT THE MOMENT, THAT'S THE MOST VALUABLE ASSET SERVICE AT THE TIME.

SO I THINK THE HIERARCHY SHOULD BE RELATIVE TO WHAT'S GOING ON IN REAL TIME.

SO, YOU KNOW, WE ALL KNOW THAT THE NON SPRING PRICE, YOU KNOW, ACTUALLY WITH STORM FIRM IS A PERFECT, UH, EXAMPLE HOW, LIKE, YOU KNOW, UM, NON SPIN, YOU KNOW, THE FOUR HOUR NON SPIN AND DS IS MORE VALUABLE THAN RE UP AT THE MOMENT THAN THE, YOU KNOW, UM, UH, THE 30 MINUTE ECS, RIGHT? WE ALL KNOW THAT, YOU KNOW, THE NIGHT BEFORE BATTERIES START, STARTED TO DISCHARGE, BUT THEN THEY WRAPPED DOWN AFTER TWO TO THREE HOURS, AND THEN THEY COULD NOT BE CHARGED IN TIME TO SUPPORT THE, YOU KNOW, THE FAST LOAD INCREASE IN THE NEXT MORNING.

SO ERICA HAD TO RACK INSTRUCTIONS, YOU KNOW, UH, SEND THE RACK INSTRUCTIONS TO CERTAIN UNITS, YOU KNOW, TO SAVE THE SYSTEM.

IT AGAIN, TELLS YOU AT THOSE MOMENTS, LONGER DURATION, IT SERVICES ARE MUCH MORE VALUABLE THAN SHORT, UM, DURATION IT SERVICES.

SO, UM, UM, SO I DON'T THINK OUR FOCUS SHOULD BE, UH, ALWAYS TRY TO FIX THE ER AND ESPECIALLY, YOU KNOW, THERE HASN'T BEEN YEAH, A, UH, UM, COMPREHENSIVE, YOU KNOW, STUDY TO, TO SEE, YOU KNOW, THE, YOU KNOW, IF THIS PROPOSED TO CHANGE, YOU KNOW, UH, REALLY FIX THE PROBLEM, REALLY HAVE A, UH, VALUE END.

SO, UH, WITHOUT A, UH, EVEN A BASIC, UM, GOOD ANALYSIS TO SUPPORT THIS CHANGE.

YOU KNOW, I, I THINK FOR MARKET STABILITY, UH, SAKE, YOU KNOW, WE SHOULD JUST KEEP THE CURRENT DESIGN AND THEN, YOU KNOW, MOVE FORWARD.

UM, YEAH.

THANK YOU.

ALL RIGHT.

THANK YOU.

LET'S, UM, I UNDERSTAND ARCA HAS A PRESENTATION AND THEY FILED I THINK THREE SETS OF COMMENTS SINCE PRS.

UM, BUT, BUT WE DO APPRECIATE THE, THE HARD WORK WORKING WITH OTHER STAKEHOLDERS.

RYAN, IS RYAN DOING THE PRESENTATION? RYAN, CAN WE DO THIS IN 10 MINUTES? YOU GOT IT? CAN YOU HEAR ME OKAY? YES.

ALRIGHT.

APOLOGIES.

LESS THAN 10 MINUTES IS FUNNY TOO.

APOLOGIES FOR LESS THAN 10 MINUTES.

ALRIGHT, 10 UP TO 10 MINUTES.

YOU COULD MAYBE GET BONUS MINUTES IF YOU RHYME OR HAVE LYRICS.

OKAY.

YEAH, MY APOLOGIES FOR NOT BEING THERE IN PERSON.

I GUESS Y'ALL HAVE TO SEND ME EMOJIS IF I'M GOING OFF TRACK HERE.

BUT, UH, MAYBE WE CAN GO TO THE NEXT SLIDE.

I'LL TRY AND, UH, HONE IN ON WHAT I THINK ARE SOME OF THE KEY COMPONENTS, UH, OF ERCOT COMMENTS AS THEY PERTAIN TO, TO 1309.

BUT THERE'S A COUPLE OF THINGS THAT WE WANNA HIGHLIGHT WHEN WE DO THIS PRESENTATION.

UM, ONE IS MAYBE JUST REEMPHASIZE THE NATURE OF ANCILLARY SERVICE, DEMAND CURVES AND SHORTAGE FLOOR PRICES.

UH, WE WANNA DO A COMPARISON AND A, A CONTRAST WITH SOME OF THE, UH, THE COMPETING PROPOSALS THAT ARE OUT THERE AND ARE RECOMMENDED A SDC CURVE AND SHORTAGE PRICE FOR SHORTAGE FLOOR PRICE, RATHER FOR MPR 1309.

NEXT SLIDE.

SO THIS HAS BEEN MENTIONED, UH, A COUPLE OF TIMES, BUT I THINK IT BEARS REPEATING, IS THAT WHEN WE ARE TALKING ABOUT ANCILLARY SERVICE DEMAND CURVES AND, UH, SHORTAGE FLOORS AND THE CONSTRUCTION OF THOSE CURVES WITH MINIMUM PRICES, UH, WE ARE TALKING ABOUT A SITUATION WHERE THERE IS INSUFFICIENT SUPPLY TO MEET THE AF PLAN.

AND THAT'S WHERE THESE DEMAND CURVES OR PENALTY CURVES COME INTO EFFECT.

IT DOES BEAR REPEATING THAT ABSENT THAT IT IS JUST THE MARKET, UH, DYNAMICS OF SUPPLY AND DEMAND OPPORTUNITY COSTS, AND REAL TIME CO-OP OPTIMIZATION THAT WILL DETERMINE THE, THE PRICES FOR THESE SERVICES.

SO WE ARE, WE ARE TALKING ABOUT THE TIMES WHEN WE DON'T HAVE ENOUGH AND THEN WHAT THE, WHAT THE PENALTY FUNCTION SHOULD BE FOR THAT.

SO THAT'S JUST SORT OF AN ILLUSTRATION OF HOW THAT, UH, CONSTRUCTION WORKS.

NEXT SLIDE.

ALRIGHT.

SO TO SOME EXTENT WE, WE'VE TALKED ABOUT THE, THESE ADCS, UH, AT AT NAM.

SOMETIMES I THINK WE, WE COULDN'T MAKE THIS MORE CONFUSING AND IF WE TRIED, BUT I'LL, I'LL DO WHAT I CAN TO, TO HOPEFULLY CLARIFY SOME OF THIS.

UM, AGAIN, THE, THE DEMAND CURVES, THEY, THEY REFLECT THE PRIMARILY PRICE FOR GOING SHORT

[01:05:01]

ON THE ANCILLARY SERVICE PRODUCTS RELATIVE TO THEIR VOLUMES IS DEFINED BY THE AS PLAN, AND THEY REPRESENT THAT WILLINGNESS TO PROCURE, UH, VOLUME AT A GIVEN PRICE AND WHAT HAPPENS, YOU KNOW, WHEN WE START TO GO SHORT ON THAT.

AND SECONDLY, THE, THE SHORTAGE FLOOR PRICE.

THIS APPLIES AGAIN, SORT OF THE MINIMUM PORTION WHEN WE ARE SHORT.

SO WHEN WE DON'T HAVE ENOUGH SUPPLY TO MEET THE AS PLAN FOR A GIVEN PRODUCT, WHAT SHOULD THAT FLOOR PRICE BE? AND WE WANNA MAKE SURE THAT THAT TAIL ISN'T APPROACHING ZERO AS, UM, YOU KNOW, FOR ALL THE REASONS THAT, THAT HAVE BEEN MENTIONED PREVIOUSLY.

BUT I THINK THAT THE DISTINCTION HERE, AND I'M I'M SORRY FOR KIND OF GOING ON, IS THAT THE, THESE ARE NOT THE, THE, THE NORMAL CONDITIONS THAT'S COMPETITIVE OFFERS THAT ARE SETTING THE PRICE.

AND SO NEITHER THE A SDC SHAPE NOR THE SHORTAGE FLOOR PRICE COME INTO PLAY.

BOTH ARE, ARE, THINK OF THEM AS, AS HOW DO WE DESIGN THE SHORTAGE PRICING AND HOW DO WE CONSTRUCT THE HIERARCHY? NEXT SLIDE.

OKAY, SO I TALKED ABOUT SHORTAGE PRICE FLOORS.

NOW I'M TALKING ABOUT MINIMUM PRICES.

AND SO MINIMUM PRICES HERE, AND, AND THIS IS WHERE IT, IT DOES BEAR.

UM, THERE WAS AN EXCELLENT PRESENTATION, I MAY SAY FROM THE, FROM THE IMM AT THE THIRD WORKSHOP THAT ORCO, UH, STAFF HAD HELPED IN TERMS OF ANALYSIS.

UM, THIS IS ALL ABOUT THE LOWER BOUND ON THE NON-LINEAR CURVE SEGMENT OF AN A FDC.

AND THIS IS ABOUT ENSURING THAT WE GET THE, THE KIND OF SHAPE OF EACH CURVE THAT REFLECTS THE RELATIVE RELIABILITY VALUE OF THAT PRODUCT.

AND, AND THAT'S IMPORTANT.

THERE, THERE IS A HIERARCHY AND, UM, THIS IS THE, THE CONSTRUCT THAT WE'VE USED, UH, IN CON IN CONCERT WITH OUR DISAGGREGATE AND BACKFILL APPROACH.

THIS IS THE SET OF MINIMUM PRICES THAT WE USE THAT THAT CONSTRUCT OR SHAPE THOSE, THOSE INDIVIDUAL ASCS PER THEIR RELATIVE, UH, RELIABILITY VALUE.

AND THEN, AS I MENTIONED, THE SHORTAGE FLOOR PRICE ARE DIFFERENT ELEMENT.

THEY APPLY AT THE TAIL END AND THEY'RE THE FINAL STEP IN THE METHODOLOGY.

SO THIS IS WHAT WE HAVE PROPOSED, UM, THE REG UP AND RS VALUES, AND PROBABLY MORE SPECIFICALLY, UH, IN THE COMMENTS THAT WERE FILED WITH WITH THE IMM IS, UH, A MINIMUM PRICE FOR ECRS AT $15 $5 FOR NONS SPEND AND ONE PENNY FOR DRF.

AND I THINK IF WE CAN GO TO THE NEXT SLIDE, THIS WILL REALLY GIVE AN ILLUSTRATION OF HOW THOSE MINIMUM PRICES ARE DERIVED AN A SDC.

SO WHAT YOU CAN SEE IS, UH, ON THE, THE LEFT CHART, THIS IS THE, THE ERCOT, I SHOULD SHOULD SAY, THE ERCOT IMM PROPOSAL, WHEN WE SET THE DRS MINIMUM PRICE AT A PENNY IN THE CONSTRUCTION OF THAT CURVE, WHAT IT DOES IS IT KEEPS THE DRS CURVE, THAT PURPLE CURVE BELOW NONS SPIN THROUGHOUT THE SHORTAGE RANGE CORRECTLY, REFLECTING THAT NONS SPIN HAS A GREATER SHORT TERM RELIABILITY VALUE, UH, THAN DRS IN REAL TIME.

ONE OF THE THINGS THAT WE CAN'T LOSE SIGHT OF, AND I KNOW WE'RE GOING BACK TO THE STATUTE, BUT, UH, IT'S IMPORTANT TO RECALL THAT WHEN IT COMES TO ANCILLARY SERVICES, ONE OF THESE THINGS IS NOT LIKE THE OTHER DRS IS NOT JUST AN ANCILLARY SERVICE.

IT HAS SOME UNIQUE REQUIREMENTS THAT ARE, UH, DEFINED BY STATUTE.

IT IS MORE OF A, A, A RUCKING OPTION.

AND THE FACT OF THE MATTER IS THAT IT, IF WE BUY MORE DRS IN REAL TIME, WE CANNOT DEPLOY IT.

IT IT IS A WRECKING OFFSET OPTION.

SO THIS IS THE, HOW WE CAN KIND OF CON COMPARE AND CONTRAST THE CURVE THAT I JUST DESCRIBED WITH ERCOT, WITH, WITH ONE OF THE OTHER PROPOSALS HERE, WHICH SETS THE MINIMUM PRICE FOR DRS $15 NONS SPIN AT A PENNY.

AND YOU CAN SEE THAT WHAT HAPPENS HERE IS THAT IT CAUSES THE DRS CURVE TO SIT ABOVE OR EQUAL TO NONS SPIN OVER MUCH OF THE RANGE.

YOU CAN SEE THAT PURPLE, UH, THAT PURPLE CURVE IS NOW ABOVE THE, THE GREEN ONE FOR, FOR MUCH OF THAT.

AND WHAT THIS DOES IS IT, IT REALLY DOES OVERSTATE THE RELATIVE RELIABILITY VALUE OF DRS AND COULD DIVERT RESOURCES AWAY FROM NONS SPIND WHEN BOTH ARE COMPETING FOR THE SAME CAPACITY.

SO REMEMBERING WHAT I SAID BEFORE ABOUT, THERE'S NO, THERE'S NO REAL TIME DEPLOYMENT OF, OF DRS, LIKE THERE IS FOR NONS SPIND.

SO IT, IT, IT'S NOT RATIONAL THAT WE WOULD WANT TO, UH, IF WE'RE GETTING INTO SHORTAGE CONDITIONS THAT WE WOULD PRIORITIZE DRS OVER NONS SPENT.

THAT'S, THAT'S NOT A GOOD CONSTRUCT.

AND I, I THINK THE, THE HIERARCHY THAT WE PRESERVE WITH THE MINIMUM PRICES THAT WE PROPOSE HERE, UH, IS A BETTER REFLECTION OF THE RELATIVE RELIABILITY VALUE OF THOSE SERVICES.

NEXT SLIDE.

UH,

[01:10:01]

I'LL, I'LL TRY AND KEEP THIS QUICK 'CAUSE I KNOW THAT THERE'S, THERE'S A LOT OF QUESTIONS.

SO, UM, YEAH, IF WE CAN GO TO THE NEXT SLIDE.

UM, I, I MAY SKIP THIS ONE JUST BECAUSE IN THE INSTANCE OF TIME FOLKS HAVE SOME FURTHER QUESTIONS, BUT THE, THE CONSTRUCT OF THAT IS, IS BASICALLY A, A REITERATION OF THE PRESENTATION THAT WAS GIVEN AT THE, THE WORKSHOP ON MARCH 9TH SIDE.

OKAY.

SO, UH, THE NEXT CRITICAL PIECE IS THIS, A SDC, UH, SHORTAGE FLOOR PRICE.

SO, AS I MENTIONED, IT REPRESENTS THE MINIMUM PRICE AT WHICH THE FULL AS PLAN QUANTITY WILL BE PROCURED.

AND SO IT ONLY COMES INTO EFFECT WHEN OFFERS ARE INSUFFICIENT TO MEET THE AS PLAN, UH, IN THE ABSENCE OF WHICH THE, THE TAIL COULD, COULD GO, UH, TO, TO $0.

SO IF YOU CAN THINK BACK TO, TO ONLY A FEW MONTHS AGO, UM, WHEN WE WERE TALKING ABOUT, UH, NPR 1269 AND THE CONSTRUCTION OF THESE ADCS INITIALLY FOR R ACTUALLY, UM, THE IMPETUS FOR THIS 15 MEGAWATT, $15 PER MEGAWATT PER HOUR FLOOR ON THE EXISTING ANCILLARY SERVICES WAS ALL ABOUT, UM, THE SENSITIVITY ANALYSIS THAT WAS DONE TO SHOW THAT WHAT KIND OF A, A PENALTY PRICE DO WE NEED TO MAKE SURE THAT WE DON'T HAVE THESE NONS SPIND SHORTAGES IN RUCK AND $15 APPEAR TO BE THE RIGHT NUMBER THAT, THAT HELP TO RESOLVE THOSE, UM, THOSE SHORTAGES.

AND, UM, IT ENSURES THAT THE, THE SUFFICIENT CAPACITY IS COMMITTED TO MEET TO, TO MEET THE AS PLAN.

AND, UM, WE, WE, WE CAME TO SUPPORT THE, THE, THE TCPA AT THE TIME IN THEIR PROPOSAL TO, TO ADD THESE, UH, SHORTAGE FLOOR PRICES TO, TO BOTH THE, THE DAM IN REAL TIME.

AND, UH, UNDER THE EXPECTATION THAT, UM, NOT HAVING A SEAM, WE WERE CONCERNED AROUND THAT.

AND, AND THAT THE, THE ANALYSIS WAS PRESENTED TO INFORM THAT IT WAS, THAT IT WAS A RELATIVELY MODEST A S DC PRICE FOR LOW LEVELS OF SHORTAGES.

NEXT SLIDE.

SO WHAT I MIGHT DO IS KIND OF SKIP THIS ONE, BUT BASICALLY IT'S REALLY, REALLY HARD TO SEE WHAT A PRICE FLOOR OF A SHORTAGE PRICE FLOOR OF $10 VERSUS $15 IS.

UM, YOU KNOW, WHEN YOU'RE LOOKING AT THE, THE KIND OF CURVES, IT'S ALMOST INVISIBLE.

WE HAVE KIND OF ZOOMED IN TO, TO UNDERSTAND, YOU KNOW, WHAT, WHAT A FLOOR PRICE WOULD MEAN FOR, FOR 10 VERSUS $15.

BUT I THINK IN THE INTEREST OF TIME, I'LL KIND OF GET TO OUR RATIONALE FOR $10 AND THEN MAYBE OPEN IT UP TO, TO QUESTIONS NEXT SLIDE.

SO HERE, HERE IS OUR PERSPECTIVE ON THE DRS, UH, SHORTAGE FLOOR PRICE FOR ONE, THE $10 FLOOR, IT MAINTAINED THAT, UH, RATIONAL RELATIVE PRICING BETWEEN THE AS PRODUCTS AND REFLECTS, I KIND OF NEED TO UNDERMINE THIS, BUT IT'S UNIQUE CHARACTERISTICS OF DRS RELATIVE TO OTHER ANCILLARY SERVICES.

ONE OF THESE IS NOT LIKE THE OTHER.

AND, UH, THE OTHER THING AROUND THE $10 IS THAT IT DOES ALIGN WITH SOME OF THE, THE, THE POINTS THAT I THINK HAVE BEEN MADE FROM VARIOUS PER PERSPECTIVES HERE AROUND A SELF COMMITMENT INCENTIVES.

AND SO THE, THE $10 PER MEGAWATT PER HOUR DOES, DOES KIND OF ALIGN WITH, WITH THE STARTUP INCENTIVES OF A MARGINAL COMBUSTION TURBINE UNIT WITH A FOUR HOUR MINIMUM RUNTIME, AND AGAIN, INCREASING THE FLOOR FOR DRF TO $15 IF WE'RE GETTING INTO TO REAL TIME, IT INFLATES THE VALUE OF DRS RELATIVE TO OTHER PRODUCTS, IN PARTICULAR NONS SPIN.

AND WE DON'T THINK THAT'S THE RIGHT APPROACH GOING BACK TO THE UNIQUE CHARACTERISTICS OF THIS SERVICE RELATIVE TO OTHERS.

AND SO WE WANNA MAKE SURE THAT WE'RE NOT SENDING THE WRONG SIGNAL.

UM, BUT WE WANNA MAKE SURE ALSO THAT THERE IS SOMETHING THAT REFLECTS THE, YOU KNOW, THE, THE OPPORTUNITY COST OF, OF, OF NOT STARTING UP AND PROVIDES THAT MARGINAL INCENTIVE THAT ALIGNS WITH, WITH THIS AS, AS KIND OF A, A RUCKING OPTION.

SO, UH, AT THE BOTTOM HERE, YOU KIND OF NOW SEE THAT OUR, OUR MINIMUM PRICE CONSTRUCT, THAT'S TO DERIVE THE, THE HIERARCHY OF THE ADCS AND THEN THE, THE PRICE FLOOR, WHICH IS REALLY ABOUT SENDING THAT SIGNAL WHEN WE DON'T HAVE ENOUGH TO MEET THE AS PLAN.

NEXT SLIDE.

I THINK THAT'S BASICALLY A SUMMARY OF OUR COMMENTS.

UM, WE DID HAVE COMMENTS THAT, UH, AS, UH, AS THE IMM NOTED KIND OF REVERTING BACK TO THE, TO THE POSITION AROUND NONS SPEND.

SO THIS SLIDE DOESN'T REALLY GET INTO THAT.

THE FOCUS OF THIS IS REALLY AROUND THE ADCS GETTING THE MINIMUM PRICE CONSTRUCTS THAT WE GET, THE HIERARCHY THAT WE THINK REFLECTS THE RELATIVE RELIABILITY VALUE OF THESE SERVICES, ESPECIALLY AS WE'RE APPROACHING INTO REAL TIME ACCOUNTING FOR THE UNIQUENESS OF DRS AND, UH, SIMILARLY, UH, A SLIGHTLY DIFFERENT FLOOR PRICE FOR DRS VERSUS THE OTHER ANCILLARY SERVICES, GIVEN ITS UNIQUENESS AND,

[01:15:01]

AND PRESERVING THAT HIERARCHY.

SO I MAY PAUSE THERE, UH, HOPEFULLY I'M NOT TOO FAR OVER OR UNDER TIME, AND I SEE THERE'S A FEW QUESTIONS IN THE QUEUE, SO HAPPY TO STOP HERE.

I THINK KEITH WANTED TO MAKE A, A QUICK COMMENT.

YEAH, JUST A, JUST A QUICK COMMENT BECAUSE I KNOW THERE'S SOME CONFUSION THAT WE HAD MULTIPLE COMMENTS AND WHY WERE THERE TWO YESTERDAY AND WHAT DOES THIS ALL MEAN? BUT I'LL, I'LL JUST SORT OF SUMMARIZE OUR COMMENTS VERY CLEARLY.

NUMBER ONE, WE SUPPORT THE TWO HOUR DURATION, AND THAT IS AN ERCOT POSITION, NOT A KEITH OR A COMMERCIAL OPERATIONS POSITION.

THAT'S AN ERCOT POSITION.

TWO HOURS DURATION NUMBER TWO, AS, AS RYAN WAS CLEAR IN HIS PRESENTATION, WE SUPPORT A $10 SHORTAGE FLOOR PRICE.

JUST TO BE CLEAR, THAT'S ONLY DURING SHORTAGE INSTANCES.

AND FOR SOME, SOME, SOME COLOR.

I LOOKED AT NONS SPIND OVER THE LAST SIX MONTHS.

1.2% OF ALL INTERVALS WAS NON SPIN SHORT, AND IN HALF OF THEM, THEY WERE AT THE FLOOR TOTALING ABOUT $1.1 MILLION.

OKAY, THAT'S SIX MONTHS.

AND SO, UM, I'LL BE CLEAR, THIS IS, YOU KNOW, COMPARED TO WHAT THE IMM WAS SUGGESTING, THIS IS NOT A, UH, MASSIVE SHIFT OF, OF REVENUES TO GENERATORS.

IT'S $1.1 MILLION, BUT WE FEEL THAT THE PRICE ACCURACY IS MORE IMPORTANT.

AND SO WE DO SUPPORT THE $10 FLOOR.

AND, UH, YOU KNOW, WE'RE, WE'RE DEFINITELY HAPPY TO HAVE AN ANY QUESTIONS, UH, THAT YOU MAY HAVE.

THANKS.

THANKS, KEITH.

OKAY, LET'S GO TO THE Q UH, JOHN HUBBARD.

JOHN HUBBARD WITH TIEC.

UM, RYAN OR KEITH, DOES ERCOT HAVE A RELIABILITY CONCERN WITH A 1 CENT PRICE FLOOR? WE HAVE A PRICE FORMATION CONCERN WITH THE 1 CENT FLOOR, BUT NOT A RELIABILITY CONCERN.

WE HAVE A PRICE FORMATION CONCERN.

AND THAT, AGAIN, IF YOU LOOK AT HOW THAT ULTIMATELY TRANSLATES INTO RELIABILITY, YOU KNOW, OUR MISSION IS TO PROMOTE RELIABILITY THROUGH MARKETS.

SO I THINK THAT'S, THAT'S THE SENSE, BUT WE THINK THAT IT'S, IT IS BETTER PRICE FORMATION, UH, WITH THE, UH, AGAIN, I CALL IT THE SHORTAGE FLOOR PRICE BECAUSE IT'S REALLY ONLY DURING THOSE SHORTAGES TO, TO ENHANCE THAT SIGNAL.

THANKS, O OKAY.

BUT, SO JUST TO BE CLEAR, ERCOT DOES NOT HAVE A RELIABILITY CONCERN.

THERE MAY BE SOME PRICE FORMATION CONCERNS, BUT THERE'S NO RELIABILITY CONCERN AROUND A 1 CENT PRICE FLOOR.

A AGAIN, OUR SENSE IS THAT MARKETS PROMOTE RELIABILITY.

SO IT'S, THERE IS INDIRECT EFFECTS, UH, BUT WE'RE, WE'RE NOT EXPECTING SOME SORT OF SHORTAGE, UH, SOME SORT OF FUTURE CONDITION.

BUT WE DO BELIEVE THAT MARKETS PROMOTE RELIABILITY.

SO IN THIS CASE, WE WOULD LIKE THE MARKETS TO PROMOTE RELIABILITY WITH USE OF THE FLOOR.

BUT YOU PREVIOUSLY SUPPORTED A 1 CENT PRICE FLOOR IN COMMENTS TWO WEEKS AGO.

WE, WE HAVE CONSIDERED, UH, OUR VIEW, RECONSIDERED OUR VIEW, AND WE BELIEVE THAT THE $10 IS THE RIGHT NUMBER.

OKAY, THANK YOU.

UM, MY OTHER COMMENT IS THAT MANY OF THE COMMENTERS HAVE BEEN QUICK TO DISMISS A, A 1 CENT FLOOR, UM, AND RETICENT TO CHANGING THE NONS SPEND DURATION.

BUT AS SHELL NOTED, THERE WILL BE OTHER CHANCES TO CHANGE THE PRICE FLOORS.

UM, THE ANCILLARY SERVICE DEMAND CURVES ARE BEING, WILL BE STUDIED THROUGHOUT THE BEFORE DRS IS FINALLY IMPLEMENTED.

AND I THINK ARBITRARILY SELECTING A $15 FLOOR OR EVEN A $10 FLOOR, UH, AT THIS TIME, DOESN'T MAKE SENSE.

UM, THAT CAN BE ADDED LATER, BUT AT THIS TIME, I THINK IT MAKES SENSE NOT TO HAVE, UH, A HIGHER PRICE FOR THAN 1 CENT.

THANKS.

OKAY, THANKS.

UH, LET'S GO TO IKA.

HI, IKA FOR COMMISSION STAFF.

SO WE REALLY STRONG THE SUPPORT, UH, REDUCING DURATION PROMPT FOUR TO TWO HOURS.

AND REASON FOR THAT IS IT'S REALLY ALIGNS WITH AS STUDY RECOMMENDATIONS.

IT ALIGNS WITH ERCOT BUDGET PERFORMANCE MEASURES, AND WE REALLY WORK CLOSELY.

WE MEET REGULARLY WITH ERCOT AND IMM ON THE AS STUDY AND HOW EVERYTHING IS IMPLEMENTED.

SO WE WERE VERY HAPPY WHEN THEY FILED JOINT COMMENTS.

ERCOT SAY THAT RELIABILITY IS NOT IMPACTED.

IMM SAID IT'S GOOD MARKET DESIGN, SO WE REALLY STRONGLY SUPPORT TWO OURS ON THE FLOORS, WE ARE MORE NEUTRAL, BUT AFTER HEARING, SEEING REALLY RYAN'S REALLY EXCELLENT PRESENTATION, WE ARE OKAY WITH ERCOT STAND DOLLARS, BUT OUR MAIN ISSUE IS REALLY TO OURS, REALLY TWO HOURS.

THANK YOU.

THANK YOU.

OKAY, LET'S GO TO NED.

NED.

NO, NO.

FOUR MINUTE LONG QUESTION.

, HOW AM I SUPPOSED TO WORK WITHIN THESE CONSTRAINTS? CAITLYN, THAT'S JUST .

ALL RIGHT.

UH, I'LL TRY TO HIT THESE QUICKLY.

SO, UM, FIRST

[01:20:01]

OFF, UM, I WANT TALK TO THE BOARD.

LAST WEEK I TRIED TO HIGHLIGHT SOME OF OUR CONCERNS WITH THIS DIFFERENT TOPIC, BUT, UM, I TRIED TO FRAME WHAT OUR OBJECTIVE IS, IS SUSTAINABLE RELIABILITY THROUGH COMPETITIVE MARKETS AND WANT TO BRING THAT SAME FRAMEWORK.

KEITH, YOU SAID RELIABILITY THROUGH MARKETS.

I JUST WANT TO EMPHASIZE WE WANT THAT RELIABILITY TO BE SUSTAINABLE, SELF-SUSTAINED THROUGH THOSE COMPETITIVE MARKETS, AND THE MARKETS NEED TO BE COMPETITIVE.

SO THE PRICING AND THE PRICE FORMATION.

JOHN RUST TO YOUR, YOUR QUESTION, YOU KNOW, IS THERE A RELIABILITY ISSUE? WELL, THE MARKETS NEED TO BE THE ONE, BE THE FUNCTION THAT IS BRINGING THAT RELIABILITY TO THE MARKET, NOT A MONOS OPTIMISTIC PRICE SETTING FUNCTION THROUGH THE ANCILLARY SERVICE DEMAND CURVE.

SO IF YOU WANT THE COMPETITIVE MARKET TO DRIVE IT, YOU NEED TO GIVE ENOUGH ROOM FOR COMPETITION TO WORK.

SO THERE'S, THERE'S THAT POINT.

UM, AND I'LL PAUSE IT THAT A 1 CENT FLOOR MINIMUM PRICE ON THE ANCILLARY SERVICE DEMAND CURVE DOES NOT ALLOW FOR THAT.

OKAY.

THAT'S ANOTHER POINT.

KEITH, I'M REALLY, REALLY GLAD THAT YOU, YOU MENTIONED THE STATISTICS ON WHEN THINGS GO SHORT.

'CAUSE RYAN, THAT WAS ONE OF THE THING, I THINK THE MOST IMPORTANT PARTS OF THIS PRESENTATION IS WE'RE NOT TALKING ABOUT AN ALL DAY, EVERY DAY MINIMUM PRICE ISSUE.

WE'RE TALKING ABOUT WHAT HAPPENS IN THE 1.2% OF THE TIME THAT WE'RE SHORT.

AND EVEN THEN OF THAT 1.2% OF THE TIME, I THINK IT WAS HALF OF THAT.

SO 0.6% OF THE TIME YOU ACTUALLY HAVE PRICING SITTING AT, AT THE, UH, AT THE ANCILLARY SERVICE DEMAND CURVE.

SO, UM, WE'RE TALKING ABOUT BUDGET DUST IN TERMS OF THE, UH, THE OVERALL ERCOT SETTLEMENTS, UH, REALTIME SETTLEMENTS.

THIS IS, THIS IS MINOR, BUT IT'S AN IMPORTANT PRINCIPLE THAT WE STAND BY AS A MARKET.

AND, AND IKA, I I REALLY APPRECIATE YOUR, YOUR COMMENTS ABOUT THE, YOU KNOW, KIND OF THE CLARIFICATION ON, ON STAFF'S POSITION THERE.

UM, I DO HAVE ONE QUESTION, UH, AND THIS IS FOR, I GUESS FOR, FOR ANYONE THAT IS, UH, IN FAVOR OF REDUCING THE NONS SPEND DURATION FROM FOUR HOURS TO TWO HOURS IN THIS PARTICULAR NPR.

AND I'VE ALREADY SAID I'M NOT IN FAVOR OF THAT, BUT IS THE INTENT THAT THAT WOULD BE DONE IN THE 2029 ANCILLARY SERVICE PLAN AFTER DRS GO LIVE? OR IS THAT INTENDED TO, UM, HAPPEN IMMEDIATELY? UM, BECAUSE THAT'S, UH, THERE'S, THERE'S, THAT WOULD BE A DISJOINTED IMPACT.

AND, YOU KNOW, WHEN, WHEN INDIANA JONES TRIES TO REPLACE THE BA THE BAG OF SAND FOR THE, THE JEED, UM, THING ABOUT BOB IN THE, IN THE, IN THE CAVE, THAT'S WHAT ENDS UP, YOU KNOW, BRINGING THE BOULDER DOWN.

SO I WANNA MAKE SURE THAT WE'RE, UH, IF WE'RE GONNA GO THAT ROUTE, YOU'RE AT LEAST TRYING TO, YOU KNOW, REPLACE THE, THE, THE JEWEL WITH A BAG OF SAND AT THE SAME TIME TO AVOID THE, THE BOULDER OF DEATH.

YES, I BELIEVE WE WERE, WE WERE GONNA DO IT CONCURRENTLY.

UM, AND NOT, NOT DISJOINTEDLY.

OKAY.

I APPRECIATE THAT.

APPRECIATE.

ALRIGHT, I'LL BE QUIET.

CAITLYN, KEEP GOING.

ARE YOU GOOD? I CAN SAY MORE .

OKAY.

DO YOU NEED TO SAY MORE OR ARE YOU GOOD? SHANE AND CHEWE HAD SOME GOOD POINTS ABOUT THERE BEING MULTIPLE, YOU SAID, YOU SAID SHANE ACTUALLY HAD SOME GOOD POINTS.

I SAID SHANE AND CHEWIER.

OH, OKAY.

AND CHEWE HAD GOOD POINTS ABOUT THERE BEING MULTIPLE DIMENSIONS TO THE RELATIVE VALUE OF ANCILLARY SERVICES.

IT'S NOT A MULT A SINGLE DIMENSION ANYMORE ABOUT HOW FAST DOES IT RESPOND.

THERE ARE DURATION, UH, CONSIDERATIONS THAT I THINK HAVE EMERGED.

SO, OKAY, I WON'T REPEAT THAT.

OKAY.

UM, JUST TO FOLLOW UP, I DID ADDRESS HAND COMMENTS THERE, UH, CLAIM THAT IT DOES NOT REFLECT COMMISSION DIRECTION GUIDANCE IN FLOYD'S MEMO.

WE RESPECTFULLY DISAGREE WITH THAT.

SO, UH, SHAMS, IF YOU WANNA CONTACT US AND WE CAN TALK MORE WHY, BUT, UH, WE THINK IT DOES REFLECT COMMISSION GUIDANCE.

OKAY.

THANKS FOR THAT.

LET'S GO TO MARK.

THANK YOU CHAIR.

AND I'LL BE BRIEF.

UM, I REALLY APPRECIATE RYAN'S PRESENTATION AND UH, IT CLARIFIED A POINT FOR ME AND I THINK THE, THAT POINT IS THAT THE REAL HEART OF THE PROBLEM HERE IS CONSERVATIVE OPERATIONS.

CONSERVATIVE OPERATIONS IS WHY WE HAVE TO HAVE A SHORTAGE PRICE FLOOR.

THERE HAVE BEEN A LOT OF PROMISES IN A LOT OF ROOMS ABOUT REVISITING CONSERVATIVE OPERATIONS, AND IT IS TIME TO LIVE TO DELIVER ON THOSE PROMISES.

THANK YOU.

OKAY, BILL BARNES, YOU HAVE THE RHYMES READY.

IT'S A TOUGH ONE, BLAKE.

I MEAN, YOU CAN'T MAKE IT AS COMPLICATED LIKE, I'VE, I WAS READY FOR THE BATTERY BURNOUT OR WHATEVER WE'RE GONNA DO, BUT, YOU KNOW,

[01:25:01]

MAKE IT REALLY DIFFICULT.

I'VE BEEN THINKING AND SO FAR NOTHING'S COMING TO ME.

AGAIN.

BACK TO THE, THE RUCK ISSUE, WHICH IS LIKE OUR PRIMARY CONCERN.

AND THIS LOOKING AGAIN, BACK AT THE, AT THE DECK FROM LAST WEEK WHERE THERE WAS A INSTANCE WHERE ERCOT HAD TO RUCK AT LEAST SIX THERMAL UNITS DUE TO CONCERNS ABOUT BATTERIES CARRYING TOO MUCH OF THE RESERVES.

AND I'M JUST WONDERING, CAN YOU RECONCILE THAT CONCERN THAT ERCOT RAISED WITH THE FACT THAT YOU'RE ALSO RECOMMENDING SHORTENING NONS SPEND TO A TWO HOUR DURATION LIMIT, WHICH BASICALLY MAKES IT A BATTERY PRODUCT, YET ANOTHER BATTERY PRODUCT.

AND SO HOW DO WE ENSURE THAT WHAT WE PASS TODAY WILL REDUCE AND IF THE HEAVEN'S PART, MAYBE EVEN ELIMINATE ROCK, WHICH I THINK EVERYONE WOULD CELEBRATE.

HOW DO WE ENSURE THAT WE DO THAT? OKAY, SO YOU, YOU ARE RAISING DAN'S DISCUSSION AND I BELIEVE THE CORRECT TERM IS FOLD BACK, UM, AS IT'S, SORRY, FOLD BACK, FOLD BACK.

APOLOGIZE.

THAT'S MY UNDERSTANDING.

UM, BUT I, I RECOGNIZE DAN DID USE A DIFFERENT TERM, BUT FOLD BACK, I BELIEVE IS THE CORRECT TERM.

UH, AND THIS IS AN ISSUE FROM OUR PERSPECTIVE.

AND, AND IF YOU FOLLOW SOME OF THE CAL ISO DIALOGUE, THIS IS AN ISSUE THEY'VE SEEN AND WORKED TO CORRECT.

AND SO I WOULD ANTICIPATE US WORKING AROUND WITH OUR STORAGE FOLKS TO FIND WAYS TO ADDRESS THAT PARTICULAR ISSUE SO THAT IT BECOMES A BETTER APPRECIATION FOR WHAT THAT STATE OF CHARGE IS.

AND SO FROM A DURATION PERSPECTIVE, WE'RE NOT SAYING THAT, UM, THAT A TWO HOUR VERSUS FOUR HOUR IS, IS THE SOLUTION TO THAT ISSUE.

THE SOLUTION TO THAT ISSUE IS BETTER APPRECIATION FOR WHAT THE ACTUAL STATE OF CHARGE ON THESE RESOURCES ARE ONCE YOU GET TO A, A, EITHER A LOW LEVEL OR A HIGH LEVEL AND WHAT DOES THAT MEAN FOR YOUR ANCILLARY SERVICES AND TO INCORPORATE THAT IN HOW WE, WE ADDRESS THAT.

AND I THINK IF WE CAN GET THAT ACCURATE, THEN THE, THE ACTUAL DURATION DOESN'T MATTER BECAUSE YOU'LL ACCURATELY REFLECT WHAT THE STORAGE CAN DO.

AND, AND, UH, IN, IN THE EVENT THAT, UH, THAT MAY RESULT IN LESS QUANTITY THAN THERE WILL BE OTHER RESOURCES, UH, THERMAL OR HIGHER PRICES AS A RESULT.

BUT YOU'LL HAVE ACCURATE REFLECTION OF WHAT THAT, UH, THE STATED CHARGE IS.

SO THAT, THAT FROM OUR VIEW IS, IS HOW WE NEED TO ADDRESS THAT ISSUE, WHICH WE BELIEVE TO BE SEPARATE FROM THIS PARTIC PARTICULAR ISSUE.

OKAY.

AND TO BE CLEAR, I'M A NO ON THE CURRENT MOTION.

I JUST DON'T THINK IT'S A STRONG ENOUGH VERSION TO HELP REDUCE RUX.

RTC WAS SUPPOSED TO DO THAT.

IT HA IT REALLY HASN'T.

UM, SO I DO ACKNOWLEDGE THAT THERE IS A, A CONCEPT OR A SUGGESTION THAT WE'RE GONNA CONTINUALLY REVISIT WHAT THE DURATION LIMITS SHOULD BE IN THE ANNUAL ANCILLARY SERVICE METHODOLOGY.

I HOPE THAT ONE OF THE KEY INPUTS INTO THAT DISCUSSION IS RUCK ACTIVITY AND WHETHER IT'S GOING DOWN OR NOT.

AND, AND JUST TO, TO BE CLEAR ON TWO THINGS, I THINK RTC FROM OUR VIEW HAS, IT HAS NOT ELIMINATED RUCKS, BUT IT HAS GREATLY REDUCED THE INSTANCE OF RUX.

AND WE THINK THAT 1309, UM, AND HOW THE MECHANISM IS GOING TO WORK AS A FULL PACKAGE SHOULD ALSO ADDRESS, UH, FURTHER ADDRESS THE RUCK ISSUE AS WELL.

SO WE HAVE COMMENTS THAT IT'LL DO THAT.

THANKS.

OKAY.

THANKS.

OKAY, SETH? YEAH.

CAN WE GO TO SLIDE SIX ON THERE? SO WHEN I WAS LOOKING AT THIS, IT LOOKS LIKE WE'RE BASICALLY CAPPING D'S PROCUREMENT AT A GIGAWATT.

IF WE SET THE PENALTY VALUE AT A PENNY, I DON'T WANT TO USE THE WORD PRICE FOR IT 'CAUSE IT'S REALLY NOT A PRICE FOR, IT'S AN OPTIMIZATION CAP, BUT, SO THE QUESTION IS WHY WOULD WE DO THAT? TO ME, WE WOULD ROCK MORE IF WE DID THAT.

SO THIS IS ABSOLUTELY A PRICE FORMATION ISSUE BECAUSE IF YOU ROCK, YOU GET THE SAME RELIABILITY, BUT WE CAN OBVIATE THE ROCKS BY GETTING THIS RIGHT.

SO I THINK I'M WITH, YOU KNOW, BRIAN SAMS AND NED OVER HERE THAT WE NEED TO HAVE A PRICE FLOOR THAT WILL ACTUALLY ALLOW US TO PROCURE MORE OF THIS TO AVOID ROCKING IN THE FIRST PLACE.

AND GETTING BACK TO KEITH'S POINT, I DON'T REALLY SEE THE RELIABILITY BEING THE CALCULUS IN ALL OF THIS.

IT'S REALLY A PRICE FORMATION ISSUE.

AND IF WE GET THE PRICE FORMATION RIGHT, I AGREE RELIABILITY FOLLOWS.

SO THAT, THAT'S, THAT'S WHERE I'M FALLING ON ALL THIS.

UM, I REALLY DON'T KNOW WHY WE WOULD JUST STOP PROCURING DRS AT, I'M SEEING IT, UH, OVER THERE WHERE IT'S SET AT A PENNY.

IT'S ACTUALLY AROUND 800 MEGAWATTS OR SO AS IT APPROACHES ZERO, MAYBE IT'S LIKE 900.

BUT I, TO ME THAT JUST, THAT THAT'S NOT THE CORRECT PATH TO GO IF WE WANT TO OBVIATE THE RUCKING THAT WE'RE SEEING.

SO, SO JUST A COUPLE POINTS.

THIS IS AN ILLUSTRATIVE VIEW.

WE DON'T ACTUALLY KNOW WHAT THE QUANTITIES ARE YET.

THAT'S, THAT'S TO BE STUDIED RELATED.

WHEN WOULD WE KNOW WHEN THOSE QUANTITIES? UM, THAT'S AN NITKA QUESTION, BUT, UH, I SAW HER EARLIER.

BUT, UM, WE'RE, WE'RE, WE'RE GONNA BE STUDYING THAT SHORTLY,

[01:30:01]

BUT NOT BEFORE, UH, THE JUNE BOARD UNFORTUNATELY.

UH, AND I THINK TO YOUR, YOUR, YOUR OTHER POINT, I THINK RYAN DID ALLUDE TO THIS IN HIS PRESENTATION THERE IS WHEN YOU THINK OF HOW THE RUCK IS GOING TO DEPLOY THE RESOURCES, THE REAL TIME AND HOW THAT INTERACTS IS, IS DIFFERENT.

AND, AND RYAN, I DON'T KNOW IF YOU WANT TO JUST CHIME IN ON THAT PARTICULAR POINT, UM, AND, AND REEMPHASIZE THAT, RYAN.

YEAH.

UH, THANKS VERY MUCH.

YEAH.

THIS, THIS IS THE UNIQUE CONSTRAINTS ON, ON DRS.

SO THERE IS A REAL TIME PROCUREMENT OF DRS, BUT IF, UH, FOLKS RECALL THAT WAS WHEN WE DESIGNED THAT, THAT WAS REALLY MORE TO, UH, ENSURE THAT WE HAD, UM, KIND OF GOOD, GOOD PRICE FORMATION BETWEEN DAY AHEAD AND REAL TIME.

THE, THE FACT OF THE MATTER IS, IS THAT, UM, YOU, THERE'S NO DEPLOYMENT OF DRS IN REAL TIME LIKE THERE IS WITH NON SPEND.

IT'S JUST NOT THAT KIND OF A SERVICE.

IT IS DEPLOYED THROUGH R AND IT IS, IT IS MADE, UH, MORE IN MADE TO LOOK INEXPENSIVE SO THAT RUCK WILL SELECT IT FIRST.

THAT'S THE INHERENT NATURE OF THIS.

AND THAT IS A CRITICAL REASON WHY WE CAN'T JUST TAKE A KIND OF THROUGH LINE AND SAY, WE'LL, WE'LL TREAT ALL THE, YOU KNOW, WE'LL TREAT THIS LIKE ANY OTHER ANCILLARY SERVICE 'CAUSE IT, IT IS DIFFERENT.

AND SO WE THINK THAT WITH THE, THE MINIMUM PRICES THAT INFORM THIS A-O-R-D-C CONSTRUCT, WE THINK THIS GIVES US THE RIGHT HIERARCHY.

IT FORCES GET TO MAKE WHAT WE THINK ARE THE RIGHT DECISIONS WHEN WE GET INTO SHORTAGE AND HOW TO ALLOCATE THAT.

AND, AND, AND IT'S THE SIMILAR CASE, UH, WITH THE FLOORS.

OKAY.

I SAW NETIKA, DID YOU WANNA WEIGH IN ON THE NOPE.

OKAY.

, LET'S GO TO TIKAS NOT HERE.

UM, LET'S GO TO BOB HILTON.

I'LL BRING ANYTHING I'M GOING TO SAY UP LATER.

OKAY.

ON THAT, ON WHAT I WAS GONNA SAY.

OKAY.

SO I THINK WE HAVE THE MOTION ON THE FLOOR.

WE'RE DOING DECENT TIME-WISE.

WE'VE BEEN ON THIS ABOUT AN HOUR AND 10 MINUTES.

COREY, WHAT WAS THE, UH, IT WAS RECOMMENDED APPROVAL AS RECOMMENDED BY PRS AS AMENDED BY THE ERCOT 2, 4 28 COMMENTS AS REVISED BY TECH.

AND THE RED LINE BY T WAS THE $10 TO 1 CENT ON THE NOT FLOOR, BUT THE SHORTAGE PRICING.

UM, AND THEN WE'RE, WE'RE DOING A MINI COMBO WITH RECOMMENDED APPROVAL OF GER 2 82 IS RECOMMENDED BY ROSS AND THE FOUR TWO ROSS REPORT AS AMENDED BY THE FOUR NINE OR CO COMMENTS.

ALL RIGHT, WE'RE READY.

COREY, DO YOU HAVE A RHYME? SURE.

NOW THAT I CAN SAY IN POLITE COMPANY, , GEEZ, WE WILL BEGIN UP WITH THE CONSUMERS AND START WITH MIKE REED.

YES.

THANK YOU, GARRETT.

YES, THANK YOU.

MARK DREYFUS.

YES.

THANK YOU.

THANK YOU, NICK.

YES, THANK YOU, BETH.

YES, THANK YOU WILL.

YES, THANK YOU.

ONTO OUR CO-OPS.

BLAKE? NO, THANK YOU SIR.

KYLE? NO, THANK YOU.

JOE.

DAN FOR MIKE? NO, THANK YOU.

AND JOHN, NO THANK YOU.

ONTO OUR INDEPENDENT GENERATORS.

NED, I'M GONNA TRY TO MEET BLAKE'S CHALLENGE AND SAY, NO, NO, NO.

BRIAN.

NO.

AND MY HEART WILL GO ON BOB HILTON.

WOW.

.

UH, NO THANK YOU SIR.

CAITLIN? YES.

OH, THANK YOU, COREY.

DON'T, I DON'T HAVE A GOOD LYRIC ONTO THE IPMS. JEREMY? NO, THANK YOU.

THANK YOU, SETH.

NO, THANK YOU.

IAN.

YEAH, THANK YOU.

NO, THANK YOU SHANE FOR RASHMI.

UH, NO, SIR, SIR, ONTO OUR I REPS.

BILL? NO, YOU, JAY? NO, THANK YOU.

CHRIS.

GOT YOUR KNOWN CHAT.

CHRIS.

THANK YOU, JENNIFER.

NO, THANK YOU.

ONTO THE IOUS.

MARTHA?

[01:35:04]

YES, THANK YOU.

EBY? YES.

THANK YOU.

AARON.

YES, THANK YOU, ROB.

FOR KEITH? YES.

THANK YOU.

UNDER OUR MUNIS.

DAVID? YES.

THANK YOU, ALICIA? YES.

THANK YOU JOSE.

NO, THANK YOU.

AND CURTIS? YES, THANK YOU.

MOTION FAILS.

40% IN FAVOR.

47% IN FAVOR.

53% OPPOSED.

OKAY, I HAD, UH, MARK DREYFUS IN THE QUEUE, AND THEN IT LOOKS LIKE A COUPLE OTHERS.

GO AHEAD, MARK.

THANK YOU CHAIR.

UM, I'D LIKE TO MAKE A MOTION TO, UH, AND AS, AS SPECIFIED AS RELATED THE APPROPRIATE COMMENTS TO INCLUDE THE TWO HOUR NONS SPEND DURATION AND THE $10 PRICE FLOOR.

SO I THINK THAT'S ERCOT COMMENTS, THAT'S ERCOT TWO, THOSE WOULD BE ERCOT TWO COMMENTS FROM YESTERDAY WOULD DO THAT.

OKAY.

SO TO APPROVE THE PRS RECOMMENDATION AS MODIFIED BY ERCOT TWO, OKAY, SO RECOMMEND APPROVAL AS RECOMMENDED BY PRS AS AMENDED BY ERCOT 4 28.

TWO COMMENTS? YES, THANK YOU.

AND THEN, UH, NOER, WHATEVER, 2, 2 83.

AND ANY ACCOMPANYING NOER 1328 OR NO, 2 83 IS RECOMMENDED BY ROSS, IS AMENDED BY ERCOT.

FOUR, NINE COMMENTS.

YOU SAY THAT VERY WELL.

THANK YOU.

WELL, BETH IS NODDING IN ENCOURAGINGLY, SO, UM, I THINK, BOB, YOU WANTED A SECOND? YEAH, SO THE MOTION BY MARK, DRIVE A SECOND FROM BOB PELTON.

NED, YOU'RE IN THE QUEUE.

I WAS TRYING TO BEAT MARK TO MAKE A MOTION, BUT I WILL BE VOTING AGAINST THIS ONE AS WELL.

I DO THINK WE HAVE BETTER OPTIONS AVAILABLE TO US.

WOULD YOU, LIKE, ARE YOU, ARE YOU MAKING A MOTION TO AMEND THE MOTION? I WOULD AMEND THE MOTION.

I WOULD, I WOULD MAKE A MOTION TO AMEND THE MOTION TO ENDORSE THE LATEST HINT.

COMMENTS? COMMENTS, WHAT? AND IN THE SPIRIT OF COMPROMISE, I WOULD, UH, MODIFY THE $15 MINIMUM TO $10.

I DUNNO, WILL OF THE GROUP, IF YOU, IF WE TAKE A MOTION IN A SECOND TO AMEND THE MOTION, WE'LL RUN THROUGH A, A BALLOT JUST TO SEE IF YOU'D RATHER VOTE ON NED'S MOTION INSTEAD VERSUS JUST RUN THROUGH THE MOTION WE HAVE.

IF IT FAILS, THEN THE DECK'S CLEAR FOR ANYONE TO MAKE A NEW MOTION.

SO I'D PREFER THAT SOUNDS LIKE NED'S LETTING EVERYONE KNOW IF YOU VOTE NO ON WHAT'S IN FRONT OF YOU, HE'S, YOU KNOW, HOT TO GO WITH HIS OWN MOTION.

SO YOU'VE ALREADY SEEN HOW QUICKLY WE CAN RUN THROUGH A VOTE AND HAVE IT FAIL.

SO , THANK YOU AARON.

GOT IT.

TWO VOTES FOR AARON.

WHAT? WHAT DO YOU WANNA DO, NED? WELL, I'VE GOT THE, I'VE GOT THE MOTION OUT.

OKAY.

DO YOU HAVE A SECOND? YEAH.

CAN WE SUMMARIZE WHAT THIS IS? YEAH, I BELIEVE, I DON'T KNOW.

I BELIEVE YOU'RE TRYING TO AMEND THE MOTION TO KEEP THE $10, BUT GO TO FOUR HOUR DURATION.

BUT FIRST WE'D HAVE TO JUST VOTE ON THE ABILITY TO AMEND IT.

YES.

THE AMENDMENT WOULDN'T BE TO THE ERCOT.

TWO COMMENTS.

THE AMENDMENT WOULD BE TO SUBSTITUTE THE ERCOT TWO COMMENTS WITH THE HEN COMMENTS, AND THEN IN TURN SWAP OUT THE $15 MINIMUM FOR THE, UM, THE $10 MINIMUM.

SORRY, I'M GETTING DIZZY.

I THINK WE ALL ARE.

GO AHEAD, BOB.

I, I WAS JUST TRYING TO MAKE SURE THAT EVERYONE UNDERSTOOD EXACTLY WHAT WE WERE VOTING ON.

SO WHEN IT COMES DOWN TO IT, YOU'RE SAYING FOUR HOUR AND 15 AND YOU'VE CHANGED THE 15 TO A 10 IS WHAT YOU'RE SAYING? YEAH, CORRECT.

[01:40:02]

SO THE MAIN DIFFERENCE IS THAT IS THE FOUR HOUR DURATION LIMIT VERSUS TWO HOUR? I THINK SO I HAVEN'T DONE A PERFECT COMPARE BETWEEN THE TWO.

IS THAT, THAT IS MY PRIMARY CONCERN IS GOING FROM FORD BACK TO TWO WITHOUT THE ANALYSIS TO JUSTIFY THAT.

YEAH.

GIVEN THE CONCERNS RAISED AT THE BOARD MEETING LAST WEEK.

SO YEAH, IF THAT'S THE ONLY DIFFERENCE, I WOULD SECOND THIS MOTION HOWEVER WE GET TO THAT.

YEAH, THAT'S THE INTENT.

I WILL SAY THE HEN COMMENTS ALSO INCLUDE THE TCPA COMMENTS THAT INCLUDED THE ADJUSTMENTS TO, UH, TRACK THE STATUTORY LANGUAGE ON MARKET UNCERTAINTY VERSUS UNCERTAINTY AND A COUPLE OF OTHER MINOR CLEANUPS THAT ARE CONSISTENT.

OKAY.

THEY'RE CONSISTENT.

I'M GOOD TO SECOND HILTON HILTON SECONDED THE MARK MOTION.

AND THEN THIS IS A MOTION TO AMEND FROM NED WITH BILL SECOND.

OKAY.

BILL, DID YOU HAVE OTHER COMMENTS FIRST MATT AMEND, UH, MATT ARTHUR THERE AT LEGAL IF, UH, THE H OR THE TCPA COMMENTS ARE BEING CONSIDERED? UH, JUST, YOU KNOW, ERCOT MIGHT HAVE A COUPLE OF VIEWS ON THAT, BUT I'M JUST SPEAKING ABOUT THE MARKET UNCERTAINTY LANGUAGE FROM THE STATUTE.

SO, UH, IF, IF THAT LANGUAGE IS TO BE ADDED, I THINK THAT'S IN THREE DIFFERENT PLACES IN THE NPRR, I THINK IT'S IN 2.1, THE DEFINITION IT'S IN 3 17 5 1 AND IT'S IN 6 5, 7, 6 2 5, WHICH I CAN REPEAT IF NEEDED.

BUT, UM, TO, SO CURRENTLY IT SAYS TO MANAGE UNCERTAINTY AND WE WOULD BE ADDING MARKET UNCERTAINTY BECAUSE THE STATUTE DOES REFER TO, UH, MARKET UNCERTAINTY.

BUT, UH, WOULD ASK IF THIS IS TO MOVE FORWARD TO SAY, TO ACCOUNT FOR MARKET UNCERTAINTY INSTEAD OF TO MANAGE MARKET UNCERTAINTY BECAUSE NOT DISPLAY HARRIS, BUT THAT WOULD BE THE ACTUAL TRACKING OF THE STATUTE IF THE GOAL IS TO TRACK THE STATUTE.

OKAY.

COREY MOTION TO AMEND WOULD JUST BE, ARE WE WILLING TO AMEND IT, RIGHT? NOT AN UP OR DOWN ON THE AMENDED MOTION? UH, CORRECT, BUT WE ALSO, IT'S THE CHICKEN OR THE EGG THING.

WE NEED TO GET THE RED LINE STRAIGHT SO EVERYONE KNOWS HOW THEY SHOULD VOTE ON THE MOTION TO AMEND THE MOTION.

BUT YES, THE MOTION TO AMEND IF IT SUCCEEDS WOULD JUST PUT A NEW MOTION IN FRONT OF EVERYONE TO MAKE AN UP OR DOWN VOTE ON IT.

OKAY.

BUT SETH, I JUST NEED A RECAP.

SO WE'RE, WE'RE VOTING ON FOUR HOUR DURATION REQUIREMENT FOR BATTERIES AND A $10 PRICE FLOOR.

WE WOULD BE VOTING ON THE ABILITY TO VOTE ON FOUR HOUR DURATION AND $10 PRICE FLOOR AND ALSO TRACKING DEFINITIONS.

YEAH.

SO IT WOULDN'T BE AN UP OR DOWN ON THAT YET.

IT WOULD JUST BE, ARE WE WILLING TO CHANGE THE, THE MOTION TO THAT, DAVID? THAT'S GOOD.

OKAY, LET'S GO FORWARD COREY.

WELL LET'S GET THE DOCUMENT READY FIRST.

OKAY.

OKAY.

SO LET'S GET THE ROAD LINES FIRST.

SO NED, ARE YOU AMENABLE TO MATT'S CHANGING MANAGE MARKET UNCERTAINTY TO ACCOUNT FOR MARKET UNCERTAINTY? I AM.

IF YOU CAN MAKE THE, THE RECITATION OF ALL THOSE SECTIONS RHYME , I CAN MAKE IT RHYME.

IF I HAD ENOUGH TIME.

GOOD ENOUGH, THANK YOU.

DON'T, DON'T ENCOURAGE ME.

HEY CAITLIN, I, I GUESS I DID HAVE A QUESTION WHILE WE'RE MAKING THESE CHANGES.

SURE.

UM, I THINK THERE WAS A HIGHLIGHT ON SOME OF THE, UH, MINIMUM PRICE FLOORS THAT WERE CHANGED.

I DON'T KNOW IF EVER WE EVER GOT AN EXPLANATION FOR THOSE.

SO I WAS GONNA SEE, UM, IF SEAN'S OR SOMEONE CAN SPEAK TO THOSE, GO AHEAD NED.

'CAUSE I BELIEVE WE'RE CHANGING THOSE FROM THE IN THE HAND COMMENTS, CORRECT? YES.

SO WHERE IS IT SAYS 15 NOW CHANGE THAT TO 10 AS WELL AS THE ANCILLARY SERVICE DEMAND CURVE FLOOR FOR THE, THE, UM, YEAH, DOWN THERE.

SO THERE'S TWO FUNCTIONS.

ONE IS YOU'RE, WHERE YOU'RE SETTING THE, THE FLOOR ANYWAY,

[01:45:01]

BASED ON, UM, BASED ON THE INSULAR SERVICE PLAN, RIGHT? AND THIS LANGUAGE STILL RETAINS HAVING NONS SPIND FILL OUT THE TAIL OF THE AGGREGATE RDC.

SO IN, IN TOTAL THE AGGREGATE OR DC WILL STILL MOVE OUT ASYMPTOTICALLY TOWARDS ZERO, RIGHT? AND SO ESSENTIALLY IT'S JUST KEEPING THOSE TWO, UH, TOGETHER.

NOW RYAN DID SHOW IN HIS PRESENTATION THAT THERE, THERE IS AN IMPACT ON HOW THE CURVE IS SET.

AND I THINK WE'VE ALREADY TALKED ABOUT HOW THERE IS RELATIVE VALUE TO THAT.

THAT IS A, UH, AN ANCILLARY SERVICE THAT THE LEGISLATURE PUT IN STATUTE AND IS REQUIRING US TO IMPLEMENT TWO, TO HELP ACCOUNT FOR MARKET UNCERTAINTY AND TO MEET THE RELIABILITY STANDARD AND SUPPORT DISPATCHABLE GENERATION.

SO, UM, THAT'S WHERE I THINK THERE'S SOME, SOME REASONABILITY IN, IN CONSIDERING THAT DIFFERENT SHAPE.

IT DOESN'T NECESSARILY, I, I, I THINK YOU'VE HEARD FROM A NUMBER OF FOLKS SAYING IT DOESN'T HAVE TO SIT BELOW NONS SPIN.

THAT'S A LITTLE BIT OF A, YOU KNOW, THAT'S A, I WOULD ALMOST SAY IT'S AN ANACHRONISTIC VIEW THAT THERE IS A SINGLE DIMENSION ACROSS WHICH WE'RE, WE'RE VALUING ANCILLARY SERVICES RELATIVE TO EACH OTHER.

THE SYSTEM'S CHANGING, THE RESOURCE MIX IS CHANGING, THE LOAD MAKEUP IS CHANGING, AND THE NEEDS OF THE SYSTEM ARE CHANGING, INCLUDING SUPPORTING A FLEET THAT CAN MEET THE RELIABILITY STANDARD.

SO WE DON'T HAVE A SINGLE TOOL FOR MEETING THE RELIABILITY STANDARD OR, OR GETTING THERE.

WHAT WE NEED IS THE SUM OF THE PARTS TO GET THERE.

THAT'S, THAT'S THE POLICY FRAMEWORK THAT WE'VE BEEN LEFT TO WORK WITHIN.

AND SO, UM, I THINK THAT CHANGE IS SOMETHING THAT CAN HELP ALONG THOSE LINES.

AND YEAH.

COREY, COULD YOU SCROLL UP TO THE TABLE JUST A LITTLE BIT? AND I GUESS MY, MY ATTENTION WAS DRAWN TO, UM, MOVING THE NONS SPIND MINIMUM PRICE FROM $5 TO A PENNY, AND THEN MOVING DRS FROM A PENNY TO $10 OF ENSURE WHAT THE JUSTIFICATION FOR THE NONS SPIND CHANGE WAS.

AND THAT MIGHT BE TO YOUR POINT, THAT THEY'RE NOT IN ORDER, BUT I'M, I WASN'T SURE ON THAT.

IT WAS ALSO BECAUSE IF YOU SCROLL UP JUST A LITTLE BIT THERE, YOU SIGN ANY REMAINING ONE MEGAWATT SEGMENTS OF THE A RDC PRICED ABOVE A PENNY TO NONS SPIND, IT STRUGGLED WITH HOW I, I KNOW I PERSONALLY STRUGGLED WITH HOW YOU COULD HAVE THE $5 MINIMUM THERE AND STILL GIVE EFFECT TO THAT CASE, REQUIRE 10 WEEKS THREAD.

UH, YOU HAVE A LIVE MIC.

SO THAT WAS, THAT WAS, AT LEAST IN MY MIND, THAT WAS THE CONNECTION THERE.

OTHERS MAY HAVE A A OKAY.

A DIFFERENT VIEW.

WELL, I JUST WANTED TO DRAW THAT DISTINCTION 'CAUSE I, I THINK WE'VE NOT REALLY DIRECTLY FOCUSED ON THAT, SO I JUST WANNA MAKE SURE WE HAD THAT ANSWERED.

SO THANK YOU.

THAT'S A GOOD QUESTION.

THANK YOU DAVID.

KEITH? YEAH, JUST TO FOLLOW UP ON, ON A POINT THAT, THAT NED MADE, I THINK WE, WE DEFINITELY DISAGREE WITH THE INTERACTIONS OF THE, THE CURVES THAT ARE, ARE IN THE PROPOSAL.

UM, AND SO WE, WE'LL, WE'LL BE CLEAR THAT WE, WE DON'T SUPPORT THAT.

WE, WE SEE THAT AS A PROBLEM AND WE DISAGREE WITH, WITH THAT ON THAT.

THANKS WITH, OKAY.

UM, COREY, ARE YOU STILL WORKING UP EDITS? WELL, THAT'S WHAT I WAS GONNA ASK NED.

WHEN, WHEN YOU IS CHANGING THE $10 THERE, THE ONLY PLACE YOU NEED IT CHANGED OR DO YOU NEED THE LANGUAGE FROM, LIKE THE ERCOT TWO COMMENTS ABOUT THE D-R-S-A-S-D-C WILL HAVE A FLOOR PRICE OF $10 PER MEGAWATT, OR IS THAT NOT NEEDED IF YOU GET THE MEN PRICE YOU'RE LOOKING FOR HERE? UH, YEAH, THAT WOULD PROBABLY, YOU WOULD PROBABLY NEED TO INCORPORATE THAT.

THAT'S A GOOD CATCH, CORY.

OKAY.

WELL, I DON'T KNOW, I DON'T KNOW IF I WANT TO COMPLICATE IT, BUT IF YOU PUT THE MEN PRICE AT $10, IT'S EFFECTIVELY SETTING THE, THE FLOOR AT ABOVE $10 OR, YOU KNOW, LIKE IT'LL, IT'LL DRAW THE CURVE WHERE IT TERMINATES AT $10.

YEAH, I AND SHANE, THAT'S A GREAT POINT.

I'VE, I'VE SAID EARLIER, I THINK YOU WANT TO HAVE COMPETITIVE MARKET DYNAMICS.

YOU KNOW, ERCOT SAID THEY THINK $10 IS ABOUT WHERE YOU GET TO THE, THE EQUIVALENT OF A COMMITMENT, UH, COST.

THAT MAY OR MAY NOT ALWAYS BE THE CASE, DEPENDING ON WHAT GAS LOOKS LIKE ON THAT PARTICULAR DAY.

UM, BUT WHAT I'M TRYING TO, TO GET AT IS A, A COMPROMISE THAT INCORPORATES THAT, THAT FEEDBACK HERE.

I THINK, YOU KNOW, 90, 99% OF THE TIME, OR ACTUALLY 99.4% OF THE TIME, IT'S GONNA BE BELOW THAT POINT ANYWAY.

YEAH, I MEAN THAT'S, YEAH, WE'RE NOT SETTING A, YEAH.

OKAY.

98.8, RIGHT? 'CAUSE IT'S 1.2, BUT HALF OF THAT 1.2 IS UNDERNEATH

[01:50:01]

THE OKAY, FINE.

ALL COREY, ARE WE GOOD? GOOD'S NOT A DEFINED TERM, BUT COREY ARE WE YES, WE ARE IN A STOPPING PLACE FOR A VOTE.

YEAH, LEMME GET A MOTION OF FOR Y'ALL.

OKAY.

DO WE PEOPLE NEED MORE TIME TO REVIEW THE EDITS THAT, BUT THE VOTE IS TO DETERMINE WHETHER WE WANT TO TAKE A SUBSTANTIVE VOTE ON THOSE EDITS? YEAH, THE MOTION IN FRONT OF YOU RIGHT NOW IS THE ERCOT TWO COMMENTS, WHICH HAS THE TWO HOUR DURATION AND THE $10 FLOOR.

SO THE MOTION THAT NED HAS MADE WOULD MODIFY THAT MOTION TO BE THE HEN COMMENTS, WHICH KEEPS THE FOUR HOURS, HAS SOME $10 CHANGES.

AND SO THIS, THIS MOTION IN FRONT OF YOU WILL BE DECIDE IF YOU WANT LIKE TO VOTE ON THAT MOTION INSTEAD.

OKAY.

SO TO BE CLEAR, LYRICS, WE'RE VOTING TO DECIDE WHETHER WE WANT TO VOTE ON A DIFFERENT MOTION, CORRECT? WE'RE, YEAH, VOTING ON THE ABILITY TO VOTE ON NED'S MOTION BECAUSE IT WAS AN UNFRIENDLY AMENDMENT.

.

I THINK THAT'S A, A FAIR ASSUMPTION WE DIDN'T EVEN ASK MARK, DO YOU WANNA ACCEPT THE AMENDMENT? I DON'T WANNA HAVE ANY KUNG FU FIGHTING HERE, BUT NO, IT WAS NOT A FRIENDLY AMENDMENT.

THANK YOU.

MAY I ASK SOMETHING? OF COURSE.

I THINK, I DON'T UNDERSTAND WHY YOU ARE AGAINST TWO HOURS, BECAUSE THIS HAS BEEN DISCUSSED, ANALYZED.

IT WAS IN THE AS STUDY, IT WAS IN PERFORMANCE MEASURES.

UH, YEAH, I I DON'T UNDERSTAND THAT.

AND WE DON'T SUPPORT THAT.

YEAH, THAT'S A VERY FAIR QUESTION.

IKA AND I, I AGREE.

IT HAS BEEN DISCUSSED A LOT AND IT HAS BEEN INCLUDED IN THE STUDY.

UM, THERE'S REALLY 2, 2, 2 PIECES THAT I CAN THINK OF OFF THE TOP OF MY HEAD.

FIRST IS, UM, I THINK BILL COVERED THIS PRETTY EXTENSIVELY, WHICH IS JUST LAST WEEK, UM, THERE WAS, YOU KNOW, DISCUSSION OF, YOU KNOW, HOW THE, HOW ERCOT IS REACTING TO MORE RESERVES FROM, UH, DURATION LIMITED RESOURCES AND, UH, THE IMPACT THAT HAS ON ERCOT OPERATIONS AND THAT, YOU KNOW, THAT IS A, CALL IT A NEW INFORMATION THAT, THAT PROBABLY WASN'T IN, UH, WASN'T AVAILABLE AT THE TIME OF THE STUDY AND IS SOMETHING IMPORTANT THAT WE SHOULD BE CONSIDERING.

THE SECOND PIECE, AND THIS I TRIED TO HIGHLIGHT THIS EARLIER, IS WITH THAT REDUCTION IN, UH, NONS SPEND IN, UH, MY PRESUMPTION IS THAT ERCOT WILL THEN SEE THE, THE MAKEUP OF RESOURCES PROVIDING NONS SPEND IS PROVIDING A LOWER QUALITY RESERVE.

AND TO TRADE OFF THAT LOWER QUALITY THEY MAY SAY WE NEED NOW NEED A GREATER QUANTITY.

AND IF THAT IS A TRADE OFF, THAT IS REALLY SOMETHING WE HAVE TO CONSIDER.

I WOULD REALLY LIKE TO SEE WHAT THOSE TRADE-OFFS ARE BEFORE MAKING A DECISION RATHER THAN TRYING TO MAKE, YOU KNOW, KIND OF FORCE IT IN TO A DRS DECISION IN THIS NPRR.

I THINK IT'S SOMETHING THAT FOLKS AREN'T GOING TO, YOU KNOW, AREN'T GONNA LET GO OF.

AND I THINK WE'LL BE DISCUSSING IT, WE'LL CONTINUE TO DISCUSS IT, BUT WE HAVE, AS, AS KEITH SAID, THE INTENT WOULD BE TO, TO BRING THIS UP FOR THE 2029 ANCILLARY SERVICE, UH, METHODOLOGY ANYHOW, ONCE DRS IS LIVE.

SO WE'VE GOT, YOU KNOW, TWO-ISH YEARS TO, TO CONTINUE TO, TO WORK THROUGH THAT AND ANALYZE IT.

AND THAT'S NOT A DECISION THAT NEEDS TO BE MADE TODAY.

THAT'S, THAT'S AT LEAST MY VIEW.

I SECOND OKAY, I SEE CARDS FROM BILL AND BOB IF THERE'S ANY MORE CARDS AFTER THAT, I'M GONNA CALL THE QUESTION AND MARTHA SAID SHE WOULD SECOND IT.

SO, UM, LET'S GO TO BILL AND THEN BOB.

YEAH, I WAS ALSO GONNA ADDRESS EUREKA'S QUESTION ABOUT WHY WE HAVE DISCOMFORT WITH SHORTENING THE DURATION CURVE FROM FOUR HOURS TO TWO HOURS FOR NON SPEND AT THIS TIME.

AND THAT'S BECAUSE THE MOST RECENT ANALYSIS WE HAVE IS FROM LAST WEEK THAT SHOWS THAT A FOUR HOUR DURATION LIMIT FOR NONS SPIND WASN'T ENOUGH TO AVOID RUCKS.

AND SO WHAT WE'RE CONCERNED ABOUT IS SHORTENING NONS SPIND TO TWO HOURS AND KEEPING DRS AT FOUR, WHICH DIDN'T WORK LAST WEEK OR DIDN'T WORK IN JANUARY AS PRESENTED LAST WEEK.

WE MAY BE GOING BACKWARDS.

SO WHAT WE WOULD LIKE TO SEE IN THE ANALYSIS THAT'S ALREADY BEEN COMMITTED TO, AS PART OF THE ANCILLARY SERVICE METHODOLOGIES WHEN WE ANALYZE THE DURATION LIMITS FOR BOTH NONS, SPIND AND DRS

[01:55:01]

IS WHAT COMBINATION SOLVES THE OBJECTIVES.

SO WE MAY END UP WITH A TWO HOUR NONS SPIND DURATION AND AN EIGHT HOUR DRS DURATION LIMIT.

I WOULD LIKE TO SEE ALL THAT ANALYSIS BEFORE MAKING A FINAL DECISION ON THE DURATION LIMITS FOR NONS SPIN.

THAT'S WHAT, THAT'S OUR PERSPECTIVE ON THIS.

THANKS.

THANKS, BILL.

THAT WAS GOOD.

MADE SUCCINCTLY, BOB.

YEAH, I'M GLAD TO SEE THAT WE LIVE IN WASHINGTON DC WHERE NO GOOD ISSUE GOES UNEXPLOITED.

UH, I THINK THAT THO THOSE ISSUES ARE COMPLETELY DIFFERENT.

I THINK ERCOT AT THE BOARD MEETING YES, DID BRING UP SOME ISSUES THAT THEY'VE IDENTIFIED AND THEY'RE DOING SOME RESEARCH ON.

I THINK THEY ALSO DISCUSSED THE, THE POTENTIAL WAYS THEY'RE GONNA GET AROUND IT.

AND NONE OF THEM THAT THEY MENTIONED WERE ANYTHING TO DO WITH THE DURATION PIECE.

THEY'RE TALKING ABOUT COMING OUT WITH SOME, UH, ADDITIONAL, UH, REVISION REQUESTS TO ADDRESS THOSE ISSUES.

WE'RE GONNA BE WORKING WITH THEM TO RESOLVE THOSE ISSUES.

SO, UH, I DON'T SEE THAT REALLY PLAYING A FACTOR IN HERE.

MM-HMM .

DAN TOLD THE BOARD THAT THE TAX CHAIR WAS WORKING WITH THEM ON AN NPRR AND I BELIEVE HIM.

SO, UH, LET'S GO TO BETH.

I, I, I APOLOGIZE YOU PUTTING OFF YOUR, UH, MOTION TO CALL THE QUESTION TO, TO ALLOW ME TO CHIME IN ON THIS QUESTION, ON THIS ISSUE.

UM, AS, AS I THINK ABOUT ANCILLARY SERVICES, I THINK ABOUT WE HAVE DIFFERENT SERVICES TO ADDRESS DIFFERENT KINDS OF RISKS.

AND MY CONCERN IS THAT BY JUST PANCAKING A FOUR HOUR PRODUCT IN NONS SPIN WITH ANOTHER FOUR HOUR PRODUCT IN DRRS, WE'RE NOT DIFFERENTIATING THOSE RISKS APPROPRIATELY.

AND FOR THOSE THAT ARE REALLY INTERESTED IN MAKING SURE THERE'S A MARKET FOR, YOU KNOW, SLOW STARTING, YOU KNOW, DISPATCHABLE RESOURCES TO PROVIDE THIS SERVICE, IT SEEMS LIKE YOUR POINT BILL GOES TO THAT END.

IF, IF NONS SPIN ISN'T GOING TO BE THE THING AND DRRS NEEDS TO BE A LONGER DURATION, THAT THAT SHOULD BE IN YOUR INTEREST, UH, OR IN THE INTEREST OF THOSE, UH, OF THOSE FACILITIES.

SO I AM VERY OF ALL OF THE ISSUES I CAN GIVE ON THE, ON THE A AS DEMAND CURVE ASPECT OF THIS, BUT THE DURATION IS SUPER IMPORTANT FROM MY PERSPECTIVE.

OKAY, THANK YOU BETH.

LET'S DO, LET'S DO IT COREY, LET'S GO.

OKAY.

ON YOUR MOTION TO AMEND THE MAIN MOTION FOR 1309 TO BE INSTEAD OF THE ERCOT TWO COMMENTS TO BE RECOMMENDED APPROVAL OF 1309 AS RECOMMENDED BY PRS AND THE APRIL PRS REPORT AS AMENDED BY THE HE COMMENTS AS REVISED BY T WITH THE DESKTOP HEAD AS WE PUT UP ON SCREEN.

SO AGAIN, IF THIS PASSES, THIS WILL BE THE MOTION THAT I'LL DROP INTO THE MINI COMBO BALLOT AND WE'LL VOTE ON 1309 AND IT'S NOER USING THIS MOTION.

IF THIS FAILS, WE'LL GO BACK TO THE MOTION WE HAVE OF THE ERCOT COMMENTS.

HEY COREY, CAN I ASK A QUESTION ON 2 83? IT WOULD BE WITHOUT THE ERCOT COMMENTS, RIGHT? 'CAUSE ERCOT COMMENTS ON 2 83 CHANGE IT TO TWO HOURS THE DURATION.

YEAH.

SO IT WOULD JUST BE 2 83, IS THAT CORRECT? SO 2 83 IS RECOMMENDED BY FOUR TWO ROSS, LET ME, I THINK THE RECOMMENDATION FROM ROSS WAS WITH THE FOUR HOUR.

YEAH, YEAH.

SO WE TREATING THE COMBO MOTION FROM BOB AS TWO MAIN MOTIONS THAT ARE GONNA BE AMENDED.

SO WE NEED THE MOTION TO AMEND TO REFLECT BOTH AMENDING THE MOTION ON 1309 AND AMENDING THE MOTION ON THE NOER TO BE JUST THE ROSS REPORT, NOT THE CORRECT OR COMMENTS.

OKAY.

IS THAT RIGHT? NED? NED BILL CONFIRMED? YES.

GOOD, GOOD HEAD NOD.

YEAH.

OKAY, ANDREW, WE HAVE 45 SECONDS.

.

HI GUYS.

SORRY, I'M ON A PLANE.

YEAH, I'M NOT EVEN SURE WHAT ALL HAS BEEN AMENDED.

UH, SO I LOOKED AT THE INCOME AND I SEE A $15 MINIMUM PRICE ON DRS AND ON ECRS AS IS THAT WE, WE'VE, WE'VE CHANGED THE $15 AND WHAT'D YOU CHANGE IT TO? 10.

[02:00:01]

SO THIS, THIS VOTE IS TO BE ABLE TO VOTE ON THAT SUBSTANTIVE VOTE, RIGHT? IT'S A MOTION TO AMEND.

SO WOULD CAN WE TAKE YOUR COMMENTS UP AFTER THIS VOTE? THIS IS A VOTE TO BE ALLOWED TO MAKE THAT ADJUSTMENT.

SO THE MOTION ON THE TABLE IS THE ERCOT TWO COMMENTS, BUT THERE WAS A REQUESTED AMENDMENT.

IT WAS NOT A FRIENDLY QUOTE UNQUOTE FRIENDLY AMENDMENT.

SO WE'RE HAVE TO TAKE A VOTE TO BE ABLE TO AMEND.

OKAY, GO AHEAD.

OKAY, THANKS ANDREW.

OKAY, LET'S GO COREY.

SO NOW TO AMEND THE TWO MAIN MOTIONS, WE WILL START UP WITH THE CONSUMERS, WITH MIKE.

NO THANK YOU GARRETT.

NO, THANK YOU.

MARK DREYFUS.

NO, THANK YOU NICK.

NO, THANK YOU.

THANK YOU BETH.

NO, THANK YOU.

WILL NO THANK YOU.

ONTO THE CO-OPS.

BLAKE? YES, KYLE? YES.

THANK YOU JO, DAN FOR MIKE? YES.

THANK YOU, JOHN.

YES, THANK YOU.

ONTO OUR INDEPENDENT GENERATORS.

NED? YES.

THANK YOU, COREY.

THANK YOU BRIAN.

YES, THANK YOU.

THANK YOU, BOB.

NO, THANK YOU KAITLIN.

NO THANK YOU.

UNDER IPMS. JEREMY ABSTAIN.

THANK YOU SETH.

NO, THANK YOU.

IAN ABS ABSTENTION.

THANK YOU SHANE FOR REMI.

UH, ABSTAIN.

THANK YOU.

AND IRE.

BILL? YES, THANK YOU JAY.

NO, THANK YOU.

CHRIS GOT YOUR YES IN CHAT, CHRIS? THANK YOU JENNIFER.

NO THANK YOU.

ONTO OUR IOUS.

MARTHA? NO, YOU EBY? NO.

WAS THAT, WAS THAT A NO, EBY? I'M SORRY.

YEAH, THAT WAS A NO.

OKAY.

THANK YOU AARON.

NO, THANK YOU ROB FOR KEITH? NO, THANK YOU.

ONTO OUR MUNIS.

DAVID.

NO, THANK YOU ALICIA.

NO, THANK YOU JOSE.

NO THANK YOU.

AND CURTIS, NO THANK YOU.

MOTION FAILS.

70% OPPOSED.

OKAY, SO THE, WE'RE BACK TO THE DREYFUS HILTON MOTION, WHICH IS BOY RECOMMEND 1309 AS RECOMMENDED BY FOUR 15 PRS AS AMENDED BY 4 28 ERCOT.

TWO COMMENTS AND RECOMMEND APPROVAL OF GER 2 83 AS RECOMMENDED BY FOUR TWO ROSS AS AMENDED BY ERCOT.

FOUR, NINE COMMENTS.

I DID THAT ALL WITHOUT READING ANYTHING .

THAT WAS RIGHT TOO, RIGHT? COREY? I'M SHUFFLING BALLOTS AT THE MOMENT, BUT MARTHA SAID IT WAS RIGHT, SO YEAH.

OH, WELL I TRUST, OKAY, UM, LET'S, WE'LL TAKE THE QUEUE WHILE COREY SHUFFLES BALLOTS.

BILL, WHY CAN'T WE BE FRIENDS? WE ARE FRIENDS.

I'M SUGGESTING THIS WOULD BE A COMBO BALLOT VOTE.

I DON'T, IS ANYONE GONNA VOTE? NO, WE'RE OBSCENE ON THIS.

WE CAN SPEED THINGS.

OH, SORRY.

NEVERMIND.

BILL.

YOU SWEET CAN CAN'T COMPLETELY BE FRIENDS.

WE'RE ALMOST FRIENDS.

GARRETT.

YEAH, I'M, I'M GONNA SUPPORT THIS MOTION AND I CAN'T THINK OF A MUSIC LYRIC TALKING ABOUT THE SPIRIT OF COMPROMISE, BUT YOU KNOW, WE STILL HAVE ISSUES WITH THE CONSERVATIVE OPERATION IN THE PRICE FLOOR, BUT BE A YES ON THIS.

THANK YOU.

OKAY, WE ARE BACK TO OUR MAIN MOTION, WHICH AGAIN FOR THOSE FOLLOWING ALONG AT HOME 1309 WITH THE ERCOT TWO COMMENTS AND WHICH IS THE TWO HOUR DURATION AND THE $10 FLOOR.

AND THEN 2 83 HAS THOSE ERCOT COMMENTS THAT ALSO LOWER THE DURATION TO TWO.

SO PRS WITH ERCOT.

TWO COMMENTS, ROSS REPORT WITH THE FOUR NINE ERCOT COMMENTS.

AND ON THIS MOTION WE WILL START UP AGAIN WITH CONSUMERS, WITH MIKE.

YOU HAVE THE SAME CONCERN WITH THE PRICE FLOOR, BUT UH, WE'LL GO AHEAD AND COMPROMISE AND SAY YES.

ALRIGHT.

THANKS

[02:05:01]

SIR.

GARRETT? YES SIR.

THANK YOU.

MARK? YES, THANK YOU, NICK.

YES, THANK YOU, BETH.

YES, THANK YOU WILL.

YES, THANK YOU.

ONTO OUR CO-OPS.

BLAKE? NO, THANK YOU.

KYLE.

NO, YOU, JOE, DAN FOR MIKE ABSTAIN.

OKAY, THANK YOU.

UH, JOHN, NO THANK YOU.

ONTO OUR INDEPENDENT GENERATORS.

NED.

NO, THANK YOU, COREY.

THANK YOU BRIAN.

NO, THANK YOU.

BOB HILTON.

YES, SIR.

THANKS SIR.

CAITLIN? YES, THANK YOU.

ONTO OUR IPMS. JEREMY? YES.

THANK YOU.

THANK YOU, SETH.

YES, YOU IAN? YES.

THANK YOU.

THANK YOU, UH, SHANE FOR RASHMI.

UH, YES, THANK YOU.

A PAINED.

YES.

WE'LL TAKE THAT ONTO OUR I REPS.

BILL.

YES.

THANK YOU, JAY? YES, THANK YOU.

CHRIS.

GOT YOUR YES IN CHAT, CHRIS.

THANK YOU, JENNIFER.

YES.

THANK YOU.

ONTO OUR IOUS.

MARTHA? YES, THANK YOU, EBY.

YES.

THANK YOU.

THANK YOU.

AARON.

YES, THANK YOU ROB FOR KEITH? YES.

THANK YOU.

ONTO OUR MUNIS.

DAVID.

YES, THANK YOU, ALICIA.

YES, THANK YOU, JOSE.

YES, THANK YOU.

AND CURTIS? YES, THANK YOU.

Q.

MOTION CARRIES 83% IN FAVOR, FIVE OPPOSED, AND ONE ABSTENTION TO BILL'S COMMENTS I GET BY WITH A LITTLE HELP WITH FROM MY FRIENDS.

I DID IT.

UM, AND WE DID IT.

SO LET'S TAKE, ARE THERE ANY OTHER QUESTIONS OR COMMENTS ON THIS? DAVE? I HAD ONE QUICK QUESTION.

UM, I THINK THE BATTERY STORAGE WAS SEPARATED FROM 1309.

IS THIS THE RIGHT ONE? JUST A QUICK STATUS UPDATE ON WHAT WE CAN EXPECT FOR THAT FOLLOW ON NPR.

WE DO HAVE AN ADVANCED DRAFT, UH, OF THAT, UM, THAT PROPOSED NPRI THINK OUR GOAL IS TO HAVE THAT, UH, FINISHED AND COMPLETE, UH, BY NEXT MONTH.

AND SO IT'LL ENTER THE PROCESS, BUT MECHANICALLY, I WOULD IMAGINE THAT PROBABLY STARTING IN JUNE THERE'D BE SOME DIALOGUE.

OKAY.

THANK YOU.

OKAY, LET'S TAKE A QUICK, THIS IS MY PLAN.

I THINK WE SHOULD TAKE A QUICK BREAK, COME BACK AT 1145 AND THEN TRY TO GET 45 MINUTES IN BEFORE WE BREAK FOR LUNCH SO WE CAN AT LEAST TAKE THE TEMPERATURES ON VOL VOLTAGE RIDE THROUGH, WHICH IS OUR NEXT BIG EVENT.

SO LET'S, LET'S TAKE A FIVE MINUTE BREAK.

AND, YOU KNOW, EVEN THOUGH THAT'S NOT FIVE MINUTES, LET'S TRY TO ACTUALLY START AGAIN AT 1145 AND THEN GET MAYBE 45 MINUTES IN BEFORE LUNCH.

OKAY.

WE ARE GOING TO HAVE, WE'RE THE, WE'RE STILL ON OUR PRS UPDATE AND THE LAST ITEM ON PRS IS OUR PRIORITIZATION UPDATE WITH TROY.

THANK YOU.

GOOD MORNING, TAC.

THIS IS MY EVERY OTHER MONTH.

QUICK UPDATE ON THE STATUS OF REVISION REQUESTS IN THE PROJECT PROCESS.

BEFORE I START THOUGH, THOSE WHO KNOW ME KNOW I WON'T BE ABLE TO AVOID COMPLYING WITH THE THEME OF THE DAY.

SO AS I WAS THINKING ABOUT AGING REVISION REQUESTS, WHAT CAME TO ME WAS, YOU TAKE IT ON FAITH, YOU TAKE IT TO THE HEART, THE WAITING IS THE HARDEST PART.

.

YAY.

OKAY, SO THE TOP, UH, THE 10 HIGH PRIORITY ITEMS THAT, UH, WERE DEEMED.

SO LAST YEAR AT OUR PRIORITIZATION WORKSHOP, WE'VE TALKED ABOUT THESE BEFORE.

HERE'S THE STATUS.

1234 HAD THREE CHANGES THAT ARE ALL LIVE.

NO MORE SYSTEM CHANGES.

LEFT.

THERE IS A GRAY BOX RELATING TO THE LARGE LOAD INTERCONNECTION STUDY FEE.

AND MY UNDERSTANDING IS WITH FIGURE 1 45, THAT MIGHT SUPERSEDE THIS FEE.

SO IT'LL REMAIN IN A GRAY BOX UNTIL WE STRIKE IT SOMETIME DOWN THE ROAD WITH A FUTURE REVISION REQUEST.

ALSO, EAL UH, 1277 WENT LIVE.

AND THEN IN FLIGHT 1188 AND 1244, THEY ARE TARGETING A JANUARY, 2027 GO LIVE.

WE TRIED TO FIGURE OUT A LATE 26 TIMEFRAME THAT WOULD WORK, AND WE WERE UNSUCCESSFUL.

SO IT HAD TO GO TO JANUARY, 1198 IS TARGETING SEPTEMBER, UH, 1238 WITH THE LLCM PROJECT IS TARGETED FOR LATE THIS YEAR GOING LIVE.

AND THEN 1281 OCTOBER OF 2026, UH, 10 91 IS STILL GONNA BE PART OF AN RDPA ANALYSIS WITH OTHER REVISION REQUESTS.

1004, WE MAY HAVE FOUND A WINDOW TO START IT IN JULY.

SO

[02:10:01]

THAT'S A, A, A, UH, TARGET START THAT WE'RE WORKING TOWARD.

HOPEFULLY I CAN REPORT MORE ON THAT AT A FUTURE MEETING.

AND THEN 1216 EMERGENCY PRICING PROGRAM.

NO ACTION.

'CAUSE WE HAVE A WORKAROUND.

IN ADDITION, THERE ARE OTHER REVISION REQUESTS UNDERWAY.

UH, THE CRR PROJECT WITH 9 36 AND 1288 IS EXPECTING A Q4 GO LIVE.

SO WE'LL HONE IN ON A DATE IN THE NEXT MONTH OR TWO.

I DID FIND ONE ERROR HERE, 1201.

IT IS TARGETING LATE 2026, BUT IT'S NOT YET IN FLIGHT.

SO IT SHOULD BE IN THE, THE NOT STARTED GROUP.

UH, 1303 IS MOVING A, A LANDING SPOT FOR INFORMATION FROM ONE PLACE TO ANOTHER IN SEPTEMBER.

AND THEN SCR EIGHT 20, WHICH IS RELEASING A NEW TOOL TOOL.

WE'RE CALLING REAL TIME OPERATOR COMMUNICATION, RTOC, THAT GOES LIVE IN JUNE.

IF YOU'RE INTERESTED IN SSCR EIGHT 20, THERE'S A WHOLE BUNCH OF INFORMATION ON THE TWG WEBSITE ABOUT THAT.

THEN UPCOMING STARTS 1290, PAIRED WITH 1323.

WE WANNA GET STARTED, UH, VERY SOON.

THAT'LL BE AT THE 1323.

IT'LL BE AT THE COMMISSION NEXT MONTH.

AND, UH, THE API FOR N-D-C-R-C 8 29, WE WILL START IN MAY 'CAUSE WE HAD RESOURCE AVAILABILITY FOR THAT, THE PARTICULAR PERSON THAT WORKS ON THAT APPLICATION.

AND LAST BUT NOT LEAST, SCR EIGHT 18 PHASE TWO.

AND IT'S CONNECTED, WHICH IS CONNECTED WITH 8 31.

WE'RE HAVING RESOURCE CONSTRAINTS WITH THE SIM 16 PROJECT.

LOOKS LIKE IT MAY NOT ACTUALLY START TILL EARLY 2027 AT THIS POINT.

SO THAT'S KIND OF THE LATEST ON REVISION REQUESTS IN THE PROJECT PROCESS.

AND CONTINUE TO UPDATE PRS EVERY MONTH AND T EVERY OTHER MONTH.

GREAT.

ANY QUESTIONS OR COMMENTS FOR TROY? ALL RIGHT, THANK YOU.

THANK YOU.

SEE YOU IN JULY.

OKAY.

UM, WE ARE ONTO OUR REVISION REQUEST PREVIOUSLY TABLED AT TECH GER 2 81 CAN REMAIN TABLED AWAITING NPR 1307.

UM, THEN TO OUR TECH PRIORITY ITEMS, WE ARE GOING TO MOVE THOSE TO THE VERY END OF THE AGENDA AFTER THE COMBO BALLOT.

UM, SO WE ARE ONTO

[8. Large Load Working Group (LLWG) Report]

THE LARGE LOAD WORKING GROUP REPORT.

GOOD AFTERNOON.

I'M BOB WHITMEYER AND, AND, UH, CAITLYN ASKED ME TO DO THIS QUICKLY, SO I'M GONNA SKIP ALL OF THE RHYMES AND ALL OF THAT STUFF.

SO LET'S MOVE ON.

I TOLD HER 10 MINUTES.

SO LET'S SEE HOW I DO.

UH, WE HAD OUR MEETING ON APRIL 24TH.

WE GOT OUR LARGE LOAD UPDATE FOR THE INTERCONNECTION QUEUE.

AND MY FAVORITE QUOTE OF THE WEEK WAS, IT WAS ONLY AN ADDITIONAL 35 GIGAWATTS SINCE THE LAST UPDATE, SOME OF THOSE WHO HAVEN'T BEEN AROUND THAT LONG MIGHT REMEMBER WHEN A GIGAWATT WAS A BIG NUMBER.

BUT NOW 35 IS ONLY, EXCUSE ME, MARK HENRY GAVE AN UPDATE ON NERC ACTIVITY AND THE STANDARDS THAT ARE GONNA COME, UM, FROM, FROM NERC REGARDING LARGE, UH, COMPUTE LOADS, WHICH WILL BE THE NEW TERM THAT'S USED IN ERCOT.

WE REVIEWED, UM, UH, FREQUENCY FOR LARGE ELECTRONIC LOADS, SOON TO BE LARGE COMPUTE LOADS.

UH, DISCUSSION OF PICKER 1 44 AND I'D LIKE TO COMMEND ERCOT.

UM, WE TALKED LAST TIME THERE WAS SOME, SOME CONTROVERSY OVER A FEW SWAPPED FROM, FROM, UH, CRYPTO TO AI.

UM, AND ERCOT HAS AGREED WHEN A LARGE LOAD MAKES A CHANGE, IF IT IS AS GOOD OR BETTER, THERE'S A MUCH ABBREVIATED REVIEW PROCESS.

SO APPRECIATE ERCOT FOR DOING THAT.

AND I THINK AS GOOD OR BETTER IS A GOOD WAY TO MOVE FORWARD.

I DUNNO WHAT THAT MEANS.

CAN YOU PUT THAT IN? YES.

SO WHAT IT MEANT IS IF YOUR VOLTAGE RIDE THROUGH REQUIREMENTS, IF YOU ARE SWAPPING EQUIPMENT AND YOUR NEW EQUIPMENT IS AT LEAST AS GOOD OR BETTER, THEY'RE GONNA HAVE A SHORTENED PROCESS FOR YOUR REVIEW.

AND LIKE I SAID, UM, AT PRS IF OR AT LARGE LOAD WORKING GROUP, IF YOU'RE NOT INSTALLING AS GOOD OR BETTER, YOU'RE JUST AN IDIOT.

.

ALL RIGHT.

AND THEN WE HAD PUTTING A LYRIC FRIGGING IDIOT WAS ACTUALLY THE WORD THAT I USED.

SO THERE YOU GO.

UM, AND THEN WE HAD, UH, PRESENTATION FROM VENDORS ON HOW THEY COULD MEET THE VRT AND OSCILLATION SOLUTIONS.

WE'RE GONNA HEAR A LOT MORE ABOUT THAT IN NORE 2 82, BUT THERE IS TECHNOLOGY, BRAND NEW TECHNOLOGY OUT THERE TODAY THAT CAN DO SOME OF THIS STUFF.

HERE IS YOUR LARGE LOAD INTERCONNECT QUEUE,

[02:15:01]

UM, TOPPING OUT AT 445 GIGAWATTS IN 2023.

UM, AND, UH, YEAH, NO, NO PROBLEM WITH A HUNDRED GIGAWATT SYSTEM TODAY.

WE JUST GROW FOUR TIMES BY 2033.

UM, HERE IS THE REDUCTION IN IN PROJECTS MIDDLES LATELY WE'RE, WE'RE DOWN TO 25 GIGS IN THE LAST QUARTER.

UM, AND NEXT MEETING IS MAY 21.

AND I THINK I BEAT MY 10 MINUTES QUESTIONS.

THAT WAS AWESOME.

THANK YOU.

YOU'RE NOT A FREAKING IDIOT.

OKAY, LET US GO

[9. ROS Report (Vote)]

TO THE ROSS REPORT.

SANDEEP, WHY DON'T YOU RUN THROUGH YOUR REPORT AND LET'S SAVE QUESTIONS THOUGH, 'CAUSE WE'LL TAKE THE REVISION REQUESTS UP OUT OF ORDER.

YEAH, THANK YOU CA.

CAITLYN, THIS IS SANDY BOKAR.

UM, MY RHYME FOR THE DAY IS, UH, I'LL TRY TO MAKE THIS QUICK FOR YOU SO YOU CAN GET GOING WITH NO GOOD.

2 82 MM.

WHICH, UH, BRINGS US TO THAT TOPIC.

NOLE 2 82 WAS DISCUSSED AT ROSS, UH, SEVERAL COMMENTERS, UH, SPOKE ABOUT IT.

UH, PATRICK DID A GOOD PREVIEW OF WHAT COMMENTS WERE FILED AND HOW THEY WERE ADDRESSED OR NOT ADDRESSED.

AMONG THE ONES THAT WERE NOT ADDRESSED WERE, UH, COMMENTS FROM TIC AND I BELIEVE, UH, DATA CENTER COUNCIL.

UM, THE COMMENTS WERE MOSTLY OF THE TYPE OF MORE ABOUT THE LEGAL ASPECT OF IT.

AND SO WE, UH, AND WE DIDN'T HAVE THE RIGHT FOLKS FROM ERHART TO SPEAK ABOUT IT AT THAT TIME.

SO THOSE WEREN'T, UH, WHILE THEY WERE HEARD, THEY WERE NOT TAKEN UP FOR DISCUSSION.

AND SO THEY'LL BE BROUGHT UP TODAY.

UH, I THINK TIC HAS FILED COMMENTS ON THAT.

UH, ONCE IT WAS PUT TO VOTE, WE HAD, UM, EIGHT ABSTAINS.

UM, YOU HAVE THE SEGMENTS MENTIONED ON THE SLIDE, CONSUMERS, COOPERATIVES, INDEPENDENT GENERATORS, SO IT'S ACROSS THE BOARD AND ONE NO FROM CONSUMERS.

UH, BUT THE MOTION PASSED AND IT IS, UH, READY TO ENDORSE AND FORWARD TO ATTACK, UH, AS AMENDED BY 3 27.

COMMENTS, IF WE MOVE TO THE NEXT SLIDE, PLEASE.

YEAH, 1308 WAS, UH, PART OF THAT DISCUSSION.

THERE WAS SOME DISCUSSION ON EXPANDING THE DEFINITION OF ALL LARGE LOADS, BUT IT DIDN'T GO FOR THE ENOUGH TO FILE COMMENTS OR ANYTHING, BUT, BUT WE DID PUT IT VOTE.

WE GOT THREE ABSTAINS ON THAT, UH, PARTICULAR VOTE.

UH, BUT THE MOTION PASSED.

NO, 2 83.

UH, I'LL SKIP THIS SINCE WE'VE HAD GOOD BIT OF DISCUSSION ALREADY ON IT.

UH, THAT MOTION PASSED, UH, AT ROSS.

UH, THE TWO QUICK ONES WERE P 1 43, STEADY STATE PLANNING SCHEDULE POSTING, UH, MORE LIKE AN ADMINISTRATIVE CHANGE.

THAT MOTION PASSED, UH, VIA COMBO BALLOT.

UH, AND, AND IT'S, UH, READY FOR TACK TO VOTE ON P 1 33 IS CLARIFYING LEGACY GENERATOR BREAKER CONTROL, UH, THAT FINALLY CAME BACK TO ROSS AND WE RECOMMENDED TO APPROVE, UM, THE, THE BIGGER 1 33 AS FILE BOUND 1 28 JOINT COMMENTERS.

COMMENT, UH, SOME ACTION, UH, AT ROSS.

UM, WE HAD, UH, DISCUSSED A NEW NGER, UH, 7 65 ABOUT OPERATIONAL VOLTAGE LIMITS, UH, THAT NGER WAS REFERRED TO VPWG AND IS CURRENTLY TABLED.

UH, LOOKING FORWARD TO TAKING IT UP AT THE NEXT ROSS.

AND BIGGER 1 45 WAS, UH, FORMALLY, UH, DISCUSSED AND IT IS OF COURSE TABLED IN TARGETING THE VOTE ON MAY 7TH.

SO MORE TO COME ON IT.

UH, AS MANY, MANY COMMENTS.

I THINK WE ARE AT COMMON NUMBER 52, UH, AT LOSE COUNT.

BUT YEAH, GET GETTING THERE, UM, ON THE FIGURE 1 45.

AND THAT'S, I BELIEVE THAT'S ALL OF, YEAH, THAT'S ALL FOR IT.

REST OF THE SLIDES JUST TALK ABOUT WHAT, UH, REVISION REQUESTS ARE WITH ROSS CURRENTLY TABLED AT DIFFERENT STAGES.

ANY QUESTIONS ON ROSS? IF NOT, WE CAN GET, UH, GET MOVING ON THE VOTING.

YEAH, LET'S GO TO THE VOTING ITEMS. SO, UM, NOER 2 83 WE JUST VOTED ON.

AND THEN WE WOULD ALSO BE LOOKING TO RECOMMEND APPROVAL OF PR 1 33 AS RECOMMENDED BY ROSS.

AND IN THE FOUR TWO P, UH, FOUR TWO ROSS REPORT AND 4 22 IMPACT ANALYSIS.

AND THEN RECOMMEND APPROVAL OF PIGGER 1 43 IS RECOMMENDED BY ROSS AND THE FOUR TWO ROSS REPORT.

ANY QUESTIONS OR COMMENTS ON THOSE TWO? PIGGER 1 33 AND PIGGER 1 43? CAN WE PUT THOSE ON THE COMBO BALLOT?

[02:20:02]

YES.

OKAY.

OKAY, SO NOW WE ARE ON TO NORE 2 82.

UM, SAME THING.

I WOULD RECOMMEND THAT WE TAKE THIS UP WITH NPRR 1308, IS THAT CORRECT? YEP.

SO MANY COMBO BALLOT.

UM, NUMBER OF COMMENTS, I BELIEVE FOUR 13 ERCOT COMMENTS FOUR 14.

DISTRICT COMMENTS.

FOUR 14 REVISED IMPACT ANALYSIS, 4 24 TIC COMMENTS, 4 24 ERCOT COMMENTS, UM, ISSUED ISSUES HERE, A LITTLE BIT MORE VARIED.

SO I THINK WE CAN TAKE UP QUESTIONS SORT OF AS WE GO IN THE COMMENTS, BUT ERCOT HAS ASKED THAT THEY DO THEIR PRESENTATION FIRST.

SO LET'S HAVE PATRICK DO HIS PRESENTATION.

UM, I THINK TAKE PATRICK TAKE COMMENTS AT THE QUESTIONS AT THE END OF YOUR PRESENTATION.

IS THAT WHAT YOU'D LIKE TO DO? YES.

AND THEN RUN THROUGH, UM, THE COMMENTS.

AND I BELIEVE YOU'RE GONNA COVER FOUR 13 COMMENTS.

YOU'LL COVER EVERYTHING FOR ARCH ARCHIVE EXCEPT FOR THE LEGAL ASPECTS, CORRECT? OKAY.

YES.

ALL RIGHT.

THANKS KAITLYN.

UH, GOOD, WELL, GOOD.

A GOOD MORNING, AFTERNOON.

GOING AFTERNOON EVERYONE.

THIS IS PATRICK GRAVEL FROM ERCOT.

UH, JUST WANNA KIND OF GIVE AN UPDATE ON WHERE WE ARE WITH NOER 2 82 AND 13 0 8 BEFORE WE GET INTO, UH, SOME OF THE DISCUSSION ITEMS. UM, SO SANDEEP WENT INTO A LOT OF THIS ALREADY.

WE DID PASS IT ROSS.

UM, I DO HAVE THE LINK TO THE ERCOT ROSS PRESENTATION THERE.

THAT TALK GOES OVER A LOT OF THE TECHNICAL REQUIREMENT REVISIONS THAT WERE REALLY MADE IN RESPONSE TO SOME OF THE DATA CENTER COALITION COMMENTS.

WE TALKED ABOUT IT AT TAC LAST MONTH AS WELL.

UM, I DO HAVE A SLIDE IN THE APPENDIX THAT KIND OF LIST SOME OF THOSE CHANGES WE MADE.

UH, I'M NOT GONNA GO OVER THAT TODAY, BUT IT'S THERE FOR YOUR, FOR YOUR REFERENCE.

UM, DO WANNA MENTION THAT AFTER ROSS, WE SUBMITTED SOME COMMENTS TO CHANGE THE NAME FROM A LARGE ELECTRONIC LOAD TO LARGE COMPUTATIONAL LOAD, UM, OR LCL.

UM, REALLY BECAUSE THE ACRONYM LEL WAS TAKEN AND THE NERC EFFORTS ARE LOOKING AT USING COMPUTATIONAL LOAD, WE'RE ALREADY DEFINING, UH, THAT AS A COMPUTATIONAL LOAD AS WELL.

SO WE MADE THAT CHANGE AFTER ROSS AND BROUGHT THAT TO PRS.

AND THAT GOT RECOMMENDED THAT PRI RECOMMENDED FOR APPROVAL AT PRS AS WELL WITH A 93% APPROVAL, ONE OPPOSING VOTE.

AND NOW WE'RE LOOKING FOR A POTENTIAL VOTE TODAY ON BOTH THE NPRR AND THE NOER.

UM, STILL TARGETING THE JUNE, UH, BOARD OF DIRECTORS VOTE AS WELL.

SO THIS SLIDE JUST LISTS OUT THE COMMENTS THAT WE RECEIVED AND WHAT WE RESPONDED TO.

UM, THE LEFT COLUMN.

WE COVERED ALL OF THESE AT LAST TACK, UH, DOWN TO THE LATEST DATA CENTER COALITION THAT, UM, WE RESPONDED TO AND MADE A LOT OF THE REVISIONS, UH, IN THE MIDDLE.

SOME OF THE COMMENTS WE HAVE NOT FORMALLY RESPONDED TO TEXAS BLOCKCHAIN COUNCIL, UM, WHOSE COMMENTS, UH, PROVIDED THOSE SUGGESTED REVISIONS REALLY JUST WENT OVER WHAT THE, UH, CRYPTOCURRENCY FACILITIES CAN RIDE THROUGH IN THE LOW VOLTAGE, UH, VERY LIMITED THERE AND THAT THEIR CLAIMS THAT THEIR, THE RIDE THROUGH SOLUTIONS WOULD BE, UM, NOT ECONOMICALLY VIABLE FOR THEM AS WELL.

UH, SHAPER HAD SOME COMMENTS AS WELL THAT MENTIONED ERCOT NEEDS TO LOOK MORE AT TRANSMISSION MARKET SOLUTIONS, WHICH WE HAVE PRESENTED AT VARIOUS STAKEHOLDER MEETINGS, INCLUDING LLWG LAST WEEK.

UH, WE TALKED A LITTLE ABOUT ABOUT FAST FREQUENCY RESPONSE DOWNWARD.

UH, WE'RE STILL LOOKING INTO THAT, BUT IT'S NOT GOING TO, UM, ALLEVIATE THE, THE NEED FOR WRITE THE REQUIREMENTS FOR THE LARGE COMPUTATIONAL LOAD.

UH, SOME OF THE ISSUES THAT PR 1 44, WHICH I THINK NEED TO BE ADDRESSED THERE.

AND THEN SOME OF GOOGLE'S COMMENTS THAT WERE ALSO ADDRESSED IN THE DCC RESPONSE, THEY WERE THE SIMILAR COMMENTS.

UH, ON THE RIGHT, WE HAVE, UM, ERCOT LATEST COMMENTS FROM 4 24 ADDRESSING SOME OF THE LEGAL, UM, CONCERNS BROUGHT UP BY THE TIEC COMMENTS AND THE TEXAS BLOCKCHAIN COUNSEL COUNSEL COMMENTS AS WELL.

UM, AND SOME OF THE EXEMPTION CRITERIA, UH, COMMENTS, THE EXEMPTION DATE, UH, FOR THE RIDE THROUGH REQUIREMENTS BROUGHT UP BY VISTRA AND INTERSECT POWER.

SO WE'RE GONNA KIND OF FOCUS ON THOSE TODAY.

WE DO HAVE NATHAN FROM LEGAL HERE TO DISCUSS SOME OF THE, THE LEGAL CONCERNS BROUGHT UP BY TIEC.

UM, I'M GONNA COVER SOME OF THE ISSUES THAT ERCOT WOULD HAVE WITH THE MOVING THAT EXEMPTION DATE, UM, AND SOME OF MY SLIDES, UH, FIRST I WANT TO KIND OF COVER, I WANNA MAKE EVERYTHING CLEAR ON WHAT THE EXEMPTION CRITERIA IS, UM, FOR ALL OF THE FREQUENCY AND VOLTAGE RIDE THROUGH REQUIREMENTS IN NOGA 2 82.

SO WE SUBMITTED THE INITIAL RRS ON

[02:25:01]

NOVEMBER 14TH OF LAST YEAR.

UH, ANYTHING THAT WAS OPERATIONAL, ANY LARGE COMPUTATIONAL LOAD THAT WAS EITHER OPERATIONAL ENERGIZED OR HAD RECEIVED APPROVAL TO ENERGIZE FROM ERCOT ON OR BEFORE THAT DATE IS EXEMPT.

UH, I'M GONNA GO OVER THE NUMBERS HERE ON THE NEXT SLIDE AS WELL.

SO THOSE ARE ALL EXEMPT FROM THE REQUIREMENTS.

IN ADDITION, ANY OF THE LARGE COMPUTATIONAL LOADS THAT MET THIS CRITERIA ARE ALSO EXEMPT.

SO IF THEY HAD THEIR SIGNED INTERCONNECTION AGREEMENT WITH THE TSP OR THE RESOURCE ENTITY, IF THEY'RE CO-LOCATED BEFORE NOVEMBER 14TH, THE TSP ALSO RECEIVED THE FINANCIAL SECURITY AND NOTICE TO PROCEED WITH INTERCONNECTION FACILITIES IF THEY RECEIVED THAT BEFORE THAT DATE.

AND ONE OF THE FOLLOWING AS WELL, AND THIS BREAKS IT DOWN, DEPENDING ON IF YOU WENT THROUGH THE LARGE LOAD, THE INTERIM LARGE LOAD INTERCONNECTION PROCESS, OR IF YOU WENT THROUGH RPG.

SO IF YOU WENT THROUGH THE LARGE LOAD INTERCONNECTION PROCESS AND YOU HAD YOUR STUDIES APPROVED BEFORE ON OR BEFORE NOVEMBER 14TH, AND THAT MEANS YOUR STEADY STATE, UM, STUDY AND YOUR STABILITY STUDY, IF YOU HAD THOSE APPROVED AND RECEIVED NOTICE FROM ERCOT, THEY WERE APPROVED, YOU'RE ALSO EXEMPT.

OR IF YOU WENT THROUGH RPG AND WE RECEIVE AN ATTESTATION FROM THE INTERCONNECTING TSP THAT YOU WEREN'T REQUIRED TO GO THROUGH LILLIS BECAUSE YOU WEREN'T LOOKING TO INTERCONNECT WITHIN TWO YEARS, AND THAT WAS ONE OF THE CRITERIA FOR THE INTERIM LARGE LOAD INTERCONNECTION PROCESS, AND YOU'RE EXPECTED TO ENERGIZE THIS YEAR, YOU'RE ALSO EXEMPT.

SO WHAT WE WERE TRYING TO DO HERE IS SAYING ANYTHING THAT HAD KIND OF RECEIVED THE GREEN LIGHT TO GO AHEAD AND START BUILDING OUT, WE WERE TRYING TO EXEMPT THAT.

'CAUSE WE KNOW IT MIGHT BE TOO LATE, THEY'RE ALREADY UNDER CONSTRUCTION.

THEY MAY HAVE PROCURED THEIR EQUIPMENT ALREADY.

SO WE DIDN'T WANT TO HAVE TO GO BACK AND SAY, NOW YOU HAVE TO MEET THESE REQUIREMENTS.

HOWEVER, WHEN WE POSTED THESE IN NOVEMBER 14TH, THIS SERVED AS NOTICE THAT THESE RIDE THROUGH REQUIREMENTS WERE COMING AND THEY WERE NEEDED.

SO IF YOU HAD THEY RECEIVED THAT GREEN LIGHT AFTERWARDS, YOU SHOULD HAVE KNOWN THAT THESE REQUIREMENTS WERE COMING AND WERE EXPECTING TO HAVE SOME RIDE THROUGH CAPABILITY, UM, AS YOU GO THROUGH YOUR BUILD OUT.

SO THESE ARE THE NUMBERS ABOUT HOW MUCH WOULD BE EXEMPT, HOW MUCH WILL BE EXEMPT, AND HOW MUCH COULD BE EXEMPT IF WE MOVE THAT EXEMPTION DATE.

UH, WE RECEIVED A LOT OF COMMENTS ABOUT MOVING THAT EXEMPTION DATE FROM NOVEMBER 14TH TO WHEN THE RRS ARE ACTUALLY APPROVED, UM, ARE EFFECTIVE, WHICH WOULD BE THIS SUMMER.

SO I WORKED WITH THE LARGE LOAD INTERCONNECTION TEAM TO ANALYZE HOW MUCH WOULD BE EXEMPT NOW AND HOW MUCH COULD BE TO POTENTIALLY BE EXEMPT.

SO RIGHT NOW, AS WRITTEN WITH THAT NOVEMBER 14TH DATE, WE HAVE 14 GIGAWATTS OF LLCL FACILITIES THAT WILL BE EXEMPT.

EIGHT GIGAWATTS WERE L-L-I-L-C-L PROJECTS THAT WERE EITHER OPERATIONAL OR APPROVED ENERGIZED ON NOVEMBER 14TH.

AND ADDITIONAL SIX GIGAWATTS DID NOT GO THROUGH LLI, THEY CAME THROUGH RPG.

UH, SO WE HAVE 14 GIGAWATTS THERE FOR ABOUT 1415 GIGAWATTS IS WHAT WENT INTO THAT ORIGINAL VRT ASSESSMENT.

THAT INTERIM VRT ASSESSMENT THAT KICKED OFF AT THE END OF LAST YEAR.

UH, WE EXPECT THAT SIX GIGAWATTS WILL GROW THIS YEAR.

UM, IN OUR LATEST VRT ASSESSMENT, WE'RE ALREADY LOOKING AT 20 GIGAWATTS IN THE LATEST VRT ASSESSMENT, AND WE'RE EXPECTING MOST OF THAT WILL BE EXEMPT AS WELL.

SO WE'RE REALLY LOOKING AT 14 TO 20 GIGAWATTS OF DATA CENTER AND CRYPTO LOADS THAT ARE GONNA BE EXEMPT FROM THE REQUIREMENTS AS WRITTEN.

THE NEXT BUCKET, I ASK THE LLI TEAM TO ANALYZE HOW MANY ADDITIONAL LCLS HAD THEIR STEADY STATE AND THEIR STABILITY STUDIES APPROVED BEFORE ON OR BEFORE NOVEMBER 14TH.

UH, THEY CAME UP WITH 26 GIGAWATTS THAT WERE APPROVED AT THAT POINT.

UH, WE DO NOT KNOW HOW MUCH OF THAT MEETS THE 9.5 REQUIREMENTS.

THAT'S THE SIGN INTERCONNECTION AGREEMENT, THE NOTICE TO PROCEED AND THE FINANCIAL SECURITY.

WE WEREN'T REALLY TRACKING THOSE DATES BEFORE PR ONE 15 BECAME EFFECTIVE.

BUT SINCE THAT EFFECTIVE DATE, WE HAVE BEEN GETTING A LOT OF THAT 9.5 REQUIREMENTS AND TRACKING THAT.

BUT ALL THE DATES WE HAVE ARE POST NOVEMBER 14TH.

UH, THEY'RE STARTING REALLY IN DECEMBER.

SOME OF THIS 26 GIGAWATTS WOULD LIKELY ALREADY BE EXEMPT.

THEY PROBABLY MET THOSE 9.5 REQUIREMENTS BEFORE NOVEMBER 14TH.

WE'RE JUST NOT AWARE OF THAT.

WE STILL NEED TO KIND OF GO THROUGH SOME RFIS.

WE HAVE THIS DATA, UH, IT'S GONNA TAKE SOME TIME TO GO THROUGH AND FIGURE OUT HOW MUCH OF THAT IS EXEMPT.

UH, BUT RIGHT NOW THE LARGE LOAD TEAM IS FOCUSED ON SEEING WHICH FACILITIES MEET THE 9.4, THE 9.5 REQUIREMENTS, BECAUSE THEY'RE TRYING TO GET INTO BATCH ZERO.

SO IF WE MOVE THIS DATE OUT TO TODAY'S

[02:30:01]

DATE OR THE SUMMER, A LOT OF THIS 26 GIGAWATTS WILL ALSO BE EXEMPT.

WE DO KNOW OF THIS 26 GIGAWATTS, 14 GIGAWATTS OF THAT HAS MET THE 9.5 REQUIREMENTS ON OR BEFORE, ON OR AFTER, SINCE EITHER BEFORE NOVEMBER 14TH UNTIL NOW.

SO IT'S A BIT OF A SLIDING SCALE.

HOW MUCH THIS 26 GIGAWATTS WILL ALSO BE EXEMPT IF WE MOVE THIS DATE.

UM, THE BOTTOM, WE HAVE 10 GIGAWATTS ON TOP OF THAT 10 GIGAWATTS THAT HAD THEIR PLANNING STUDIES APPROVED AND MET 9.5 AFTER NOVEMBER 14TH.

SO THAT 10 GIG GIG GIGAWATTS WILL BE IN ADDITION TO THE LOWS THAT ARE EXEMPT.

SO BROKEN DOWN ON THE RIGHT, IF YOU ADD IT ALL UP, WE'RE LOOKING AT POTENTIALLY 40 TO 50 GIGAWATTS OF EXEMPTED LOAD.

NOW, OF COURSE, WE KNOW NOT ALL OF THIS 50 GIGAWATTS WILL LIKELY COME IN, BUT WE'RE GOING ON THE PROJECTED NUMBERS, WHAT WE'RE BEING TOLD FROM THESE DATA CENTERS.

SO SLIDING THIS OUT IS REALLY GONNA IMPACT ERCOT OPERATIONS A GREAT DEAL.

UH, WE'RE ALREADY LOOKING AT POTENTIALLY CURTAILING LOAD IN REAL TIME TO, IN RE TO RESPECT THE SYSTEM OPERATING LIMIT OF NOT LOSING MORE THAN 3,200 MEGAWATTS OF, OF LOAD FOR ONE COMMON DISTURBANCE.

UH, WE'VE ALREADY IDENTIFIED TWO POTENTIAL SYSTEM OPERATING LIMITS AS A RESULT OF THE FIRST VRT ASSESSMENT.

WE'RE WORKING WITH THE TSPS TO FIGURE OUT HOW WE'RE GONNA MAINTAIN THAT OPERATING LIMIT.

AND IT'S GOING TO BE VERY CHALLENGING.

WHAT WE'RE DOING RIGHT NOW IS WE ARE IDENTIFYING THE GROUP OF LOADS FOR EACH TSP, GIVING THEM THE, THE GROUP OF LOADS AND TELLING THEM, HEY, YOU HAVE TO MAINTAIN A CONSUMPTION BELOW THAT LEVEL, PRE-CON CONTINGENCY.

THIS IS GOING TO BE VERY CHALLENGING ON THEIR END.

UH, THEY, WE DON'T HAVE THE ABILITY TO AUTOMATE THIS.

WE DON'T HAVE THE ABILITY TO DISPATCH THIS SCED.

THIS IS GONNA BE ALL MANUAL OPERATIONS.

IT'S GOING TO BE THE TSPS WORKING WITH THESE DATA CENTERS TO UNDERSTAND HOW THEY CAN REDUCE THEIR CONSUMPTION, UH, FROM A VERBAL DISPATCH INSTRUCTION.

AND IF WE'RE NOT CAPABLE OF DOING THAT, THERE'S POTENTIAL THAT WE'LL JUST HAVE TO BE OPENING BREAKERS FOR A LOT OF THESE FACILITIES.

IF WE INCREASE THE AMOUNT OF EXEMPTED LOAD, THAT'S JUST GOING TO MAKE IT MORE CHALLENGING.

WE'RE GONNA HAVE MORE CURTAILMENTS.

UM, IT'LL BE A DAILY CURTAILMENT, MAYBE A 24 7 TYPE CURTAILMENT THAT WE'RE LOOKING AT, UH, WHERE WE'RE HAVING TO MAINTAIN THESE SYSTEM OPERATING LIMITS.

UM, WE ARE FINISHING UP THE LATEST VRT ASSESSMENT RIGHT NOW, AND WE'VE ALREADY IDENTIFIED A COUPLE OF ADDITIONAL SYSTEM OPERATING LIMITS THAT WE'RE GONNA HAVE TO MAINTAIN AS WELL.

SO AS AN OPERATIONS ENGINEER, WE FIND, I FIND THIS VERY, VERY CONCERNING THAT WE'RE POTENTIALLY EXEMPTING 50, 40, 50 GIGAWATTS OF LOAD.

UH, WE DON'T KNOW HOW WE'RE GONNA BE ABLE TO MAINTAIN THIS.

WE'RE WORKING ON A LOAD CURTAILMENT MANAGEMENT TOOL RIGHT NOW, BUT THAT'S REALLY FOCUSED ON CURTAILING LOAD AND EMERGENCY TYPE SITUATIONS, ASKING SOME OF THESE DATA CENTERS TO SWITCH OVER TO BACKUP GENERATION.

BUT THIS RIDE THROUGH IS A 24 7, 24 7, 365 WILL HAVE TO BE OPERATING TO THESE LIMITS.

AND THESE EVENTS COULD HAPPEN ANY TIME, MIDDLE OF THE NIGHT DAY PEAK DEMAND, UM, ANYTIME.

SO THAT'S OUR CONCERN WITH MOVING THE ESTATE.

UM, AND THEN WE CAN KIND OF TAKE QUESTIONS AND THEN WE CAN TALK ABOUT THE LEGAL ASPECT AS WELL.

THANK YOU.

OKAY.

YEAH, LET'S PAUSE ON THE LEGAL QUESTION FOR NOW.

UM, SO, SO TWO OTHER THINGS BEFORE WE GET TO THE DATE THAT YOU, YOU COVERED AT LEAST ONE OF THEM, I THINK, PATRICK.

SO THE, THE NAME CHANGE WAS IN THE ERCOT FOUR 13 COMMENTS, LARGE ELECTRONIC LOAD TO LARGE COMPUTATIONAL LOAD.

AND THEN THERE WERE ALSO ERCOT COMMENTS, UM, OR, UH, REVISED IMPACT ANALYSIS ON FOUR 14.

AND THAT, UH, INCREASED THE FTE REQUIREMENT FROM 2.9 TO 3.2 FTES.

AND THEN LET'S FOCUS, I THINK, ON THE DATE UNTIL WE GET TO LUNCH.

MAYBE IF WE CAN DO LEGAL BEFORE THAT TOO.

BUT LET'S AT LEAST GET THE, THE DATE CONVERSATION DOWN.

NED, I KNOW YOU'RE IN THE QUEUE, BUT DO YOU WANT TO GO THROUGH YOUR COMMENTS OR HOWEVER YOU WANNA DO THAT? BUT, BUT THIS IS ALSO YOUR TIME TO ADDRESS THE FOUR 14 RA COMMENTS IN THE SPIRIT OF EFFICIENCY.

I'LL, I'LL COMBINE THEM.

'CAUSE I, I HAVE A QUESTION FOR, FOR PATRICK, AND THEN I THINK IT, IT DOVETAILS INTO EXACTLY WHAT OUR COMMENTS WERE.

SO, UM, AND PATRICK, FIRST OFF, THANK YOU FOR THE PRESENTATION AND REALLY WANT TO RECOGNIZE ERCOT HAS, YOU KNOW, HEARD FROM, YOU KNOW, HEARD CONCERNS FROM STAKEHOLDERS AND, AND THE LARGE LOADS AND, UM, YOU KNOW, TAKING SOME STEPS TO TRY TO, YOU KNOW, ADDRESS THOSE.

UM, AND I APPRECIATE YOU RECOGNIZING THE CONCERN

[02:35:01]

ABOUT FOLKS MAKING INVESTMENTS BASED ON, YOU KNOW, THE, THE RULES THAT EXIST AT A POINT IN TIME.

UM, AT THE END OF THE DAY, VIST COMMENTS ARE TRYING TO RECONCILE WHAT I THINK IS A, IS KIND OF A, IS THE SAME TOUGH PROBLEM THAT, THAT YOU'RE LOOKING AT.

WE RECOGNIZE THAT YOU'VE, YOU'VE LAID OUT THERE'S A RELIABILITY NEED TO ADDRESS THIS, UM, OR, AND THAT WE'RE SETTING ASIDE THE LEGAL DISCUSSION, BUT WE RECOGNIZE THAT PROBABLY NEEDS TO HAPPEN ONE WAY OR THE OTHER.

UM, IT'S, IT'S, IT'S A RISK THAT WE NEED TO COLLECTIVELY MANAGE.

AND SO, UM, THAT WILL PLAY OUT.

HOWEVER, THAT WILL PLAY OUT.

THE, THE ISSUE THAT WE'VE HAD WITH THIS IS, IS REALLY, IT'S A PRINCIPLED ONE ABOUT WHAT EXACTLY DO, ARE YOUR EXPECTATIONS ONCE AN NPRR OR A NOER OR ANY REVISION REQUEST IS FILED? AND, YOU KNOW, WHILE THAT MAY BE, MAY PUT YOU ON NOTICE THAT SOMETHING IS CHANGING, YOU DON'T KNOW WHAT THAT CHANGE IS UNTIL IT'S ACTUALLY GONE THROUGH THE PROCESS.

AND SO THAT, THAT DOESN'T NECESSARILY MAKE THAT, UH, TO, TO USE THE TERM BRIAN, UH, USED EARLIER INVESTIBLE, UM, FROM, YOU KNOW, FROM JUST THE SIGNAL THAT SOMETHING MIGHT CHANGE.

AND SO AS A, AS A PRINCIPLE THEN THAT, YOU KNOW, THAT APPLIES NOT JUST IN THIS CASE, BUT IN, IN MANY OTHER INSTANCES THAT WE AS MARKET STAKEHOLDERS HAVE.

THAT'S, THAT'S WHERE VISTA'S CONCERN CAME IN AND SAID, WELL, LET'S JUST MAKE THIS EFFECTIVE AT THE EARLIEST POSSIBLE DATE AFTER, AFTER APPROVAL TO TRY TO ADDRESS THE, THE CONCERNS YOU'VE LAID, THE RELIABILITY CONCERNS YOU'VE LAID OUT, AND, AND ALSO HAVE SOME, YOU KNOW, SUPPORT FOR THE PROCESS TO PLAY OUT BEFORE WE PUT IT IN PLACE.

SO THAT, THAT'S THE SHORT TERM LAY THE, THE VERY SHORT VERSION LAYOUT OF, OF VISTA'S COMMENTS.

BUT TO HELP KIND OF CONTEXTUALIZE THAT, YOU, YOU WERE MENTIONING EARLIER, PATRICK, THAT YOU KNOW, THESE LOADS THAT ARE QUOTE UNQUOTE EXEMPTED WOULD STILL BE SUBJECT TO CURTAILMENT UNDER THE INTERIM LARGE ELECTRONIC LOAD, UM, RIDE THROUGH EVALUATION PROCESS WHERE YOU'VE GOT THE MODELS, YOU'RE, YOU'RE, YOU'RE SEE, YOU'RE EVALUATING THOSE TO SEE HOW THEY PERFORM IN DIFFERENT SCENARIOS.

IF THEY RIDE THROUGH, THEN THAT'S GOOD.

IF THEY DON'T RIDE THROUGH IN THOSE MODELS THOUGH, THEN THERE'S ONE OF TWO THINGS HAPPEN.

EITHER YOU DON'T APPROVE TO ENERGIZE IF IT WOULD HAVE AN IMPACT ON A SYSTEM OPERATING LIMIT OR AN EYE ROLL, OR IF IT DOESN'T HAVE THAT IMPACT, THEN YOU SAY, ALL RIGHT, YOU CAN ENERGIZE, BUT YOU'RE ON NOTICE.

IF WE SEE A RISK, WE, WE, WE WON'T, WE WILL CURTAIL.

AND, YOU KNOW, I THINK THE, THE LANGUAGE YOU USE THEN IS PROBABLY IMPORTANT TO SAY THAT'S, THAT'S NOT EXACTLY AN EXEMPTION , THAT'S, THAT'S, UH, THAT'S OPERATING UNDER A CERTAIN DEGREE OF, OF, YOU KNOW, KNOWN RISK TAKING.

AND I THINK THAT A LOT OF, UH, SOPHISTICATED INVESTORS WILL LOOK AT THAT RISK PROFILE AND DECIDE, YOU KNOW WHAT, WE MAY TECHNICALLY BE EXEMPT, BUT WE SHOULD PROBABLY JUST GO AHEAD AND TRY TO PLAN AROUND IT.

I THINK BOB HAS A, A VERY, UH, COLORFUL WAY TO, TO DESCRIBE THAT, UH, THAT THAT MENTALITY.

AND, UM, SO I, I REALLY APPRECIATE YOU BRINGING THE, THE DATA THAT KIND OF GOES ALONG WITH THIS.

LOAD FORECAST IS OBVIOUSLY A HOT TOPIC.

WE CAN PROBABLY, WE COULD HAVE A LOT OF DEBATE ABOUT WHAT'S ACTUALLY IN THERE, BUT I, I DID WANT TO AT LEAST CONFIRM WITH YOU THAT WHAT YOU SAID IS, IS CORRECT, AND THAT IS, IF YOU'RE QUOTE UNQUOTE EXEMPT, YOU'RE STILL SUBJECT TO CURTAILMENT.

THAT IS CORRECT, YES.

OKAY.

ALRIGHT.

THAT'S SUPER HELPFUL.

THANK YOU.

AND I THINK THAT ALSO LAYS OUT, NO KAITLYN'S GONE, SO I CAN KEEP GOING.

BUT, UH, THAT, THAT, THAT LAYS OUT THE VISTA COMMENTS ON WHY WE, WE WOULD SUPPORT THE, THE ROSS REPORT ADJUSTED, OR ACTUALLY IT WAS THE LATEST ERCOT COMMENTS TO, OR THE ERCOT COMMENTS THAT WENT INTO THE ROSS REPORT.

CUT.

I AM TERRIBLE WITH THIS TODAY DAY.

THE ERCOT COMMENTS FROM APRIL 13TH MODIFIED TO YOU TO HAVE A JULY 10TH, UH, DATE AS OPPOSED TO NOVEMBER 14TH.

AND SO THAT'S WHERE VISTA COMES OUT.

I'M WILLING TO MAKE THE MOTION TO ENDORSE THE VISTA COMMENTS ALONG THOSE LINES, BUT I REALIZE WE HAVE MORE DISCUSSION TO GO THROUGH, SO I DON'T WANNA JUMP THE JUMP THE GUN THERE.

THANKS NED.

BETH.

UM, THIS IS, UH, AND, AND I WAS, I WAS ON BOARD WITH, UH, I WILL SAY I WAS ON BOARD WITH VISTA'S COMMENTS UNTIL I SAW SOME OF THESE REALLY SCARY NUMBERS THAT GAVE ME PAUSE.

MM-HMM .

UM, I, AND I HAVE JUST A COUPLE OF MYTHS THAT I'D LIKE TO BETTER GRASP SOME OF THESE REALLY BIG COMMENTS, IF YOU DON'T MIND, PATRICK.

UM, THE, THE SIX GIGAWATTS RELATED TO PROJECT OR SIX GIGAWATTS OF PROJECTS RELATED TO RPG PROJECTS, ARE ALL OF THOSE RPG PROJECTS NOW ENDORSED, OR ARE SOME OF THEM STILL IN PROCESS? I BELIEVE THERE'S MORE TO COME.

UH, SO THIS SIX GIGAWATTS ARE LCLS THAT WE'RE IN OUR VRT ASSESSMENT.

WE'VE BEEN MONITORING THESE MAKING

[02:40:01]

SURE, BECAUSE WE MIGHT HAVE TO START LIMITING THESE AS WELL.

UM, RIGHT NOW THAT CONSUMPTION, THAT AGGREGATE CONSUMPTION IS ABOUT 1400 MEGAWATTS.

SO WE'RE A GOOD WAYS AWAY FROM THE 3,200.

BUT A LOT OF THESE HAVEN'T STARTED TO RAMP UP YET.

UH, THEY'RE MODELED, SO WE DON'T DO THE VRT ASSESSMENT UNTIL THEY'RE IN OUR MODEL.

SO THAT'S USUALLY CLOSE TO BEING ENERGIZED.

MOST OF THEM MAY BE ENERGIZED, THEY'RE JUST NOT CONSUMING YET.

UM, AND THE ONLY REASON WE REALLY HAVEN'T HAD TO DO ANY CURTAILMENT YET IS BECAUSE IT'S BEEN MUCH SLOWER THAN WE WERE EXPECTING.

WE DON'T KNOW IF THEY'RE ACTUALLY GONNA GET UP TO THAT FULL CAPACITY.

WE NEED TO REACH OUT TO THEM AND GET THOSE UPDATED, UH, RAMP SCHEDULES, SEE WHAT THEY'RE PLANNING ON DOING.

UM, BUT THAT SIX GIGAWATTS WE KNOW IS, IS THERE AND COMING, HOW MUCH? NOT EXACTLY.

SURE.

OKAY.

UM, WE EXPECT THERE'S SOME MORE.

OKAY.

UH, THAT'S COME THAT ARE COMING.

THAT'LL BE ENERGIZED SOON.

UM, I WENT THROUGH THE LATEST VRT ASSESSMENT, EVERYTHING THERE, LOOKS LIKE IT WAS IN THE LLI, WE DID SEND OUT SOME RFIS LAST YEAR TO GET ACCOUNT ON WHAT'S REMAINING ON THAT RPG.

UM, WE HAVEN'T GOTTEN THOSE NUMBERS, WE'RE NOT QUITE SURE WHAT'S GOING ON, BUT WHEN WE WERE WRITING THESE REQUIREMENTS, THIS WAS KIND OF A REQUEST FROM THE TSPS TO HAVE THAT ATTESTATION TO MAKE SURE WE'RE EXEMPTING THOSE AS WELL.

SO I'M EXPECTING THERE'S GONNA BE ANOTHER COUPLE OF GIGAWATTS IN THERE SOMEWHERE.

WE'RE NOT QUITE SURE EXACTLY HOW MUCH MORE.

ALRIGHT.

ALRIGHT.

THAT, THAT WAS, I'M GLAD I ASKED THE QUESTION.

THAT WAS VERY, THAT WAS A VERY HELPFUL FOR ME.

IT WAS A VERY HELPFUL DISCOURSE ON ON ON MUCH OF THE MOVING PIECES.

HOPEFULLY THIS NEXT QUESTION WILL BE SIMPLER TO ANSWER , WHICH IS THE LAST 10 GIGAWATTS? UM, UH, 10 GIGAWATTS AS OF WHAT DATE? SINCE NOVEMBER 14TH.

SINCE NOVEMBER 14TH.

SINCE NOVEMBER 14TH LAST YEAR UNTIL LIKE LAST WEEK.

OKAY.

COULD BE MORE FROM THIS WEEK.

I THAT I DIDN'T KNOW IT WAS YESTERDAY.

I SAID EVERYONE'S, EVERYONE'S TRYING TO GET THIS 9.4 AND 9.5 MET SO THEY CAN GET INTO BE ZERO.

SO I THINK THESE ARE GOING UP PRETTY QUICKLY.

OKAY.

I, I WAS SURPRISED WHEN I SAW THESE NUMBERS AS WELL.

OKAY.

THAT'S, THAT'S ALL I HAVE AT THIS POINT.

THANK YOU, MARTHA.

THANK YOU.

UH, MARTHA HENSON SPEAKING ON BEHALF OF ENCORE AND I, I UNDERSTAND THE SENSITIVITY THAT VISTA HAS TO A FUTURE DATE.

I IMAGINE THERE WILL BE OTHERS THAT, YOU KNOW, AREN'T IN FAVOR OF THAT ON PRINCIPLE AS WELL, BUT, UM, ENCORE'S NOT SUPPORTIVE OF MOVING THE COMPLIANCE DATE TO JULY AS YOU SUGGEST IN YOUR COMMENTS.

I THINK IT'S JUST NOT FEASIBLE TO POTENTIALLY EXEMPT 50 GIGAWATTS OF LOAD, WHICH IS WHAT I THINK PATRICK'S SLIDE IS SAYING HERE.

UM, AND TO THE EARLIER POINT, THE MORE LOAD YOU EXEMPT FROM THESE REQUIREMENTS, THE MORE CUSTOMER LOAD YOU'RE GONNA BE SUBJECTING TO MANDATORY CURTAILMENTS.

SO IT'S GONNA LIMIT THE AMOUNT OF LOAD THAT CAN BE SERVED IN PARTICULAR GEOGRAPHICAL AREAS IF WE HAVE TO RESPECT, BECAUSE WE HAVE TO RESPECT THE 3,200 LOAD LOSS CRITERIA AND WE'RE ALREADY LOOKING AT THAT AND PREPARING FOR IT AS PATRICK INDICATED.

AND THAT HAS NOTHING TO DO REALLY WITH THE LOAD FORECAST ACTUALLY, YOU KNOW, IT'S BASED ON CUSTOMERS THAT ARE IN, IN SERVICE TODAY THAT HAVEN'T REACHED THEIR FULL LOAD RAMPS AND OTHERS THAT ARE ABOUT TO ENERGIZE.

SO WE WOULD MUCH PREFER TO SEE, UM, THE COMMENTS THAT ARE CAUGHT FILED ON THE 13TH, I THINK MOVE FORWARD, WHICH, UH, MAINTAINS THE NOVEMBER 14TH COMPLIANCE DATE.

THANKS, BILL.

YEAH, WE SUPPORTED THIS AT ROSS.

UM, MAINLY DUE TO WHAT MARTHA JUST SAID AND A LITTLE BIT OF BETH'S COMMENTS AS WELL AS TERMS OF THE, THE NUMBERS THAT WOULD BE EXEMPT.

WE'RE JUST WORRIED ABOUT THE LOAD SHIFT RISK, RIGHT? AND, AND WHAT THIS COULD END UP BEING.

AND A LOT OF LARGE LOADS ARE IN REMOTE AREAS, BUT THERE'S ALSO A LOT IN POPULATION CENTERS AND YOU'RE GONNA EXPOSE THE GENERAL PUBLIC TO LOAD SHED.

AND LIKE I SAID EARLIER, WE CAN'T DO THAT , THAT'S NOT GONNA WORK WELL FOR ANYONE.

SO I KNOW THE, THE BAR NEEDS TO BE HIGH WHENEVER WE IMPLEMENT A RETROACTIVE COMPLIANCE REQUIREMENT, WHICH IS, IS, I KNOW YOU FILED IT ON THE DATE, YOU KNOW, AND GAVE A DATE THAT WAS NEAR THE DATE THAT YOU FILED IT TO GET PEOPLE A HEADS UP.

IT'S STILL ESSENTIALLY RETROACTIVE THOUGH, UM, FOR A BIG CHUNK.

THE REASON WHENEVER WE DO THAT, THERE HAS TO BE A REALLY GOOD REASON.

AND TO ME, RISK OF LOAD SHED IS THAT IS MEETS THAT HURDLE.

AND SO WE'RE SUPPORTIVE OF ER KAT'S COMMENTS ON THIS.

THANKS.

YEAH, THANKS BILL.

I JUST WANNA RESPOND TO THAT.

I THINK, I THINK THAT'S HOW WE WOULD'VE PREFERRED TO DO IT.

UM, IF WE COULD HAVE, UM, IT'S JUST WE WERE TOO LATE.

I MEAN, IF WE COULD HAVE WORKED ON THIS A COUPLE YEARS AGO, GOTTEN SOME REQUIREMENTS IN THERE, WE KIND OF TO SEE IT WAS COMING, BUT WE WEREN'T ABLE TO GET THOSE RIDE THROUGH REQUIREMENTS IN BACK THEN.

AND IT IS JUST THE AMOUNT THAT'S KIND OF COME IN SINCE NOVEMBER 14TH HAS KIND OF CHANGED THE PERSPECTIVE ON WHAT WE CAN DO AS FAR AS MOVING THAT DATE.

[02:45:01]

UH, YOU KNOW, IF WE HAD JUST THE 14 GIGAWATTS OF EXEMPT, I THINK ERCOT OPERATIONS COULD, WE COULD WORK ON SOME TRANSMISSION MARKET SOLUTIONS.

WE COULD WORK ON SOME MITIGATION.

WE CAN WORK WITH SOME OF THESE FACILITIES TO GET THEIR RIDE THROUGH IMPROVED AND MITIGATE THAT.

BUT IF WE, THIS GROWS TO 30 40 GIGAWATTS, I I JUST DON'T SEE HOW WE CAN REASONABLY MITIGATE THIS WITHOUT A CONSTANT LOAD SHED OR CURTAILMENT OF THESE DATA CENTERS IN REAL TIME.

AND NO ONE WANTS THAT.

UH, THE DATA CENTERS DON'T WANT IT.

ERCOT DOESN'T WANT IT.

THE TSPS DON'T WANT IT.

UH, THIS DOESN'T, IT DOESN'T HELP ANYONE IF WE HAVE TO CONSTANTLY, UH, CURTAIL THIS LOAD.

OKAY.

BLAKE KING.

BLAKE KING WITH GALAXY POWER.

I, IT, IT'S STILL NOT CLEAR TO ME THAT, THAT FOLKS UNDERSTAND THAT THE, THE MANDATORY CURTAILMENT EXISTS TODAY.

LIKE FOR ALL OF THESE LOADS.

LIKE ERCOT CAN SPIN UP AN SOL OR AN IOL TOMORROW AND CURTAIL ALL OF THESE LOADS ALREADY, THAT THAT ALREADY EXISTS.

AND SO TO ME THE QUESTION IS WHAT IS THE MARGINAL BENEFIT OF APPLYING THIS RULE ACROSS THE INDUSTRY RELATIVE TO THE EXISTING RELIABILITY MECHANISM THAT ERCOT ALREADY HAS, RIGHT? THE, THE COSTS THAT ARE GOING TO BE IMPOSED HERE ON AN ENTIRE INDUSTRY RELATIVE TO THE MARGINAL RELIABILITY BENEFIT.

AND I THINK WHAT PATRICK STATED DURING HIS COMMENTS WAS THAT IT'S COMPLICATED TO, TO ENACT THESE OPERATIONAL SORT OF PROCEDURES AND, AND I, IT'S NOT CLEAR TO ME THAT IT'S COMPLICATED IS WORTH HAVING AN ENTIRE INDUSTRY SORT OF REFORM THEIR REQUIREMENTS WHEN THERE ALREADY IS AN EXISTING PROCESS FOR CURTAILING LOADS.

SO I I'M NOT SAYING THAT THAT, THAT THERE DOESN'T NEED TO BE A REQUIREMENT.

IT JUST, THAT DOESN'T SEEM TO ME LIKE A VERY STRONG ARGUMENT FOR NOT PUSHING THE DATE BACK, RIGHT? IF, IF ALL OF THE LOADS ARE ALREADY SUBJECTIVE TO MANDATORY CURTAILMENTS, IF THEY ARE IDENTIFIED, THEN THIS SOUNDS LIKE A HAMMER WHEN THERE ALREADY EXISTS A SCALPEL.

UM, AND YEAH, AND I'M ALSO PARTICULARLY, IT SEEMS LIKE THESE NUMBERS ARE BEING USED TO SORT OF SCARE EVERYONE INTO THIS RULE.

I'M, I'M PARTICULARLY SUSPICIOUS OF THESE NUMBERS, RIGHT? IT, IT SEEMS TO ME THAT ARE, ARE WE EXPECTING BATCH ZERO BASE LOAD FIRM TO BE 50 GIGAWATTS? LIKE I I, 'CAUSE MY ASSUMPTION HERE WOULD BE THAT EVERYONE THAT WOULD BE EXEMPT WOULD END UP IN BASE FIRM LOAD CATEGORY.

AND I, I CAN'T RECALL IF 50 GIGAWATTS IS THE KIND OF NUMBER THAT WE'RE TALKING ABOUT FOR BASE LOAD.

I DON'T KNOW, PATRICK, IS THAT THE QUANTITY? YEAH.

THESE, THESE ARE THE NUMBERS THAT HAVE MET THE 9.4 AND 9.5 THAT ARE LOOKING TO GET INTO BATCH.

THIS, WELL, 26, WELL 26 GIGAWATTS HERE DOESN'T SAY ANYTHING ABOUT 9.5, RIGHT? IT JUST SAYS LLIS APPROVED, RIGHT? SO IT'S NOT, SO WE DON'T HOW MUCH THAT 26 MEANT THE 9.5, BUT I DO KNOW A LOT OF THIS HAS MET 9.5 SINCE NOVEMBER 14TH.

SOME OF IT MAY HAVE BEEN BEFORE NOVEMBER 14TH, WE JUST WEREN'T TRACKING THOSE DATES YET.

BUT YES, THIS IS GOING ON THE PATH.

IF WE'RE MOVING THIS DATE, ALMOST EVERYTHING THAT GETS INTO BATCH WOULD BE EXEMPT.

AND YOU'RE UNDERSELLING THE OPERATIONAL CHALLENGES THAT WE'RE GONNA HAVE CURTAILING THIS LOAD.

THIS IS NOT JUST, WE PUT IT IN SCED AND WE DISPATCH THESE LOADS DOWN.

THESE ARE ALL MANUAL INSTRUCTIONS THAT WE'RE GONNA HAVE TO BE GIVING TO THE TSPS.

THE TSPS, THERE ARE NO COMMUNICATION PROTOCOLS THAT EXIST RIGHT NOW BETWEEN ERCOT AND THE LOADS.

THERE'S VERY LIMITED THAT EXIST BETWEEN THE TSPS AND THE LOADS AS WELL.

SO THIS IS LIKELY GOING TO END UP A LOT OF OPENING BREAKERS FOR EXTENDED PERIODS OF TIME.

THE MORE LOADS THAT ARE EXEMPT, THE MORE LOADS THAT ARE GONNA BE CURTAILED.

AND, AND THE CHALLENGES IS JUST GOING TO BE, THEY'RE GONNA BE EXTREME CHALLENGES FROM THE AIR COTT OPERATION SIDE AND THE TSB SIDE TO MAINTAIN THESE SYSTEM OPERATING LIMITS.

AND LIKE I SAID, WE CAN, WE CAN LIKELY MANAGE, IF WE KEEP THIS DOWN TO A 14 TO 20 GIGAWATTS RANGE, THERE'S STILL GONNA BE CURTAILMENT.

BUT IF WE DOUBLE THAT EXEMPTED LOAD, UM, IT'S JUST GOING TO BE CONSTANT CURTAILMENT.

AND YES, WE DO HAVE THE ABILITY TO DO THIS, BUT AGAIN, THIS IS NOT, THIS IS NOT A DIRECTION WE WANT, THERE'S NOT A PATH WE WANT TO HEAD DOWN IF WE CAN AVOID IT.

OKAY.

UM, I THINK JEFF BILLOW WANTED TO JUMP IN TOO.

UM, I'M HAPPY TO WAIT MY TURN.

GO AHEAD.

OKAY.

OKAY, PLEASE.

WELL, YEAH, SO, UM, UH, MAY MAYBE ON BLAKE'S, UH, QUESTION ON, YOU KNOW, WHAT WILL BE IN BACHELOR.

[02:50:01]

SO I THINK WE DON'T KNOW.

I DO WANNA POINT OUT THE, THAT THE OPERATIONAL, SO, SO AS WE PRESENT NUMBERS IN THE, THE, UM, IN, IN THE WORKSHOPS OR AT THE COMMISSION OR, UM, YOU KNOW, AT, AT VARIOUS DISCUSSIONS WE'RE HAVING ON BATCH, UH, WE'RE NOT INCLUDING THE OPERATIONAL.

UH, SO THAT WHAT WHAT IS ALREADY OPERATIONAL IS, IS ALREADY EXEMPT, BUT IT'S NOT, NOT INCLUDED AS NUMBERS.

SO IT, IT, WE, WE COULD HAVE 50 GIGAWATTS OF BOTH OPERATIONAL PLUS NEW STUFF AND, UH, BA BATCH ZERO BASE LOAD THAT WOULD POTENTIALLY BE EXEMPT IF WE MOVE THE NUMBERS FORWARD.

AND AGAIN, UH, THE, THE JULY 10TH THIS, SO THIS IS ONLY AS OF LAST WEEK BY JULY 10TH, THOSE NUMBERS COULD GROW SIGNIFICANTLY.

UM, ALSO WANTED TO NOTE THAT, UM, WE ALREADY, AS PATRICK MENTIONED, WE ALREADY HAVE TWO AREAS TODAY THAT WE ARE MONITORING.

THE ONLY REASON THAT WE HAVE NOT STARTED CURTAILING IS BECAUSE THOSE LOADS ARE NOT AT THE LEVELS THAT THEY HAVE, UH, COMMUNICATED TO US.

SO THEY, THEY COULD RAMP UP AND, AND WE COULD, THIS SUMMER, WE COULD BE CURTAILING IN, IN THOSE AREAS, BUT WE'RE NOT, JUST BECAUSE THOSE LOADS HAVE NOT GOTTEN TO THAT, THAT LEVEL YET.

SO IF THEY WERE ALREADY AT THE LEVEL THAT THEY, UM, HAD TOLD US THAT THEY WERE, WOULD BE AT, THEN WE WOULD ALREADY BE CURTAILING.

UM, AND, AND AS PATRICK ALSO MENTIONED, I'LL, I'LL REITERATE, WE HAVE ALREADY IDENTIFIED WE HAVE AT LEAST ONE AND MAY, MAYBE TWO ADDITIONAL AREAS THAT WE ARE, UH, WE HAVE GOTTEN TO THE POINT WHERE WE HAVE MORE THAN 3,200 MEGAWATTS THAT DO NOT RIDE THROUGH THAT.

WE MAY ALSO, UH, START MONITORING AND EVENTUALLY CURTAILING LOAD IN THOSE AREAS.

UM, I I AM SYMPATHETIC TO THE IDEA THAT THE LOADS, UM, CANNOT, IF THEY DON'T KNOW WHAT THE REQUIREMENTS ARE, THEN THEY CAN'T PLAN TO MEET THOSE REQUIREMENTS WITH, WITH THEIR EQUIPMENT.

UM, I, I UNDERSTAND THAT.

UM, HOWEVER, THREE YEARS AGO WE PROPOSED VOLTAGE RIDE REQUIREMENTS FOR LARGE LOADS AND NO GROUP 2 56.

WE GOT A LOT OF PUSHBACK FROM STAKEHOLDERS AT THAT TIME.

ONE, ONE BECAUSE OF THE SAME ISSUE, WHICH WE'LL TALK ABOUT IN A LITTLE BIT, WHICH IS, UH, YOU KNOW, CAN'T, CAN OR CAUGHT PUT REQUIREMENTS ON LOADS.

UH, BUT THE OTHER ISSUE WAS AROUND SKEPTICISM THAT THIS WAS A REAL ISSUE.

UH, AND SO I'M NOT SYMPATHETIC TO THE IDEA THAT WE GET PUSHBACK WHEN WE TRY TO BE PROACTIVE AND, AND COME UP WITH RULES AHEAD OF TIME.

AND THEN WHEN WE HAVE TO PULL BACK FROM THAT AND, AND THEN WE DO COME UP, WE, WE DO IDENTIFY IN JUNE OF LAST YEAR WE TELEGRAPH THIS WAS COMING 'CAUSE IT, WE, WE PROVE AT THAT POINT THAT THIS WAS A REAL ISSUE.

AND, AND UH, AND THEN IT, YOU KNOW, OBVIOUSLY WE TRIED TO WORK WITH STAKEHOLDERS AND COME UP WITH A GOOD SET OF, UM, UH, REQUIREMENTS, UH, WHICH WE CAME OUT WITH IN NOVEMBER AND HAVE TRIED TO WORK WITH INDUSTRY AND, AND UPDATE THOSE AS WE WENT ALONG.

BUT I, I'M, I'M JUST, I'M NOT SYMPATHETIC TO A, HEY WE, WHEN WE TRY TO BE PROACTIVE, THEN YOU PUSH BACK AND THEN WHEN, AND THEN THAT LEADS US TO POINT WHERE WE ALREADY HAVE SO MUCH THAT HAS GONE THROUGH THE GATE WHERE WE COULD HAVE HAD THESE REQUIREMENTS BEEN IN PLACE PREVIOUSLY.

ALL RIGHT.

THANKS JEFF.

UH, BOB, YEAH, JUST REAL QUICKLY, I STILL HAVE STITCHES IN ME FROM NO GROUP 2 45 RIGHT NOW.

AND THIS SOUNDS A WHOLE LOT LIKE THAT.

SO A COUPLE QUESTIONS AND I, I GET IT.

YOU KNOW, I WAS GLAD TO HEAR YOU THAT NO ONE SAID THAT THEY COULDN'T LOOK THEIR KIDS IN THE EYE IF THIS DIDN'T PASS AND IT WAS JUST A CONCERN.

SO IT SOUNDS LIKE THERE WERE SOME LESSONS LEARNED OUT OF IT SO FAR.

UH, BUT UH, , IF I COULDN'T RESIST, SORRY.

UH, BUT EACH OF YOUR KIDS IS DIFFERENT.

LIKE EACH, EACH ONE OF MY KIDS ARE SERVICE DIFFERENT.

YEAH.

SO YOU DON'T HAVE A FAVORITE ANCILLARY SERVICE.

LIKE YOU DON'T HAVE A FAVORITE KIDS.

YEAH.

SO FOUR, YOU SET THE DATE.

UH, AND OF COURSE THIS IS WHERE WE'RE HAVING ISSUES WITH 2 45 IS THE REASON I'M ASKING THIS QUESTION IS YOU'VE GOT THE DATE YOU HAVE TO COMPLY.

THIS IS ALL NEW, YOU KNOW, A LOT OF THIS IS NEW.

SOME SAY THEY CAN DO IT, SOME SAY THEY CAN'T.

I UNDERSTAND THE VENDORS ARE GONNA MAKE A PRESENTATION, UH, AT THE BOARD POTENTIALLY.

AND WE FOUND THAT SOME OF THE VENDORS HAVE SAID THINGS THEY COULD DO, THEY COULDN'T DO IT OR IGNORED YOU WHEN YOU TRIED TO CALL 'EM.

SO WHAT KIND OF PROCESS HAVE YOU ALREADY LAID OUT? HAVE YOU TAKEN LESSONS LEARNED FROM 2 45 ON WHAT HAPPENS AFTER THIS IS IN EFFECT AND THE LOADS START TO COMPLY AND FIND, THEY RUN INTO SOME OF THE SAME ISSUES THAT WE HAVE WITH 2 45? HAVE YOU GUYS, ARE YOU TAKING LESSONS LEARNED FROM THAT? OR, OR HOW, HOW IS THAT PROCESS LAID

[02:55:01]

OUT? OR IS IT LAID OUT? 'CAUSE I THINK THAT'S REAL IMPORTANT TO THIS.

SO, UM, THAT'S A QUESTION FOR ANYBODY.

YEAH, I CAN TAKE THAT.

GO AHEAD.

UM, YOU KNOW, SOME OF THE LESSONS LEARNED FROM NOGA 2 45, YOU KNOW, WE ARE EXEMPTING THE OPERATIONAL NOGA 2 45 WENT BACK AND IMPOSED NEW REQUIREMENTS ON EXISTING OPERATIONAL FACILITIES.

WE'RE NOT DOING THAT HERE.

UH, THERE IS INCENTIVE FOR THEM, AS NED MENTIONED.

THERE'S DEFINITELY AN INCENTIVE THERE FOR, TO MEET THESE REQUIREMENTS.

UM, SO THEY'RE NOT RISKING POTENTIAL CURTAILMENT, BUT WE'RE NOT FORCING THESE REQUIREMENTS ON THOSE OPERATIONAL FACILITIES.

UM, WE'RE NOT DOING THE FULL MAXIMIZATION PROVE THAT YOU MAXIMIZED TO YOUR FULLEST CAPABILITIES.

UH, WHAT WE'RE DOING IS WE'RE SAYING, HEY, THIS IS WHAT YOU NEED TO MEET.

UM, AND EVEN SOME OF THE EXISTING, THEY MAY NOT HAVE TO MEET ALL OF NORE 2 82.

THEY NEED TO SHOW THAT THEY CAN RIDE THROUGH SOMEWHAT AND THAT CAN HELP US WITH OUR POTENTIAL CURTAILMENT.

UM, IT'S KIND OF THE SAME PROCESS WE'VE HAD WITH THE IBS.

WE HAVE EVENT ANALYSIS TEAM.

WE'VE LEARNED A LOT SINCE THEN.

DETECTING THESE EVENTS, IDENTIFYING WHEN FACILITIES DON'T RIDE THROUGH, WORKING WITH THEM TO DEVELOP, FIND THE ROOT CAUSE, CORRECTIVE ACTIONS.

WE WERE VERY SUCCESSFUL, UM, AFTER THE ODESSA EVENTS AND IMPLEMENTING, GETTING A LOT OF THINGS FIXED IN THAT MANNER.

UH, I THINK A LOT OF THE, THE REASON, ONE OF THE REASONS WE HAVEN'T SEEN A LOT OF THOSE EVENTS, ONE IS ONE IS SOMEWHAT OF THE MAXIMIZATION OF THE IRS HAS HELPED EVERYONE'S GOING BACK AND LOOKING AT THEIR SETTINGS AND VERIFYING, UH, BUT IT'S REALLY PICKING UP SMALLER EVENTS, GOING BACK, WORKING WITH THEM, FIGURING OUT WHAT HAPPENS, SEEING IF THEY CAN MAKE SOME ADJUSTMENTS.

THERE MAY BE MORE CHALLENGES HERE.

UM, REMEMBER I BS WERE ALREADY HAD RIDE THROUGH REQUIREMENTS.

THESE FACILITIES DIDN'T HAVE THEM BEFORE, SO THERE'S GOING TO BE SOME GROWING PAINS.

SOME OF THEM MAY NOT HAVE THE, THE EQUIPMENT THEY NEED, UM, BUT THEY'RE GOING TO BE EXEMPT, UM, UNTIL THEY CAN MAYBE SWAP OUT SOME EQUIPMENT.

MAYBE THEY'RE SUBJECT TO CURTAILMENT AND THEY NEED TO IMPLEMENT SOME RIDE THROUGH TO GET OUTTA CURTAILMENT.

SO WE'VE DEFINITELY TAKEN SOME OF THE LESSONS LEARNED FROM NOGO 2 45 AND AND APPLIED THEM TO WHAT WE'RE DOING HERE.

OKAY.

ALRIGHT.

THANK YOU.

AND I JUST WANNA SAY THAT I WASN'T TRYING TO HIT ERCOT EFFORTS TO HELP ON 2 45.

I LOOKED AT THE PROBLEMS WITH 2 45 AND WHERE WE'RE AT STRUCTURALLY NOT, NOT THAT WE'RE NOT TRYING TO WORK TOGETHER, SO I JUST WANTED TO MAKE SURE WE WEREN'T TRYING TO SET THAT WASN'T GETTING SET UP.

THANK YOU.

OKAY.

JENNIFER, ARE YOU OUT OF THE QUEUE? YOU'RE DONE, YOU'RE GOOD.

OKAY, AARON, UM, I'M GONNA QUOTE A SWIFTY SONG AND SAY IT WAS LIKE SLOW MOTION STANDING THERE IN MY PARTY DRESS.

OH.

AND I AM ASKING FOR A MOTION TO VOTE ON THE ERCOT COMMENTS FROM APRIL.

OKAY.

13TH, I THINK.

IS THAT FOUR 13 ERCOT COMMENTS? YES.

SO IT WOULD BE NGER RECOMMEND NGER 2 82 IS RECOMMENDED BY IN THE FOUR TWO ROSS REPORT AS AMENDED BY FOUR 13 ERCOT COMMENTS AND THE IMPACT AND THEN THEN IMPACT ANALYSIS AND THE FOUR 14 REVISED IMPACT ANALYSIS.

AND THEN ALSO, IF YOU WILL INDULGE US, IT WOULD BE ALSO NPRR 1308 AS RECOMMENDED BY FOUR 15 PRS.

YOU WANT ME TO, THAT WAS REVISED ALSO, WASN'T IT? NO.

WAS REVISED BEFORE PR? YES.

OKAY.

YOU'RE CONFIRMED.

DO, DO WE WANT A MOTION BEFORE WE GET INTO THE UM, UH, YOU KNOW, AUTHORITY GETS? YEAH.

WE CAN TAKE THE MOTION AND THEN WE CAN CONTINUE DISCUSSION UNTIL SOMEBODY CALLS THE QUESTION.

I THINK BLAKE'S TRYING TO SECOND WHILE WE, WHILE HE WAS TALKING TO ME.

OKAY.

DO YOU HAVE FURTHER COMMENTS OR JUST A TAYLOR SWIFT QUOTE AND EMOTION TAYLOR SWIFT QUOTE AND EMOTION.

THAT'S THE BEST COMMENT ALL DAY.

I FELT LIKE IN A ROOM I NEEDED TO CALL OUT THE LYRIC.

NO OFFENSE TO MAYBE THE DADS THAT MAY ALSO BE SWIFTIES, BUT I'M GOOD.

SOMETIMES, SOMETIMES DADS ARE SWIFTIES.

OKAY.

BILL, DO YOU HAVE A TAYLOR SWIFT LYRIC FOR US? NO, I WAS GONNA SECOND THE MOTION WE CAN WELL, WE GOT AHEAD OF YOU.

SORRY, BLAKE.

GOT IT.

BLAKE, DO YOU HAVE A TOILET? TAYLOR SWIFT MOTION LYRIC.

OKAY.

ALL RIGHT.

UM, WE, AS BETH POINTED OUT, WE HAVE NOT HAD THE LEGAL DISCUSSION.

DO YOU WANNA GO AHEAD AND DO THAT OR DO YOU WANNA BREAK FOR LUNCH? TRY TO DO IT.

DOES IT MATTER? UM, NO, OI MEAN, I HAVE SOME THOUGHTS ON THAT IF, BUT MAYBE THE, MAYBE I UTTER MY THOUGHTS,

[03:00:01]

GAVE PEOPLE AN OPPORTUNITY TO SPEAK TO THEIR COMMENTS.

I THINK WE SHOULD GIVE TIEC AND NATHAN AN OPPORTUNITY TO SPEAK TO THEIR COMMENTS UNLESS IF WE'RE GONNA DO THAT, AARON OR ANYONE WANT TO CALL THE QUESTION JOHN.

LOOKS LIKE HE MAY BE LEFT THE ROOM THOUGH.

I'D LIKE TO GO TO LUNCH IF THAT, IF WE'RE GONNA DO THAT, MY COMMENT WOULD BE THAT IT'S AN IMPORTANT ISSUE THAT NEEDS TO GET RESOLVED AND THIS IS NOT THE GROUP TO RESOLVE IT.

AND MY MOTIVATION IS TO, WOULD BE TO ACT ON THE MOTION THAT'S ON THE TABLE SO THAT WE CAN MOVE IT FORWARD AND THAT FIGHT CAN BE HAD IN THE FORMS IN WHICH IT'S APPROPRIATE TO HAVE.

OKAY.

ALL RIGHT.

UM, NATHAN, DO YOU WANNA SAY ANYTHING? AND THEN I THINK WE CAN GO TO, TO A VOTE.

DO YOU WANNA DISCUSS YOUR COMMENTS AT ALL? SO IF, IF THAT'S THE PLEASURE OF THIS COMMITTEE, I'M HAPPY TO, UH, ALSO HAPPY TO LET TIAC AND OTHERS ADDRESS THEIR COMMENTS IF THEY, IF THEY'D LIKE, SINCE WE RESPONDED, WE CAN LET THEM ADDRESS THEIRS.

OH, THERE'S, THERE'S JOHN RUSS THERE.

THERE'S JOHN.

GO AHEAD JOHN.

SORRY.

SORRY.

APPRECIATE Y'ALL'S PATIENCE.

UH, UM, SO TIEC FILED ADDITIONAL COMMENTS.

UM, WE HAD, YOU KNOW, SOME BRIEF CONVERSATIONS AT, UH, BRIEF CONVERSATIONS AT ROSS, BUT, UM, YOU KNOW, WE JUST WANT TO EMPHASIZE THAT ERCOT SHOULD CONSIDER ANOTHER APPROACH OTHER THAN ATTEMPTING TO IMPOSE THE ERCOT PROTOCOLS ON PURE RETAIL CUSTOMERS.

ALTHOUGH NOIR 2 82 DOESN'T SEEM TO TARGET TIEC MEMBER COMPANIES, IT SETS A CONCERNING PRECEDENT THAT ERCOT WILL CONTINUE TO USE ITS RELIABILITY MANDATE ON OTHER PURE RETAIL CUSTOMERS.

THE GRID AND ITS ATTENDANT RELIABILITY REQUIREMENTS EXIST TO SERVE CUSTOMERS AND NOT VICE VERSA.

AS OUTLINED IN PRIOR COMMENTS, ERCOT LACKS THE STATUTORY AUTHORITY TO IMPOSE OPERATIONAL REQUIREMENTS ON RETAIL CUSTOMERS AND LACKS THE TECHNICAL EXPERTISE TO MANAGE INDUSTRIAL PROCESSES AND EQUIPMENT IN THESE COMMENTS, TIC SUGGESTS REVISING THE LANGUAGE AND REQUIRING UTILITIES TO PROVIDE INFORMATION TO ERCOT ON THE CAPABILITIES OF LARGE COMPUTATIONAL LOADS AND TO CREATE OPERATING GUIDELINES FOR INTERCONNECTING LARGE COMPUTATIONAL LOADS.

OUR HOPE IS THAT ERCOT CAN EXPLORE THIS ALTERNATIVE APPROACH TO ADDRESS ITS RELIABILITY CONCERNS WITHOUT VIOLATING PURE.

THANK YOU.

OKAY, THANKS JOHN.

UM, ANY QUESTIONS OR COMMENTS BEFORE WE VOTE ON THE MOTION? CAN I ASK SOMETHING? YOU CAN ASK SOMETHING, OF COURSE.

SO, JOHN, CAN WE EXPECT APPEAL AT THE COMMISSION AFTER BOARD APPROVAL? LIKELY, YES.

THANK YOU.

OKAY.

ANY, ANY OTHER QUESTIONS OR COMMENTS? NATHAN, DID YOU WANNA ADD ANYTHING QUICKLY? NO, I'M, I'M HAPPY TO, UH, REMAIN SILENT AND LET OUR COMMENTS SPEAK FOR THEMSELVES, IF THAT'S HELPFUL.

OKAY.

NO TAYLOR SWIFT LYRIC.

OKAY, CORY, LET'S, UH, YOU KNOW, IT'S ON THE SCREEN.

I SAID IT EARLIER, RECOMMENDED APPROVAL OF NPR 1308 IS RECOMMENDED BY PRS IN THE FOUR 15 PRS REPORT.

RECOMMENDED APPROVAL OF NO G 2 82 IS RECOMMENDED BY ROSS IN THE FOUR TWO ROSS REPORT IS AMENDED BY THE FOUR 13 ERCOT COMMENTS AND FOUR 14 REVISED IMPACT ANALYSIS WITH THE ADDITIONAL 0.3 EMPLOYEE.

ALRIGHT, TAKE IT AWAY.

ALRIGHT, SO ON OUR MINI COMBO BALLOT THAT YOU KNOW ALL TOO WELL, WE WILL START UP WITH CONSUMERS, WITH MIKE.

UH, BASED ON THE, WHAT WE JUST TALKED ABOUT AND THE LEGAL CONCERNS, UH, IT'S NO FROM US.

THANK YOU, GARRETT.

NO, SIR.

THANK YOU.

MARK DREYFUS.

UH, YES, THANK YOU.

THANK YOU, NICK.

NEXT.

THANK YOU SIR.

BETH? YES, THANK YOU WILL.

YES, THANK YOU.

ONTO OUR CO-OPS, BLAKE? YES.

THANK YOU, KYLE.

YES.

THANK YOU JODAN FOR MIKE ABSTAIN.

THANK YOU.

THANK YOU, JOHN.

YES, THANK YOU.

ONTO OUR INDEPENDENT GENERATORS.

NED, I'LL ABSTAIN.

THANK YOU.

THANK YOU, BRIAN.

UH, YES.

THE SHEEP IS, YES.

WE'LL TAKE IT.

BOB, NOT VOTING FOR THE LEGAL SIDE.

I'LL VOTE.

YES, SIR.

CAITLIN? YES.

THANK YOU.

[03:05:01]

ONTO OUR IPS.

JEREMY? YES.

THANK YOU.

THANK YOU, SETH.

YES, THANK YOU IAN.

YES, THANK YOU COREY.

THANK YOU SHANE FOR REMI.

YES, SIR.

THANK YOU.

THANKS SIR.

ONTO OUR I REPS.

BILL? YES.

THANK YOU, JAY? YES, THANK YOU CHRIS.

I GOT YOUR ABSTENTION IN CHAT.

CHRIS, THANK YOU.

AND JENNIFER? YES, THANK YOU.

ONTO OUR IOUS.

MARTHA? YES.

THANK YOU, ABBY.

YES, THANK YOU.

AARON.

YES, THANK YOU ROB FOR KEITH? YES.

THANK YOU.

ONTO OUR MUNIS.

DAVID? YES.

THANK YOU, ALICIA.

YES, THANK YOU JOSE.

YES SIR.

THANK YOU.

AND CURTIS? YES, THANK YOU.

MOTION CARRIES 92% IN FAVOR TO OPPOSED FOR ABSTENTIONS.

OKAY.

ANY REMAINING QUESTIONS OR COMMENTS ON THIS OR ANYTHING UNDER ROSS REPORT? OKAY, LET'S, UM, BREAK FOR LUNCH.

AFTER LUNCH, WE WILL TAKE UP THE VOTING ITEM ON CFSG.

IF ANYBODY FEELS LIKE DOING HOMEWORK DURING LUNCH, YOU CAN SEE IF YOU HAVE QUESTIONS ON R-M-S-W-M-S OR CFSG.

OTHERWISE WE WILL SKIP THOSE REPORTS.

BLAKE IS MAKING A FACE THAT INDICATES HE'S NOT TAKING QUESTIONS.

UM, SO WE'LL DO THE CFSG VOTING ITEM AND THEN WE WILL GO TO ERCOT REPORTS, WHICH FOR TODAY ARE RPG, UM, SOMETHING VERY STRATEGIC.

AND THEN THE LOAD FORECAST, UH, A LONG LUNCH, I DUNNO, 1 31, SAY 1 25 AND START AT ONE 30, SAY 1 25.

AND SUSIE, WE NEED SUSIE IN THE ROOM TO START ON TIME.

ALL RIGHT.

1 25.

I CAN'T BELIEVE YOU DID IT.

YOU CAN'T.

AND OF COURSE WE DID IT.

OKAY.

ARE WE READY? SO WE ARE, UM, TO OUR

[10. Approval of CFSG Membership (Vote)]

REPORTS, AGAIN, WE'RE NOT GONNA GO THROUGH THE PRESENTATIONS UNLESS PEOPLE HAVE QUESTIONS.

UM, BUT WE DO HAVE A VOTING ITEM UNDER CFSG.

IS, IS JET ON AND ABLE TO PRESENT THIS? UH, YES MA'AM.

OKAY, GO AHEAD.

OKAY, AND I'LL START US OFF WITH AN ADELE, UH, LYRIC OF HELLO FROM THE OTHER SIDE OF THE LUNCH BREAK.

UH, WE HAVE ONE ITEM PER VOTE HERE.

IT'S A MEMBERSHIP APPLICATION FOR A RICHARD SANTOYO FROM CTS ENERGY.

UH, WE HAVE JIMMY KOOL, WHO WAS PREVIOUSLY ON THE, UM, ON THE SUBCOMMITTEE THAT IS ROLLING OFF AND RICHARD IS, UH, REPLACING HIM.

AND SO WE ARE ASKING FOR A VOTE TO APPROVE RICHARD AS A, A MEMBER OF CFSG.

OKAY.

UM, SORRY, I'M SORRY.

WE HAVE HER LISTED AND NOT, I LISTED THE WRONG PERSON.

OKAY.

SO I, WE HAVE HER.

OKAY, SO WE CAN GO FORWARD, ANN.

ALL RIGHT.

UM, SO WE ARE LOOKING TO APPROVE THE CFSG MEMBERSHIP EDITION IS PRESENTED.

UM, RICHARD SANTOYO FROM CPS ENERGY.

ANYBODY HAVE ANY ISSUES WITH THIS ON THE COMBO BALLOT? ALL RIGHT, LET'S GO AHEAD.

OKAY, THANK YOU.

UM, THANK YOU.

OKAY, NOW WE ARE UP

[12. ERCOT Reports]

TO ERCOT REPORTS AND WE ARE STARTING WITH RPG.

I BELIEVE PABU IS GOING TO, UM, PRESENT WHAT THEY PRESENTED AT RPG REGARDING KIND OF THE NEW PROCESS FOR TAKING COMMENTS AT AT TAC.

UM, WE CAN MAYBE DO A, A QUICK VERSION OF THAT AND THEN WE WILL MOVE ON TO OUR, UM, RPG ENCORE PAIR SWITCH TO MONTICELLO SWITCH PROJECT.

THANK YOU.

UH, GOOD AFTERNOON, .

SO I'LL START WITH THE, UH, THE COMMON PROCESS WE STARTED FOR RPG PRIOR TO THE TAC.

UM, WE PRESENTED THIS AT THE RPG MEETING.

UH, JUST A COUPLE OF SLIDES HERE.

SO, UH, RECENTLY WE HAVE HAD SOME LENGTHY DISCUSSIONS AT THE TAC.

UM, SO WE CAME UP WITH THIS PROCESS, DISCUSSIONS WITH TAC LEADERSHIP AND OTHERS RECOMMENDATION.

[03:10:01]

WE CAME UP WITH THIS PROCESS.

SO THIS IS BASICALLY, WE WILL OPEN A COMMON SPACE WHEN THE, BEFORE BRINGING THE PROJECT TO, TO TAC.

UM, SO THIS WILL BE A, A TWO DAY WINDOW.

UH, WHEN THE PROJECT IS DONE, WE POST THE FINAL REPORTS.

WE'LL OPEN IT FOR COMMENTS FOR SEVEN DAYS PRIOR TO THE TAC MEETING, AND WE'LL GIVE TWO BUSINESS DAYS FOR PEOPLE WHO WANNA SUBMIT COMMENTS AND ANY COMMENTS SUBMITTED, WE WILL TRY TO ADDRESS THOSE COMMENTS PRIOR TO TAC AND, UH, I THINK THIS WAS THE FIRST PROJECT.

THE NEXT PROJECT, I'M GONNA TALK ABOUT THE PARIS TO MONTICELLO SWITCH.

WE IMPLEMENTED THIS, UM, THIS IS AN EXAMPLE, BUT, UH, WE DID THAT FOR THIS PROJECT.

WE SENT OUT THE COMMENTS, UH, NOTICE TO RPG.

AND I BELIEVE THERE WAS ONE SET OF COMMENTS SUBMITTED FOR THIS PROJECT.

UM, I WONDER, I WONDER WHO THAT MIGHT HAVE BEEN.

I WONDER WHO THAT IS.

BUT ANYWAY, .

OKAY, SORRY.

UM, I THINK IT'S PUBLIC.

YOU CAN SEE USMAN COMMENT, .

SO, UM, THAT'S, THAT'S THE PROCESS.

SO I JUST WANTED TO, YOU KNOW, BRING THIS TO TACK.

SO THIS, THIS IS SOMETHING WE ALREADY PRESENTED AT RPG.

ANY ANY QUESTIONS ON THAT? PERFECT.

THANK YOU.

SO, SEE THE PRESENTATION? OKAY.

YEAH.

NEXT, WE MOVED TO THIS, UH, ENCORE PARIS SWITCH TO MONTICELLO 3 45 KV DOUBLE CIRCUIT REBUILD PROJECT.

SO THIS IS A SUB, THIS IS A PROJECT SUBMITTED BY ENCORE FOR THE REBUILD OF THE, UH, PARIS TO MONTICELLO SWITCH DOUBLE CIRCUIT LINE, WHICH IS APPROXIMATELY 50 MILES.

UH, THIS IS A TIER ONE PROJECTS BASED ON THE COST ESTIMATE THAT DOESN'T REQUIRE CCN, THE ESTIMATED COST AND THE SUBMITTAL WAS $231.75 MILLION.

AND THIS IS PRIMARILY TO ADDRESS POST CONTINGENCY THERMAL OVERLOADS ON THE PARIS TO MONTICELLO SWITCH, UM, PRIMARILY IN THE NORTH, NORTH CENTRAL AND EAST WEATHER ZONE.

SO OUR CO PERFORMED THE INDEPENDENT REVIEW.

WE VERIFIED THE RELIABILITY CRITERIA VIOLATIONS LISTED HERE.

SO YOU COULD SEE UNDER VARIOUS CONTINGENCY CONDITIONS, P THREE P SIX TWO, WE DID SEE, UH, THERMAL OVERLOADS ON THE PARTICULAR LINE.

SO I THINK, UH, UM, THAT DEMONSTRATES THE RELIABILITY NEED FOR THE PROJECT.

IN ADDITION TO THAT, WE ALSO PERFORMED THE MINIMUM DELIVERABILITY CRITERIA ASSESSMENT FOR THIS PROJECT, AND IT ALSO SHOWED SOME RELIABILITY CRITERIA VIOLATIONS UNDER THE GEN DELIVERABILITY CRITERIA.

TO ADDRESS THIS, WE LOOKED AT FIVE DIFFERENT ALTERNATIVES OR OPTIONS, UM, BASED ON THAT.

THREE OPTIONS WERE SHORTLISTED AND THE RESULTS ARE PRESENTED HERE.

UH, OPTION ONE IS THE ENCORE OPTION.

YOU COULD NOTE THE COST OF THE PROJECTS ARE SLIGHTLY DEVISED FROM 231 TO $233.3 MILLION.

UM, SO THIS MET ALL THE RELIABILITY CRITERIA, UH, GAINED NO CCN AND THIS PROJECT IS FEASIBLE.

WE ALSO LOOKED AT A COUPLE OF OTHER PROJECTS ALTERNATIVES, WHICH WERE AT HIGHER COST.

IN ADDITION TO THAT, WE PERFORMED THE SENSITIVITY ANALYSIS AND THE SUBSTANTIAL OSCILLATION ASSESSMENT.

UH, WE DID NOT SEE ANY ADVERSE IMPACT FOR SSO IMPACT, UH, BASED ON THE PLANT FUTURE GENERATION IN THE STUDY AREA.

OKAY.

AND THESE ARE THE RESULTS OF THE CONGESTION ANALYSIS AND THE SENSITIVITY ANALYSIS FOR GENERATION.

UM, WE DID NOT SEE ANY ADVERSE IMPACT TO THE EXISTING SYSTEM WITH THE ADDITION OF OPTION ONE.

OKAY.

UH, THE RECOMMENDATION TODAY IS ERCOT WILL RECOMMEND TO THE BOARD TO ENDORSE OPTION ONE TO ADDRESS THE RELIABILITY ISSUES IN NORTH, NORTH, CENTRAL, AND, UH, EAST WEATHER ZONES.

THE ESTIMATED IN-SERVICE DATE IS MAY OF 2027, AND THE ESTIMATED COST IS $233.3 MILLION.

UH, NO CCN IS REQUIRED FOR THIS PROJECT.

WITH THAT, I'LL JUST, UH, HIGHLIGHT THE STUDY AREA AND THE LINE, WHICH IS HIGHLIGHTED HERE, THAT'S THE PARIS TO MONTE TIC SWITCH APPROXIMATELY 50 MILES OF DOUBLE CIRCUIT LINE.

UM, THIS WILL BE UPGRADED TO, UH, CONDUCT A RATING OF 2,987 AMPS AND THE TERMINAL EQUIPMENT NOT TO EXCEED, UH, 1,792 AMPS OR MVA.

I'M SORRY.

SO I'LL PAUSE HERE TO SEE IF THERE ARE ANY QUESTIONS, ANY QUESTIONS OR COMMENTS?

[03:15:01]

OKAY.

SO CAN I, CAN I MAKE A REQUEST? SO YES.

TO, TO KEEP THE SPIRIT OF TODAY'S, UH, THEME.

CAN I QUOTE LYRIC? YEAH, CAN YOU, WHAT? CAN I, CAN I QUOTE LYRIC? OF COURSE.

OKAY.

BLAKE LOOKS REALLY PROUD EVERY TIME SOMEBODY QUOTES THE RIC TO .

SO I WAS JUST THINKING OF THE DISCUSSIONS HERE, PROBABLY THAT, UH, YOU KNOW, REMINDS ME OF THE, THE COLORS OF THE WIND FROM POCAHONTAS.

SO, SO MY, MY, MY LYRIC IS I NEED HELP FOR SOMEBODY TO, YOU KNOW, FINISH THE NEXT LINE.

BUT IF YOU WALK THE FOOTSTEPS OF A STRANGER , YOU'LL LEARN THINGS YOU NEVER KNEW.

YOU NEVER KNEW.

THANK YOU.

THANK YOU.

OH, YEAH, I, I WAS WORRIED SOMEBODY'S GONNA MISCO AND SAY LIKE, YOU WILL LEARN THINGS THAT YOU DON'T WANNA KNOW, .

BUT ANYWAY, THANK YOU.

ALRIGHT, I'LL LEAVE IT.

OKAY.

SO WE ARE LOOKING TO ENDORSE THE 25 RPG OH 26 ENCORE PARIS SWITCH TO MONTICELLO OR MONTICELLO MON MONTE.

I WOULD SAY MONTICELLO SWITCH 3 45 KV LINE REBUILD PROJECT OPTION ONE.

CAN WE PUT THIS ON THE COMBO BALLOT? AMAZING.

ALL RIGHT.

OKAY.

THANK YOU.

BU WORD, I THINK YOU CAN DO EITHER, RIGHT? MONTICELLO, MONTICELLO NOT IN TEXAS.

WHAT WOULD YOU LIKE TO SAY IN TEXAS? ERIC? MARTHA, YOU'RE A TEXAS.

MARTHA, YOU'RE THE ENCORE EXPERT.

OKAY, WE'RE, WE'RE MO WE'RE MOVING ON.

I THINK IT'S MANTELLO.

YOU GOTTA SAY IT WITH AN ACCENT.

CELO.

OKAY, WE'RE MOVING ON.

UM, BUT THAT WAS GOOD.

ALRIGHT.

UH, KEITH, WE'RE GONNA TRY NOT TO HAVE DISCUSSION ON, UH, STRATEGIC VERSUS TACTICAL, BUT YOU CALLED YOUR PRESENTATION STRATEGIC DISCUSSION ON RESOURCE ADEQUACY AND THE ROLE OF DEMAND RESPONSE.

WE'RE GONNA STOP, COLLABORATE, AND LISTEN.

SO, UM, OOH, REALLY GOOD.

SO, UM, WAIT, CAN I THROW IN, I DID HAVE MY POP CULTURE REFERENCE OF THE WEEK, WHICH SURVIVOR 50 IS VERY GOOD.

AND CHRISTIAN AND HIS EXIT INTERVIEWS DID DISCUSS THE DIFFERENCE BETWEEN STRATEGIC AND TACTICAL BEHAVIOR.

SO WE LOVE CHRISTIAN, HE'S A ROBOTICS PROFESSOR.

ALL RIGHT, GO AHEAD KEITH.

SO, SO ON THAT NOTE, I WILL NOT GET INTO THAT DISCUSSION.

JUST GO WATCH SURVIVOR 50 AND YOU'LL BE GOOD TO KNOW.

ALRIGHT, UH, SO THIS IS, THIS IS ESSENTIALLY A, A, A MINI VERSION OF THE PRESENTATION I GAVE AT THE BOARD LAST WEEK.

IT, UH, WE, WE DID COVER THE, THE CHARLES RIVER ASSOCIATES REPORT, UH, AND WE'LL TALK ABOUT THAT A LITTLE BIT HERE AS WELL.

UH, BUT I THINK IT'S, IT'S REALLY IMPORTANT TO, TO FRAME WHAT WE WERE, WHY, WHY NOW? WHAT ARE WE TALKING ABOUT? AND WHAT WAS IT THE BOARD, UH, WAS ENGAGED ON AND REALLY WANTED TO HEAR? I THINK THAT'S ANOTHER THING TO THINK FOR FOLKS THAT, THAT WERE ABLE TO LISTEN IN TO THE BOARD DISCUSSION.

THERE WAS, THERE WAS POINTS AND QUESTIONS THAT THEY WANTED TO GET ACROSS, AND THERE WAS, THERE WAS DEFINITELY DIALOGUE, UH, UH, AMONGST THE BOARD, UH, ALONG WITH THE PUC AND ALONG WITH, UH, ER, ERCOT STAFF AS WELL.

ALRIGHT, WE'LL, WE'LL GO TO THE NEXT SLIDE.

SO THE, THE GENESIS OF OF THIS REALLY STARTS WITH, UH, YOU KNOW, THE, THE TWO BIG CHALLENGES THAT WE'RE SEEING, AND WE, WE'VE TALKED ABOUT IT, UH, IN, IN BOTH WAYS, UH, BOTH THE FIRST POINT AND THE SECOND POINT OF OBVIOUSLY THERE ARE LARGE LOADS, UH, WE KNOW THEY'RE COMING.

UM, IT'S STILL REMAINS TO BE SEEN HOW MUCH, BUT, BUT THERE IS SOME VOLUME OF THAT.

UH, WE ALSO ARE AWARE THAT THERE'S A LOT OF DISCUSSION ABOUT LIMITATIONS IN SUPPLY CHAINS.

UH, YES, YOU CAN GET TURBINES, BUT WHEN AND HOW MANY, UM, HOW MUCH, UH, THESE ARE ALL IMPORTANT QUESTIONS.

AND SO WHEN WE LOOK AT BOTH OF THOSE TWO PIECES, YOU PUT THAT TOGETHER AND, AND WHEN YOU LOOK AT, FOR INSTANCE, OUR CDR REPORT, OUR AURORA ANALYSIS, THE E THREE ANALYSIS, IT'S ALL KIND OF POINTING TO THE SAME PROBLEM RELATED TO, UH, RESOURCE ADEQUACY AND THE CHALLENGES THAT THAT THAT FACES.

AND SO, ONE OF THE THINGS THAT, THAT WE'VE BEEN TALKING ABOUT, AND TODAY, THE DISCUSSION ON 1310, AND I KNOW, UH, SOME OF THE FOLKS BROUGHT IT UP TODAY IN TERMS OF, WELL, WHAT, WHAT, WHAT TOOLS DO WE HAVE? AND 1310 IS, IS SOMETHING THAT WE'VE DISCUSSED AND IS, IS ON THE HOPPER FOR DISCUSSION LATER IN THE YEAR.

UH, AND, AND PART OF THE REASON FOR THAT IS, WELL, THESE INCENTIVES THAT WE, WE'VE TALKED ABOUT TO ENSURE MORE GENERATION, UH, WE'VE ALSO JUST TAUGHT DISCUSSION

[03:20:01]

ABOUT TRANSMISSION EXPANSION AND OBVIOUSLY THE 7 65 KV DISCUSSIONS THAT, THAT HAVE BEEN GOING ON IN TERMS OF ENABLING THE, NOT ONLY THE, THE LOADS, BUT THE, THE SUPPLY RESOURCES TO, TO BE A PART OF THE SOLUTION.

AND, AND THOSE THINGS ARE, ARE WELL AND GOOD, UH, BUT I THINK SOME FOLKS HAVE CORRECTLY POINTED OUT THAT, WELL, WHEN'S THE TRANSMISSION GONNA BE IN SERVICE? WELL, IT'S PROBABLY SEVERAL YEARS FROM NOW.

UH, AND, AND WHEN, IF WE SEND PRICE SIGNALS TODAY, WHEN'S THE NEW GENERATION COMING? THE, THE THERMAL GENERATION? WELL, THAT'S PROBABLY A FEW YEARS FROM NOW.

WELL, WELL, WHAT DO YOU DO IN THE SHORT TO MIDTERM? AND, AND THAT'S REALLY THE QUESTION THAT CAME UP.

AND AGAIN, THERE WAS SOME DISCUSSION AMONGST THE BOARD MEMBERS OF THAT PARTICULAR QUESTION AND WHAT, WHAT WERE THOSE OPTIONS TO BE ABLE TO ENHANCE THE RELIABILITY? UM, AND AS WE SAID, AS I SAID EARLIER, ENHANCING RELIABILITY THROUGH MARKET SOLUTIONS.

ALRIGHT, NEXT SLIDE.

AND SO THAT'S WHERE THE FOCUS SHIFTED TO A DISCUSSION ABOUT, WELL, DEMAND RESPONSE SEEMS TO BE AN OPTION THAT CAN FILL THAT GAP, UH, IN, IN TERMS OF BEING ABLE TO HELP MEET THE RELIABILITY OF THE SYSTEM.

AND, AND THAT COMES IN DIFFERENT FORMS AND FLAVORS.

WE KNOW THERE'S SENATE BILL SIX, THERE'S LARGE LOAD PROGRAMS AND, UH, AND, AND, AND OBVIOUSLY SOME OF THOSE ARE OBVIOUSLY UN UNDER DEVELOPMENT AT THE COMMISSION AND, AND SOME OF THE QUESTIONS GOING AROUND ON WHAT THOSE PROGRAMS MAY LOOK LIKE.

AND SO, YEP, THOSE, THOSE LARGE LOAD PROGRAMS ARE A PART OF THE, THE MIX.

UH, AND AND PART OF WHAT WE, WE HAD THE, THE CHARLES RIVER ASSOCIATES LOOK AT IS, WELL, LET'S LOOK AT OUR EXISTING PROGRAMS AND LET'S THINK ABOUT WHAT, WHERE ARE SOME POTENTIAL GAPS AND, AND AREAS OF, UH, UH, FURTHER DEVELOPMENT.

BUT HERE ARE THE, THE QUESTIONS THAT WE RAISED.

I KNOW NED HAD HAD SOME ADDITIONAL QUESTIONS THAT HE WANTS TO ADD TO SOME OF THESE STRATEGIC QUESTIONS, BUT I'LL LET, I'LL LET NED COVER THOSE A LITTLE BIT LATER.

BUT, UH, CAN DEMAND RESPONSE BE, UH, HELP ADDRESS NEAR TERM RESOURCE ADEQUACY CONCERNS? AND THE DISCUSSION AT THE BOARD, THE CHECK MARK, IS THAT I THINK THE SENSE WAS THAT YES, IT CAN, UH, OUR CURRENT DEMAND RESPONSE INCENTIVES ALIGNED WITH SYSTEM NEEDS.

I THINK, UH, THIS IS WHERE WE MAY DISAGREE WITH NED, BUT I THINK WE, WE FELT THERE WAS A QUESTION MARK ON, ON THAT AT THIS TIME.

UH, CAN DEMAND RESPONSE BE EFFICIENTLY TAPPED TO HELP ADDRESS RELIABILITY? AND I THINK THERE WAS A, A SENSE ALSO AT THE BOARD THAT YES, IT CAN AND CAN OUR EXISTING PROGRAMS BE IMPROVED? AND AGAIN, CHECK MARK, I THINK THERE WAS A SENSE THAT YES, THERE'S SOME AREA FIRM IMPROVEMENT AS WELL.

SO I, I THINK THAT THESE, THESE QUESTIONS ULTIMATELY TRANSLATED INTO WHAT THE REPORT WAS, WAS TRYING TO GET AT, AT A, AT A HIGH LEVEL AT LEAST.

AND, AND I THINK THE, THE DISCUSSION THAT THE BOARD DID REVOLVE AROUND, UH, SEVERAL OF THESE QUESTIONS AND, AND IT WAS GOOD DISCUSSION AMONGST THE, THE MEMBERS, RIGHT? NEXT SLIDE.

SO THAT, THAT GETS INTO THE, THE CHARLES RIVER ASSOCIATES REPORT.

AND, AND I THINK THAT, UH, WE, WE DID OBVIOUSLY GET A LOT OF FEEDBACK IN THE PROCESS.

I THINK ONE OF THE THINGS WE WANTED TO BE CLEAR ABOUT WAS IT, IT WASN'T A, IT WASN'T A DEEP DIVE INTO EVERY, EVERY PARTICULAR ISSUE, BUT WHAT WE WANTED TO DO WAS TO GET A, A BIG, UH, A BIG OVERVIEW OF, UH, HOW THEY SAW THINGS, WHERE THINGS ARE AND WHERE ARE SOME AREAS OF, OF OPPORTUNITY.

AND IF THAT MEANS WE, WE FOCUS, UH, UH, COULD THERE BE FOLLOW UP ANALYSIS? SURE.

BUT WHAT WE WANTED TO DO WAS GET THE BIG PICTURE, AND THAT WAS REALLY THE SCOPE OF THE DOCUMENT.

I BELIEVE THAT WAS SHARED ULTIMATELY WITH, WITH FOLKS HERE AS WELL.

I THINK, UM, THAT THAT SCOPE WAS, WAS SOMETHING THAT, THAT WE, YOU WANTED TO SEE.

AND WE, WE DID SHARE, UH, BUT IT WAS, WAS NOT AN EXHAUSTIVE SCOPE.

ALRIGHT, NEXT SLIDE.

AND SO, UH, WHAT WERE THE KEY TAKEAWAYS? UH, THESE ARE THE, THE CHALLENGES THAT, THAT WERE IDENTIFIED.

AND I, I THINK THE, THE NICE THING IS IN, IN MOST CASES, THESE ARE NOT UNEXPECTED FOR, FOR FOLKS IN THIS ROOM, OBVIOUSLY THE SCARCITY, UH, CHALLENGES WITH, WITH DEMAND POTENTIALLY OUTPACING GENERATION.

THAT'S, THAT'S, UH, AGAIN, WE'VE SEEN THAT IN SEVERAL REPORTS AND THAT'S, THAT'S NOT NEW.

UH, THEY TOUCHED UPON THE, THE FOUR CP AND HOW THAT, UH, IT, IT, IT IT'S ITS OWN, OBVIOUSLY IT'S A, IT'S A PROGRAM DESIGN FOR, UH, TRANSMISSION COST ALLOCATION, BUT IT DOES HAVE IMPLICATIONS AND WHEN AND WHERE, WHERE THAT OCCURS.

THAT, THAT, HOW THAT AFFECTS THE, UH, THE SOLUTIONS.

SO THEY TALKED ABOUT THAT.

THEY TALKED ABOUT RETAIL DEMAND PROGRAMS AND, AND THEIR ALIGNMENT WITH, WITH THE MARKETS AND THE NEEDS OF THE SYSTEM, THE ERS AND, AND THE PRICE SENSITIVE RE RESOURCES, PARTICULARLY THE, THE CRYPTO MINING RESOURCES THAT, THAT PARTICIPATE AND, UH, LEADING TO THE POTENTIALLY INEFFICIENT LOW PRICES IN, IN THAT MARKET.

AND THEN THE A DR PILOT AND SOME OF THE, THE TECHNICAL AND PARTICIPATION CHALLENGES THAT ARE, UH, THAT ARE PART OF THAT PROGRAM.

AND THEN WE GO TO THE, THE NEXT

[03:25:01]

SLIDE.

WE, WE TALKED ABOUT, OKAY, WELL THOSE ARE THE CHALLENGES.

WHAT, WHAT WERE THEIR TAKEAWAYS? AND, AND ULTIMATELY THE DEMAND RESPONSE IS, IS A PART OF THE SOLUTION SET, UH, PARTICULARLY BECAUSE IT CAN OFFER A NEAR TERM SOLUTION.

I THINK THE TERM